HomeMy WebLinkAbout4118 Resolution - Amendment No. 4 - RH2 for West Pasco Water Treatment Plant RESOLUTION NO. 4118 A RESOLUTION AUTHORIZING EXECUTION OF AMENDMENT NO. 4 TO THE PROFESSIONAL SERVICES AGREEMENT WITH RH2 ENGINEERING, INC., FOR THE WEST PASCO WATER TREATMENT PLANT IMPROVEMENTS PHASE 1. WHEREAS, the City and RH2 Engineering, Inc. entered into a Professional Services Agreement on July 14, 2020, to provide engineering services with respect to the WPWTP Improvements Project; and WHEREAS, the City and the RH2 Engineering, Inc. entered into the first amendment to PSA No. 20-021 on December 21, 2020, for additional design engineering services in the amount of$19,075.00; and WHEREAS, the City and the RH2 Engineering, Inc. entered into the second amendment to PSA No. 20-021 on May 13, 2021, for a revised scope of work (with no fee increase) to focus on the 12 million gallon per day Phase 1 improvements; and WHEREAS, the City and the RH2 Engineering, Inc. entered into the third amendment to PSA No. 20-021 on August 10, 2021, for additional design engineering services and to add additional time of performance; and WHEREAS, in accordance with Pasco's Purchasing Policy and Procedures, the amount of the first and third contract amendments and the proposed cost of this fourth amendment exceed 15% of the original contract amount of$646,574.00, and thus,requires Council approval; and WHEREAS, the parties agree that all remaining terms and conditions of the PSA (Agreement No. 20-021) not inconsistent with this fourth amendment, shall remain in full force and effect. NOW,THEREFORE,BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PASCO,WASHINGTON: Sections 1. The compensation for this amendment is to provide professional services during the bidding and construction phases of the project and is not to exceed the amount of $949,841.00 for a total contract amount of$1,715,221.00. Section 2. The City Council of the City of Pasco hereby authorizes the City Manager for the City of Pasco to execute Amendment No. 4 with RH2 Engineering, Inc. to the PSA for the WPWTP Improvements, a copy of which is attached hereto and incorporated herein by this reference as Exhibit A; and to make minor substantive changes as necessary to execute the Agreement; and Resolution—PSA Amendment No.4 to RH2 Engineering,Inc. West Pasco Water Treatment Plant Improvements—Page 1 Be It Further Resolved that this Resolution shall be in full force and effect upon adoption. PASSED BY the City Council of the City of Pasco,Washington this 15�'day of November, 2021. Saul Martinez Mayor ATTEST: APPROVED AS TO FORM: , �' - ,�� Debra Barham, CMC �-ltierr Ferg i ;PLLC �,�7$�� City Clerk City Attorney 1' Resolution—PSA Amendment No.4 to RH2 Engineering,Inc. West Pasco Water Treatment Plant Improvements—Page 2 EXHIBIT A AMENDMENT NUMBER 4 to PROFESSIONAL SERVICES AGREEMENT 16008—West Pasco Water Treatment Plant Improvements AGREEMENT NO.20-021 WHEREAS,the City and RH2 Engineering, Inc. entered into a Professional Services Agreement on 7/14/2020 to provide engineering services with respect to the West Pasco Water Treatment Plant Improvements Project. WHEREAS,the City and the RH2 Engineering, Inc. entered into the first amendment to the Professional Services Agreement No. 20-021 on December 21, 2020; and WHEREAS,the City and the RH2 Engineering, Inc. entered into the second amendment to the Professional Services Agreement No. 20-021 on May 13, 2021; and WHEREAS,the City and the RH2 Engineering, Inc. entered into the third amendment to the Professional Services Agreement No. 20-021 on August 10, 2021; and WHEREAS, the parties agree that all remaining terms and conditions of the PSA (Agreement No. 20-021} not inconsistent with this fourth amendment, shall remain in full force and effect. NOW, THEREFORE, this agreement is amended to allow RH2 Engineering, Inc. to provide additional design engineering services, additional construction management services, and to add additional time of performance. 1. Scoae of Work• See Exhibit A. 2. Fee: The compensation for this amendment is based on a Time and Materials Basis and is not to exceed the amount of$949,841.00 for a total contact amount of$1,715,221.00. please refer to Exhibit B for the breakdown of hours. 