HomeMy WebLinkAboutDW Excavating, Inc - Columbia East Force Main Change Order #1 (17003)ECONOMIC DEVELOPMENT ADMINISTRATION
CHANGE ORDER FORM
EDA Award Number: 070107483
Recipient: City of Pasco
OMB Number: 0610-0096
Expiration Date: 11/30/2021
Date: 6/22/2021
Co-Recipient(s):
Recipient's Authorized Representative: Dave Zabell, City Manager 509-543-3404
Name & Phone Number
Construction Contractor Name Change Order
Contract No. No.
17003 DW Excavating, Inc. 1
The Change Order will provide for the following:
See attached explanation.
Change Order Justification (Include cost analysis, if not unit cost in bid proposal or schedule of values):
See attached explanation.
* Construction coir on Is, not o PA Grant Project and do not include EDA funds nor local match funds.
a By (S' nature) Date
Jon Padvorac,;PE, Senior Civil Engineer
Prepared By (Typed or Written Name & Title)
Richard A. Digitally signed by Richard A.
Moore P.E.
Page 1 of 1 11nf1f1rP P F Date: 2021.07.2210:00:40
------313
TOTAL
EDA Funded Amount
* Non -EDA Funded Amount
Original Contract Amount
$ 5985057.86
$ TBD
$ TBD
Current Contract Amount adjusted by
$
$
$
previous Change Orders
$
Jhis Change Order will
$
$
(increase) (decrease)
36396.95
TBD
TBD
the Contract Amount by:
The original, scheduled date of
completion is/was:
$TBD
The new Contract Amount including
$ 6021454.81
$TBD
this Change Order will be:
e Contra ll
✓ (increase)(decrease)
6 calendar days
calendar days
calendar days
the schedule by:
The estimated date for completion of all
Early Sept '21 (Date)
(Date)
(Date)
work is:
* Construction coir on Is, not o PA Grant Project and do not include EDA funds nor local match funds.
a By (S' nature) Date
Jon Padvorac,;PE, Senior Civil Engineer
Prepared By (Typed or Written Name & Title)
Richard A. Digitally signed by Richard A.
Moore P.E.
Page 1 of 1 11nf1f1rP P F Date: 2021.07.2210:00:40
------313
CITY OF PASCO
PUBLIC WORKS DEPARTMENT
CONTRACT CHANGE ORDER NO. 1
Project No: 17003 Project Title: Columbia East Force Main
Contractor: DW Excavating, Inc.
Description of Change: FA #01 -Work around unlocated line ($1,362.50); FA #02 -Water break on
unlocated line ($4,014.78); FA #03 -Sewer FM for Freeze Pack ($2,180.01);
FA #04 -Over ex due to unlocated lines ($18,526.09); FA #05-2' PVC lines
located & repaired ($1,364.60); FA #06 -Mobilize equipment around Tieg's
field ($916.00); and FA #07-Unlocated utilited, 7 ea ($5,150.71)
Detail as Appropriate: FA #01 -Work around unlocated line; FA #02 - Water break on unlocated
line at STA 7+60; FA #03 -Sewer force main for Freeze Pack at STA 12+25;
FA #04 - Dig 2' deeper from STA 12+20 to STA 16+2- due to Freeze Pack
FM STA 13+25 and Power line STA 16+05 approx 650 Cr, FA #05 - 2"
PVC lines located and repaired; FA #06 -Mobilize equipment around T"'s
field; and FA#07 - Unlocated utilities (7 ea) conduits between STA 138+88
and STA 138-97
Contract Bid Amount: $ 5,511,103.00
SALES TAX @ 8.6%: $ 473,954.86
Total: $ 5,985,057.86
PREVIOUS CHANGE ORDER CURRENT CHANGE ORDER
Subtotal Subtotal $ 33,514.69
Sales tax @ 8.6% $ - Sales tax @ 8.6% $ 2,882.26
Total $ - Total $ 36,396.95
Total Change.Orders To Date $ 36,396.95
New Contract Amount $ 6,021,454.81
IS CONTRACT TIME AFFECTED BY THIS CHANGE ORDER
Contract Time Prior to this Change Order .................................
Modification to Contract time by this Change Order ....................
revised Total Contract Time ....................................................
