HomeMy WebLinkAboutRH2 Engineering, Inc - Update City's Potable Water & Irrigation Models - Task Order 2019-1 (Agreement # 19016)ORIGINAL_LPAGE NO _L OF _LPAGES
TASK ORDER NO. 1 ----
REGARDING GENERAL AGREEMENT BETWEEN CITY OF PASCO
AND
RH2 ENGINEERING, INC.
Project Description:
The objective of this project is to update the City's potable water and irrigation models to reflect
extensions made to each system that have occurred since each model was last updated.
Scope of Services:
See attached Exhibit A
Time of Pcrformanc ... :
RH2 will start thi s work upon receipt of a signed task authorization. Primary model updates will be completed
within four (4) weeks of receipt of City GIS shape files. Final model updates will be completed within eight (8) week:
of receipt of all record drawings.
l?ee for Sen ices: ·
Services will be performed using the 2019 hourly rates in Agreement No. 19016, not to exceed $16,468.
Proposed:
RH2 Engineering, Inc.
Paul ut·
Approved:
Professional Services Agreement-RH2 Engineering, Inc.
On-Call Municipal Engineering Services
g .zs.10
Date
Agreement No. 19016
Background
EXHIBIT A
Scope of Work
City of Pasco
Task Authorization No. 1
2019 Water and Irrigation Model Updates
September 2019
ORIGINAL .l_PAGE NO .....L_ OF _LPAGES
The potable water and irrigation system models for the City of Pasco (City) were last updated several
years ago and do not reflect the current distribution systems attributed to the substantial growth
that has occurred in the interim. Under a separate contract (No. 19038), RH2 Engineering, Inc., (RH2)
has been asked to prepare an addendum to the City's Comprehensive Sewer Plan (CSP), with its
identified subtask of updating the sewer model, as well as updating the City's water and irrigation
system models.
All three model updates require incorporation of City GIS mapping that has occurred since the last
model updates . Collectively, it is known that many additional plats and extensions to all three
systems have occurred that are not yet included in the City GIS mapping. RH2 will be reviewing
electronic record drawings of the additional plats and extensions and manually entering the line
extensions and attributes into the sewer model as part of the CSP contract. Significant efficiency is
gained by using that time spent to identify and orient each plat during the sewer model update to
also update the water and irrigation models.
Once all three models are updated to reflect the expansion of each system that has taken place, they
will become significantly more valuable tools for the City to measure and assess the impact of both
current and future developments on the core infrastructure and level of service to its customers.
Task 1 -Water and Irrigation Model Updates
Objective: Identify changes that have occurred to the potable water and irrigation systems since the
last model updates and add the pipeline extensions to each model attributing the size, age, material
type, and services adjoining each node.
Approach:
1.1 Compare the water and irrigation models in WaterGEMS to the expanded service areas and
urban growth area (UGA) boundaries of the City.
1.2 Compare City water and irrigation system maps in the City's GIS files to each model.
1.3 Import shape files and attributes for extensions shown in GIS that are not currently in the
models into each model.
1.4 Review electronic record drawings of plats with water and irrigation extensions that are not yet
included in the City GIS maps.
1
8/27/2019 4 :17:17 PM J:\DATA\PSC\719-050\00 CONTRACT\TA·l\TASKAUTH_NO.l_SOW_2019 WATER AND I RRIGATION MODEL UPDATES.DOCX
City of Pasco -Task Authorization No. 1
2019 Water and Irrigation Model Update
ORIGIN.AJ...l_PAGENO_J_OF.2_PAGES
Exhibit A
Scope of Work
1.5 Manually draw and attribute up to fifty (SO) plat extensions shown in record drawings into each
model.
1.6 Populate demands from service connections into adjacent model nodes and check model runs
for errors.
Assumptions:
• The number of plats and extensions that are not currently included in the City GIS maps is not
known. It is estimated that no more than fifty (50) plats will be reviewed, manually drawn,
and attributed into both the water and irrigation system models.
