Loading...
HomeMy WebLinkAbout4100 Resolution - RH2 Engineers PSA for WPWTP Zone 3 ProjectRESOLUTION NO. 4100 A RESOLUTION AUTHORIZING EXECUTION OF THE PROFESSIONAL SERVICES AGREEMENT BY THE CITY MANAGER WITH RI -12 ENGINEERING, INC. FOR THE DESIGN OF THE TRANSMISSION MAIN TO THE WEST PASCO WATER TREATMENT PLANT TO ZONE 3 PROJECT. WHEREAS, the City of Pasco, Washington requires professional services from an engineering firm for the purpose of design services for the Transmission Main to the West Pasco Water Treatment Plant (WPWTP) to Zone 3 Project; and WHEREAS, the City of Pasco published an announcement of its Request for Qualifications (RFQ) related to its need for professional services of design services as required by RCW 39.80.030; and WHEREAS, the City of Pasco reviewed and scored three responses that were received and determined RI -12 Engineering, Inc to be the most highly qualified pursuant to RCW 39.80.040; and WHEREAS, the City of Pasco, pursuant to RCW 39.80.050(1), has negotiated a fair and reasonable PSA with RI -12 Engineering, Inc. based on the estimated value of the services including their scope, complexity, and professional nature; and WHEREAS, the City of Pasco hereby finds that RI -12 Engineering, Inc. is the most highly qualified firm to perform the necessary design services for the Transmission Main to the WPWTP to Zone 3 Project, and the negotiated contract is both fair and reasonable, for an amount not to exceed $552,005.00. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PASCO, WASHINGTON: That the City Manager for the City of Pasco is hereby authorized to execute the Professional Services Agreement with RI -12 Engineering, Inc., a copy of which is attached hereto, and incorporated herein by reference as Exhibit A; and to make minor substantive changes as necessary to execute the Agreement; and Be It Further Resolved that this Resolution shall be in full force and effect upon adoption. Resolution — PSA with RI -12 Engineering, Inc Transmission Main to the WPWTP to Zone 3 Project - 1 PASSED by the City Council of the City of Pasco, Washington, this 4th day of October, 2021. Saul Martinez Mayor ATTEST: V-,1141yX� .��i&t=F Debra Barham, CMC U City Clerk Resolution — PSA with RH2 Engineering, Inc Transmission Main to the WPWTP to Zone 3 Project - 2 APPROVED AS TO FORM: V Kms'' erguson Law, PLLC amity Attorney EXHIBIT A Scope of Work City of Pasco Transmission Main — West Pasco Water Treatment Plant to Zone 3 September 2021 Background The City of Pasco (City) has retained RH2 Engineering, Inc., (RH2) to design a new non -dedicated transmission water main and associated appurtenances from the West Pasco Water Treatment Plant (WPWTP) proposed pump station to two connections in the City's Zone 3 system. In addition, a section of existing 16 -inch ductile iron water main along Chapel Hill Boulevard to the intersection with Broadmoor Boulevard and continuing to St. Thomas Drive may be replaced with 24 -inch water main as part of this project. Tasks to complete this project are outlined in this Scope of Work. Task 1— Project Management Objective: Manage RH2's project team and maintain frequent client communications. Maintain project schedules and prepare monthly invoices and budget status summaries. Approach: 1.1 Provide direction, coordination, and oversight to the RH2 project team. Organize, manage, and coordinate technical disciplines as described herein, and implement quality assurance and quality control (QA/QC) reviews to execute this Scope of Work in close coordination with City staff. 1.2 Document and retain information generated during the execution of the project. 1.3 Prepare monthly invoices and budget status summaries. 1.4 Prepare for and attend progress meetings with City staff as requested. Prepare meeting agenda and minutes. A total of three (3) progress meetings are assumed in the Fee Estimate, inclusive of an in-person kick-off meeting at City Hall, in addition to the other milestone and review meetings identified elsewhere in this Scope of Work. 1.5 Create, maintain, and update a project design schedule. Monitor, modify, and update the project schedule throughout the design phase to determine potential impacts of proposed changes. Adjust the schedule to reflect the current status of the project and revisions made to this Scope of Work. RH2 Deliverables: • Monthly invoices and budget status summaries in electronic PDF. • Meeting agendas and minutes in electronic PDF. • Project schedule updates in electronic PDF. 1 9/23/20212:22:18 PM \\CORP.RH2.COM\DFS\NEWBUSINESS\PROPOSAL\PSC\20210716_PSC_M210081_TRANSMISSION MAIN - WPWTP TO ZONE 3\CONTRACT\PSA_SOW_TRANSMISSION MAIN - WPWTP TO ZONE 3.DOCX City of Pasco Exhibit A Transmission Main — West Pasco Water Treatment Plant to Zone 3 Scope of Work Task 2 — Subsurface Investigation and Preliminary Design Objective: Obtain existing site information from available as -built drawings provided by the City. Obtain subsurface data relevant to this project. Analyze water main size and develop construction cost estimates for the water main replacement. Approach: 2.1 Confirm the proposed connection points to the City's water system for the project based on as -built information, and kick-off meeting preferences and expectations from City staff. 