Loading...
HomeMy WebLinkAbout2019.09.09 Council Workshop PacketWorkshop Meeting AGENDA PASCO CITY COUNCIL 7:00 p.m. September 9, 2019 Page 1. CALL TO ORDER: 2. ROLL CALL: (a) Pledge of Allegiance 3. VERBAL REPORTS FROM COUNCILMEMBERS: 4. ITEMS FOR DISCUSSION: 3 - 120 (a) Capital Improvement Plan (CIP) 2020-2025 121 - 134 (b) Interlocal Agreements - Columbia Basin College & Port of Pasco for Argent Road Project 135 - 143 (c) Code Amendment: Maximum Dwelling Height in R-3 & R-4 Zones 144 - 152 (d) Pasco City Hall Renovation Progress and Cost Update 5. MISCELLANEOUS COUNCIL DISCUSSION: 6. EXECUTIVE SESSION: 7. ADJOURNMENT. REMINDERS: • Thursday, September 12, 7:00 - 8:00 PM: Ben-Franklin Transit Board - Transit Facility (Mayor Watkins, Rep; Councilmember Alvarado, Alt.) This meeting is broadcast live on PSC-TV Channel 191 on Charter Cable and streamed at www.pasco-wa.gov/psctvlive. Audio equipment available for the hearing impaired; contact the Clerk for assistance. Spanish language interpreter service may be provided upon request. Please provide two business day's notice to the City Clerk to ensure availability. (Servicio de intérprete puede estar disponible con aviso. Por favor avisa la Secretaria Municipal Page 1 of 152 Workshop Meeting September 9, 2019 dos días antes para garantizar la disponibilidad.) Page 2 of 152 AGENDA REPORT FOR: City Council September 6, 2019 TO: Dave Zabell, City Manager Workshop Meeting: 9/9/19 FROM: Richa Sigdel, Director Finance SUBJECT: Capital Improvement Plan (CIP) 2020-2025 I. REFERENCE(S): Proposed CIP Project Sheets II. ACTION REQUESTED OF COUNCIL / STAFF RECOMMENDATIONS: Discussion III. FISCAL IMPACT: NA IV. HISTORY AND FACTS BRIEF: A Capital Improvement Plan (CIP) identifies various capital projects expected to be undertaken each year and the method of financing for each and is essential for effective financial and capital planning for the City. The plan is fiscally constrained, meaning that in projects slated to be completed earlier the planning horizon could be accomplished with the funds reasonably expected to be available. Execution of CIP projects, particularly in the outward years, are reliant on anticipated grants, bonds, which will in part require rate adjustments, or other factors as discussed in the Plan. Approval of the CIP itself does not bind the City Council to future actions. City Council is being presented with the project sheets for review and will be presented with a proposed CIP during the Workshop meeting. V. DISCUSSION: Page 3 of 152 2020-2025 Capital Improvement Plan - Page 1 of 117 Page 4 of 152 2020‐2025 Capital Improvement Plan Fire Station 83 Replacement Status Department Group Assessment Principal Need Funding Status Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design 274            49                  225           ‐                ‐                 ‐                 ‐                 ‐                 ‐                 ‐                      Land & Right‐of‐Way ‐                 ‐                      ‐                  ‐                ‐                 ‐                 ‐                 ‐                 ‐                 ‐                      Construction 5,695         ‐                     1,255        4,440        ‐                 ‐                 ‐                 ‐                 ‐                 4,440             Other ‐                 ‐                      ‐                  ‐                ‐                 ‐                 ‐                 ‐                 ‐                 ‐                      Total Expenditures 5,969         49                  1,480        4,440        ‐                 ‐                 ‐                 ‐                 ‐                 4,440             Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Capital Improvement Fund REET 1 274            49                  225           ‐                ‐                 ‐                 ‐                 ‐                 ‐                 ‐                      LTGO Bond 4,945         ‐                     505           4,440        ‐                 ‐                 ‐                 ‐                 ‐                 4,440             Sale of Assets 750            ‐                     750           ‐                ‐                 ‐                 ‐                 ‐                 ‐                 ‐                      ‐                 ‐                      ‐                  ‐                ‐                 ‐                 ‐                 ‐                 ‐                 ‐                      ‐                 ‐                      ‐                  ‐                ‐                 ‐                 ‐                 ‐                 ‐                 ‐                      Total Funding 5,969         49                  1,480        4,440        ‐                 ‐                 ‐                 ‐                 ‐                 4,440             Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                 ‐                      ‐                  ‐                ‐                 ‐                 ‐                 ‐                 ‐                 ‐                      Expenses ‐                 ‐                      ‐                  ‐                ‐                 ‐                 ‐                 ‐                 ‐                 ‐                      Net Impact ‐                 ‐                      ‐                  ‐                ‐                 ‐                 ‐                 ‐                 ‐                 ‐                      Fire Station 83 Replacement PICTURE Project Number ‐ 18001 Ongoing Fire Fire Necessary PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT Public Safety Fully Funded Justification Summary Project Description This project includes the relocation and construction of Fire Station 83. The current station location does not allow response times to meet current target times with  the new growth experienced within the City's urban growth boundary (UGB). The relocation of the station to the proposed location will maintain the current service  demand inside the Pasco UGB to within six minutes or less travel time of a staffed station. The Fire Department Master Plan identified the requirement to  relocate the station to match current staffing