HomeMy WebLinkAboutHDR Engineering, Inc - Argent Road Improvement Phase 2 (Supplement No. 1) (No. 21-035)Adw
Washington State
V. Department of Transportation
Supplemental Agreement
Number ._ 1 -
Original Agreement Number
21-035
Project Number
20011
Project Title
Argent Road Improvement, Phase 2
Organization and Address
HDR Engineering, Inc.
929 108th Avenue NE Suite 1300, Bellevue, WA
Phone: 425-450-6200
Execution Date Completion Date
September 30, 2025
New Maximum Amount Payable
$197,348.03
Description of Work
This project will provide for intersection improvements at Argent Road and Road 36. Improvements will
include: a traffic signal, sidewalk, stormwater facilities, illumination, and related improvements.
WSDOT Agreement No. LA -9552 (#3)
The Local Agency of City of PascQWA
desires to supplement the agreement entered in to with HDR.--- ineering. Inc.
and executed on 6/4/21 and identified as Agreement No. 21-035
All provisions in the basic agreement remain in effect except as expressly modified by this supplement.
The changes to the agreement are described as follows:
Section 1, SCOPE OF WORK, is hereby changed to read:
See Exhibit "B", Scope of Services attached hereto and made a part of this agreement.
Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days
for completion of the work to read: 16 months
III
Section V, PAYMENT, shall be amended as follows:
See Exhibit "D" Prime Consultant Cost Computations attached hereto and made a part of this agreement.
as set forth in the attached Exhibit A, and by this reference made a part of this supplement.
If you concur with this supplement and agree to the changes as stated above, please sign in the Appropriate
spaces below and return to this office for final action.
By: Rob Berman
— ?� Consultant Signature
DOT Form 140-063
Revised 09/2005
By: Dave Zabell
Authority Signature
cO —,t( -.,2dd-(
Exhibit "A"
Summary of Payments
DOT Form 140-063
Revised 0912005
Basic
Agreement
Supplement #1
Total
Direct Salary Cost
$35,157.16
$29,410.83
$64,567.99
Overhead
(Including Payroll Additives)
$51,790.01
$43,325.09
$95,115.10
Direct Non -Salary Costs
$29,017.50
-$10,722.96
$18,294.52
Fixed Fee
$10,547.15
$8,823.25
$19,370.40
Total
$126,511.82
$70,836.21
$197,348.03
DOT Form 140-063
Revised 0912005
EXHIBIT B
Pasco
Scope of Services
Argent Road Improvements (Phase 2) — Road
36 Intersection Improvements
Amendment No.1: Final Design Services
City of Pasco, WA
September 28, 2021
FN City of Pasco I Argent Road Improvements (Phase 2)
Amendment No. 1 - Scope of Services - October 5, 2021
TABLE OF CONTENTS
INTRODUCTION........................................................................................................................3
Background............................................................................................................................
3
ProjectDescription..................................................................................................................
3
ProjectTeam..........................................................................................................................
3
Scopeof Work.......................................................................................................................
3
Major Milestone Schedule.......................................................................................................
3
Quality Assurance / Quality Control........................................................................................
3
ChangeManagement.............................................................................................................
3
Subconsultant Coordination....................................................................................................
3
ProjectAssumptions...............................................................................................................
4
PROJECTTASKS......................................................................................................................4
TASK 1. PROJECT MANAGEMENT AND ADMINISTRATION..............................................4
1.1 Project Management, Invoicing, and Controls...............................................................
4
1.2 Project Team Coordination Meetings............................................................................
4
1.3 Project Schedule...........................................................................................................
4
TASK 2. SURVEY, MAPPING AND RIGHT OF WAY.............................................................4
TASK 3. GEOTECHNICAL INFORMATION REVIEW.............................................................4
TASK4. TRAFFIC ANALYSIS................................................................................................4
TASK5. 30% DESIGN............................................................................................................4
TASK 6. ENVIRONMENTAL DOCUMENTATION & PERMITTING........................................5
TASK7. FINAL DESIGN - PS&E............................................................................................5
7.1 General.........................................................................................................................5
7.2 Typical Roadway Sections............................................................................................
6
7.3 Temporary Erosion and Sedimentation Control (TESC) and Site Preparation
............... 6
7.4 Plan and Profile Plans...................................................................................................
6
7.5 Intersection Grading Plans............................................................................................
6
7.6 Driveway Plan and Profile (Not Included)......................................................................
7
7.7 Paving Details (Not Included)........................................................................................
7
7.8 Roundabout Plan, Island Details and Control Profiles (Not Included) ............................
7
7.9 Drainage System Plans, Profiles & Details....................................................................
7
7.9.1 Stormwater Pollution Prevention Plan(SWPPP)..................................................7
7.9.2 Drainage Design Report .......................................................................................7
7.10 Pavement Marking and Signing Plans, Schedules & Details .....................................
8
7.11 Traffic Signal and Details..........................................................................................
8
7.12 Illumination Schedules, Plans and Details................................................................
9
7.13 Landscape and Irrigation Plans and Details (Not Included) ......................................
9
7.14 Staging and Traffic Control Plans............................................................................
9
7.15 60% Over the Shoulder Review................................................................................
9
7.15.1 60% Plans..........................................................................................................10
7.15.2 Final Plan Sheet List..........................................................................................11
7.15.3 60% Specifications.............................................................................................12
7.15.4 60% Engineer's Estimate..................................................................................12
hdrinc.com 835 N Post Street, Suite 101 1 Spokane, WA 99201-2126
(509) 343-8500
0� City of Pasco I Argent Road Improvements (Phase 2)
Amendment No. 1 - Scope of Services - October 5, 2021
7.16
90% Submittal ......................................................................................................12
7.16.1
90% Plans........................................................................................................12
7.16.2
90% Specifications.............................................................................................12
7.16.3
90% Engineer's Estimate..................................................................................12
717
Ad -Ready Submittal...............................................................................................12
7.17.1
Ad -Ready Plans.................................................................................................12
7.17.2
Ad -Ready Specifications....................................................................................13
7.17.3
Ad -Ready Engineer's Estimate..........................................................................13
7.17.4
Construction Schedule.......................................................................................13
TASK 8.
REAL ESTATE SERVICES (RES)..........................................................................13
TASK 9.
BIDDING PHASE ASSISTANCE............................................................................13
TASK 10.
PUBLIC INVOLVEMENT PROGRAM.....................................................................14
TASK 11.
MANAGEMENT RESERVE FUND..........................................................................14
TASK 12.
CONSTRUCTION SUPPORT SERVICES (FUTURE).............................................14
hdrinc.com 835 N Post Street, Suite 101 1 Spokane, WA 99201-2126
(509) 343-8500
City of Pasco I Argent Road Improvements (Phase 2)
01AmendmentNo. 1 - Scope of Services - October 5, 2021
INTRODUCTION
During the term of this PROFESSIONAL SERVICES AGREEMENT (AGREEMENT), HDR
Engineering, Inc. (CONSULTANT) shall perform professional services for the City of Pasco
(CITY) in connection with the following project: Argent Road Improvements (Phase 2)
(PROJECT)
Background
No change. See original agreement.
Project Description
No change. See original agreement.
Project Team
No change. See original agreement.
Scope of Work
This scope of work supplements the original agreement and includes additional project
management, final roadway design, final PS&E development, temporary traffic control and
staging and bidding phase assistance.
Construction support services can be added to the contract by the CITY as a supplement to this
contract prior to that phase of work.
Major Milestone Schedule
The following are major schedule milestones for the project:
30% Design ................................................. October 2021
SEPA Submittal ........................................
November 2021
Final Design ................................................
December 2021
ROW Acquisition Complete
....................... December 2021
Ad -Ready ....................................................
January 2022
Bidding Phase .............................................
Spring 2022
Quality Assurance / Quality Control
No change. See original agreement.
Change Management
No change. See original agreement.
Subconsultant Coordination
No change. See original agreement.
hdrinc.com 835 N Post Street, Suite 101 1 Spokane, WA 99201-2126
(509)343-8500
M
F) City of Pasco I Argent Road Improvements (Phase 2)
Amendment No. 1 - Scope of Services - October 5, 2021
Project Assumptions
No change. See original agreement.
PROJECT TASKS
Task 1. Project Management and Administration
1.1 Project Management, Invoicing, and Controls
The purpose of this task is to describe those services necessary to plan, perform, and control
the various elements of the PROJECT so that this scope of work is delivered by CONSULTANT.
Activities:
No change. See original agreement.
Assumptions:
• Amendment No. 1 extends the contract duration from September 2021 through
September 2022, for an additional 12 months.
Deliverables:
No change. See original agreement.
1.2 Project Team Coordination Meetings
No change. See original agreement.
1.3 Project Schedule
No change. See original agreement.
Task 2. Survey, Mapping and Right of Way
No change. See original agreement.
Task 3. Geotechnical Information Review
No change. See original agreement.
Task 4. Traffic Analysis
This task is deleted from the scope of work. No traffic analysis work will be performed for this
project.
Task 5.30% Design
No change. See original agreement.
hdrinc.com 835 N Post Street, Suite 101 1 Spokane, WA 99201-2126
(509)343-8500
0� City of Pasco I Argent Road Improvements (Phase 2)
Amendment No. 1 - Scope of Services - October 5, 2021
Task 6. Environmental Documentation &
Permitting
This task is deleted from the scope of work. The NEPA Categorical Exemption will not be
modified by this project, so no contingency environmental work will be performed for this project.
TASK 7. Final Design - PS&E
The CONSULTANT shall follow the guidelines set forth in the CITY's Design Standards and
WSDOT LAG manual when preparing the 60%, 90%, and Ad -Ready plans, specifications, and
estimate.
Assumption(s):
• The level of effort and fee estimate for this task is based on the number of sheets for each
discipline as shown in the sheet list provided. The sheet list was prepared based on
CONSULTANT's current knowledge of the project scope and anticipated work elements.
• The CONSULTANT shall consult with the CITY prior to developing any sheets if the actual
number of required sheets varies from the original sheet count estimate. If the CITY and
CONSULTANT concur that total number of sheets required to detail the project exceeds the
original estimate, the budget for this task may be amended.
• Standard CITY and WSDOT details will be called out in the Plans, but not included in the
detail sheets.
• The CONSULTANT will prepare two separate PS&E packages for Phase 2 and Phase 3 of
the project.
7.1 General
The CONSULTANT will prepare the contract drawings in accordance with the CITY's design
standards. Unless otherwise noted or directed by the CITY, the CONSULTANT will prepare plan
view sheets at a 1"= 20' scale (full size 22"x34") and 1" = 40' scale (half size 11"x17").
The CONSULTANT will prepare a cover sheet including an index of drawings. The list of plan
sheet titles in the indices will exactly match the titles as they appear on the plan sheets.
The CONSULTANT will prepare a vicinity map showing the project limits. The vicinity map will
include the beginning and ending of construction, stations, major cross streets, waterways, and
critical areas.
The CONSULTANT will prepare a sheet layout index for each scale used showing the sheet
layout for the various disciplines. CONSULTANT will prepare general notes, abbreviations, and
symbols sheet.
The CONSULTANT will prepare a set of alignment tables and plan sheets for survey control,
monumentation, and alignments. The alignment tables will list necessary curve details for both
hdrinc.com 835 N Post Street, Suite 101 1 Spokane, WA 99201-2126
(509) 343-8500
0� City of Pasco I Argent Road Improvements (Phase 2)
Amendment No. 1 - Scope of Services - October 5, 2021
existing and proposed centerline alignments. The plan sheets will include alignment centerline,
horizontal and vertical control data.
7.2 Typical Roadway Sections
The CONSULTANT will further develop the typical roadway sections developed at 30% Design.
The typical sections cover typical work throughout sections of the project and will not include
every minor change in section dimensions and features. Where there are anomalies the
appropriate discipline plans will be referenced for concurrence.
7.3 Temporary Erosion and Sedimentation Control (TESC) and
Site Preparation
The CONSULTANT will prepare temporary erosion control details which show erosion and
sedimentation controls measures to be used for this project.
The TESC drawings will be prepared in accordance with the CITY requirements and by
reference the requirements written in the SWMMEW and will also be included with the SWPPP.
The CONSULTANT will define the site preparation and demolition activities, including items to
be abandoned, salvaged, recycled, or removed, and identify facilities that need to be protected
during construction. Site Prep plans will include surface feature items, such as pavements (by
type), sidewalk, curbs, walls, and miscellaneous structures. Demolition required for utilities,
drainage features, signing, signalization and illumination will not be included in these drawings
and will be shown on the relevant discipline drawings.
Cut/fill lines will be shown on the plans.