2.2 Coordinate with City staff and a subconsultant to perform a geotechnical investigation, coring, and potholing along the proposed alignment to assess soils, asphalt depth and thickness, and depth of existing utilities. This subtask assumes up to ten (10) potholing and three (3) coring locations; potholes will be approximately 10 feet deep, and cores will be approximately 5 feet deep. 2.3 Review available construction records, asphalt coring logs, as -built information, and potholes. 2.4 Perform a visual observation of the pipeline routes to confirm the interfering utility data obtained from the City to the degree possible by surface observation. Collect additional site data relating to the interfering utilities. 2.5 Provide up to eight (8) hours of RH2 staff time to perform desktop investigations to assist with determining permitting requirements for the Franklin County Irrigation District (FCID) and Interstate 182 (1-182) crossings and any utility relocation required for the project. 2.6 Provide an analysis of proposed water main size, including hydraulic modeling, for two (2) different flow scenarios and summarize the findings in a technical memorandum. Approximately forty (40) hours of RH2 staff time are anticipated for modeling and field review. No model calibration is anticipated for this effort. 2.7 Prepare a geotechnical memorandum on geotechnical findings and recommendations on soil conditions, trench cross sections, and constructability issues. 2.8 Attend one (1) meeting with City staff to review findings, receive staff comments, and confirm the extents of the improvements. Meeting is assumed to be a virtual Teams meeting. Assumptions: • RH2 will rely upon the accuracy and completeness of information, data, and materials generated or produced by the City or others in relation to this Scope of Work. Provided by the City: • Construction and as -built records, as available, for the water main alignment. • Backhoe and operator for geotechnical investigation and surface restoration. • Potholing coordination with other utility operators. 0 9/23/20212:22:18 PM \\CORP.RH2.COM\DFS\NEWBUSINESS\PROPOSAL\PSC\20210716-PSC-M210081-TRANSMISSION MAIN - WPWTP TO ZONE 3\CONTRACT\PSA-SOW-TRANSMISSION MAIN - WPWTP TO ZONE 3.DOCX City of Pasco Exhibit A Transmission Main — West Pasco Water Treatment Plant to Zone 3 Scope of Work • Attendance at one (1) meeting to review findings, confirm extents of improvements, and provide comments. RH2 Deliverables: • Coordination with coring and potholing subconsultant. • Summary of potential permitting requirements for the FCID crossings. • Technical memorandum summarizing the construction recommendations, including pipe size and material selection, in electronic PDF. • Geotechnical memorandum summarizing geotechnical findings in electronic PDF. • Attendance at one (1) meeting to review findings, confirm extents of improvements, and discuss City staff comments. Task 3 — Topographic Survey and Easements Objective: Coordinate with a professional land surveyor as a subconsultant to RH2 to provide the vertical and horizontal control and topographical mapping necessary for design of the water main replacements. Approach: 3.1 Contract with a licensed surveyor to provide horizontal and vertical survey control and topographic information, including surface features, underground utilities, topography, roadway, utility alignments, rights-of-way, and property lines and easements to be provided on a USB drive in a format compatible with AutoCAD 2021 and RH2 standards. 3.2 Format survey data for use in AutoCAD 2021. Create base map for project design using RH2 standards. 3.3 Coordinate with the surveyor to obtain additional subsurface utility information (utility locates will be performed by a private firm). Coordinate with City and FCID staff to provide utility potholing to determine utility depths. Incorporate findings into the plans. 