HomeMy WebLinkAboutDKS Associates, Inc - Task Order No. 10 - Jubille Headquarters (Agreement No. 19009) TASK ORDER NO. 10
Reviewed By:�_ �� � Date: � �2U Project Code:
REGARDING GENER.AL AGREEMENT BETWEEN CITY OF PASCO
AND
DKS ASSOCIATES, INC.
Project Description: Jubilee HQ Tier 2 TIA
Scope of Services: The Consultant will provide a traffic impact analysis (TIA) for the Jubilee Headquarters
development located on East A Street near Tierra Vida Lane. The TIA will include AM& PM peak hour
vehicular traffic analysis, an inventory of the study area's transportation network, surrounding area land
uses and zoning, background growth assumptions, background project trips, crash history summary, crash
data analysis, safety recommendations (if applicable), trip generation, trip distribution, parking discussion,
and any required mitigation or improvements.
Vehicular traffic analysis will include the Existing, Future No-Build, and Future Build scenarios. The
chosen future year will be the expected year of opening. Only one future year will be analyzed; a future
horizon year will not be included as part of this scope.
The study intersections will be limited to the following:
• E A St& Heritage Blvd
+ E A St& Tierra Vida Ln
� EASt& US 12
� All site access points onto public roadways
As part of this Task, Consultant will prepare a written electronic TIA with a technical appendix and will be
submitted to the City via email. If the project plan is updated, replaced, or changed in any way that impacts
trip generation or site access, additional fee will be required to re-do work for the TIA.
All vehicular traffic analysis will be perfortned in Synchro, using HCM 6th Edition methodology or other
methodology pending approval from City staff.
Assumptions: City will provide any signad timing data for study intersections and TIAs for any background
projects to be considered for this analysis. No site visits will be conducted at this time. One 1-hour meeting
will be included for this effort. Trip generation will account for 120 employees at a Corporate
Headquarters land use and 4 rooms of Hotel land use.
Work Product: Jubilee HQ Tier 2 TIA with technical appendix. (Electronic only)
Time of Performance: Within four weeks from receiving signed contract, completed TIA will be
submitted to the City for their use, pending traffic count data availability.
Fee for Services: Time and materials not to exceed$15,805.00.
Professional Services Agreement-DKS Associates,Inc.
On-Call Municipal Engineering Services Page 1 of 2
.
_�- � ;
Proposed: . ',`J �_�'� ------ Ma_�27 2020
Richard Hutchinson, Principal Date
DKS Associates, Inc.
Approved: �� � ��' LO
City of Pasco �,�jj Date
Rick White, irector<$50,000
Dave Zabell, City Manager>$50,000
Professional Services Agreement-DKS Associates,Inc,
On-Call Municipal Engineering Services Page 2 of 2
0
� n
N —
V
�
A��;�d;�lHaO�' d w c X o
� 9
T�ms�'-Tr"ir • g
� n A� 'o Woa oNAfa �G • S
�� ti� >D3 '�'037 NO�i � W
°° ���.�3 °�--o'T oa a ND O. 2 W
s3 N A
� ° N � n� m.�'»3 �CW 1 CN1
.Z� o , � y
C N O
— > > o�i f0 � 'C
o '",�� m � NW
' � 1 O
� � D y
s �
3 Z
3
n
r w
'� o n
S �
� o
�
s �
m
a
0
O
o �
� d
N �
� �
n �
y c y a
� �
d nai °e �'
n. N H �
O
8
$ Principal Grade 42
Project Plenne�Grotla 35
$
v
g o+N ProJect Meneqer Oreda 27
�`
3 g
� � Projact Enginear Gretle 20 �
$
x
HD
8 Aes(fent ProJ EnBr Orede 75 p
R
�
CAD Deaignar 6rade R
� a a Admin Tech V
g QAIQC Grade 39
�
w Fn w fn Fn(n u u w v,ew u w w
a
wo g �Pensea
0
S�
a� �U'N � � � Topl Hours By 7ask
�
0
S
� O1 � � " Tofa/Labor Sy Task
� m oo , �� , � � �
o g , g ,
� M y
y �v Tofal Expenses By Task
�` a
j �9
� d m GrendToralByTask
o ' —� �
� � No , �� �� , � ,
o �
0
�
ti
� °a
o �