YES NO
Additional 6 Days
It is mutually agreed by both parties that this Change Order fully describes the change(s) that is (are) being
made and that the compensation for this Change Order is full and complete and is the only compensation
due or owing for this Change Order. Further, it is mutually agreed that this document will supplement the
present Contract Documents and that the provisions of the previously executed Contract Documents shall
apply to this Change Order.
AGREED TO AND ACCEPTED: APP E 1
4/q 6-17-21 ] (p Z l
CONTRACTOR Date 1 PR ECT NAGER Date
APPROVED: AP E
917-1 IfI41
Ll
UD LIC
CONST. MANAGE Date CI NAGER Date S Date
DIRECTOR
Columbia East Force Main
FA Worksheet FA # 01 4/22/21
Work Around Unlocated Line
1. Labor
•Quantif
Rafe
Amount
Superintendent
2:5
$70.00
$175.00
Operator- Excavator under 3 Yds.
2.$
$49.39
$123A8
Operator- Loader under 4 Yds
0
$48.95
$0.00
Operator- Bobcat
0
$48.79
$0.00
Laborer- To man
0
$42.54
$0.00
Laborer- Pipe Layer
2,5
$43.08
Truck Driver
0
$51.50
L$107.70
$0.00
Water Truck
4
$51.39
$0.00
Total Craft Hours
KS
Total Direct Labor Wages and Benefits
$4ttfr;l3.
State of WA Indust. Insur.
6.80%
W7V
FICA
7.66%
011.0y
FUTA
6.00%
$24 X37
SUTA
4.35%
$41A#
WISHA Max 2% of Direct Labor
2.00%
'58:12
Travel/Per Diem Hrs x $5.00 Hr.)
7.5
$5.00
$37.50
Total Labor w/o Markup
$55253
Total Labor with Marko
Quantity2. Material Costs
29%
$712.76
$0.90
$� o0
$6.60
AO
Total Material Costs w/o Marko
woo
Total Material Coss with Msrku
Equipment3. Tools
Hitachi 470 Excavator
2.5
$182.09
$0.00
$45.23
Ford F-460 Crew Truck
2.5
$32.70
$81.75
$0.00
$0.00
$0.00
$538:88
Total E ui menfCosts with Markuq
4. Services
$649.74
$0.00
$0.00
$0.00
$0.00
Total of Services Work w/o MarkUp
$4.40
Total of Services Work with Ma rku.Q
5. Mobilization
$0.00
Total Mobilization
SubcontractorsG.
Sa•00
$0.00
$0.00
$0.00
$0.00
Total Subcontractors Cost w/o Markup
;0.00
Total Subcontractors Cost with Markup
7. ..-. Days
FA Total total of green boxes in 1-61
12%
$GAO
$1,362.50
Added Working Days Requested
0.5
Columbia East Force Main
FA Worksheet FA # 02 4122121
Water Break on Unlocated Line at STA 7+60
Labor1.
Qaawn-Uty
Rate
Amount
Superintendent
5
$70.00
$350.00
Operator- Excavator under 3 Yds.
7
$49.39
$345.73
Operator- Loader under 4 Yds
5
$48.95
$244.75
Operator- Bobcat
0
$48.79
$0.00
Laborer- To man
3
$42.54
$127.62
Laborer- Pie Layer
4
$43.08
$172.32
Truck Driver
0
$51.50
$0.00
Water Truck
0
$51.39
$0.00
Total Craft Hours
24
Total Direct Labor Wages and Benefits
$.1,240;42
State of WA Indust. Insur.
6.80%
$84.35
FICA
7.65%
$94$9
FUTA
6.00%
$74.43
SUTA
4.35%
$53:96
WISHA Max 2% of Direct Labor
2.00%
$24x81
Travel/Per Diem Hrs x $5.00 Hr.
24.0
$5.00
$124.00
Total Labor w/o Markup
$1,652-85
-Total Lat 44 with Marku
Costs2. Material
M3terial!'UnIt Quantity
29%
Rate
$2,183.78
$0 00
$0.00
$0.00
$0.00
Total Material Costs w/o Markup
$0.00
Total Material- Costewith Marku
Equipment3. Tools
Hitachi 470 Excavator
5
2i'°f.
$182.09
$0 -DO
$910.45
John Deere 85 Excavator
2
$62.11
$124.22
John Deere 724 Loader
5
$63.01
$315.05
Ford F-450 Crew Truck
5
$32.70
$163.50
$1,5'13.22
Total E ui ment Costs with Marku
4. Services
21%
$1,831.00
$0.00
$0.00
$0.00
$0.00
Total of Services Work w/o Markup
$0.00
Total of Services Work with Marku
5. Mobilization
210/6
$0.00
Total Mobilization
SubcontractorsG.
SD.DO
$0.00
$0-00
$0.00
$0.04
Total Subcontractors Cost w/o Markup
$0.00
Total Subcontractors Cost with Marku
7. Credits,Totals,Added Days
FA Total total of green boxes in 1-61
12°A
1$4,014.78
Added Working Days Requested
IQ•5
WSOO'* 1-09.6, ZU18 5tE CI9M 5p m=ms m ♦,-,u, w ... January i, �v,n
111164
I,
Columbia East Force Main
FA Worksheet FA # 03 5/3121
Sewer Force Main for Freeze Pack at STA 13+25
Labor1.
Qua
Rate
I A ount
Superintendent
4
$70.00
1 $280.00
Operator- Excavator under 3 Yds.
4
$49.39
$197.56
operator- Loader under 4 Yds
0
$48.95
$0.00
Operator- Bobcat
0
$48.79
$0.00
Laborer- To man
0
$42.54
$0.00
Laborer- Pipe La er
4
$43.08
$172.32
Truck Driver
0
$51.50
$0.00
Water Truck
0
$51.39
$0.00
Total Craft Hours
19
Total Direct Labor Wages and Benefits
$649.88
State of WA Indust. Insur.
6.80%
$4:4.19
FICA
7.65%
$49.72
FUTA
6.00%
$38jJ9
SUTA
4.35%
$28=27
WISHA Max 2% of Direct Labor
2.00%
Travel/Per Diem Hrs x $5.00 Hr.
12.0
$5.00
$60.00
Total Labor w/o Markup
$88405
Total Labor with Marku
2. Material Costs
Material/Unit Quantity
29°k
Rate
$1,146.42
$13.00
$0:00
$0.00
Total Material Costs w/o Markup
56.06
Total Material Costs with Marku.13
Tools.3. Equipment CostsISmall
Hitachi 470 Excavator
4
21°/a
$182.09
$6.60
$728.35
Ford F-450 Crew Truck
4
$32.70
$130:80
3859.1.5
Total E ui merit Casts with klarku
4. Services
21%
$1,039.58
$0.00
$0.00
$0.00
$0.00
Total of Services Work w/o Markup
$0,00
Total of Services Work with Marku
5. Mobilization
21%
70.00
Total Mobilization
6. Subcontractors
54.00
$0.00
$0.00
$0.00
$0.00
Total Subcontractors Cost w/o Markup
$0.00
Total Subcontractors Cost with Marku
7. Cradits,Totals,Added Days
FA Total total of green boxes in 17)
12%
$0.00
1 $2,180.01
Added'Working Days Requested
1 1
w�wr �-ua.c, zuie aianaera apacncanmis m.�-w�..w.�Ne�+=���_�>.���,_
Columbia East Force Main
FA Worksheet FA # 04 5/3/21
FA 04 - Over Ex due to Unlocated Lines
Description: Dig 2' deeper from Sta 12+20 to STA 16+20 due to Freeze
Pack force main STA 13 +25 and Power line STA 16+05. Approx. 650 CY
Labor
• Costs Yon I ete I mount
Superintendent
20
$70.00
$1,400.00
Operator- Excavator under 3 Yds.
20
$49.39
$987.80
Operator- Loader under 4 Yds
26
$48.95
$979.00
Operator- Bobcat
0
$48.79
$0.00
Laborer- To man
0
$42.54
$0.00
Laborer- Pi a Laver
0
$43.08
$0.00
Truck Driver
20
$51.50
$1,030.00
Water Truck
26
$51.39
$1,027.80
Total Craft Hours
Total Direct Labor Wages and Benefits
100
$.5.424.60
State of WA Indust. Insur.