7.4 Plan and Profile Plans
The CONSULTANT will further develop and detail the plan and profile plan sheets developed at
30% Design.
7.5 Intersection Grading Plans
The CONSULTANT will design intersection grading to tie Argent Rd and Road 36. Intersection
curb radii will be designed including curb radii tables with locations and elevations for PC, PT,
quarter points, low points, and curvature staking information including radius, length of curve,
tangent, and delta. Curb ramp grading will be performed for each curb ramp in the corridor and
will be designed on curb ramp detail sheets to meet ADA requirements.
It is assumed that an ADA Maximum Extent Feasible (MEF) per WSDOT standards will not be
required on this PROJECT.
It is assumed the following intersections will have associated intersection and curb ramp grading
sheets:
hdrinc.com 835 N Post Street, Suite 101 1 Spokane, WA 99201-2126
(509)343-8500
City of Pasco I Argent Road Improvements (Phase 2)
FNAmendment No. 1 - Scope of Services - October 5, 2021
INTERSECTION HALF/FULL # CURB
GRADING RAMPS
ROAD 36 Full 5
7.6 Driveway Plan and Profile (Not Included)
Not included. No existing or proposed driveways exist within the project limits.
7.7 Paving Details (Not Included)
Not included. No special paving or concrete details will be required.
7.8 Roundabout Plan, Island Details and Control Profiles (Not
Included)
Not included.
7.9 Drainage System Plans, Profiles & Details
The CONSULTANT will prepare plans, profiles and details for the drainage design necessary for
the additional impervious surface and other new surface improvements, including plan views of
drainage pipes and structures, sub -surface infiltration facilities, connections to the existing
stormwater systems, and nonstandard drainage details. Additional existing drainage inlets will
be evaluated for relocation as necessary to accommodate the additional roadway width and
runoff conveyance. These storm system layouts will include catch basin and manhole locations,
and the details required to describe the stormwater facilities.
These plans will include profiles for the storm drains required within the project limits. Pipe
elevations on all inverts, size, length, and type as well as drainage structures will be included.
Profiles of the stormwater facilities will also be included. Existing and proposed utility crossings
will be depicted based on survey information.
7.9.1 Stormwater Pollution Prevention Plan (SWPPP)
Not included.
7.9.2 Drainage Design Report
The CONSULTANT shall prepare a Drainage Design Report in accordance with the
requirements of the CITY's municipal code and by reference the SWMMEW. The Drainage
Design Report will document the minimum stormwater management requirements that apply to
the project; BMP selection; calculations to support complete BMP and conveyance sizing; and a
summary of long-term operations and maintenance plan components.
The CONSULTANT will evaluate and select Best Management Practices (BMPs) to provide
permanent stormwater management for the project in accordance with the CITY
requirements. It is anticipated that stormwater infiltration will be used.
BMP selection will be based on infiltration capacity, topography, the amount of space available
within the right of way, life -cycle cost and aesthetic considerations, and the CITY's overall
sustainability goals for the project.
hdrinc.com 835 N Post Street, Suite 101 1 Spokane, WA 99201-2126
(509)343-8500
FNF�1 City of Pasco i Argent Road Improvements (Phase 2)
Amendment No. 1 - Scope of Services - October 5, 2021
Hydrologic modeling will be performed using an Ecology approved hydraulic design software to
size BMPs and evaluate the expected performance of each in terms of meeting Minimum
Requirements from the SWMMEW, as they apply to the project.
Assumption(s):
• The existing drainage system crossing the project will not be modified or adversely
impacted by the planned roadway improvements.
• The Draft Drainage Design prepared under this task will correspond to the 60% complete
designs.
• There will be only one version each of a Draft Drainage Design Report and Final Drainage
Design Report.
• The 60% Draft Drainage Design Report will be subject to one round of CITY review. The
CITY will provide one consolidated set of comments on the draft memorandum to the
CONSULTANT. The CONSULTANT will incorporate the CITY's comments, as applicable,
in the Final Drainage Design Report submitted for the 90% Design Submittals.
• Microsoft Excel or StormShed 3G single -event modeling software will be used.
• Model calibration or validation will not be performed.
• Long-term design infiltration rates from the geotechnical report will be used for modeling
infiltrating BMPs.
• The CITY will register any new UICs with DOE. The CONSULTANT will provide information
for the CITY to complete the registration online.
Deliverable(s):
The Draft Drainage Design Report will be submitted with the 60% design.
The Final Drainage Design Report will be submitted with the 90% design.
7.10 Pavement Marking and Signing Plans, Schedules & Details
The CONSULTANT will further develop and detail the pavement marking plan sheets developed
at 30% Design and develop project details as needed.
CONSULTANT will prepare signing plans that show the location of new signs and associated
sign design details. Signing will conform to the current edition of the MUTCD and the CITY'S
signing guidelines.
7.11 Traffic Signal and Details
The CONSULTANT will prepare the signal plans and details showing proposed locations for the
signal equipment, electrical hardware, and wiring diagrams for the Road 36 and Argent Road
signalized intersection.
CONSULTANT will include underground conduits and room in the equipment for future
intelligent transportation systems (ITS). An ITS system will not be implemented for the project.
hdrinc.com 835 N Post Street, Suite 101 i Spokane, WA 99201-2126
(509)343-8500
FN�� City of Pasco I Argent Road Improvements (Phase 2)
rJ Amendment No. 1 - Scope of Services - October 5, 2021
7.12 Illumination Schedules, Plans and Details
Based on the selection of preferred illumination design from the CITY, CONSULTANT will
prepare the illumination plans, and details. The CONSULTANT will submit to the CITY a set of
illumination plans showing proposed locations for the new illumination, wiring diagrams,
illumination base type and electrical hardware. The CONSULTANT shall prepare voltage drop
calculations documenting the wire sizing needed to accommodate the anticipated electrical
loading of the system.
CONSULTANT will coordinate with Franklin PUD for a new electrical service connection. CITY
will support CONSULTANT in any application and/or billing process needed.
Illumination improvements will consist of new facilities through the project limits. All existing
illumination facilities and luminaires will be removed, relocated, or upgraded at existing
intersections.
Assumptions:
• Up to two (2) circuits are proposed to accommodate the lighting design.
• Voltage drop calculations and wire sizing will adhere to IES standards.
Deliverables:
Voltage drop calculation results for the preferred alternative in PDF format.
Illumination design plans and details.
7.13 Landscape and Irrigation Plans and Details (Not Included)
Not included. Roadside restoration will be limited to hydroseeding disturbed areas with
native seed mix.
7.14 Staging and Traffic Control Plans
The CONSULTANT will develop basic traffic control narrative and sequencing plan for
construction of roadway, intersection, utility, and stormwater improvements utilizing lane
closures, limited detours, and shifts. Traffic control plans will provide sufficient information to be
the basis of bid for the Contractor and will be developed to maintain traffic on Argent Road (at
least one lane each direction open at all times).
The CONSULTANT will include a detour plan for Road 36 to facilitate the intersection
construction.
7.15 60% Over the Shoulder Review
The CONSULTANT will use the 30% design plans and progress to the 60% design and plan
level. The CONSULTANT will take into consideration the 30% design review comments from the
CITY while advancing to the 60% level.
hdrinc.com 835 N Post Street, Suite 101 1 Spokane, WA 99201-2126
(509)343-8500
FNCity of Pasco I Argent Road Improvements (Phase 2)
Amendment No. 1 - Scope of Services - October 5, 2021
This review will be an informal review of the Plans, Specifications and Estimate during a working
session (teleconference) between the CITY and CONSULTANT. CONSULTANT will generate
notes from the meeting and distribute_
7.15.1 60% Plans
The CONSULTANT will further develop the 30% plans to a 60% plan level including the sheets
listed in the following table.