3.4 Prepare legal descriptions and exhibit maps required for final documents for up to five (5) properties where easements are required and/or for the license agreement with FCID. Assumptions: • Survey to include full right-of-way width, identify sidewalk infill areas, include future Costco driveway approach, and include high survey density at 60 foot cross sections for overlay, sidewalk, and driveway approach work. • Survey to include 30 feet plus on either side of the alignment and connection points. • Legal descriptions will include the preparation of a black and white original prepared for each easement that meets Franklin County recording requirements. 3 9/23/20212:22:18 PM \\CORP.RH2.COM\DFS\NEWBUSINESS\PROPOSAL\PSC\20210716-PSC-M210081_TRANSMISSION MAIN - WPWTP TO ZONE 3\CONTRACT\PSA_SOW_TRANSMISSION MAIN - WPWTP TO ZONE 3.DOCX City of Pasco Exhibit A Transmission Main — West Pasco Water Treatment Plant to Zone 3 Scope of Work Provided by the City: • Markings of existing utilities. RH2 Deliverables: • Field survey formatted for AutoCAD 2021. • Base map for design documents. • Legal descriptions and exhibits maps for up to five (5) properties in electronic PDF. Task 4 — Prepare Preliminary Design Alternatives Objective: Prepare 30 -percent construction drawings that illustrate the proposed water main and restoration improvements to the City's water system. Prepare the design alternatives based upon up to two (2) concepts regarding the location and capacity of the pump station on the WPWTP site. Approach: 4.1 Prepare preliminary site plans for the two (2) assumed pump station locations. 4.2 Prepare two (2) preliminary designs of the City's proposed water main improvements for this project. Plans will be provided at 1 -inch equals 30 feet horizontal scale and 1 -inch equals 5 feet vertical scale. 4.3 Deliver review plan sets and attend one (1) preliminary design meeting with City staff to review the two (2) preliminary designs and obtain City comments on the design options and a preferred alternative to use in the preparation of the construction documents. Assumptions: • It is assumed that the preliminary design alternatives, pump station locations, and capacity of each alternative will be directed by the City at the kick-off meeting in Task 2. • Meeting is assumed to take place at City Hall. Provided by City: • Attendance at meeting for 30 -percent design review. RH2 Deliverables: • Four (4) sets of half-size plans for City review: two (2) for each 30 -percent design alternative. • Meeting agenda and minutes for the preliminary design meeting in electronic PDF. • Attendance atone (1) preliminary design meeting. Task 5 — Prepare Construction Documents Objective: Prepare construction drawings that illustrate the proposed water main and restoration improvements to the City's water system. 4 9/23/20212:22:18 PM \\CORP.RH2.COM\DFS\NEWBUSINESS\PROPOSAL\PSC\20210716_PSC_M210081_TRANSMISSION MAIN - WPWTP TO ZONE 3\CONTRACT\PSA_SOW_TRANSMISSION MAIN - WPWTP TO ZONE 3.DOCX City of Pasco Exhibit A Transmission Main — West Pasco Water Treatment Plant to Zone 3 Scope of Work Approach: 5.1 Revise preliminary design plans from 30- percent to 60 -percent and internal QA/QC comments. 5.2 Develop details of temporary testing configurations and final configurations of connections to the City's existing water system. 5.3 Develop design criteria for dewatering and trench backfill. 5.4 Prepare and provide standard construction details. 5.5 Develop 1-182 crossing and Chapel Hill Boulevard design concepts and details. 5.6 Develop notes on the plans as necessary to clarify the proposed improvements, including general construction notes. 5.7 Perform a site visit with City staff to confirm details of the preliminary alignment and roadway restoration requirements. 5.8 Prepare a Stormwater Pollution Prevention Plan. 5.9 Prepare a Traffic Control Plan. 5.10 Deliver review plan sets and attend three (3) preliminary design meetings with City staff to review and obtain staff comments: one (1) review set and meeting at 30 -percent design completion; one (1) review set and meeting at 60 -percent design completion; and one (1) review set and meeting at 90 -percent design completion. Prepare meeting agendas and minutes for each design review meeting. Specifications prepared in Task 6 also will be provided for City review at the 60- and 90 -percent design meetings. 5.11 Perform internal QA/QC review of the preliminary design plan sets at the 60 -percent and 90 -percent design completion phases. 