requirements  (apparatus and personnel). This meets the Council Goal of: Community Safety 2020-2025 Capital Improvement Plan - Page 2 of 117 Page 5 of 152 2020‐2025 Capital Improvement Plan Fire Station 84 Replacement Status Department Group Assessment Principal Need Funding Status Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design 371                46                   325           ‐                 ‐                 ‐               ‐                ‐                 ‐                ‐                       Land & Right‐of‐Way ‐                     ‐                       ‐                 ‐                 ‐                 ‐               ‐                ‐                 ‐                ‐                       Construction 12,305          ‐                       ‐                12,305     ‐                 ‐               ‐                ‐                 ‐                12,305             Other ‐                     ‐                       ‐                 ‐                 ‐                 ‐               ‐               ‐                 ‐                ‐                       Total Expenditures 12,676          46                   325           12,305     ‐                 ‐               ‐                ‐                 ‐                12,305             Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Capital Improvement Fund REET 1 371                46                   325           ‐                 ‐                 ‐               ‐                ‐                 ‐                ‐                       LTGO Bond 12,305          ‐                       ‐                12,305     ‐                 ‐               ‐                ‐                 ‐                12,305             ‐                     ‐                       ‐                 ‐                 ‐                 ‐               ‐                ‐                 ‐                ‐                       ‐                     ‐                       ‐                 ‐                ‐                 ‐               ‐                ‐                 ‐                ‐                       ‐                     ‐                       ‐                 ‐                 ‐                 ‐               ‐                ‐                 ‐                ‐                       Total Funding 12,676          46                   325           12,305     ‐                 ‐               ‐                ‐                 ‐                12,305             Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                     ‐                       ‐                 ‐                 ‐                 ‐               ‐                ‐                 ‐                ‐                       Expenses ‐                     ‐                       ‐                 ‐                 ‐                 ‐               ‐                ‐                 ‐                ‐                       Net Impact ‐                     ‐                       ‐                 ‐                 ‐                 ‐               ‐                ‐                 ‐                ‐                       Fire Station 84 Replacement Project Number ‐ 18002 Ongoing Fire Fire Necessary PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT Public Safety Fully Funded Justification Summary Project Description This project includes the relocation and construction of Fire Station 84, which was acquired as part of an asset transfer due to annexation of land. The current  station does not provide for good crew quarters and apparatus access. The current station was not designed with an attached crew quarter, training room, or the  ability to house modern fire apparatus. The replacement will also address additional training and community rooms, as well as additional administrative office space  to facilitate growth along with the community.  The Fire Department Master Plan identified the requirement to  relocate the station to match current staffing requirements  (apparatus and personnel). This meets the Council Goal of: Community Safety 2020-2025 Capital Improvement Plan - Page 3 of 117 Page 6 of 152 2020‐2025 Capital Improvement Plan Fire Station 86 Property Purchase Status Department Group Assessment Principal Need Funding Status Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Land & Right‐of‐Way 500                 ‐                        ‐                 ‐                 ‐                 ‐                 500            ‐                 ‐                 500                  Construction ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Other ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Total Expenditures 500                 ‐                        ‐                 ‐                 ‐                 ‐                 500            ‐                 ‐                 500                  Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 General Fund 500                 ‐                        ‐                 ‐                 ‐                 ‐                 500            ‐                 ‐                 500                  ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Total Funding 500                 ‐                        ‐                 ‐                 ‐                 ‐                 500            ‐                 ‐                 500                  Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Expenses ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Net Impact ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT Public Safety Fully Funded Justification Summary Project Description As the community continues to grow, it will become more difficult and expensive to secure property for fire stations. As soon as suitable locations can be  identified, Council should attempt to purchase property for future fire stations. Meeting Council's 6‐minute Fire travel time goal. Maintain WSRB Protection Class 3. This meets the Council Goal of: Community Safety Fire Station 86 Property Purchase Project Number ‐ 20044 New Fire Fire Desirable 2020-2025 Capital Improvement Plan - Page 4 of 117 Page 7 of 152 2020‐2025 Capital Improvement Plan Fire Station 87 Property Purchase Status Department Group Assessment Principal Need Funding Status Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design ‐                       ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Land & Right‐of‐Way 500                 ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 500            ‐                 500                  Construction ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Other ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Total Expenditures 500                 ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 500            ‐                 500                  Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 General Fund 500                 ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 500            ‐                 500                  ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Total Funding 500                 ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 500            ‐                 500                  Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Expenses ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Net Impact ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT Public Safety Fully Funded Justification Summary Project Description As the community continues to grow, it will become more difficult and expensive to secure property for fire stations. As soon as suitable locations can be  identified, Council should attempt to purchase property for future fire stations. Meeting Council's 6‐minute Fire travel time goal. Maintain WSRB Protection Class 3. This meets the Council Goal of: Community Safety Fire Station 87 Property Purchase Project Number ‐ 20045 New Fire Fire Desirable 2020-2025 Capital Improvement Plan - Page 5 of 117 Page 8 of 152 2020‐2025 Capital Improvement Plan Fire Station 85 Addition  Status Department Group Assessment Principal Need Funding Status Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design 2                    2                    ‐                   ‐              ‐                 ‐               ‐              ‐                 ‐                  ‐                     Land & Right‐of‐Way 300                ‐                     300             ‐              ‐                 ‐               ‐              ‐                 ‐                  ‐                     Construction 8,000            ‐                     ‐                  8,000        ‐               ‐              ‐                 ‐                  8,000             Other ‐                     ‐                     ‐                   ‐              ‐                 ‐               ‐              ‐                 ‐                  ‐                     Total Expenditures 8,302            2                    300             ‐             8,000        ‐               ‐              ‐                 ‐                  8,000            Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Capital Improvement REET 2 302                2                    300             ‐              ‐                 ‐               ‐              ‐                 ‐                   Unsecured Revenue Bond 8,000            ‐                     ‐                   ‐             8,000        ‐               ‐              ‐                 ‐                  8,000             ‐                     ‐                     ‐                   ‐              ‐                 ‐               ‐              ‐                 ‐                  ‐                     ‐                     ‐                     ‐                   ‐              ‐                 ‐               ‐              ‐                 ‐                  ‐                     ‐                     ‐                     ‐                   ‐              ‐                 ‐               ‐              ‐                 ‐                  ‐                     Total Funding 8,302            2                    300             ‐             8,000        ‐               ‐              ‐                 ‐                  8,000            Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                     ‐                     ‐                   ‐              ‐                 ‐               ‐              ‐                 ‐                  ‐                     Expenses 6,400            ‐                     ‐                   ‐             1,000        900         900         1,600         2,000         6,400             Net Impact 6,400            ‐                     ‐                   ‐             1,000        900         900         1,600         2,000         6,400             PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT Public Safety Partially Funded Justification Summary Project Description This project will construct a Fire station on Road 100 on property purchased in 2019. This station will primarily serve the area south of Interstate182 and west  of Road 76. It will be second on call in the areas of Stations 83 and 84 when those stations are on other calls. As the City expands, adding additional stations on  the west and north sides of the City will be critical to maintaining travel times and the Washington Surveying and Rating Bureau (WSRB) rating. Meeting Council's 6‐minute Fire travel time goal. Maintain the Washington Surveying and Rating Bureau  (WSRB) Protection Class 3. This meets the Council Goal of: Community Safety Fire Station 85 Addition PICTURE Project Number ‐ 19003 New Fire Fire Necessary 2020-2025 Capital Improvement Plan - Page 6 of 117 Page 9 of 152 2020‐2025 Capital Improvement Plan Training Center Car Prop Status Department Group Assessment Principal Need Funding Status Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Flammable Car Prop 23                  ‐                       ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 23              23                    ‐                     ‐                       ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                     ‐                       ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                     ‐                       ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Total Expenditures 23                  ‐                       ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 23              23                    Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Unsecured Funding 23                  ‐                       ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 23              23                    ‐                     ‐                       ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                     ‐                       ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                     ‐                       ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                     ‐                       ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Total Funding 23                  ‐                       ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 23              23                    Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                     ‐                       ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Expenses ‐                     ‐                       ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Net Impact ‐                     ‐                       ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Training Center Car Prop PICTURE Project Number ‐ 20005 New Fire Fire Necessary Maintain WSRB Protection Class 3 by helping meet  training requirements. Meet demands of a growing City with high level of  qualified firefighters tasked with a variety of  emergency situations. Firefighter Safety and Health PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT Public Safety Not Funded Justification Summary Project Description In 2017, a Strategic Plan for the Pasco Fire Department was initiated to develop a training center for the Fire Department and it's consortium members. These  features would bring valuable assets to the training ground.  This car prop would prepare personnel to extinguish car fires. 2020-2025 Capital Improvement Plan - Page 7 of 117 Page 10 of 152 2020‐2025 Capital Improvement Plan Training Center Improvements  Status Department Group Assessment Principal Need Funding Status Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Gear Washer/Dryer 14                  ‐                         ‐                  ‐                 14             ‐                 ‐                  ‐                 ‐                 14                    2 Box Fire System 128                ‐                         ‐                  ‐                  ‐                128           ‐                  ‐                 ‐                 128                  Rescue Systems 1 Props 30                  ‐                         ‐                  ‐                  ‐                 ‐                30              ‐                 ‐                 30                    Asphalt 50'x50'7                     ‐                         ‐                 ‐                  ‐                 ‐                 ‐                 7               ‐                 7                      Total Expenditures 179                ‐                         ‐                  ‐                 14             128           30              7               ‐                 179                  Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Unsecured Funding 179                ‐                         ‐                  ‐                 14             128           30              7               ‐                 179                  ‐                      ‐                         ‐                  ‐                  ‐                 ‐                 ‐                  ‐                 ‐                 ‐                       ‐                      ‐                         ‐                  ‐                  ‐                 ‐                 ‐                  ‐                 ‐                 ‐                       ‐                      ‐                         ‐                 ‐                  ‐                 ‐                 ‐                  ‐                 ‐                 ‐                       ‐                      ‐                         ‐                  ‐                  ‐                 ‐                 ‐                  ‐                 ‐                 ‐                       Total Funding 179                ‐                         ‐                  ‐                 14             128           30              7               ‐                 179                  Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                      ‐                         ‐                  ‐                  ‐                 ‐                 ‐                  ‐                 ‐                 ‐                       Expenses ‐                      ‐                         ‐                  ‐                  ‐                 ‐                 ‐                  ‐                 ‐                 ‐                       Net Impact ‐                      ‐                         ‐                  ‐                  ‐                 ‐                 ‐                  ‐                 ‐                 ‐                       Training Center Improvements  Project Number ‐ 20004 New Fire Fire Necessary Maintain WSRB Protection Class 3 by helping meet training  requirements. Meet demands of a growing City with high level of  qualified firefighters tasked with a variety of emergency  situations. Firefighter Safety and Health Raise the basic skill level of the entire workforce. Rescue Systems 1 capabilities would promote joint training  PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT Public Safety Not Funded Justification Summary Project Description In 2017 a strategic plan for the Pasco Fire Department was initiated to develop a training center for the Pasco Fire Department and it's consortium members.  These features would bring valuable assets to the training ground. The gear washer and dryer would support the Healthy In, Healthy Out program and benefit  overall healthy and safety of the work force, especially with presumptive illness legislation. The machines would decrease overall exposure to products of  combustion as a result of training. Station 81 would also utilize the cleaning systems. The 2 Box Fire System would assist with fire behavior labs, support fire  academies, assist with instructor development, and has a possibility of generating revenue from outside agencies. Rescue Systems 1 capabilities will better  prepare personnel to the many hazards that the Pasco Fire Department may encounter in a urban and rural environment.  2020-2025 Capital Improvement Plan - Page 8 of 117 Page 11 of 152 General 2020-2025 Capital Improvement Plan - Page 9 of 117 Page 12 of 152 2020‐2025 Capital Improvement Plan Animal Shelter  Status Department Group Assessment Principal Need Funding Status Quality of Life 2018 Facility Plan Specific goal of completing new Animal Shelter  Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design 217                  187                  30               ‐                    ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Land & Right‐of‐Way ‐                        ‐                        ‐                  ‐                    ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Construction 4,800              ‐                        ‐                  4,800          ‐                   ‐                   ‐                   ‐                   ‐                  4,800               Other ‐                       ‐                        ‐                  ‐                    ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Total Expenditures 5,017              187                  30              4,800          ‐                   ‐                   ‐                   ‐                   ‐                  4,800               Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Capital Improvement REET 273                    63                    10               ‐                    ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        City of Kennewick Contribution 1,672              62                    10               1,600          ‐                  ‐                   ‐                   ‐                   ‐                  1,600               City of Richland Contribution 1,672              62                    10               1,600          ‐                   ‐                   ‐                   ‐                   ‐                  1,600               Future LTGO Bond 1,600              ‐                        ‐                  1,600          ‐                   ‐                   ‐                   ‐                   ‐                  1,600               ‐                       ‐                        ‐                  ‐                    ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Total Funding 5,017              187                  30              4,800          ‐                   ‐                   ‐                   ‐                   ‐                  4,800               Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                       ‐                        ‐                  ‐                    ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Expenses ‐                       ‐                        ‐                  ‐                    ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Net Impact ‐                       ‐                        ‐                  ‐                    ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT Growth Fully Funded Justification This meets the Council Goal of: Summary Project Description This project will replace the current Animal Control Facility which has reached the end of its lifespan. The new facility will meet new standards for animal care and provide a  modern facility for Pasco, Richland, and Kennewick. This is a group project with funding coming from all three cities.  Animal Shelter  PICTURE Project Number ‐ 18004 Ongoing ACS General Necessary 2020-2025 Capital Improvement Plan - Page 10 of 117 Page 13 of 152 2020‐2025 Capital Improvement Plan Animal Shelter ‐ Little League Parking Lot  Status Department Group Assessment Principal Need Funding Status Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design 15                   ‐                       15              ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Land & Right‐of‐Way ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Construction 600                 ‐                        ‐                 600            ‐                 ‐                 ‐                 ‐                 ‐                 600                  Other ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Total Expenditures 615                 ‐                       15              600            ‐                 ‐                 ‐                 ‐                 ‐                 600                  Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Park Development  Zone 1 615                 ‐                       15              600            ‐                 ‐                 ‐                 ‐                 ‐                 600                  ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Total Funding 615                 ‐                       15              600            ‐                 ‐                 ‐                 ‐                 ‐                 600                  Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Expenses 54                   ‐                        ‐                 ‐                 10              10              11              11              12              54                    Net Impact 54                   ‐                        ‐                 ‐                 10              10              11              11              12              54                    OPERATING IMPACT ANNUAL OPERATING IMPACT PROJECT SCOPE ANNUAL ALLOCATION The chosen location for the new animal shelter is on the shared parking lot for the Pasco Little League facility. Through discussion with the Pasco Little League, it was  determined that a shared parking lot will accommodate both the little league and animal shelter demands. Staff also contends that parking and sidewalk  improvements will enhance the aesthetic view corridor along A Street as well as ensure that a public project meets the development standard that the City requires of  the private sector. This will be funded by the Pasco Park Development Fund. Animal Shelter ‐ Little League Parking Lot  PICTUREFully Funded Justification This meets the Council Goal of: Summary Project Description Project Number ‐ 20001 New ACS General Necessary Quality Improvement 2020-2025 Capital Improvement Plan - Page 11 of 117 Page 14 of 152 2020‐2025 Capital Improvement