hdrinc.com 835 N Post Street, Suite 101 1 Spokane, WA 99201-2126
(509) 343-8500
01City of Pasco i Argent Road Improvements (Phase 2)
Amendment No. 1 - Scope of Services - October 5, 2021
7.15.2 Final Plan Sheet List
Project Sheet List Estimate
Phase 2
(Signal)
Cover Sheet with Vicinity Map and Index
1
1
Legend, General Notes, Abbreviations, and Project Key map
1
1
Roadway Typical Sections
1
1
Plan and Profile Plans
3
3
TESC Notes
1
1
Temporary Erosion & Sedimentation Control (TESC) and Site
Preparation Plans
1
1
TESC Details
--
2
Paving Detaile (Not
Intersection & Curb Ramp Grading Details
IPOveway Plan ani-! PPA -file Plane (Not inn6 ded
Reundabout Plan I 'and netails (Not innli iiJorl\
__
--
__
--
--
1
__
--
and
Drainage Plans
2
2
Drainage Profiles
1
1
Drainage Details
--
2
Pavement Marking & Signing Plans
2
2
Pavement Marking Details
--
1
Signing Schedule & Details
2
2
Signal Plan
1
1
Signal Details (1 Intersection)
2
2
Illumination Schedule & Details
1
1
Illumination Plans
ITS Detailo
II.andsE;a PiR9 and Irrigation Plans (N9t
1 nri Gaping details (Not in L�.t�
carra�vgprn�vccarr�-rfvrTnoraa �
2
__
__
2
__
__
_-
Irrigatien details (Net
Utility PIaR6 (Not
I Itility details (Alec innli irler!\
Staging and Traffic Control Sequencing Notes
__
1
__
--
--
1
Staging and Traffic Control Plans (Assume 2 stages)
2
2
Total # Sheets
24
30
hdrinc.com 835 N Post Street, Suite 101 i Spokane, WA 99201-2126
(509) 343-8500
FNCity of Pasco I Argent Road Improvements (Phase 2)
r Amendment No. 1 - Scope of Services - October 5, 2021
7.15.3 60% Specifications
The CITY will supply the CONSULTANT with the current version of the CITY's Special
Provisions. The CITY's administrative sections of the contract documents including
advertisement for bids, information for bidders, and bid package information will be supplied in a
Microsoft Word format. The CONSULTANT will develop a "run -list" utilizing the WSDOT APWA
GSPs and supplemental project specific information. The CONSULTANT shall keep a current
project "run -list" and rerun the WSDOT PS&E Work Software Program prior to each plan
submittal.
7.15.4 60% Engineer's Estimate
The CONSULTANT will update the 30% estimate. The "Bid Proposal" within the specifications
shall be prepared from this information by the CONSULTANT.
7.16 90% Submittal
The CONSULTANT will use the 60% design plans and progress to the 90% design and plan
level. The CONSULTANT will take into consideration the 60% over the shoulder review
comments from the CITY while advancing to the 90% level.
7.16.1 90% Plans
The CONSULTANT will further develop the 60% plans to a 90% plan level including the sheets
listed in the previous table and develop final detail sheets as noted in the table.
7.16.2 90% Specifications
The CONSULTANT will update the 60% specifications with any new or additional special
provisions from the advancement of design and incorporation of CITY comments. The
CONSULTANT shall run the "run -list" prior to submittal_
7.16.3 90% Engineer's Estimate
The CONSULTANT will further develop the 60% estimate to a 90% level including adding all
anticipated bid items and costs.
The 90% estimate will remove all contingencies. The "Bid Proposal" within the specifications
shall be prepared from this information by the CONSULTANT.
7.17 Ad -Ready Submittal
CONSULTANT will use the 90% design plans and progress to the Ad -Ready design and plan
level. The CONSULTANT will take into consideration the 90% design review comments from
the CITY and WSDOT while advancing to the Ad -Ready level.
7.17.1 Ad -Ready Plans
The CONSULTANT will further develop the 90% plans to an Ad -Ready plan level without the
addition of any new sheets.
hdrinc.com 835 N Post Street, Suite 101 1 Spokane, WA 99201-2126
(509)343-8500
12
01City of Pasco I Argent Road Improvements (Phase 2)
Amendment No. 1 - Scope of Services - October 5, 2021
7.17.2 Ad -Ready Specifications
The CONSULTANT will update the 90% specifications with any new or additional special
because of CITY or WSDOT comments. The CONSULTANT shall run a final "run -list" prior to
submittal.
7.17.3 Ad -Ready Engineer's Estimate
The CONSULTANT will finalize the engineer's estimate based on any comments received from
the CITY or WSDOT during the 90% design review.
The "Bid Proposal" within the Ad -Ready specifications shall be prepared from this information
by the CONSULTANT.
7.17.4 Construction Schedule
The CONSULTANT shall develop an anticipated construction schedule based on the planned
advertisement date and final quantities. The Construction Schedule shall show the sequencing
and durations of all construction activities. All constraints, such as wet weather conditions,
utility work coordination, etc., shall be identified and factored in the schedule. The number of
working days for the construction contract shall be based on the overall construction duration
shown in the schedule.
