HomeMy WebLinkAboutC&E Trenching, LLC - Foster Wells Force Main - Change Orders 5 & 6 (CP7-SR-1A-19-00)Project No: CP7-SR-1 A-19-00 CIN OF PASCO PUBLIC WORKS DEPARTMENT CONTRACT CHANGE ORDER NO. 5 Contractor: C&E Trenching, LLC Project Title: Foster Wells Forcemain Improvements Description of Change: RFC 06 - Extend HDPE DR 11 Pipe Detail as Appropriate: RDC 06: Cost to extend 16" & 8" with DHPE R 11 pipe to reach the new tie-in point per RFI 17. Contract Bid Amount: $ 4,390,989.00 SALES TAX @ 8.6%: $ 377,625.05 Total: $ 4,768,614.05 PREVIOUS CHANGE ORDER CURRENT CHANGE ORDER Subtotal $ 94,911.92 Subtotal $ 14,123.94 Sales tax @ 8.6% $ 8,162.43 Sales tax @ 8.6% $ 1,214.66 Total $ 103,074.35 Total $ 15,338.60 Total Change Orders To Date $ 118,412.95 New Contract Amount $ 4,887,027.00 IS CONTRACT TIME AFFECTED BY THIS CHANGE ORDER Contract Time Prior to this Change Order ................................. Modification to Contract time by this Change Order .................... revised Total Contract Time .................................................... YES NO 128 2 130 It is mutually agreed by both parties that this Change Order fully describes the change(s) that is (are) being made and that the compensation for this Change Order is full and complete and is the only compensation due or owing for this Change Order. Further, it is mutually agreed that this document will supplement the present Contract Documents and that the provisions of the previously executed Contract Documents shall apply to this Change Order. AGREED TO AND ACCEPTED: APPROVED: Com= 12-31-19 CONTRACTOR Date P OJECT MANAGER Date APPROVED: t ✓. Z -/07 ,MANAGER Dade APPROVED: Date Date WREfrT6R C&E Trenching LLC PO Box 3788 Pasco, WA 99302 Phone: (509) 545-6940 Fax: (509) 545-8671 �iJ ziIJ:JZ Jr:1law r To: City of Pasco PO Box 293 Pasco, WA 99301 Project: Foster Wells Forcemain Improv. RFC No: 06 Date: 10/17/2019 Description: Cost to extend 16" & 8" with HDPE DR I 1 pipe to reach the new tie in point per RFI 17. SS pipe alone no welding, excavation, labor or equipment is $22,227.00 Plan to extend into ground off of manifold, 90 then flange SS, connect HDPE via flange, extend to new location, flange back to SS via flange, SS 90 and flange to connect to valve. (S S 90 's is already fabbed) Update plan may be to go HDPE all the way to the valve as we are short one SS Flange. Labor $ 3,619.85 Equipment 2,577.52 Material $5,743.68 Mark up $2,577.52 Credit portion of RFI 17 coming seperate once we get paper work on the credit from supplier. Need to get material ordered asap for this extension. Please add 2 days to the contract for this change. The above work is subject to the same conditions as specified in the original contract unless otherwise stipulated. Upon approval the sum of $14,123.94will be added to the contract price. Original Contract $4,390,989.00 Other Approved Change Orders $80,404.67 Total Contract to Date $4,471,393.67 This Request $14,123.94 Other Pending Requests $0.00 Total Contract plus Pending RFCs $4,485,517.61 Project No CP7-SR-1 A-19-00 CITY OF PASCO PUBLIC WORKS DEPARTMENT CONTRACT CHANGE ORDER NO.6 Project Title: Foster Wells Forcemain Improvements Contractor: C&E Trenching, LLC Description of Change: RFC 09 - Heat Tape Detail as Appropriate: RFC 09 - Add heat tape to Pump Station end above ground pipe & PWRF 30" above ground pipe. Contract Bid Amount: $ 4,390,989.00 SALES TAX @ 8.6%: $ 377,625.05 Total: $ 4,768,614.05 PREVIOUS CHANGE ORDER CURRENT CHANGE ORDER Subtotal $ 109,035.86 Subtotal $ 9,898.98 Sales tax @ 8.6% $ 9,377.08 Sales tax @ 8.6% $ 851.31 Total $ 118,412.94 Total $ 10,750.29 Total Change Orders To Date $ 129,163.23 New Contract Amount IS CONTRACT TIME AFFECTED BY THIS CHANGE ORDER Contract Time Prior to this Change Order ................................. Modification to Contract time by this Change Order .................... revised Total Contract Time .................................................... $ 4,897,777.28 YES NO 130 0 130 It is mutually agreed by both parties that this Change Order fully describes the change(s) that is (are) being made and that the compensation for this Change Order is full and complete and is the only compensation due or owing for this Change Order. Further, it is mutually agreed that this document will supplement the present Contract Documents and that the provisions of the previously executed Contract Documents shall apply to this Change Order. AGREED TO AND ACCEPTED: (� (t) 12/31/19 CONTRACTOR 41 Date APPROVED: CONST. MANAGER Date APPROVED: PROJECT MANAGER Date Date M4 -0U AAqEJ2— C&E Trenching LLC PO Box 3788 Pasco, WA 99302 Phone: (509) 545-6940 Fax: (509) 545-8671 J �� 4� i �-� �• r T r r 1J To: City of Pasco PO Box 293 Pasco, WA 99301 Project: Foster Wells Forcemain Improv. RFC No: 09 Date: 12/12/2019 Description: Cost to add heat tape to Foster Wells pump station end above ground pipe, and PWRF 30" above ground pipe. See LBS quote for details. Option cost of $1,400.00(with markup) to add Thermostats Sub cost $8,425.20 Markup $1,473.78 The above work is subject to the same conditions as specified in the original contract unless otherwise stipulated. Upon approval the sum of $9,898.98will be added to the contract price. Original Contract $4,390,989.00 Other Approved Change Orders $109,035.86 Total Contract to Date $4,500,024.86 This Request $9,898.98 Other Pending Requests $0.00 Total Contract plus Pending RFCs $4,509,923.84 Authorized Signature: Authorized Signature: C&E Trenching LLC City of Pasco Date: Date: