Loading...
HomeMy WebLinkAboutC&E Trenching, LLC - Foster Wells Force Main Change Order No. 11 (CP7-SR-14-19-00)CITY OF PASCO PUBLIC WORKS DEPARTMENT CONTRACT CHANGE ORDER NO. 11 Project No: CP7-SR-1A-19-00 Project Title: Foster Wells Forcemain Improvements Contractor: C&E Trenching, LLC Description of Change: RFC #15 - Credit to leave 10" meter as installed. Detail as Appropriate: Sub cost ($-1,485.00); Labor ($-4,945.85); Equipment ($-3,170. Material ($4,471.54); and Markup ($-2,510.35) Contract Bid Amount: SALES TAX @ 8.6%: Total: $ 4,390,989.00 $ 377,625.05 $ 4,768,614.05 PREVIOUS CHANGE ORDER CURRENT CHANGE ORDER Subtotal $ 188,414.23 Subtotal $ (16,582.71 Sales tax @ 8.6% $ 16,203.62 Sales tax @ 8.6% $ 1,426.11 Total $ 204,617.85 Total $ (18,008.82) Total Change Orders To Date $ 186,609.03 New Contract Amount $ 4,955,223.08 IS CONTRACT TIME AFFECTED BY THIS CHANGE ORDER YES NO Contract Time Prior to this Change Order ................................. 140 Modification to Contract time by this Change Order .................... 0 revised Total Contract Time .................................................... 140 It is mutually agreed by both parties that this Change Order fully describes the change(s) that is (are) being made and that the compensation for this Change Order is full and complete and is the only compensation due or owing for this Change Order. Further, it is mutually agreed that this document will supplement the present Contract Documents and that the provisions of the previously executed Contract Documents shall apply to this Change Order. AGREED TO AND ACCEPTED: APPROVED: 15�QE VTTI'W-4w;lD �' S -Q - ZOZo CONTRACTOR DateR�MANA ER Date APPROVED: MANAGER .. .. • C&E Trenching LLC PO Box 3788 Pasco, WA 99302 Phone: (509) 545-6940 Fax: (509) 545-8671 To: City of Pasco PO Box 293 Pasco, WA 99301 Project: Foster Wells Forcemain Improv. RFC No: 15 Date: 8/3/2020 Description: Credit to leave 10" meter as installed. Meter was installed directly between the 20 to 10 reducers with no RFCA's or 10" C900 pipe as drawings show. See quotes for details on material Sub cost $1,485.00 Labor $4,945.50, Equipment $3,170.32 Material $4,471.54 Markup $2,510.35 Cost reflects C&E's cost to repair it at this point. The above work is subject to the same conditions as specified in the original contract unless otherwise stipulated. Upon approval the sum of $-16,582.71will be added to the contract price. Original Contract $4,390,989.00 Other Approved Change Orders $188,414.23 Total Contract to Date $4,579,403.23 This Request $-16,582.71 Other Pending Requests $0.00 Total Contract plus Pending RFCs $4,562,820.52 Authorized Signature: c�� Date: 8-3-20 C&E Trenching LL(.' Authorized Signature: Date: