HomeMy WebLinkAboutPACE Engineers, Inc - Columbia East Lift Station & Forcemain - PSA Amendment No. 1 CP9-SR-2A-17-01 11.5.2018AMENDMENT NUMBER 1 to
PROFESSIONAL SERVICES AGREEMENT
17003 - COLUMBIA EAST LIFT STATION AND FORCE MAIN PROJECT
CONTRACT # CP9-SR-2A-17-01
WHEREAS, the City and PACE Engineers, Inc. entered into a Professional Services
Agreement on 5/31/2018 to provide engineering services with respect to the Columbia East Lift
Station and Force Main Project.
NOW, THEREFORE, this agreement is amended to allow PACE Engineers, Inc.to
provide 'additional engineering services as described on Exhibit A & B.
Scope of Work:
See Exhibit A — Construction Management Support
2. Fee:
The compensation for the work is based on a Time and Materials Basis not to exceed
the amount of $26,709.80 for a total authorization amount of $586,103.00. Refer to
Exhibit B for the breakdown of hours.
3. Time of performance:
The services shall be complete for the project on or before 12/31/2019.
DATED THIS 15TH DAY OF NOVEMBER, 2018.
CITY OF PASCO: PAC ENGINEERS, INC.:
Dave Z , ity Manager Rabin D. Nels'bn. P.E., Senior Principal Engineer
Amendment No. 1 to Professional Services Agreement Page 1
PACE Engineers, Inc.
17003 - Columbia East Lift Station and Force Main Project
Exhibit A City of Pasco
Construction Engineering Services
October 16, 2018
Robin Nelson, P.E.
City of Pasco
Columbia East Pump Station
Construction Engineering Services
Supplement
Scope of Work:
PACE was the design engineering of record for the recent Columbia East Pump Station
construction documents. The City of Pasco completed advertisement and award of the
project and has requested PACE's assistance during construction phase of the project.
The City has requested the following services during construction;
• Responding to RFIs,
• Review of submittals,
• Engineering site observations at specific milestones/components
• Observe Pump Station Start up
• Assist with Punchlist development
Project Tasks:
Task 1 — Construction Management
Task 1.1 — Construction Management
PACE anticipates a 180 working day duration for completion of the construction for the
pump station. Construction management will include the following:
• Responding to RFIs. To establish a budget for this task we estimate up to 15
RFIs.
• Shop drawing and submittal review and documentation. To establish a budget
for this task we estimate up to 25 submittals.
• Attending up to 3 on-site progress meetings with contractor and City at strategic
milestones to be determined by City staff.
• Observe pump station start up
• Complete final inspection walk thru and prepare list of work requiring completion
or correction.
Deliverables:
PACE will provide the following deliverables:
• Log and responses for up to 15 RFIs
• Log and responses for up to 25 Shop drawings and submittals
• 3 Observation reports
• Punch list for project substantial completion
End Scope of Work
1
Exhibit B
O
La
ca
Q
—.1
c
C)o
----
----
Lcmg
c,
-------
----
............. -------
-------
-
--
-------
q p
C;.
LcU-
LLJ S m
CO
-Fu Lu
(OD =0 >,
* o -
E 6,
ch
CD
0
—j cu c., 0 Lu 0
:5
0
-1-- 15 —(v L)
o o.o .0
45
a) a)
a) =
6
c2 ':D
C� OR
=32 [Li c9_ U)
...
21 a)
co
Va
COD
03
Ca
L
Ld
CL
6%
C>
CO
4t
64
CN 59. co
.................... 691
....................
....................
.80
ID
6 C,4
U,
uj
CD
...........
2f
C.0
63
.....................
I Ic
J2
a,
co
----
-------
O
CD
to
C%l
.................... ... C',
............ I'll
C-4co
L
uj
....................
co(D
amikID
Lu CL
0
......... . ..
CD
..................... . .......
go
E
.............. EL cl�
Z
A)
U)
..
..
..
.........
7
....
.......
....
.......
..............
.................... ..
.....
CD a
m tm
.................... B
Cl).............
co
co r -
Cc
0
(Dja
0 0.
—M
CD
P
LL
=
co
..... .....
.... ...........
o
a6
0
LU
OR
E>
C,
LU
U
Je
ma
)
=
:t_D
I _
3"a
w
W
U>
co
co
..........................................................
O
La
ca
Q
—.1
c
C)o
----
----
Lcmg
c,
-------
----
............. -------
-------
-
--
-------
q)
LcU-
LLJ S m
n- (D
-Fu Lu
(OD =0 >,
* o -
E 6,
ch
CD
0
—j cu c., 0 Lu 0
:5
0
-1-- 15 —(v L)
o o.o .0
45
a) a)
a) =
6
co
U) I
=32 [Li c9_ U)
21 a)
co
Va
COD
03
CL
CO
4t
cu
6 C,4
U,
uj
CD
C.0
63
J2
--
----
-------
to
C%l
C-4co
L
uj
co(D
O
La
ca
(D 1
C>l CD
—.1
c
C)o
Lcmg
c,
............. -------
cls
15
.LD
cD
q)
LcU-
LLJ S m
n- (D
-Fu Lu
(OD =0 >,
* o -
E 6,
ch
CD
0
—j cu c., 0 Lu 0
:5
0
-1-- 15 —(v L)
o o.o .0
45
a) a)
a) =
6
co
U) I
=32 [Li c9_ U)
O
La
ca
CR
CR
-C,
.0C,
E
.LD
C CL
------------------------- - --
---------------------- ---
--------------------------
----------- -------
n- (D
(OD =0 >,
ch
CD
rn0
%;
.2
2
LC)
to
co
Gt.
tq C)
12
21 a)
Va
COD
03
CL
CO
O
La
ca
CR
CR
-C,
.0C,
E
.LD
C CL
n- (D
(OD =0 >,
ch
CD
rn0
%;
.2
2
LC)
to
co
Gt.
tq C)
12
21 a)
Va
COD
03
CL
CO
cu
6 C,4
U,
uj
CD
C.0
63
J2
to
C%l
C-4co
L
uj
co(D
......... . ..
CD
E
Z
A)
7
>
CD a
m tm
7
co
co r -
Cc
0
(Dja
0 0.
—M
CD
P
LL
=
co
o
a6
0
LU
OR
E>
C,
LU
U
Je
ma
)
=
:t_D
I _
3"a
w
W
U>
co
co
0
n
A
co
co
-j
O
La
ca
CR
CR
-C,
.0C,
E
.LD
n- (D
(OD =0 >,
ch
CD
rn0
%;
CD
_0
Gt.
tq C)
12
21 a)
a-
.2
LL-