• It is assumed that the City has electronic PDF record drawings of all completed extensions and
PDF design drawings of all extensions currently under construction.
• It is assumed that all plats and extensions are referenced to the NAO 83/NA VD 88 coordinate
and elevation system.
• RH2 can rely upon the City GIS maps, records, and design drawings provided by the City as
being reflective of the actual irrigation and water system extension with regard to location,
material size, material type, and points of connection to adjoining distribution lines.
• If more than fifty (50) plats and extensions of both the potable water and irrigation systems
are identified, RH2 will renegotiate the Fee Estimate based upon the actual time to add each
plat and the additional number of plats identified.
• Both models will be retained by RH2 for use on City projects, but the updated models will be
copied and returned to the City upon request.
Provided by the City:
• GIS shape files for water and irrigation systems with attributes for pipe size, age, and material
type .
• Record drawings of as -built water and irrigation line extensions of plats not yet included in
the City GIS mapping, together with other record drawings as needed to reconcile
discrepancies between the existing or updated models and the City GIS.
RH2 Deliverables:
• Figures and shape files of existing and updated models in electronic and PDF format.
Schedule
RH2 will start this work upon receipt of a signed task authorization. Primary model updates will be
completed within four (4) weeks of receipt of City GIS shape files. Final model updates will be
completed within eight (8) weeks of receipt of all record drawings.
Future Tasks
The City may want to perform hydraulic modeling of existing or future development from time to
time to assess level of service or impacts of new development. RH2 does not work for developers in
2
8/27/2019 4:17:17 PM J:\OATA\PSC\719-050\00 CONTRACT\TA-l\TASKAUTH_NO.l _SOW_2019 WATER ANO IRRIGATION MODEL UPDATES.DOCX
City of Pasco -Task Authorization No. 1
2019 Water and Irrigation Model Update
ORIGINAL ..l_PAGE NO~ OF --2..._PAGES
Exhibit A
Scope of Work
the Pasco service area and will represent the City when contracted to do so to run scenarios in the
model as desired by the City.
The City may want RH2 to perform similar updates to the water, sewer, and irrigation models in the
future. It is recommended that updates occur at least annually to each model to keep them current
and minimize future updated efforts.
3
8/27/2019 4:17:17 PM J:\DATA\PSC\719-050\00 CDNTRACT\TA·l\TASKAUTH_NO.l_SOW_2019 WATER AND IRRIGATION MODEL UPDATES.DOCX
EXHIBIT B
Fee Estimate
City of Pasco -Task Authorization No. 1
2019 Water and Irrigation Model Update
Sep-19
ORIGINAL 2 PAGE NO _i_ OF -2.J'AGES
Description Total
Hours Total Labor Total Subconsultant Total Expense Total Cost
Classlficatlon
Task 1 Water and lrrieatlon Model Uodates I 92 s 13 679 s s 2,789 I S 16,468
1.1 Comoare each water and irrigation model in Wa terGEM S to service areas anc:1 5 s 882 s s 132 1 S 1,014
1.2 Comaare City water a nd irri2at ion SV!i.lem maos in GIS to each model 8 s 1,312 s s 253 s 1,565
1.3 lmoort shaoe files and attributes for extensions shown in GIS into each mode 8 _ 2.-1,174 s s 249 s 1423
1 .4 Review elect ronic reco rd drawings of plats w ith water an d irrigation ex~ -13_ ,...L ~ s s 377 s 2 24 1
1 .5 M anually draw and attribut e up to SO ~lat extensions Into each model 53 s 7,6 11 s s 1648 s -~
~6 Populate demands and check model runs for errors 5 s 836 s s ~~$ 967
PROJECT TOTAL 92 I s 13,679 ! $ -Is 2,789 ! $ 16,468 j
\\th2.com\dl1\RK:nlancfl0all\PSC\719-050'00 Coolrael\T A·1\T11Muth_No.1_FEE_2010 Watet a nd IMQl!ton Model UpdalN.MISW: &'27/2019 •:16 PM