Plan Gesa Stadium Status Department Group Assessment Principal Need Funding Status Quality of Life  Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design ‐                       ‐                       ‐                  ‐                    ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Land & Right‐of‐Way ‐                       ‐                       ‐                  ‐                    ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Construction 2,000             ‐                      1,000         1,000          ‐                  ‐                  ‐                  ‐                  ‐                 1,000              Other ‐                       ‐                       ‐                  ‐                    ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Total Expenditures 2,000             ‐                      1,000         1,000          ‐                  ‐                  ‐                  ‐                  ‐                 1,000              Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Future Bond 2,000             ‐                      1,000         1,000          ‐                  ‐                  ‐                  ‐                  ‐                 1,000              ‐                      ‐                      ‐                  ‐                    ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       ‐                      ‐                      ‐                  ‐                    ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       ‐                      ‐                      ‐                  ‐                    ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       ‐                      ‐                      ‐                  ‐                    ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Total Funding 2,000             ‐                      1,000         1,000          ‐                  ‐                  ‐                  ‐                  ‐                 1,000              Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                      ‐                      ‐                  ‐                    ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Expenses ‐                      ‐                      ‐                  ‐                    ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Net Impact ‐                      ‐                      ‐                  ‐                    ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT Quality Improvement Fully Funded Justification This meets the Council Goal of: Summary Project Description This project is in the second year of a two‐year project to update and improve Gesa Stadium. In 2020 we will improve and expand the visiting team's  clubhouse, adding new batting cages and re‐designing the right‐field fence line. These improvements not only modernize the stadium, but also conform the  facility to minor league baseball standards.  Gesa Stadium PICTURE Project Number ‐ 19001 Ongoing ACS General Necessary 2020-2025 Capital Improvement Plan - Page 12 of 117 Page 15 of 152 2020‐2025 Capital Improvement Plan Community Center Status Department Group Assessment Principal Need Funding Status Quality of Life Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design 150                  ‐                       150             ‐                    ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Land & Right‐of‐Way 750                 ‐                        ‐                 750             ‐                 ‐                 ‐                 ‐                 ‐                 750                  Construction 4,000              ‐                        ‐                 250             3,750         ‐                 ‐                 ‐                 ‐                 4,000               Other ‐                      ‐                        ‐                 ‐                   ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Total Expenditures 4,900              ‐                       150            1,000          3,750         ‐                 ‐                 ‐                 ‐                 4,750               Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Capital Improvement REET 2 1,150              ‐                       150            1,000          ‐                 ‐                 ‐                 ‐                 ‐                 1,000               Unsecured Funding 3,750              ‐                        ‐                 ‐                   3,750         ‐                 ‐                 ‐                 ‐                 3,750               ‐                      ‐                        ‐                 ‐                    ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                      ‐                        ‐                 ‐                    ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                      ‐                        ‐                 ‐                    ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Total Funding 4,900              ‐                       150            1,000          3,750         ‐                 ‐                 ‐                 ‐                 4,750               Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue 442                 ‐                        ‐                 ‐                   80              84              88              93              97              442                  Expenses 2,293              ‐                        ‐                 ‐                   415            436            458            480            504            2,293               Net Impact 2,735              ‐                       ‐                 ‐                   495            520            546            573            601            2,735               PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT Quality Improvement Partially Funded Justification This meets the Council Goal of: Summary Project Description This is a replacement facility for the former senior center which was sold to the Pasco School District in 2016. This facility needs to be planned, designed, and located in  a way that ensures the biggest return on investment to the City, as well as the biggest impact on the recreational lives of the public.  