3. Time of�erformance: The services shall now be complete for the project on or before 12/30/2023. DATED THIS DAY OF , 2021. CITY OF PASCO: CONSULTANT City of Pasco RH2 Engineering, Inc. Dave Zabell—City Manager Paul Cross, PE—Project Manager Amendment No.4 to Professional Services Agreement Page 1 RH2 Engineering,Inc. 16008—West Pasco Water Treatment Plant Improvements EXHIBIT A Scope of Work Amendment No. 4 City of Pasco West Pasco Water Treatment Plant Improvements 12 MGD Expansion Phase I Bidding and Construction Services November 2021 Background The City of Pasco (City) is growing rapidly, and its potable water demands are increasing with population growth and local industries.The City has two water treatment plants on opposite ends of its distribution system. While these plants can accommodate current and short-term peak demands together,individual plant capacity must increase to meet the City's 20-year planning projections.The West Pasco Water Treatment Plant (WPWTP) was designed to accommodate equipment expansion within the facility, and this is a cost-effective way for the City to handle growth. The City retained RH2 Engineering, Inc., (RH2) to perform the preliminary design, final design, and permitting of the Phase I WPWTP Expansion to increase treatment capacity from 6 million gallons per day (MGD) to 12 MGD. The design also included installation of additional strainers, membrane filtration units, filter-to-waste capabilities, a process residuals treatment and recycling system, and various plant operational improvements. This Scope of Work includes providing professional seroices during the bidding and construction phases of the project. This Scope of Work also includes final design revisions from the 90-percent design review phase to include site security systems, add additional maintenance functionality, address special permit site requirements, and other items as detailed below. This Scope of Work includes the following tasks. • Task 5—Services During Bidding • Task 6—Services During Construction • Task 7—Arc Flash Analysis • Task 8—Final Design Additions • Task 9—Cyanobacteria Mitigation Feasibility Support • Task 10—Project Administration and Management Task 5 — Services During Bidding Objective:Assist the City with the advertisement and bidding of the project. Approach: 5.1 PreRare and Submit Advertisement and Post Bid Documents: Prepare the advertisement and submit to the City for review and approval. Prepare and post the bid documents and 1 11/3/20219:29:19 AM \\CORP.RH2.COM\PROJECTS\PROJECT�DATA\PSC\240062\00 CANTRACf�A-4\PSA_SOW_AMEND N0.4_WPWTP PHi SDB SDC SOW.DOCX City of Pasco Amendment No.4 WPWTP Improvements 12 MGD Expansion Phase 1 Exhibit A Bidding and Construction Services Scope of Work advertisement with Abadan Public Plan Room. !t is assumed that the City wil! pay any advertisement fees directly. 5.2 Respond to Questions from Bidders: Respond to bidders'technical questions, as needed during the bidding process. lt is assumed that the City will respond to procedural questions. 5.3 Attend Pre-Bid Meetin�s: Attend and conduct two (2) pre-bid meetings, including a site visit with the City and potential bidders. 5.4 Prepare and Issue Addenda: Prepare up to four (4) draft addenda and submit to the City for review. Revise the addenda based on City comments and prepare final version in electronic PDF and coordinate with City to submit to Abadan for posting. A copy of the addenda will be posted on the Cit�s website for viewing. Revise and update the engineer's opinion of probable construction cost (OPCC)to reflect cost changes based on the addenda. 5.5 Review Proiect Bids and Provide Recommendation:Compile bid results,review the lowest three (3) bids, check references for the lowest bidder, and prepare letter of recommendation of award to the City. !t is assumed that the City will handle bid award and construction contract execution. Assumptions: � The City wil!be responsible for submitting the advertisement to the appropriate publications and paying a!1 associated fees directly. The bid documents wiN be distributed by an online plan center(e.g. Abadan or similarJ and no hard copies will be provided to bidders. • The City will take the lead role during bidding, will receive all bidder questions, and will record them for forwarding to RH2 at the City's discretion. • The City will respond to bidders'procedural questions. • The City will review insurance documents in the bid package(sJ. • The C'ity will conduct the bid opening. It is assumed that RH2 will not attend. Provided by the City: • Post electronic bid documents on the City's website. • Receive and record questions from bidders. • Review draft addenda. • Submit bids to RH2 for bid tabulation. • Review of insurance documents in bid packages. • Bid award and construction contract execution. • Production of construction contract documents for execution. 