Loading...
HomeMy WebLinkAboutPACE Engineers, Inc - PWRF Embankment Repair Project - Addendum No. 1 (Agreement No. 20-035)ADDENDUM TO PROFESSIONAL SERVICES AGREEMENT FOR PWRF Embankment Repair Project AGREEMENT NO. 20-035 WHEREAS, the City of Pasco (City) and PACE Engineers, Inc. (Contractor) entered into a Professional Services Agreement No. 20-035 on August 13, 2020 to provide engineering services with respect to the PWRF Embankment Repair Project. WHEREAS, the City of Pasco (City) and PACE Engineers, Inc. (Contractor) have the contractual authority to permit or deny modifications of the Professional Services Agreement No. 20-035 per Section 17 of that Agreement; and WHEREAS, all parties to this agreement agree that this addendum will not modify or change any other terms of the professional services agreement (Agreement No. 20-035) not covered by this Addendum, which is attached. NOW, THEREFORE, the agreement is modified by this Addendum. to allow PACE Engineers, Inc. to provide additional engineering services as described on Exhibit A. 1. Scope of Work: See Exhibit A Fee: The compensation for the additional work is based on a Fixed Fee Basis of $33,810.00, increasing the overall total authorization amount to $78,283.00. 3. Time of Performance: No Change. Addendum to Agreement for Professional Services No. 20-035 IN WITNESS WHEREOF, the parties have executed this Addendum on the a3rJ day of September, 2020. CITY: City of Pasco Dave Zabell, City Manager Approved as to Form: CONTRACTOR: 1 P CE Engineers, nc. Robin D. Nelson, PE Addendum to Agreement for Professional Services No. 20-035 2 EXHIBIT A Engineers I Planners I Surveyors PACE M Engineering Sernces Comparry 9/21/2020 Michael White, P.E. City of Pasco 525 N. 3'd Ave Pasco,. WA 99301 Subject: PWRF Dike Repair Proposal for Geotechnical Boring and Lab Services Dear Mr. White: PACE Engineers, Inc., (PACE) appreciates the opportunity to submit this budget proposal for providing Geotechnical Boring and Lab Services for the PWRF repair project based on the information you provided to our team on 9/21/2020. Scope of Work Please see attached geotechnical and lab services scope from Shannon & Wilson. Fee Estimate We propose to provide the services listed above on a fixed fee basis for a total of $ 33,810 in accordance with the attached geotechnical proposal The breakdown for the above fee is $29,400 shown on attachment °A" plus PACE's standard 15% subconsultant markup The above scope of work and related fee has been based on the following assumptions: The City shall provide required access to the site for the investigation work The following services are not included in this proposal: Geotechnical or Civil Engineering Design In summary, we have developed a scope of work and budget based on our present knowledge of the project. We have tried to cover all aspects of the proposed project; however, if you feel that additional areas of work require our attention, if you have any questions, or if you desire additional information please do not hesitate to contact us. PACE Engineers, Inc. 11255 Kirkland Way I Suite 300 Kirkland, Washington 98033-3417 p 425.827.2014 1 ( 425.827.5043 www.paceengrs.com 9/21/2020 Engineers I Planners I Surveyors Michael White, P.E. City of Pasco Page 2 of 2 www.paceengrs.com Again, we are pleased to submit this proposal for the subject project and look forward to working with you. If you concur with this proposal, please sign below and forward one copy back to our office. Receipt of that copy will serve as our Notice to Proceed. Sincerely, PACE Engineers, Inc. Jonathan R. Archibald \\LO-dalasvrllProject_Docs\P20\2020 PROPOSALS\MUNICIPAL\P20154 - Pasco PWRF RepaiADrilling - ASA11Fee Proposal Template - K a &d. -nm s.r.ca cuter Consultant Fee Determination - Drilling & Laboratory Testing Only PWRF Embankment Repair, Pasco, WA Shannon & Wilson - Geotechnical & Environmental Engineering Design Phase Services Vice President Sr. Associate 1 - Planning & Explorations Fieldwork 4 2 - Laboratory Testing 3 - Engineering 4. Report Preparation 5 -Plans 6 Speclficalions Review 6 - Meetings Total Staff Hours Hourly Rate Total Labor,Cost Subcontracted Services Drilling Direct Costs [production, Fedex. alel Mileage Gectechnlcal Laboratory Testing, unit pricing Sampling Supplies Notes: Please aee the proposal text for scope and assumptions. =111 SIiANNON&WLLSON.ING Associate Sc Professional Sr. Professional Sr. Professional Professional Prefesslonal Professional Prafesslanel Sr. Tech Svcs Sr. Office Svcs Office Svcs 111 Total 111 II I IV III II 1 CAD Clerical 16 _ _ _ _ 4 36 2 2 64 2 2 2 7 0 Total: $29,396 Rounded Total: $29,400 105755002,P PWRF Emb F,11—_EV16 Dag, Rp1.g9oe.r1YF S&W - GEGTECH MIQ020 0 _ _ 0 5 0 16 0 0 0 4 36 0 0 2 0 4 71 $265.00 $215.00 $195.00 $175.00 $155.00 $140.00 $130.00 $115.00 $105.00 $95.00 $125.00 $120.00 $75.00 $1,325 $0 $3,510 30 $0 $0 $520 $4,370 $0 $o $250 $0 $301) $10,275 Total labor $10,275 $15,395 Subcontracted Services Total: $15,365 $173 $3,565 $200 Direct Costs Total: $3,736 Total: $29,396 Rounded Total: $29,400 105755002,P PWRF Emb F,11—_EV16 Dag, Rp1.g9oe.r1YF S&W - GEGTECH MIQ020