HomeMy WebLinkAboutC&E Trenching LLC - 9th and Washington and S Maitland Lift Stations (#15003)Project No: 16007 / 15003 CITY OF PASCO PUBLIC WORKS DEPARTMENT CONTRACT CHANGE ORDER NO.1 Project Title: 9th & Washgington / S Maitland Lift Stations Contractor: C&E Trenching, LLC Description of Change: RFC 02: Reinstall 12" plug valves; and RFC 03: Added gravel Detail as Appropriate: RFC 02: Reinstall 12" plug valves including install fence and landscape removal (-$2,500.00); includes cost to modify angle iron and expand hatch ($781.00) (41,719.00); RFC 03: Install 6" of gravel in 35 x 13 foot area and curb cut ($2,435.53) TOTAL: $716.53 Contract Bid Amount: $ 587,360.00 SALES TAX @ 8.6%: $ . 50,512.96 Total: $ 637,872.96 PREVIOUS CHANGE ORDER CURRENT CHANGE ORDER Subtotal Subtotal $ 716.53 Sales tax @ 8.6% $ - Sales tax @ 8.6% $ 61.62 Total $ - Total $ 778.15 Total Change Orders To Date $ 778.15 New Contract Amount $ 638,651.11 IS CONTRACT TIME AFFECTED BY THIS CHANGE ORDER Contract Time Prior to this Change Order ................................. Modification to Contract time by this Change Order .................... revised Total Contract Time .................................................... YES I NO a 0 .o It is mutually agreed by both parties that this Change Order fully describes the change(s) that is (are) being made and that the compensation for this Change Order is full and complete and is the only compensation due or owing for this Change Order. Further, it is mutually agreed that this document will supplement the present Contract Documents and that the provisions of the previously executed Contract Documents shall apply to this Change Order. AGREED TO AND ACCEPTED: C4-e'� Gf 5-12-21 CONTRACTOR V Date APPROVED: f' -Ll Date APPROVED: ' 5- /l -Z l ROJECT MANAGER Date ilZ/ZI -%—PUBLIC WORKS Date DIRECTOR C&E Trenching LLC PO Box 3788 Pasco, WA 99302 Phone: (509) 545-6940 Fax: (509) 545-8671 ,J JJ ;,a r 'dr To: City of Pasco PO Box 293 Pasco, WA 99301 Project: 9th & Washington Maitland RFC No: 02 Date: 5/7/2021 Description: Cost savings to reinstall 12" plug valves in orginal location includes installing fence and removing landscape per C001 (2020.06.12) Revised plan and a Credit of $2,500.00. Change also includes cost to modify angle iron and expand hatch per RFI #10 Subcontract cost of $710 plus mark up of 10% total cost of $781 see supporting estimate from Monarch. The above work is subject to the same conditions as specified in the original contract unless otherwise stipulated. Upon approval the sum of $-1,719.00will be added to the contract price. Original Contract $587,359.99 Other Approved Change Orders $0.00 Total Contract to Date $587,359.99 This Request $-1,719.00 Other Pending Requests $0.00 Total Contract plus Pending RFCs $585,640.99 Authorized Signature: czm -� U' Date: 5-7-21 C&E Trenching LL Authorized Signature: City of Pasco Date: C&E Trenching LLC PO Box 3788 Pasco, WA 99302 Phone: (509) 545-6940 Fax: (509) 545-8671 raj Jrz:r To: City of Pasco Co 1 -6 PO Box 293 Pasco, WA 99301 Project: 9th & Washington + Maitland RFC No: 03 Date: 5/7/2021 Description: Cost to install 6" of Gravel in 35 by 13 foot area, plus cut curb down for 35'. Cost of Labor $699.82 Equipment 821.46 Gravel $303.30 Sub for curb cut $350.00 and markup $260.95 The above work is subject to the same conditions as specified in the original contract unless otherwise stipulated. Upon approval the sum of $2,435.53will be added to the contract price. Original Contract $587,359.99 Other Approved Change Orders $0.00 Total Contract to Date $587,359.99 This Request $2,435.53 Other Pending Requests $-1,719.00 Total Contract plus Pending RFCs $588,076.52 Authorized Signature: C'a� !,t/ Date: 5-7-21 C&E Trenching ftC Authorized Signature: City of Pasco Date: