PROFESSIONAL SERVICES AGREEMENT
Water Rights Change Applications
AGREEMENT NO. 20-025
WHEREAS, the City and Water Right Solutions, LLC entered into a Professional
Services Agreement on 7/21/2019 to provide engineering services with respect to the Water
Rights Change Applications project, and
WHEREAS, the scope of work for the Water Rights Change Applications includes
varying degrees of effort due to the number of irrigation wells involved and due to the
complexity of water -use records and place of use at each individual well, and
WHEREAS, the above referenced scope of work provides for a range of Water Rights
Change Applications to be processed, and
WHEREAS, the City is in need of additional water rights -related work; specifically the
preparation of a final Proof Report of Examinations for the north and south portions of water
rights Permit S3-28876P(A), and
WHEREAS, the level of effort for this additional water rights -related work is expected
not to exceed $2,000 and can be integrated with the Water Rights Change Applications scope of
work, and
WHEREAS, the total contract amount will not change.
NOW, THEREFORE, this agreement is amended to allow Water Right Solutions, LLC
to provide additional professional services as described on Exhibit A and extend the time of
performance.
Scone of Work:
See Exhibit A.
2. Fee:
The Contract amount remains at allot to Exceed $50,000.00.
3. Time ofperformance:
The time of performance is extended such that all services shall be complete on or
before 12/31/2021.
Amendment No. 1 to Professional Services Agreement Page 1
Water Rights Solutions, LLC
Water Rights Change Applications
DATED THIS DAY OF , 2020.
CITY OF PASCO:
CONSULTANT
- 0��4-a
Water Rot Solutions, LLC
Bill Neve, 4,�vner
Amendment No. ] to Professional Services Agreement Page 2
Water Rights Solutions, LLC
Water Rights Change Applications
EXHIBIT A
SCOPE OF WORK
WATER RIGHT PROOF REPORT - 53-28876(A)
CITY OF PASCO
NOVEMBER 733, 2020
wRs
WATER
SOLUTIONS, LLC
PURPOSE
Water Right Solutions, LLC (WRS) will complete the Proof of Appropriation Report of
Examination for purposes of obtaining a final water right certificate for S3-28876P(A). The
Report for the south portion of the property has been largely completed, but the remaining
portion —just east of Lowe's — remains to be finished. Water has not yet been put to full use on
these acres, and so the final report has yet to be completed. It is expected that the land will be
under full production and water put to full beneficial use for the 2021 irrigation season which
will allow establishing use of water for this portion and thus certification of the entire water
right.
SCOPE OF WORK
The primary tasks, together with time estimate are as follows:
1. Conduct on on-site field investigation documenting/confirming the irrigation system,
irrigated acres, and crops grown. Verify that permit provisions have been met.
2. Conduct an analysis of aerial and satellite photographs to delineate irrigated area within the
place of use of Permit S3-28876P(A).
3. Calculate estimated water use based on crops/acres grown, irrigation system, power records
and/or water meter records, if available.
4. Prepare a final Proof Report of Examinations, documenting findings and making
recommendations as to the attributes of a final water right certificate — this is to include both
the north and south portions of S3-28876P(A).
5. Provide a review copy to the landowner(s) for review and comment. Meet with staff to
discuss, answer questions, if necessary. Upon landowner authorization, submit to Ecology for
review.
6. Respond to questions/concerns from Ecology, provide any follow up information which may
be required.
COST ESTIMATE
The not to exceed cost estimate for this project is $2000. Unforeseen complications can extend
the hours necessary for completion of the project, should issues arise which could delay or