2 11/3/20219:29:19 AM \\CORP.RH2.COM\PROlECTS\PROJECT�DATA\PSC\20-0062\00 CONTRACT�A-4\PSA_SOW_AMEND NO.4_WPWTP PHl SDB SDC SOW.DOq( City of Pasco Amendment No.4 WPWTP Improvements 12 MGD Expansion Phase 1 Exhibit A Bidding and Construction Services Scope of Work RH2 Deliverables: • One (1) PDF of advertisement and bid documents for posting with Abadan. • Responses to bidders'technical questions. • One (1) hard copy, one (1) PDF, and one (1) Word file for up to four (4) draft and final addenda. • One (1) hard copy and one (1) PDF of up to four(4) updated OPCCs. • Review of non-insurance documents in bid and preparation of bid tabulation. • One (1) hard copy, one (1) PDF, and one (1) Word file of the letter of recommendation of award. Task 6— Services During Construction Objective: Provide professional services to the City during construction of the Phase I WPWTP improvements. Approach: 6.1 Pre are and Provide Construction Contract Documents: Incorporate addenda changes made to the plans and specifications during the bidding process, and issue conformed for construction documents. Produce and distribute up to seven (7)sets of construction drawings(half-size) and specifications, and two (2) full-size plan sets for use by the contractor, the City, and RH2. This subtask assumes that the documents wil!be distributed as follows: two (2)ful!-size plans, three (3)half-size plans, and three(3J specificotions for contractor use;two(2J half-size plans and two (2J specifications each for City and RH2 use. 6.2 Attend Pre-Construction Conference: Prepare for and attend the pre-construction conference, including preparation and distribution of ineeting invitations and agenda. Review roles of the engineer, City, contractor, and other agencies involved in the project. Discuss general construction contract provisions and review project observation and reporting responsibilities of the engineer and the City. Describe Labor Standards requirements, prevailing wage rates, apprentices and trainees, fringe benefits, weekly payroll, and on-site employee interviews. Distribute forms such as certified payroll, posters, and prevailing wage rates to the contractor and subcontractor. Prepare meeting minutes and maintain a record in the project file. 6.3 Provide Construction Consultation and Document Review:Consult with the City on construction costs, scheduling, and constructability issues. Review shop drawings and catalog submittals of items requested in the technical specifications. Provide a written response to the contractor and the City accepting or rejecting each shop drawing and reviewed catalog submittal. Review written requests for information (RFIs) and change order proposals, and provide written responses to the contractor and the City. This subtask assumes that RH2 wil! provide up to twenty-six (26) hours per week of construcrion contract administrative support services based on a sixty (60) week construction schedule. Services include project management; regular 3 il/3/20219:29:19 AM \\CORP.RH2.GOM\PROIECTS\PROJECT�DATA\PSC\20-0062\00 CONTRACT�A-4\PSA_SOW_AMEND NO.4_WPWTP PH15DB SDC SOW.DOCX City of Pasco Amendment No.4 WPWTP Improvements 12 MGD Expansion Phase 1 Exhibit A Bidding and Construction Services Scope of Work communications and coordination between RH2 and City/contractor staff during construction; identifying upcoming technical issues/needs; and the scheduling, coordination, and administration of RH2 staff and resources. lt is assumed that the City will be primarily responsible for construction contract administration and processing contractor pay requests. 6.4 Coordinate with SCADA Inte�rator: Develop process functional descriptions and coordinate with the City's supervisory control and data acquisition (SCADA) integrator on programming updates for the proposed improvements. 