5.12 Revise preliminary design plans (from 60 percent to 90 percent) per City and internal QA/QC review comments. Assumptions: • It is assumed that the new water main will be placed in the westbound travel lane of Chapel Hill Boulevard and roadway restoration details will be necessary. • Temporary water services may be required. • Meetings are assumed to take place at City Hall. Provided by City: • Attendance at a site visit with RH2 staff to confirm details of preliminary alignment and road restoration requirements. • Attendance at meetings for 60-, and 90 -percent design review. RH2 Deliverables: • Stormwater Pollution Protection Plan in electronic PDF. 5 9/23/20212:22:18 PM \\CORP.RH2.COM\DFS\NEWBUSINESS\PROPOSAL\PSC\20210716-PSC_M230081_TRANSMISSION MAIN - WPWTP TO ZONE 3\CONTRACT\PSA-SOW_TRANSMISSION MAIN - WPWTP TO ZONE 3.DOCX City of Pasco Exhibit A Transmission Main — West Pasco Water Treatment Plant to Zone 3 Scope of Work • Traffic Control Plan in electronic PDF. • Six (6) sets of half-size plans for City review: two (2) for 30 -percent design completion; two (2) for 60 -percent design completion; and two (2) for 90 -percent design completion. • Meeting agendas and minutes for each design review meeting in electronic PDF. • Attendance at a site visit and three (3) design review meetings. Task 6 — Prepare Specifications and Bid Quantities Objective: Complete technical specifications and construction contract documents necessary to solicit competitive bids for construction. Approach: 6.1 Prepare specifications using RH2's standard technical specifications. 6.2 Update the City's standard construction contract documents to include language specific to the bidder qualification requirements. 6.3 Prepare and provide 60 -percent construction contract documents and technical specifications for City review. 6.4 Revise construction contract documents and technical specifications per City 60 -percent review comments. 6.5 Submit 90 -percent complete technical specifications and construction contract documents to City for review. 6.6 Provide an internal QA/QC review on the 90 -percent technical specifications and construction contract documents. 6.7 Prepare an Engineer's Estimate of probable construction cost for both alternatives at 30 - percent, 60 -percent, and 90 -percent design. Assumptions: • Specifications will follow Washington State Department of Transportation (WSDOT) format with RH2 Amendments. Provided by City: • Standard construction contract documents. • Attendance at meetings with RH2 staff to provide comments and information on 60- and 90 -percent specifications and construction contract documents. RH2 Deliverables: • Engineer's Estimate of probable construction cost at 30-, 60-, and 90 -percent design in electronic PDF. 0 9/23/20212:22:18 PM \\CORP.RH2.COM\DFS\NEWBUSINESS\PROPOSAL\PSC\20210716_PSC_M230081_TRANSMISSION MAIN - WPWTP TO ZONE 3\CONTRACT\PSA_SOW_TRANSMISSION MAIN - WPWTP TO ZONE 3.DOCX City of Pasco Exhibit A Transmission Main — West Pasco Water Treatment Plant to Zone 3 Scope of Work • Technical specifications and construction contract documents for City review at the 60 -percent and 90 -percent design stages in electronic PDF. Task 7 — Permitting Assistance, Right -of -Way Acquisition, and Cultural Review Objective: Provide technical assistance to the City during the permitting and public outreach process. Approach: 7.1 Prepare State Environmental Policy Act (SEPA) checklist for City review and processing. 7.2 Provide City with plans and figures to convey the scope of this project to stakeholders and property owners that may be affected, including supportive drawings and simple conceptual plans. 7.3 Provide one (1) real estate appraisal for each property from which an interest is to be acquired, for up to three (3) properties. Work performed by subconsultant hired by Tierra 7.4 Contract with Tierra Right of Way Services, Ltd., (Tierra) for acquisition advisory services for up to three (3) right-of-way (ROW) files, including obtaining preliminary title reports, working with the title company to clear title encumbrances or making the offer subject to clearing title encumbrances, preparing Offer Packets and Final Report Packets for each property, obtaining escrow services, and coordinating closing transactions. 7.5 Coordinate with property owners to obtain rights -of -entry (ROES) for topographic survey, cultural survey, and geotechnical investigation access. Any hours needed in excess of twelve (12) hours for these services are outside of this Scope of Work and will be negotiated as part of an amendment to this scope of work. 7.6 Assist City staff with project information to inform the stakeholders and City Council about the project. It is assumed that this subtask will be completed by the City using its billing program to identify adjacent properties. RH2 will support this effort as requested. 