6.80%
$368:87
FICA
7.65%
$414,§.8
FUTA
6.00%
$025.48
SUTA
4.35%
$23597
WISHA Max 2% of Direct Labor
2.00%
$108.49
Travel/Per Diem Hrs x $5.00 Hr.
100.0
$5.00
$500.00
Total Labor w/o Markup2.
a7.378..',xJ
7at0FtiitSorwitli lil�afc"
Material Costs
Material/Unit Quantity
29°k
Rate
39,518.13
�u.00
$0.00
$0.00 j
$0.00
Total Material Costs w/o Markup
$0.00
Total Material Costs with Marku
3. Equipment Costs/Small Tools
1.10rhi 470 Excavator
Hours
20
Rate
$182.09
$3,641:80
John Deere 724 Loader
20
$63.01
$1,260.20
Water Truck
20
$40.56
f $811.20
D Limp Truck
20
$53.87
$1.077.40
Ford F450 Crew Truck
20
$32.70
$654.00
$7,4441$0
Total E ui msnt Coate with Marko
4. Services
21%
39,007.97
$0.00
$0.00
$0.00
$0.00
Total of Services Work w/o Markup
$0.00
Total of Services Work with Markwa
5. Mobilization
21°I°
50.00
Total Mobilization
Subcontractors6.
$0.00
$0.00
M9ubcontr,,ctors
$0.00
$0.00
Cost w/o Marko
sr0.0U
ractors Cost with Markucl
7. Credits,Totals,Added Days
FA Total [total of green boxes in 1-6
$0.00
18 526.09
Added WorkingDays Requested
2
WypT -,39,F, 2015 5tanaam 5pewr Vons M 41-1u, nmenaea January /, -
PZRColumbia East Force Main
FA Worksheet FA # 05 513121
2" PVC Lines Located and Reipaired
Labor1.
uanf
Rate
Amount
Superintendent
3
$70.00
$210.00
Operator- Excavator under 3 Yds.
2
$49.39
$98.78
Operator- Loader under 4 Yds
0
$48.95
$0.00
Operator- Bobcat
0
$48.79
$0.00
Laborer- To man
0
$42.54
$0.00
Laborer- Pipe Layer
2
$43.08
$86.16
Truck Driver
0
$51.50
$0.00
Water Truck
0
$51.39
$0.00
Total Craft Hours
7
Total Direct Labor Wages and Benefits
$394.94
State of WA Indust- Insur.
6.80%
FICA
7.65%
FUTA
6.00%
$23a{
SUTA
4.35%
WISHA Max 2% of Direct Labor]
2.00%
$?.0
TraveUPer Diem Hrs x $5.00 Hr.
7.0
$5.00
$35.00
Total Labor w/o Markup
sf,35 7F
Total Labor with liAarku
2. Material Costs
Lowes
29%
$691.16
$0.90
$0`r'0a
Total Material Costs w/o Markup
$126.98
Total Materiel Costs with Mirku
Tools3. Equipment CostsISmnli
Hitachi 470 Excavator
2
21%
$182.09
$153.65 �
$364.18
Ford F-450 Crew Truck
2
$32.70
$115:40
$0:tt'0
$0.00
$429.58
Total E ul ment Costs with Marku
4. Services
21%
$519.79
SQ.off
$0.00
$b.o0
$0.00
Total of Services Work w/o Markup
$0.00
Total of Services Worts with Marku
5. Mobilization
21%
$0.00
Total MobilizationSfoo
6. Subcontractors
$0.00
$0.00
$0.00
Total Subcontractors Cost w/o Markup
%0,00
Total Subcontractors Cost with Marku
7. . Days
FA Total total of • reen boxes in 1-8
12%
50.00
$1,364.60
Added Working Days Requested
1 0
WyIX]F 1 ao.0,"in umuam Jpwrwu-m--January i, a,.
k.411
Ap ' Columbia East Force Main
FA Worksheet FA # 06 5/3/21
Mobilize Eauloment Around Tieq's Field
Labor1.
QV?-r?UtV
I Rate
Amount
Superintendent
0
$70.00
$0.00
Operator- Excavator under 3 Yds.
10.5
$49.39
$518.60
Operator- Loader under 4 Yds
0
$48.95
$0.00
Operator- Bobcat
0
$48.79
$0.00
Laborer -To man
0
$42.54
$0.00
Laborer- Pipe Layer
0
$43.08
$0.00
Truck Driver
0
$51.50
$0.00
Water Truck
0
$51.39
$0.00
Total Craft Hours
14.5
Total Direct Labor Wages and Benefits
$51.8;60
State of WA Indust. insur.
6.80%
$3 e2fi
FICA
7.65%
$39.67
FUTA
6.00%
$31,1,2
SUTA
4.35%
$2 .156
WISHA Max 2% of Direct Labor
2.00%
$`10.87
TraveVPer Diem Mrs x $5.00 Hr.
10.5
$5.00
$52.50
Total Labor Wo Markup$710.08
ictal Labor with Markin
2. Material Costs
IV13'erial,;Unit Quantity
29°I°
I Rate
$916.00
$C).00
$0 A0
$0.(ka
Total Material Costs w/o Markup
$0.00
Total Material Costs with Marttu
Tools3. Equipment CostsiSmall
21%
50.00
$0:00
$0.00
$0.00
$0.00
$0.00
Total E ul ient Costs with Marku
4. Services
21°/°
-
E0.00
$0.00
$0.00
$0.00
$0.00
Total of Services Work w/o Markup
$0,00
Total of Services Work with Marku
5. Mobilization
21%
$0.00
Tptai Ntobilixation
G. Subcontractors
$0.00
$0.00
$0.00
$0.00
$0.00
Total Subcontractors Cost w/o Marku
$0.00
Total Subcontractors Cost with Marku
7. . Days
FA Total total oforeen boxes in 1-6
12°I°
$0,00
$916.00
Added Working Das Requested
1
N'ayJu� l-UY.°, LUI°JIdf1°Bfa JpBPIGi�une m9�- uv�iwu.rvu v��., v�o
Columbia East Force Main
FA Worksheet FA # 07 5/3/21
Unlocated utilities 7 Ea conduits between STA 138+88 and
STA 138+97
Labor1.
nt
IA► i t
Superintendent
3
$70.00
$210.00
Operator- Excavator under 3 Yds.
9
$49.39
$444.51
Operator- Loader under 4 Yds
9
$48.95
$0.00
Operator- Bobcat
0
$48.79
$0.00
Laborer- To man
7
$42.54
$297.78
Laborer- Pipe Layer
12
$43.08
$516.96
Truck Driver
0
$51.50
$0.00
Water Truck
0
$51.39
$0.00
Total Craft Hours
3.1
Total Direct Labor Wa es and Benefits
$1,469:25
State of WA Indust. Insur.
6.80%
00.91
FICA
7.65%
$112:4.0
FUTA
6.00%
$88.1$
SUTA
4.35%
$63.91
WISHA Max 2% of Direct Labor
2.00%
$29.39
Travel/Per Diem Hrs x $5.00 Hr.
31.0
$5.00
$155,00
Total Labor w/o Markup
$2,018.01
Total Labor with M41kup
2. Material Costs
29%
$2,603,23
$a.an
$0.00
$0.00
$0:00
Total Material Costs w/o Markup
$4.04
Total Material Costs wlth Marku
Tools3. Equipment Costs/Small
Hitachi 470 Excavator
7
21%
$182.09
$0,00
1 $1,274.63
John Deere 85 Excavator
2
$62.11
$124.22
Ford F-450 Crew Truck
7
$32.70
$228.90
Hitachi 470 Excavator -Standby Rate
10
$47.76
$477.60
52,106,35
Total E ui ment Costs with Marku
4. Services
21%
$2,547.47
$0.00
$0.00
$0.00
Total of Services Work w/o Markup
$0.00
$0.00
Total of ftyices Work with Markup
21%
$0.00
Mobilization5.
Total Mobilization
6. Subcontractors
$0.00
$0.00
$0.00
$0.00
$0.00
Total Subcontractors Cost w/o Markup
0.00
Total Subcontractors Cost with Marku
7. Credits Tofals,Added Days
FA Total total of green boxes in 1-6
121.
$0.00
$5,150.71
Added Working Das Requested
1