6.5 Provide On-Site Construction Observation: Provide part-time observation of the construction work in progress to evaluate construction progress and conformance with the construction documents. Prepare construction observation reports, including relevant photographs. Attend on-site construction meetings and respond to engineering field questions. Prepare progress reports, including contract time remaining statements. Coordinate with a certified testing company to identify material testing and specia) inspection. It is assumed that part-time construction observation includes, on average, approximately twenty-six(26J hours per week of construction support services for sixty(60)weeks of construction observation. lr is assumed that fhe City will pay for materia!testing and special inspections. RH2 will provide coordination and scheduling for specia! inspections with the City-contracted materials testing firm. The City will pay for a!!compaction and concrete special inspettions required for the project directly to the materials testing firm. 6.6 Assist with DWSRF Fundin� Compliance: Assist the City in administering the Drinking Water State Revolving Fund (DWSRF) requirements and provide related documentation throughout construction. Compare contractor's work classifications with federal wages and request additional classifications and wage rates through the Contracts Administration Unit (CAU). Review pay requests from the contractor per DWSRF requirements. Forward approved pay requests to the City for processing. Conduct wage rate interviews with construction staff during each pay period to review that contractor staff are paid according to the wage rates and that overtime hours and fringe benefits are administered correctly. Prepare documentation and gather the American Iron and Steel certifications per DWSRF requirements. Maintain project records to document financial, monitoring, and inspection transactions and progress reviews throughout construction. Maintain copies of weekly certified payrolls, corrected certified payrolls, correspondence and resolution of overtime violations, and copies of employee interviews in the project file for the life of the loan as defined by the loan agreement. 6.7 Assist in Startup, Testin�, and Pro�ect Closeout: Coordinate with the contractor, the City, and manufacturer's representatives of the proposed equipment for the scheduled testing and startup activities. This coordination will include the review and supplementation of the testing protocols developed by the contractor and manufacturer's representatives, and review of the tests and corrections. During startup, document activities and coordinate with the contractor per their compliance with the plans and specifications. Notify the contractor and the City of work that has not been completed by the contractor and discuss contractor rectification.Attend factory witness testing of the control panels and motor control center at either the 4 11/3/2021929:19 AM \\CORP.RH2.COM\PROJECTS\PROJECT�DATA\PSC\240062\00 CONTRACT\A-4\PSA_SOW_AMEND NO.4_WPV✓TP PHS SDB SDC SOW.DOCX City of Pasco Amendment No.4 WPWTP Improvements 12 MGD Expansion Phase 1 Exhibit A Bidding and Construction Services Scope of Work manufacturer or the control system integrator's facility. Attend final on-site walkthrough with City staff, prepare a letter of recommendation for project acceptance for the City, and prepare the Washington State Department of Health (DOH) Construction Completion Report (CCR) for the portion observed by RH2 staff.Submit approved CCR or construction approval letter to CAU prior to closing out the project to comply with DWSRF requirements. Submit a project completion amendment to CAU through the Public Works Board online forms to finalize the closeout process. This report must be signed by the City and submitted to CAU. 6.8 Prepare Record Drawings: Provide record drawings representative of the as-constructed project. Record drawings will be completed based upon contractor redlined markups to conformed for construction drawings. Provide record drawings in electronic PDF for City records. 