HomeMy WebLinkAbout4112 Resolution - DKS PSA Amendment 1 for Design Phase 2A I-182_Broadmoor Blvd RESOLUTION NO. 4112
A RESOLUTION OF THE CITY OF PASCO, WASHINGTON,
AUTHORIZING THE CITY MANAGER TO EXECUTE AMENDMENT NO. 1
TO THE PROFESSIONAL SERVICES AGREEMENT (PSA) WITH DKS
ASSOCIATES, INC. (DKS) FOR THE DESIGN OF PHASE 2A TO THE I-
182/BROADMOOR BOULEVARD INTERCHANGE PROJECT.
WHEREAS,the City and DKS entered into a Professional Services Agreement(PSA) on
September 21, 2021, to provide engineering design services for the I-182/Broadmoor Interchange
Improvements project; and
WHEREAS, it was determined that the design of the I-182/Broadmoor Boulevard
interchange project will consist of two phases; Phase 1 for WSDOT-required planning efforts and
Phase 2 for design efforts; and
WHEREAS, Phase 2A is intended to provide the site information such as surveying,
geotechnical analysis, and stormwater analysis needed to begin a preliminary design of eastbound
and westbound off-ramp improvements from I-182 onto Broadmoor Boulevard; and
WHEREAS,the additional engineering design services are necessary to fulfill the original
intent of the PSA with DKS and its addition. Parties hereto desire to execute Amendment No. 1 to
the original PSA, attached hereto as Exhibit A; and
NOW,THEREFORE,BE IT RESOLVED SY THE CITY COUNCIL OF THE CITY
OF PASCO,WASHINGTON:
Section 1.That the subject agreement is amended and will be modified as described within
Exhibit A attached hereto to add additional engineering design services.
Section 2. The City Manager of the City of Pasco, Washington, is hereby authorized,
empowered, and directed to execute said Amendment on behalf of the City of Pasco.
PASSED by the City Council of the City of Pasco, Washington this 1 St day of November,
2021.
��
Saul Martinez
Mayor
ATTEST: APPROVED AS TO FORM:
, �
� / h.� �,.
�
Debra Barham, CMC err E�� on L� , LLC
City Clerk City y
Resolution-Amendment No. 1 to PSA- 1
AMENDMENT NUMBER 1 to EXHIBITA
PROFESSIONAL SERVICES AGREEMENT
Broadmoor and I-182 Interchange Project -
Project No. 21292
AGREEMENT NO.21-044
WHEREAS,the City and DKS Associates, Inc., entered into a Professional Services
Agreement on 9/21/2021 to provide engineering services with respect to the Broadmoor and I-
182 Interchange project.
NOW, THEREFORE, this agreement is amended to allow DKS Associates, Inc., to
provide additional professional and design engineering services as described on Exhibit A.
1. Scope of Work•
See Exhibit A.
2. Fee:
The compensation for the additional work is based on a Time &Materials Basis of
$146,266.31, increasing the overall total authorization amount to $825,339.31. See
Exhibit B for full breakout.
3. Time of performance:
No Change. The services shall be complete for the project on or before 12/31/2024.
DATED THIS DAY OF ,2021.
CITY OF PASCO: CONSULTANT
City of Pasco DKS Associates, Inc.
Dave Zabell—City Manager Richard J. Hutchinson, PE—Principal
Amendment No. 1 to Professional Services Agreement Page 1
DKS Associates,Inc.
Broadmoor and I-182 Interchange Project