Loading...
HomeMy WebLinkAboutRH2 Engineering, Inc. - NW Area Sewer LID - (#19049) Amendment No. 2 - ExecutedR AMENDMENT NUMBER eto PROFESSIONAL SERVICES AGREEMENT 1800076 - Northwest Area Sewer LID AGREEMENT NO. 19049 WHEREAS, the City and RI -12 Engineering, Inc. entered into a Professional Services Agreement on 1/9/2020 to provide engineering services with respect to the Addendum to the Comprehensive Sewer Project. WHEREAS, the City and RI -12 Engineering, Inc. entered into the first Amendment to the Professional Services Agreement No. 19049 on 10/29/2020 to add additional time of performance; WHEREAS, all parties to this agreement agree that this amendment will not modify or change any other terms of the professional services agreement (Agreement No. 19049). NOW, THEREFORE, this agreement is amended to allow RH2 Engineering, Inc. to modify their original scope of work for professional and design engineering services as described within Exhibit A. 1. Scope of Work: See Exhibit A 2. Fee: No Change. The compensation for his amendment is based on a 3. Time of performance: No Change. The services shall be complete for the project on or before 12/31/2021. DATED THIS , DAY OF, 2021. CITY OF PASCO: CONSULTANT City -of Pasco Steve Worley, Public Works RI -12 Engineering, Inc. Paul Cross, PE — Project Manager Amendment No. 2 to Professional Services Agreement Page 1 RI -12 Engineering, Inc. 1800076 — Northwest Area Sewer LID Scope of Work Amendment No. 2 City of Pasco Northwest Sewer Area Alignment Project May 2021 Background EXHIBIT A The City of Pasco (City) retained RH2 Engineering, Inc., (111-12) to design a gravity sewer transmission main to connect the growing Broadmoor area of West Pasco to the existing sewer system. The original contract included limited services during construction. The City has requested additional services during construction be provided to support the City. Task 9 — Services During Construction Objective: Provide services during project construction, including daily site visits during underground sewer main installation, and coordinate with a surveyor to confirm the installed elevations of the proposed sewer main. While not onsite, coordinate with the City to respond to technical questions and issues. Approach: 9.1 Assist the City for a maximum of four hundred (400) hours to perform on-site observation, attend weekly on-site construction meetings, and respond to contractor's questions, requests for information (RFIs), or change orders. Track and review material quantities and assist the City with preparing monthly pay requests. Perform other services as requested by the City within the allotted budget. 9.2 Coordinate with MGS PASCO, Inc., as a subconsultant to RH2 to perform periodic coordinate and elevation verification during construction. 9.3 Coordinate with Shannon & Wilson, Inc., (S&W) for on-site observation of excavation and backfill activities on an as -needed basis, consistent with S&W's geotechnical engineering report prepared as part of Task 4 in the original contract. 9.4 Prepare record drawings and assist the City with project closeout. Assumptions: Effort for on-site construction observation services in excess of four hundred (400) hours are outside of this Scope of Work and will be negotiated as part of an amended scope of work. It is assumed that the City will provide on-site inspection during construction, and will be the primary contact for contractor questions. RH2 is not responsible for site safety or for directing the contractor in their work. RH2 Deliverables: • Meeting agenda and minutes for weekly construction meetings in electronic PDF. • Applicable field observation reports and documentation in electronic PDF. 1 City of Pasco Northwest Area Sewer Alignment Project • Record drawings in electronic PDF. Project Schedule Amendment No. 2 Exhibit A — Scope of Work It is anticipated that construction will occur between May and September 2021, and that record drawing preparation and project closeout will occur before the end of November 2021. EXHIBIT B Fee Estimate Amendment No. 2 City of Pasco Northwest Sewer Area Alignment Project May -21 Description Total Total Labor Total Subconsultant Total Expense Total Cost $ 34,914 1 Hours 117,946 Clafication Task 9 services During Construction 488 $ 80,0627 $ 34,914 1 $ 2,970 $ 117,946 Subtotal Northwest Sewer Area Alignment Project Tasks 499 1 $ 80,0621 $ 34,9141 $ 2,970 1 $ 117,946 Task 1 PreDesi n 205 1 $ [35,500 $ $ 1,218 $(36,71811 Task 2 Right of Way Task 5 Design 239 $ 39,610 $ PROJECTTOTAL 44 I $ 4,952 1 $ (5,221) $ 269 $ 0