6.9 Assist with Operations: Provide limited on-call assistance to the City during the first six (6) months of operation to assist with adjusting operational settings as the new residuals handling process begins. Assumptions: • RH2 is not responsible for site safety or for directing the contractor in their work. Provided by the City: • Construction contract administration and processing of pay requests. • Payment for all materials testing and special inspections. • Final completion and closeout of contract with the contractor. RH2 Deliverables: • Conformed for construction drawings and specifications in PDF and hardcopy format as noted in subtask 6.1. • Pre-construction meeting invitations, agenda, and minutes in electronic format. • Submittal and shop drawings review and documentation in electronic PDF. • RFIs and change orders review and documentation, if required, in electronic PDF. • Construction observation and correspondence with the City and the contractor,as requested, within the budgeted hours authorized. Construction observation reports from site visits in electronic PDF. • Identification and coordination of materials testing and special inspections between the contractor and City. • Progress reports, including contract time remaining statements, in electronic PDF. • Review and recommendation of contractor requests for payment in electronic format. • Work classification and payroll review. 5 11/3/2021929:19 AM \\CORP.RH2.COM\PROJECTS\PROJECf�DATA\PSC\20.0062\00 CONTRACT\A-4\PSA_SOW_AMEN�NO.4_WPWTP PHl SDB SDC SOW.DOCX City of Pasco Amendment No.4 WPWTP Improvements 12 MGD Expansion Phase 1 Exhibit A Bidding and Construction Services Scope of Work • Wage rate interviews with contractor staff. • Documentation maintenance of DWSRF compliance records. • Project completion amendment to CAU. • DOH Construction Completion Report in electronic PDF and project closeout. • Letter recommending project acceptance in electronic PDF. • Record drawings in electronic PDF. Task 7— Arc Flash Analysis Objective: Perform electrical short circuit, protective device coordination, and arc flash analysis for the electrical distribution equipment at the WPWTP. Prepare a short circuit, protective device coordination, and arc flash analysis report that summarizes the calculations and recommendations for protective device settings and Personal Protective Equipment requirements. Produce arc flash hazard labels for installation by the contractor on the front of the WPWTP's electrical distribution equipment. Approach: 7.1 Perform Site Visit: Perform a site visit to collect data on the existing electrical distribution system and model the electrical distribution system using SKM Power Tools software. Perform short circuit, protective device coordination, and arc flash calculations. 7.2 Prepare Arc Flash Analvsis Report: Prepare an arc flash analysis report that summarizes the results of the short circuit, protective device coordination, and arc flash calculations for equipment at the WPWTP. The report shall include recommended overcurrent device settings where adjustable overcurrent devices are installed or replacement equipment where old or obsolete devices are contributing negatively to the arc flash potential. 7.3 Produce Arc Flash Hazard Labels: Produce arc flash hazard warning labels for installation by the contractor to meet the requirements of Nationa) Fire Protection Association 70E. Coordinate with the contractor to adjust overcurrent device settings per the recommendations in the report. Assumptions: • RH2 will rely upon the accuracy and completeness of any information, data, and materials generated or produced by the City or others in relation to this Scope of Work. Provided by City: • Access to the WPWTP to review and collect data regarding the electrical distribution equipment. Electrica! equipment will need ta be temporarily de-energized to obtain model numbers of the overcurrent protection devices. De-energizing of the electrical equipment shal! be the responsibility of the City. 6 11/3/2021929:19 AM \\CORP.RH2.COM\PROlECTS\PROJEC'T�DATA\PSC\20-0062\00 CONTRACT'44-4\PSA_SOW_AMEND N0.4_WPWTP PHl SDB SDC SOW.DOCX City of Pasco Amendment No.4 WPWTP Improvements 12 MGD Expansion Phase 1 Exhibit A Bidding and Construction Services Scope of Work • Electrical as-built drawings and operations and maintenance manuals for the WPWTP, if available. RH2 Deliverables: • Arc flash analysis report in electronic PDF. • Arc flash hazard labeling for installation on the front of the electrical equipment at the WPWTP during construction and testing. Task 8— Final Design Additions Objective: Update the design of the WPWTP improvements according to comments received from the City's Operations and Engineering groups after the 60-percent and 90-percent review and constructability review feedback. This Task adds hours for additional design as currently allocated in Exhibit B, Fee Estimate. Design tasks includes the following: • Additional site/civil design for addressing the special permit conditions regarding site landscaping/screening and concrete masonry unit block wall fencing. • Additional site/civil design for adding a 30-inch raw water tee and vault to facilitate cleaning the raw water pipeline upstream of the strainers. • Additional site/civil/structural/electrical design for a 4-inch reverse pressure backflow assembly and insulated and heated enclosure. • Additional mechanical and structural design regarding revisions to the solids discharge system into the existing retention basins. • Additional mechanical and structural design regarding chemical tank ladder installation. • Additional structural and mechanical design forthe residuals pump station building consisting of a concrete curb area around the ferric chloride tank for additional secondary chemical containment, an exterior safety shower and eyewash station, an additional utility sink, and piping modifications. � Additional mechanical design to route a compressed air branch from the air compressor to a proposed pipe assembly within the equalization basin to provide a bubbler system for freeze protection. • Additional electrical design for security system upgrades. Task 9— Cyanobacteria Mitigation Feasibility Support Objective: Assist the City with identifying technologies and WPWTP retrofits for mitigating cyanobacteria and resulting algal bloom toxins. Approach: 9.1 Assist with C anobacteria Miti ation Feasibilit Su ort: Coordinate with the membrane system manufacturer and DOH as needed to identify treatment methods, WPWTP retrofit 7 11/3/2021929:19 AM \\CORP.RH2.COM\PROJECTS\PROJECT�DATA\PSC\240062\00 CONTRACT�A-4\PSA_SOW_AMEND N0.4_WPWTP PHi 5D8 SDC SOW.DOCX City of Pasco Amendment No.4 WPWTP Improvements 12 MGD Expansion Phase 1 Exhibit A Bidding and Construction Services Scope of Work options, and feasibility level costs to implement cyanobacteria mitigation. This Task adds hours for engineering support as currently allocated in Exhibit B, Fee Estimate.This task does not include preparing a DOH Project Report, design documents, or further agency coordination to implement cyanobacteria mitigation and those tasks will be handled in separately in a future phase of this project. RH2 Deliverables: • Feasibility level treatment suggestions and costs via email correspondence. Task 10— Project Administration and Management Objective: Administer, manage, and monitor the RH2 project team, resources, communications, scope progress, budget,files, and records. Approach: 10.1 Monitor Proiect Pro�ress: Review and monitor project progress/schedule, scope, and budget. 10.2 Mana�e RH2 Team: Manage the RH2 project team and resources. 10.3 Provide Monthlv Invoices: Provide monthly invoices with progress report documenting work performed and budget status. 10.4 Communicate with Citv: Communicate with the City regarding project progress, invoicing,and schedule. 10.5 Maintain Proiect Files: Maintain project files and records in electronic format. RH2 Deliverables: • Schedule, scope, and budget administration and management. • Project team and resource management. • Monthly invoices with progress reporting in electronic PDF. • Communication with City. 8 11/3/2021929:19 AM \\CORP.RH2.COM\PROJECTS\PROJECT�DATA\PSC\20-0062\00 CONTRACT�A-4\PSA_SOW_AMEND NO.4_WPWfP PHS SOB SDC SOW.DOCX EXHIBIT B Fee Estimate Amendment No.4 City of Pasco West Pasco Water Treatment Plant Improvements 12 MGD Expansion Phase 1 Bidding and Construction Services Nov-21 Description T��� Total Wbor 7oWl Subconsultant Total Expense Total Cost ................................................................................................................................................................... Hours Classifieation TaskS ServicesDuNn Biddfn 187 32,753 $ - S 2121 $ 34,874 Task 6 Services Durfn Constructfon 4044 5 681,992 S - S 32,926 $ 714,918 Task 7 Arc Flash Anal is 133 $ 21001 $ - $ 825 $ 21 26 Task 8 Final Desi n Additions 672 114 840 - S 14 617 $ 129,457 Task 9 anobaeterta MRI ation Feasibili Su ort 54 $ 9 594 $ 269 9 863 Task 10 Pro'ect Adminstra4ion and Maea ement 178 5 37 954 - S 949 S 38,903 PROJECTTOTAL 5268 $ 898,134 $ - $ 51,707 $ 949,841 11cory.rh2.comlprojecffi1Projecl�Data1PSC120-0062100 ContreMlA�1P5A_FEE Amentl No.4_WPWTP Pht SDB SDC 11YJJ202t 324 PM