Loading...
HomeMy WebLinkAboutChervenell Construction Company - Fire Station 83 Construction Contract (CP5FR231983)AIA ORIGINAL Document A1 01 TM 2017 Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum AGREEMENT made as of the twenty-first day of February in the year Two Thousand and Twenty (In words, indicate day, month and year.) BETWEEN the Owner: (Name, legal status, address and other information) City of Pasco 525 North 3rd Ave Pasco, WA 99301 and the Contractor: (Name, legal status, address and other information) Chervenell Construction Company 7511 W. Arrowhead, Suite B Kennewick, WA 99336 for the following Project: (Name, location and detailed description) Satellite Fire Station 83 City of Pasco 7510 Sandifer Parkway Pasco, WA 99301 The Architect: (Name, legal status, address and other information) TCA Architecture Planning Inc. 6211 Roosevelt Way NE Seattle, WA 98115 The Owner and Contractor agree as follows. ADDITIONS AND DELETIONS: The author of this document has added information needed for its completion. The author may also have revised the text of the original AIA standard form. An Additions and Deletions Report that notes added information as well as revisions to the standard form text is available from the author and should be reviewed. A vertical line in the left margin of this document indicates where the author has added necessary information and where the author has added to or deleted from the original AIA text. This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification. The parties should complete A101 TM -2017, Exhibit A, Insurance and Bonds, contemporaneously with this Agreement. AIA Document A201 TA9-2017, General Conditions of the Contract for Construction, is adopted in this document by reference. Do not use with other general conditions unless this document is modified. AIA DocumentA101TM-2077. Copyright© 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997, 2007 and 2017 by The Init. American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be / prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 13:40:29 ET on 02/20/2020 under Order N0.6895345522 which expires on 10/03/2020, and is not for resale. User Notes: (959853634) (Table deleted) (Paragraph deleted) § 3.3.3 If the Contractor fails to achieve Substantial Completion as provided in this Section 3.3, liquidated damages, if any, shall be assessed as set forth in Section 4.5. ARTICLE 4 CONTRACT SUM § 4.1 The Owner shall pay the Contractor the Contract Sum in current funds for the Contractor's performance of the Contract. The Contract Sum shall be four million, three hundred fifty-six thousand, seven hundred fifty dollars ($ 4,356,750.00 ), subject to additions and deductions as provided in the Contract Documents. § 4.2 Alternates § 4.2.1 Alternates, if any, included in the Contract Sum: Item None Price § 4.2.2 Subject to the conditions noted below, the following alternates may be accepted by the Owner following execution of this Agreement. Upon acceptance, the Owner shall issue a Modification to this Agreement. (Insert below each alternate and the conditions that must be met for the Owner to accept the alternate.) Item Price Conditions for Acceptance None § 4.3 Allowances, if any, included in the Contract Sum: (Identify each allowance) Item Price Allowance No. 1: Exterior Signage $1,500.00 Allowance No. 2 Interior Signage $3,500.00 § 4.4 Unit prices, if any: (Identify the item and state the unit price and quantity limitations, if any, to which the unit price will be applicable) Item Unit Price 1: Units and Limitations Price per Unit ($0.00) Unsuitable Soils $12.00/bank cubic yard § 4.5 Liquidated damages, if any: (Insert terms and conditions for liquidated damages, if any.) Liquidated damages shall be in the amount of $1,070.00 per calendar day beyond the allowed contract time that substantial completion is not attained. § 4.6 Other: (Insert provisions for bonus or other incentives, if any, that might result in a change to the Contract Sum.) (Paragraphs deleted) ARTICLE 6 DISPUTE RESOLUTION § 6.1 Initial Decision Maker The Architect will serve as the Initial Decision Maker pursuant to Article 15 of AIA Document A201-2017, unless the parties appoint below another individual, not a party to this Agreement, to serve as the Initial Decision Maker. (If the parties mutually agree, insert the name, address and other contact information of the Initial Decision Maker, if other than the Architect.) AIA Document A101 TM —2017. Copyright© 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997, 2007 and 2017 by The Init American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyn_,.st Law and International Treaties. 3 Unauthorized reproduction or distribution of this AIA® Dc t. or any portion of it, may result in severe civil and criminal penalties, and will n t prosecuted to the maximum extent possible under the la This document was produced by AIA software at 13:40:29 ET on 02/20/2020 under Order No.6895345522 which expires on 10/03/2020, and is not for resale. User Notes: (959853634) .1 AIA Document Al01Tm-2017, Standard Form of Agreement Between Owner and Contractor .2 AIA Document A20lTM-2017, General Conditions of the Contract for Construction (Paragraph deleted) .3 The other Conditions of the Contract are those contained in the latest version of the Project Manual for Satellite Fire Station 83 and all documents reference therein together with all Addenda issued prior to the Bid Date. .5 Drawings (Row deleted) Title of Drawings Exhibit: Drawings as issued for Bid or modified by subsequent addenda. Refer to the sheet index on Drawing T1.1 issued forbid. .6 Specifications Specifications The Specifications are those contained in the Project Manual as described in Section 9.1.3 and below: Title of Specifications Exhibit: Specification Divisions 01 through 33 as included in the Project Manual issued for Bid or as modified by subsequent addenda. Refer to the Table of Contents found in the Project Manual issued for Bid. 7 Addenda, if any: Number Date Rages Addenda 1 01/17/2020 55 Addenda 2 01/24/2020 26 Addenda 3 02/03/2020 54 Portions of Addenda relating to bidding or proposal requirements are not part of the Contract Documents unless the bidding or proposal requirements are also enumerated in this Article 9. .8 Other Exhibits: (Check all boxes that apply and include appropriate information identijying the exhibit where required.) (Table deleted)(Paragraphs deleted) (Paragraphs deleted) .9 Other documents, if any, listed below: (List here any additional documents that are intended to form? part of the Contract Documents. AIA Document A20ITM-2017 provides that the advertisement or invitation to bid, Instructions to Bidders, sample forms, the Contractor's bid or proposal, portions of Addenda relating to bidding or proposal requirements, and other information furnished by the fawner in anticipation of receiving bids or proposals, are not part of the Contract Documents unless enumerated in this Agreement. Any such documents should be listed here only if intended to be part of the Contract Documents) This Agreement entered into as of the day and year first written above. 0 NE re) C TRACTOR Fn s Imo,,.. An -7k^--oI 1 r randon M name and title) , President (Printed name and title) AIA Document A101 TM — 2017. Copyright O 1915,1918,1925,1937,1951,1958,1961, 1963,1967,1974,1977,1987,1991,1997, 2007 and 2017 by The Inst. American institute of Architects. All rights reserved. WARNIW" • n--ont is pmf—t—f h� U.S. Copyright I ,d International Treaties. 5 .-$production or distribution of this AIA' Dc of it, severe civil an • l penalties, and will be t ., to the maximum extent possible under the WA This document was produced by AIA software at 13:40:29 ET on 02/2012020 under Order No.6895345522 which expires on 10/0312020, and is not for resale. User Notes: (959853634)