HomeMy WebLinkAboutJUB Engineers, Inc. - Grimmway Connection Amendment No. 2 (Project 20103) Agreement No. 20-033AMENDMENT NUMBER 2 to
PROFESSIONAL SERVICES AGREEMENT
Grimmway Connection to Columbia East Lift Station
Project No. 20103
AGREEMENT NO. 20-033
WHEREAS, the City and J -U -B Engineers, Inc., entered into a Professional Services
Agreement on 8/24/2020 to provide engineering services with respect to the Grimmway
Connection to Columbia East Lift Station project.
WHEREAS, the City and J -U -B Engineers, Inc., entered into Amendment No. 1 on
12/10/2020 to add additional time of performance.
NOW, THEREFORE, this agreement is amended to allow J -U -B Engineers, Inc., to add
additional professional engineering services.
Scope of Work:
See Exhibit A.
2. Fee:
The compensation for the additional work is based on Time and Materials and is in the
amount of $9,564.00, increasing the overall total authorization amount to $58,164.00
Time of performance:
No Change. The services shall be complete for the project on or before 12/31/2021.
DATED THIS DAY OF F� r 2021.
CITY OF PASCO:
C o
Dave Zabell, City Manager
Amendment No. 2 to Professional Services Agreement
J -U -B Engineers, Inc.
Grimmway Connection to Columbia East Lift Station
CONSULTANT
G
J -U -B Engineers, Inc.
Alex J. Fazzari, Project Manager
Page 1
EXHIBIT A
C U -B
-7-7--lor
J -U -B ENGINEERS, INC.
J -U -B ENGINEERS, Inc.
AGREEMENT FOR PROFESSIONAL SERVICES
Attachment 1 — Scope of Services, Basis of Fee, and Schedule
PROJECT NAME: Grimmwa,: Sewer Connection Modifications
CLIENT: Citof Pasco
J -U -B PROJECT NUMBER: 30-20-059
ATTACHMENT TO:
® AGREEMENT DATED: 8/24/2020
The referenced Agreement for Professional Services executed between J -U -B ENGINEERS, Inc. (J -U -B)
and the CLIENT is amended and supplemented to include the following provisions regarding the Scope of
Services, Basis of Fee, and/or Schedule:
PART 1 - PROJECT UNDERSTANDING
J -U -B's understanding of this project's history and CLIENT's general intent and scope of the project are
described as follows:
A diversion manhole and metering manhole are being added to the project. The diversion manhole will
have diversion slide gates to direct all, or a portion of the flow to either the Kahlotus Pump Station or the
Columbia East Pump Station. The metering manhole will measure flow going to the Columbia East Pump
Station. J -U -B is subcontracting with AEI Engineers for the electrical/controls design for the flowmeter
signal/power to go from the metering manhole to the Columbia East Pump Station. Programing of the
instrument and telemetry will be done by others (subcontracted by the City). Also, a submittal to the
Department of Ecology for their review is added to the project.
PART 2 - SCOPE OF SERVICES BY J -U -B
J -U -B's Services under this Agreement are limited to the following tasks. Any other items necessary to plan
and implement the project, including but not limited to those specifically listed in PART 3, are the
responsibility of CLIENT.
A. Task 050 - Sewer Pipe Design- is being increased by $5,951 (From $26,000 to $31,951). This is a
"not to exceed" fee type.
B. Task 60 - Bid and Award Phase is being increased by $772 (From $2,200 to $2,972). This is a "not
to exceed" fee type.
C. Task 70 - Construction Phase is being increased by $2,841 (From $5,000 to $7,841). This is a "not
to exceed" fee type.
D. The total amount for the project is increased by $9,564 (From $48,600 to $58,164).
PART 3 - BASIS OF FEE AND SCHEDULE OF SERVICES
A. CLIENT shall pay J -U -B for the identified Services in PART 2 as follows:
1. Time and Materials not to exceed Ceiling Amounts noted in the table below.
B. Period of Service: If the period of service for the task identified above is extended beyond 12 months,
the compensation amount for J -U -B's services may be appropriately adjusted to account for salary
adjustments and extended duration of project management and administrative services.
J -U -B Agreement for Professional Services
Attachment 1 — Scope of Services, Schedule, and Basis of Fee Page 1
C. CLIENT acknowledges that J -U -B will not be responsible for impacts to the schedule by actions of
others over which J -U -B has no control.
D. The following table summarizes the fees and anticipated schedule for the services identified in PART 2.
TaskTask
Name
Fee Type
Amount
Anticipated Schedule
Number
010
Project Management
Not to Exceed
$4,600
Concurrent with work progress
020
QC Reviews
Not to Exceed
$2,000
Concurrent with work progress
030
Preliminary Design
Not to Exceed
$5,300
Concurrent with work progress
1 Month after preliminary
040
Topographic Survey
Not to Exceed
$3,500
design workshop.
Final for bidding 1 month after
050 Sewer Pipe Design
Not to Exceed
$31,951
receipt of comments on Draft.
060
Bid and Award Phase
Not to Exceed
$2,972
Concurrent with work progress
070
Construction Phase
Not to Exceed
$7,841
Concurrent with work progress
Total:
$58,164
NOTE on Coronavirus and Schedule: J -U -B is committed to meetingyourproject schedule commitments as delineated
above. As our response to the COVID-19 pandemic, J U -B is engaging in safety procedures in help to protect clients, staff, their
families, and the public. Our staff or offices maybe subject to quarantine or other interruptions. Since COVID-19 impacts are
beyond J -U -B's control, we are not responsible for the force majeure impacts to delivery timelines, or subsequent project delays
and related claims, costs, or damages. Should circumstances related to the COVID-19 issue arise with J -U -B staff or in a J -U -B
office that will impact our delivery schedule, we will notify you of the circumstances and mutually agree to a schedule
adjustment.
For internal J -U -B use only:
PROJECT LOCATION (STATE): WA
TYPE OF WORK: City
R&D: Yes
GROUP: Water/Wastewater
PROJECT DESCRIPTION(S):
1. Municipal/Utility Engineering (203)
2. Sewer/Wastewater Collection/Treatment/Disposal (SO4)
J -U -B Agreement for Professional Services
Attachment 1 —Scope of Services, Schedule, and Basis of Fee Page 2
EXHIBIT B
WORK BREAKDOWN STRUCTURE aa7eear
BASIS OF FEE ESTIMATE �� °a0y-,a ® o!".;
e caowmr, we a�ro-.ra.,era�rr
Project Title, Client: Grimmway Connection, City of Pasco
Project Number: 30-20-059
Prepared By: Haws
010
Project Management
D
0'
0
0
$0
50
5o
010
001
Project Management
0
a
p
0
$0
90
fp
(No Change in Scope/Fee)
$0
$0
$0
7$0
$0
$0
$0
020
QCFA"9**
0
0
0•
0
$B
:$a
no
001
QC Ravi—
(No Change in Scope/Fee)
0
e
0�
U
fa
$0
$0
$0
So
fo
$0
io
030
vnFwMryperlga
0
p
a.
a
0
$D
SO
So
030
001
Preliminary Design
a
0
9
0
p
$0
int
$a
IN, Change In Scope/Fee)
$0
$o
$0
$0
$0
$o
010
090
001
iTopographic Survey _
Topographit Sumey
0'
0
a
0
00
a
p
9
a
$0
$a
$0
~$0
$0
ip
(No Change in Scope/Fee)
$0
$0
$0
_
$0
$0
$o
090
Sewer Pipe Design
■'
3
7'
'Y
0.
..$a
$'1,900
$5,931
050
001
Sewer Pipe Design
3
1
7
5
0.
$a
53,900
fa
Electrical/C—mis design for Diversion MH and Meter MH
$0
$0
$0
$3,900
$0
$0
$3,900
$2,051
So
Civil Design for Diversion MH and Meter MH 3 1 7 5
D60
060
001
Bid and Award Phase
Bid and Award Phase
1
1
0
p
0
.D
0
0
0
0
So
30
$=
$000
Yin
Ilm
Answer questions about div. MH and/or Metering MH
1
$0
$0
$600
$0
$772
$0
07p.
Construction Phase
OA
0
1
0
p
so
$..,4
Pu.
070
001
Construction Phare
RFIs, submittals, startup, related to div. MH and Meter MH
0.3
0.5
0
1
1
C
p
_$0
$0
$2,650
$2,841
$2,841
$0
$0
$0
Total Hours
4.5
1
8
5
0
19
Total Costs
$774
$200
$840
$600
$0
$0
$7,150
$9,564
\1jub.comlCentraRClients\WA1PascoCiMProjec[s130.20.059_GmnmwayConnect,onlProjMgmMgreementslAAS#2_W B8