7.7 Prepare project information plans and provide a PDF copy for the City to reproduce. Prepare exhibits and attend two (2) public meetings at City Hall to present information about the replacement project. 7.8 Attend up to ten (10) additional virtual meetings with the City and individual property owners as requested. Twenty (20) hours are anticipated for this subtask. All meetings are assumed to take place via phone or video. 7.9 Contract with Cultural Resource Consultants, LLC, (CRC) to perform background research, tribal contact, field observation, and final reporting documentation to identify archaeological and historical resources in accordance with Washington State Department of Archaeology and Historic Preservation (DAHP) guidelines. Assumptions: • No WSDOT permits will be required for the 1-182 crossing. 7 9/23/20212:22:18 PM \\CORP.RH2.COM\DFS\NEWBUSINESS\PROPOSAL\PSC\20210716-PSC_M210081_TRANSMISSION MAIN - W PWTP TO ZONE 3\CONTRACT\PSA-SOW-TRANSMISSION MAIN - WPWTP TO ZONE 3.DOCX City of Pasco Exhibit A Transmission Main — West Pasco Water Treatment Plant to Zone 3 Scope of Work • The City shall be responsible for and take the lead on submitting all permitting submittals and paying the associated fees. • The City will assist RH2 with supplying information required for the SEPA Checklist to the extent that information is accessible to the City. • The City will process the SEPA application, if needed. • Stormwater and ROW permits will be required and will be prepared and processed by the City. • The term "properties" shall be understood to mean property that constitutes the "larger parcel" as described in the WSDOT Right -of -Way Manual. • The City will order and pay for the necessary title commitments, which is necessary to confirm ownerships before offers and negotiations are conducted and prior to recording any conveyance documents. • Tierra will provide written notice to owners of the planned appraisal inspections. The property owners will be invited to accompany the appraiser on any inspection of the property for appraisal purposes. • Special benefits, if any, must be quantified by the appraiser whether there are any compensable damages to the property. • All ROW shall be acquired in the name of the City. • Offers will be made on City letterhead and will include City contact information, acquisition and relocation brochures, offer -benefit letter, acquisition and relocation summary statements, conveyance documents, exhibits, a copy of the appraisal, map of acquisition, instruments of conveyance, and W-9 form (if money is exchanged). o If the offer is accepted, Tierra will obtain escrow services from a local title company for permanent acquisitions and coordinate closing transactions between the title company and the City. All signed Temporary Construction Easements will be forwarded to the City for processing. o If a counteroffer is received and accepted, Tierra shall prepare a justification letter supporting Administrative Settlement for the City's acquisition file. o If an acceptable agreement is not reached, Epic shall prepare a Recommendation for Condemnation. • Tierra shall review the Report of Personal Interview for each file. The Report of Personal Interview must include contact with property owners, owners' attorneys, and occupants; efforts to achieve amicable settlements; owners'suggestions for changes in plans; responses to owners' counterproposals, etc. • There are no Residential or Non -Residential relocations or personal property relocations. • Negotiation services are not included. E3 9/23/20212:22:18 PM \\CORP.RH2.COM\DFS\NEWBUSINESS\PROPOSAL\PSC\20210716-PSC-M210081-TRANSMISSION MAIN - WPWTP TO ZONE 3\CONTRACT\PSA_SOW-TRANSMISSION MAIN - WPWTP TO ZONE 3.DOCX City of Pasco Exhibit A Transmission Main — West Pasco Water Treatment Plant to Zone 3 Scope of Work • The City will perform first contact with property owners and provide contact information to RH2 to coordinate ROES. • Escrow services and title insurance are necessary for permanent acquisitions only. The Fee Estimate assumes that there will be five (5) files with permanent easements. • Temporary Construction Easements will not be recorded. • This Scope of Work includes no biological assessments, and it is assumed that there are no burrowing owl nests along the project alignment. • Cultural survey costs are based on a preliminary alignment and may change if the alignment is lengthened or significantly altered. • Cultural survey costs assume properties are clear of