Loading...
HomeMy WebLinkAboutPACE Engineering, Inc. - Columbia East FM & LS PSA Amendment No. 6 - (Contract-Agreement No. CP9.SR.2A.17.01 - Project 17003)AMENDMENT NUMBER 6 to PROFESSIONAL SERVICES AGREEMENT 17003 - COLUMBIA EAST LIFT STATION AND FORCEMAIN PROJECT CONTRACT # CP9-SR-2A-17-01 WHEREAS, the City and PACE Engineers, Inc. entered into a Professional Services Agreement on 5/31/2018 to provide engineering services with respect to the Columbia East Lift Station and Force Main Project. WHEREAS, the City and PACE Engineers, Inc. entered into the first Amendment to the Professional Services Contract No. CP -9 -SR -2A-17-01 on 12/15/2018 to add construction management services (scope & fee), and additional time of performance; WHEREAS, the City and PACE Engineers, Inc. entered into the second Amendment to the Professional Services Contract No. CP -9 -SR -2A-17-01 on 4/22/2019 to add additional design engineering and additional construction management support (scope and fee); WHEREAS, the City and PACE Engineers, Inc. entered into the third Amendment to the Professional Services Contract No. CP -9 -SR -2A-17-01 on 8/19/2019 to add additional design engineering (scope & fee) and additional time of performance; WHEREAS, the City and PACE Engineers, Inc. entered into the fourth Amendment to the Professional Services Contract No. CP -9 -SR -2A-17-01 on 5/19/2020 to add additional design engineering and construction engineering (scope and fee); WHEREAS, the City and PACE Engineers, Inc. entered into the fifth Amendment to the Professional Services Contract No. CP -9 -SR -2A-17-01 on 12/15/2020 to add additional design engineering and bid support (scope and fee) and add additional time of performance; NOW, THEREFORE, this agreement is amended to allow PACE Engineers, Inc. to revise their original scope of work for design engineering services as described within Exhibit A&B. Scope of Work: Please see Exhibit A. 2. Fee: No Change. The compensation for this amendment is based on a Time and Materials Basis and remains limited to $858,773.63. However, based on modifications to the original scope of work the allocation of budget has been modified, as described within Exhibit B. Amendment No. 6 to Professional Services Agreement Page 1 PACE Engineers, Inc. 17003 - Columbia East Lift Station and Force Main Project Time of performance: No Change. The services within this amendment shall be complete for the project on or before 12/31/2021. DATED THIS _ DAY OF , 2021. CITY OF PASCO: PAC y V ENGINEERS, INC.: Ilkl'4 � 16 //- �' /. ,6 -, 'Rhin D. Nelson. P.E. — Senior Principal Engineer Amendment No. 6 to Professional Services Agreement Page 2 PACE Engineers, Inc. 17003 - Columbia East Lift Station and Force Main Project EXHIBIT A City of Pasco Columbia EastForcemain Modifications Job # 18424 - Amendment #6 (Revised) A;)ril 2021 Project Understanding: Amendment No. 4 acknowledged additional engineering services for re -alignment of the forcemain, prepare 60% PS&E for only one forcemain, continue right of way support, and complete evaluate the impacts of removing one of the forcemains from the project, and limited construction engineering services. Amendment No. 5 was approved to revert back to the dual pipeline concept and refine the alignment to for the two pipelines within the approved route developed in previous amendments and prepare bid documents. Amendment No. 6 is prepared to acknowledge the additional level of effort required to complete the extent of work evaluating the single forcemain option, revising the PS&E, and supporting right of way acquisition efforts. Amendment No. 6 transfers budget set aside for construction engineering services included in amendment no. 4 to partially support the additional engineering costs incurred while evaluating the single pipeline alignment and the redesign to revert back to the dual pipeline alignment. Scope of Work & Budget: Amendment No. 6 is a no cost amendment reallocating budget set aside for construction engineering services of the single pipeline concept in the amount of $27,758.00. Attached is the reconciliation of the budget shown on the attached worksheet. End of Scope of Work 11Page ........... .. .. ........... .............................. . .. ... .......... .......... .. ..... .... .. . . .. .................. ................... ..... N � �� (I ........................_............:»»........ . LL !Ei L4 r4 C M Ea 0 c4 11 cr LLI F�- 1�7 EXHIBIT B .......... ........... .... ...... O .......... ........................ O ..... .................. ... .............. ............ I' I IR cL ........... .. .. ........... .............................. . .. ... .......... .......... .. ..... .... .. . . .. .................. ................... ..... N � �� (I ........................_............:»»........ . LL !Ei L4 r4 C M Ea 0 c4 11 cr LLI F�- 1�7 EXHIBIT B