Loading...
HomeMy WebLinkAboutBig D's Construction - NW Area Sewer LID - Change Order No. 1 (#1800076)CITY OF PASCO PUBLIC WORKS DEPARTMENT CONTRACT CHANGE ORDER NO. 1 Project No: 1800076 Project Title: Northwest Area Sewer LID Contractor: Big D's Construction Description of Change: Adjust the location of Manholes 18 through 22 approximately 92 feet west of the originally designed locations for consistency with proposed platting of Mr. Adams Lot No. 8 Detail as Appropriate: Contract Bid Amount: SALES TAX @ 8.6%: Total: $ 1,590,111.00 $ 136,749.55 $ 1,726,860.55 PREVIOUS CHANGE ORDER CURRENT CHANGE ORDER Subtotal Subtotal $ 49,703.50 Sales tax @ 8.6% $ - Sales tax @ 8.6% $ 4,274.50 Total $ - Total $ 53,978.00 Total Change Orders To Date $ 53,978.00 New Contract Amount $ 1,780,838.55 IS CONTRACT TIME AFFECTED BY THIS CHANGE ORDER Contract Time Prior to this Change Order ................................. Modification to Contract time by this Change Order .................... revised Total Contract Time .................................................... YES NO 120 1 121 It is mutually agreed by both parties that this Change Order fully describes the change(s) that is (are) being made and that the compensation for this Change Order is full and complete and is the only compensation due or owing for this Change Order. Further, it is mutually agreed that this document will supplement the present Contract Documents and that the provisions of the previously executed Contract Documents shall apply to this Change Order. AGREED TO AND ACCEPTED: --61.g„ Brett Hisle =p;os s.=-'CN=BM— CONTRACTOR Date APPROVED: rl-rluitu MAN G R Date �l Main Office: Big D's 3902 N. Swallow Ave. Pasco, WA 99301 Construction Excavation & Underground Proposal Submitted To: Attention: Ryan Withers Street Address: City, State, & Zip: E -Mail: rwithers()RH2.com Phone: (509)542-8322 Fax: (509)542-8362 WA# BIGDSDC893DT Date 8/4/2021 Phone: Fax: Pasco NW Area Sewer LID Job Name: Job Location: Pasco, WA 30"x30" Nyloplast Coupling 1 EA $2,541.50 $2,541.50 - Material and Install 24" Heavy Wall Gasketed PVC Sewer Pipe 56 FT $187.00 $10,472.00 - Material and Install 30" Heavy Wall Gasketed PVC Sewer Pipe 70 FT $279.00 $19,530.00 - Material and Install 30" ADS Triple Wall Pipe 65 FT $264.00 $17,160.00 - Material and Install Subtotal $49,703.50 Tax Total $49,703.50 Surveying, Compaction testing, permits, rock ex Authorized Signature: Acceptance ot ?-mposal Date of Acceptance : Signature: Name: Title: 8/4/2021 3:13 PM 1 of 1 Big D's Construction