excess vegetation so that archaeologists will be able to walk appropriately spaced transects with minimal path clearing. • Cultural costs assume that no more than one (1) unrecorded archaeological site or one (1) unrecorded historic site will be identified within the project area. It would be necessary to adjust the fee estimate if additional sites are found. The fee estimate was prepared with the assumption that no more than twenty (20) shovel test probes would be excavated. If extensive archaeological deposits are encountered or if additional shovel test probes are warranted within the project area, it may be necessary to modify this Scope of Work to accommodate additional investigations for purposes of site identification. • This Scope of Work does not include additional services for impact mitigation regarding archaeological or historic sites. • If human remains are found within the project area, all cultural field investigations will cease immediately, proper authorities will be notified, and field investigations will not resume until applicable state laws are addressed. • CRC assumes the City will submit the report to DAHP within fifteen (15) days of receipt of said report for review. CRC cannot be held liable for reports prepared but not submitted to DAHP in a timely manner. Additional fees may apply for additional services required as part of DAHP's review process for reports submitted more than fifteen (15) days after receipt. • No cultural resources study can wholly eliminate uncertainty regarding the potential for prehistoric sites, historic properties, or traditional cultural properties to be associated with a project. The information presented in reports is based on experience and professional opinions derived from the analysis and interpretation of the documents, records, literature, and information identified and used within the report, and during field investigations. The conclusions and recommendations presented will apply to the project conditions existing at the time of the study and those reasonably foreseeable. • No engineering report will be required for Washington State Department of Health review and approval. 0 9/23/20212:22:18 PM \\CORP. RH2.COM\DFS\NEWBUSINESS\PROPOSAL\PSC\20210716-PSC-M210081-TRANSMISSION MAIN - WPWTP TO ZONE 3\CONTRACT\PSA-SOW-TRANSMISSION MAIN - WPWTP TO ZONE 3.DOCX City of Pasco Exhibit A Transmission Main — West Pasco Water Treatment Plant to Zone 3 Scope of Work Provided by City: • Submittal of permit applications and payment of permit application fees. • Parcel Title Reports and payment for title reports, escrow and recording fees. • Easement negotiations, if necessary. • Coordination with the public. Postage and submittal of project information mailings. • Organize and lead public outreach meetings. RH2 Deliverables: • SEPA checklist in electronic PDF. • Rights of entry for topographic surveys and geotechnical review in electronic PDF. • Exhibits for public meetings in electronic PDF. • Project information plans in electronic PDF. • Attendance at two (2) public meetings with stakeholders and property owners, as requested. • Attendance at up to ten (10) virtual meetings with City and individual property owners. • One (1) exhibit map and legal description in electronic PDF per property for up to five (5) properties. • Up to five (5) appraisals in electronic PDF. • Up to three (3) Offer Packets for review and signature by the City. • Up to three (3) Final Report Packets for each file for payment and conveyance of title and recording to the City. • Up to three (3) Recommendations for Condemnation, if applicable. • One (1) cultural resources assessment report in electronic PDF. Task 8 — Bid -Ready Plans, Specifications, and Construction Contract Documents Objective: Prepare construction plans and specifications for bidding of up to two (2) construction contracts as separate bids: one (1) on the north side of 1-182 and one (1) on the south side of 1-182. Approach: 8.1 Perform a detailed in-house QA/QC engineering review of the construction design plans and specifications for quality and conformance to project requirements and City standards for each construction contract. 8.2 Submit 99 -percent plans, specifications, and construction contract documents to the City for final review or for City's signature for each construction contract. 10 9/23/20212:22:18 PM \\CORP.RH2.COM\DFS\NEWBUSINESS\PROPOSAL\PSC\20210716_PSC_M210081_TRANSMISSION MAIN - WPWiP TO ZONE 3\CONTRACT\PSA_SOW_TRANSMISSION MAIN - WPWiP TO ZONE 3.DOCX City of Pasco Exhibit A Transmission Main — West Pasco Water Treatment Plant to Zone 3 Scope of Work 8.3 Revise plans, specifications, and construction contract documents for each construction contract per the in-house review and City input, if any. It is assumed the revisions to the 99 - percent documents, if any, will be minor. 8.4 Finalize the Engineer's Estimate of probable construction cost based on the bid -ready design plans for each construction contract. 8.5 For each construction contract, prepare bid -ready plans, specifications, and construction contract documents for bidding. Provided by City: • Review comments and information to prepare bid -ready plans, specifications, and construction contract documents. RH2 Deliverables: • 99 -percent plans, specifications, and construction contract documents for City review and signature, if needed, in electronic PDF. • Five (5) hardcopy sets of bid -ready documents: two (2) sets for City use and bidding purposes; and three (3) sets for RH2 files and staff use during bidding. Plans will be shown at 1 -inch equals 30 feet on 11 -inch by 17 -inch sheets. It is assumed that each plan set will consist of forty (40) sheets maximum. • Bid -ready construction contract documents and plan set in electronic PDF. Plans will be shown at 1 -inch equals 30 feet on 22 -inch by 34 -inch sheets. Task 9 — Services During Bidding Objective: Provide engineering assistance throughout the bidding phase to prepare required documentation and respond to contractor questions. Perform the following tasks for up to two (2) construction contracts bid at separate times. Approach: 9.1 Provide PDF to the City and submit bid package to an online plan center (i.e., QuestCDN). 9.2 Prepare bid advertisement and coordinate the timing and placement of the bid advertisement with the City. The City will submit the advertisement to the appropriate publications and pay any advertising fees. 9.3 Attend one (1) pre-bid walkthrough with prospective bidders. 9.4 Respond to contractor or supplier technical questions during bidding. 9.5 Prepare up to three (3) addenda when determined necessary to clarify, revise, or change the construction plans, technical specifications, or project conditions during the bidding process. 9.6 Review bids and assist the City with the evaluation of the qualifications and references for the apparent low bidder. The City will administer the bid opening and prepare the bid tabulation to verify total bid prices. The City will prepare and issue the project award recommendation letter. 11 9/23/20212:22:18 PM \\CORP.RH2.COM\DFS\NEWBUSINESS\PROPOSAL\PSC\20210716_PSC_M210081_TRANSMISSION MAIN - WPWTP TO ZONE 3\CONTRACT\PSA_SOW_TRANSMISSION MAIN - WPWTP TO ZONE 3.DOCX City of Pasco Exhibit A Transmission Main — West Pasco Water Treatment Plant to Zone 3 Scope of Work 9.7 Create electronic conformed for construction contract documents for contractors, if necessary. Assumptions: • It is assumed the City will be responsible for construction contract execution. • It is assumed that the transmission lines and connections on the north and south side of 1-182 may be constructed at different times and may not be bid at the same time depending upon the state of development of the raw land north of 1-182 that could be subject to extensive grading. Provided by City: • Submission of the advertisement to the appropriate publications and payment of fees. • Attendance at pre-bid walkthrough with prospective bidders. • Issuance of addenda as needed. • Coordinate and administer the bid opening. • Prepare bid tabulation and project award recommendation letter. RH2 Deliverables: • Bid advertisement in electronic PDF. • Attendance at pre-bid walkthrough. • Responses to contractor or supplier questions via telephone or email. • Up to three (3) addenda in electronic PDF. • Conformed for construction contract documents in electronic PDF, if necessary. Task 10 —Services During Construction (Limited) Objective: Provide services during project construction to support the City. As the engineer of record, RH2 will perform at least one (1) site visit for observation of construction progress. While not onsite, RH2 will work with the City and its designated utility and special inspector to respond to technical questions and issues. It is anticipated the City will take the lead in inspection and construction contract administration and will handle day-to-day responsibilities. Approach: 10.1 Assist the City for a maximum of one hundred twenty (120) hours to perform on-site observation and respond to contractor's requests for information or change orders. 