Loading...
HomeMy WebLinkAboutDKS Associates, Inc - Task Order No. 10 - Jubille Headquarters (Agreement No. 19009) TASK ORDER NO. 10 Reviewed By:�_ �� � Date: � �2U Project Code: REGARDING GENER.AL AGREEMENT BETWEEN CITY OF PASCO AND DKS ASSOCIATES, INC. Project Description: Jubilee HQ Tier 2 TIA Scope of Services: The Consultant will provide a traffic impact analysis (TIA) for the Jubilee Headquarters development located on East A Street near Tierra Vida Lane. The TIA will include AM& PM peak hour vehicular traffic analysis, an inventory of the study area's transportation network, surrounding area land uses and zoning, background growth assumptions, background project trips, crash history summary, crash data analysis, safety recommendations (if applicable), trip generation, trip distribution, parking discussion, and any required mitigation or improvements. Vehicular traffic analysis will include the Existing, Future No-Build, and Future Build scenarios. The chosen future year will be the expected year of opening. Only one future year will be analyzed; a future horizon year will not be included as part of this scope. The study intersections will be limited to the following: • E A St& Heritage Blvd + E A St& Tierra Vida Ln � EASt& US 12 � All site access points onto public roadways As part of this Task, Consultant will prepare a written electronic TIA with a technical appendix and will be submitted to the City via email. If the project plan is updated, replaced, or changed in any way that impacts trip generation or site access, additional fee will be required to re-do work for the TIA. All vehicular traffic analysis will be perfortned in Synchro, using HCM 6th Edition methodology or other methodology pending approval from City staff. Assumptions: City will provide any signad timing data for study intersections and TIAs for any background projects to be considered for this analysis. No site visits will be conducted at this time. One 1-hour meeting will be included for this effort. Trip generation will account for 120 employees at a Corporate Headquarters land use and 4 rooms of Hotel land use. Work Product: Jubilee HQ Tier 2 TIA with technical appendix. (Electronic only) Time of Performance: Within four weeks from receiving signed contract, completed TIA will be submitted to the City for their use, pending traffic count data availability. Fee for Services: Time and materials not to exceed$15,805.00. Professional Services Agreement-DKS Associates,Inc. On-Call Municipal Engineering Services Page 1 of 2 . _�- � ; Proposed: . ',`J �_�'� ------ Ma_�27 2020 Richard Hutchinson, Principal Date DKS Associates, Inc. Approved: �� � ��' LO City of Pasco �,�jj Date Rick White, irector<$50,000 Dave Zabell, City Manager>$50,000 Professional Services Agreement-DKS Associates,Inc, On-Call Municipal Engineering Services Page 2 of 2 0 � n N — V � A��;�d;�lHaO�' d w c X o � 9 T�ms�'-Tr"ir • g � n A� 'o Woa oNAfa �G • S �� ti� >D3 '�'037 NO�i � W °° ���.�3 °�--o'T oa a ND O. 2 W s3 N A � ° N � n� m.�'»3 �CW 1 CN1 .Z� o , � y C N O — > > o�i f0 � 'C o '",�� m � NW ' � 1 O � � D y s � 3 Z 3 n r w '� o n S � � o � s � m a 0 O o � � d N � � � n � y c y a � � d nai °e �' n. N H � O 8 $ Principal Grade 42 Project Plenne�Grotla 35 $ v g o+N ProJect Meneqer Oreda 27 �` 3 g � � Projact Enginear Gretle 20 � $ x HD 8 Aes(fent ProJ EnBr Orede 75 p R � CAD Deaignar 6rade R � a a Admin Tech V g QAIQC Grade 39 � w Fn w fn Fn(n u u w v,ew u w w a wo g �Pensea 0 S� a� �U'N � � � Topl Hours By 7ask � 0 S � O1 � � " Tofa/Labor Sy Task � m oo , �� , � � � o g , g , � M y y �v Tofal Expenses By Task �` a j �9 � d m GrendToralByTask o ' —� � � � No , �� �� , � , o � 0 � ti � °a o �