Task 8. Real Estate Services (RES)
This task is deleted from the scope of work. No real estate services work will be performed for
this project.
Task 9. Bidding Phase Assistance
The objective of this task is to aid the CITY during the advertisement for construction and
bidding phase to provide information to prospective bidders to support a competitive bidding
environment.
The CONSULTANT will provide written responses to questions and requests for clarifications to
the contract documents submitted to the CITY during the bidding period. Responses will be
provided in Microsoft Word format and submitted to the CITY for inclusion in contract addenda.
The CONSULTANT will evaluate Bidder requests for alternative ("or equivalent") approvals
during the bidding phase.
The CONSULTANT will assist the CITY in preparing all addenda.
CITY Responsibilities:
Record, consolidate and deliver Bidder questions and requests for contract document
interpretations to the CONSULTANT in timely fashion.
The CITY will issue all addenda and host the bid on their website
www.cityofpascoplanroom.com
hdrinc.com 835 N Post Street, Suite 101 1 Spokane, WA 99201-2126
(509)343-8500
01City of Pasco I Argent Road Improvements (Phase 2)
Amendment No. 1 - Scope of Services - October 5, 2021
Assumption(s):
• Phase 2 and Phase 3 project will be bid separately.
• There will be no pre-bid conference.
• The budget for this task is limited to that amount shown in the project budget. Work
beyond the budgeted amount will be considered extra work.
Deliverable(s):
• Written responses to Bidders' questions and requests for interpretations and evaluation
of acceptable alternate ("or equals").
• Conformed set of contract documents based on any addenda issued.
Task 10. Public Involvement Program
This task is deleted from the scope of work. No public involvement program work will be
performed for this project.
Task 11. Management Reserve Fund
No change. See original agreement.
Task 12. Construction Support Services
(FUTURE)
To be included in future contract amendment as needed.
hdrinc.com 835 N Post Street, Suite 101 1 Spokane, WA 99201-2126
(509) 343-8500
14
W
E
g
E
W
Z
W
X i
W
d.N -W
. spgjnsuoOgng
1-301
dn,V.W qng
s4ur4nsuoogng
I -i01
x
O
U. o
� a
O
ro
lfl
o °
II
O
M
01
Of
W
O
M
C�
GOi
N
a.,
ry
In
(O
00
N
'
M
fA
fA
(A
va
N
fA
N
CD
v
h
M
fA
CO
O
7
N
7
n
N
D
M
M
oD
H
d
V
V
�
N
w C
L
H G
X
0
CL
W
Vl
V!
W
fA
fA
NA
fA
fA
fA
fA
fA
1 d!
IH
C
f6
W
O
ro
lfl
7
0 =
O
u
N
fA
fA
(A
va
fA
fA
us
fA
6»
(A
f»
fA
O
7
N
7
n
N
D
M
M
oD
H
d
V
V
�
N
w C
H G
X
W
69
fA
fA
M
(A
fA
fA
fA
66,
69
69
fA
M
(p
O
O
o
V
6
M
p--
M
w
O
w
O
N
O
I�
V
O
C
O
V
M
N
M
CO
N
N
O
R
(4
1a
O
H V
W
(A
fA
to
69
fA
fA
fA
H3
Vi
fA
EA
fA
O
N
(D
7
O
V
O
M
N
to
ol
(C
m
N
n
N
'
_ L
OW
O �
M
r
00
O
DD
M
N
(D
� J
fA
V!
(A
fA
fR
fA
fA
Y}
V!
(A
fA
fA
o
c
W
`
IL
F
LLLL
.0
�
N
E
_
O
N
sVs
C
R
C
Y
d
x
a
W
a
C
�,
m
o
LL
U)
a
O
C)
c
aui
c
(ua
a
N
R
u
W
y
w
(7
N
'N
)
a
p
a
CL
c
d
C
R
C
W
y
x
a
0
N
a
a
d
O
£
w
O
O
N
N
y
A
tOp
'G
c
m
u
'c
>
R
c
67
d
c
L.
y
h
d
y
m
t
a
>
O
>
=
(D
E
c
u
Y
u
R
d
L
O
Q
O
N
N
liJ
O
u
(U
m
N
N
m
°
7
di
O
•C
A
d
a
.6
7
c
R
t
O
M
W
LL
a
m
a
^2
U
N
CO
1�
W
Os
O
N