10.2 Prepare construction record drawings for the project. Assumptions: • It is assumed that the City will provide most services during construction. If the City determines it needs technical support from RH2, a maximum of one hundred twenty (120) hours to respond to contractor questions, observe construction activities, observe special inspections, 12 9/23/20212:22:18 PM \\CORP. RH2.COM\DFS\NEWBUSI NESS\PROPOSAL\PSC\20210716_PSC-M210081-TRANSMISSION MAIN - WPWTP TO ZONE 3\CONTRACT\PSA-SOW-TRANSMISSION MAIN - WPWTP TO ZONE 3.DOCX City of Pasco Exhibit A Transmission Main — West Pasco Water Treatment Plant to Zone 3 Scope of Work or assist with change orders is provided in this Scope of Work and Fee Estimate. Effort for these services in excess of one hundred twenty (120) hours are outside of this Scope of Work and will be negotiated as part of an amendment to this Scope of Work. • RH2 is not responsible for site safety or for directing the contractor in their work. RH2 Deliverables: • Applicable field observation reports and documentation in electronic PDF. • Construction record drawings in electronic PDF. Project Schedule RH2 will commence with design and permitting work upon notice to proceed from the City. It is anticipated that construction will commence by the beginning of November 2022 and will be completed by the end of April 2023. The schedule is contingent on finalizing the preferred alignment within three (3) months of notice to proceed. 13 9/23/20212:22:18 PM \\CORP.RH2.COM\DFS\NEWBUSINESS\PROPOSAL\PSC\20210716_ PSC_ M210081 -TRANSMISSION MAIN - WPWTP TO ZONE 3\CONTRACT\PSA_SOW_TRANSMISSION MAIN - WPWTP TO ZONE 3.DOCX EXHIBIT B Fee Estimate City of Pasco Transmission Main - West Pasco Water Treatment Plant to Zone 3 Sep -21 Task 1 Total I 90 I $ 16,458 1 $ $ Description $ 17,074 Total Labor Total Subconsultant Total Expense Total Cost Hours Task 2 Subsurface investigation and Preliminary Design ................................................................................................................................................................... Classification 1 $ 26,9831 $ 9,200 1 $ 1,929 1 $ 38,112 Task 1 Project Management I 90 I $ 16,458 1 $ $ 616 $ 17,074 Task 2 Subsurface investigation and Preliminary Design 1 143 1 $ 26,9831 $ 9,200 1 $ 1,929 1 $ 38,112 Task 3 Topographic Survey and Easements 1 27 1 $ 4,2721 $ 34,213 1 $ 547 $ 39,031 Task 4 Prepare Prelminary Design Alternatives 1 296 1 $ 44,804 $ $ 7,782 $ 52,586 Task 5 Prepare Construction Documents ilii $ 175,483 $ $ 26,572 1 $ 202,055 Task 6 Prepare specifications and Bid Quantities 226 $ 34,636 $ $ 4,001 1 $ 38,637 Task 7 Permitting Assistance, Right -of -Way Acquisition, and Cultural RevleA 145 1 $ 24,631 1 $ 68,883 1 $ 3,629 1 $ 97,142 Task 8 Bid -Ready Plans, Specifications, and Construction Contract Docume 78 $ 12,360 $ $ 2,047 $ 14,407 Task 9 Services During Bidding 2 Contracts 129 $ 21,360 $ $ 1,725 $ 23,085 Task 10 Services During Construction Limited 162 $ 26,676 $ $ 3,200 $ 29 876 PROJECT TOTAL 1 2407 1 $ 387,663 1 $ 112,295 1 $ 52,047 1 $ 552,005 \borp.rh2.o Wfs\NewBusiness\Proposal\PSC%20210716-PSC_M210081_Tmnsmission Main-WPWTP to Zone 3\Contract\PSA-FEETransmission Main-WPWTP to Zone 9/23/202110:56 AM RH2 ENGINEERING, INC. 2021 SCHEDULE OF RATES AND CHARGES RATE LIST RATE UNIT Professional 1 $144 $/hr Professional II $157 $/hr Professional 111 $169 $/hr Professional IV $187 $/hr Professional V $198 $/hr Professional VI $214 $/hr Professional VII $226 $/hr Professional VIII $235 $/hr Professional IX $235 $/hr Control Specialist 1 $130 $/hr Control Specialist II $141 $/hr Control Specialist 111 $154 $/hr Control Specialist IV $169 $/hr Control Specialist V $179 $/hr Control Specialist VI $191 $/hr Control Specialist VII $204 $/hr Control Specialist VIII $214 $/hr Technician 1 $108 $/hr Technician 11 $119 $/hr Technician III $136 $/hr Technician IV $145 $/hr Technician V $160 $/hr Technician VI $175 $/hr Technician VII $189 $/hr Technician Vill $198 $/hr Administrative 1 $72 $/hr Administrative II $84 $/hr Administrative III $99 $/hr Administrative IV $118 $/hr Administrative V $139 $/hr CAD/GIS System $27.50 $/hr CAD Plots - Half Size $2.50 price per plot CAD Plots - Full Size $10.00 price per plot CAD Plots - Large $25.00 price per plot Copies (bw) 8.5" X 11" $0.09 price per copy Copies (bw) 8.5" X 14" $0.14 price per copy Copies (bw) 11" X 17" $0.20 price per copy Copies (color) 8.5" X 11" $0.90 price per copy Copies (color) 8.5" X 14" $1.20 price per copy Copies (color) 11" X 17" $2.00 price per copy Technology Charge 2.50% % of Direct Labor Mileage $0.560 price per mile (or Current IRS Rate) Subconsultants 15% Cost + Outside Services at cost Rates listed are adjusted annually.