Community Center PICTURE Project Number ‐ 18005 Ongoing ACS General Necessary 2020-2025 Capital Improvement Plan - Page 13 of 117 Page 16 of 152 2020‐2025 Capital Improvement Plan Wayfinding and Signage  Status Department Group Assessment Principal Need Funding Status Community Transportation Network  Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design 96                   ‐                      96              ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Land & Right‐of‐Way 45                    ‐                       ‐                 15              15              15              ‐                  ‐                  ‐                 45                    Construction 500                 ‐                       ‐                 300            100            100            ‐                  ‐                  ‐                 500                  Other ‐                       ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Total Expenditures 641                 ‐                      96              315            115            115            ‐                  ‐                  ‐                 545                  Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Unsecured Funding 641                  ‐                      96              315            115            115             ‐                  ‐                  ‐                 545                   ‐                       ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Total Funding 641                 ‐                      96              315            115            115            ‐                  ‐                  ‐                 545                  Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                      ‐                       ‐                  ‐                 ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Expenses ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Net Impact ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT Other Not Funded Justification This meets the Council Goal of: Summary Project Description This is a regional project in the Tri‐Cities through which coordinated wayfinding signage gets placed in pre‐determined locations. Signage will range from  regional signage to localized signage to downtown signage. The current intention is to establish regional signage first, then work on coordinating wayfinding  in the downtown area in conjunction with the Lewis Street Overpass and the Peanuts Park renovation.  Wayfinding and Signage  PICTURE Project Number ‐ 18008 Ongoing ACS General Desirable 2020-2025 Capital Improvement Plan - Page 14 of 117 Page 17 of 152 2020-2025 Capital Improvement Plan - Page 15 of 117 Page 18 of 152 2020‐2025 Capital Improvement Plan A Street Sporting Complex ‐ Phase 1 Status Department Group Assessment Principal Need Funding Status Quality of Life  Economic Vitality  Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design 103                 3                      100            ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Land & Right‐of‐Way 104                 32                   32              40                 ‐                 ‐                 ‐                 ‐                 ‐                 40                    Construction 399                 ‐                        ‐                 399               ‐                 ‐                 ‐                 ‐                 ‐                 399                  Other ‐                      ‐                        ‐                 ‐                     ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Total Expenditures 606                 35                   132            439               ‐                 ‐                 ‐                 ‐                 ‐                 439                  Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 RCO Grant 350                 ‐                       100            250               ‐                 ‐                 ‐                 ‐                 ‐                 250                  Park Development Zone 1 256                 32                   35              189               ‐                 ‐                 ‐                 ‐                 ‐                 189                  ‐                      ‐                        ‐                 ‐                    ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                      ‐                        ‐                 ‐                     ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                      ‐                        ‐                 ‐                     ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Total Funding 606                 32                   135            439               ‐                 ‐                 ‐                 ‐                 ‐                 439                  Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                      ‐                        ‐                 ‐                     ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Expenses ‐                      ‐                        ‐                 ‐                     ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Net Impact ‐                      ‐                        ‐                 ‐                     ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       A Street Sporting Complex ‐ Phase 1 PICTURE Project Number ‐ 18028 Ongoing ACS Parks & Recreation Desirable PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT Quality Improvement Fully Funded Justification This meets the Council Goal of: Summary Project Description Phase 1 of this project will be three fields and a parking lot, as funded with the $350,000 in Recreation and Conservation Office (RCO) grant funds obtained in 2019.  Phase II will be to add additional multi‐use sports fields. 2020-2025 Capital Improvement Plan - Page 16 of 117 Page 19 of 152 2020‐2025 Capital Improvement Plan Chapel Hill Park  Status Department Group Assessment Principal Need Funding Status Quality of Life  Economic Vitality  Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design 1                     1                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Land & Right‐of‐Way 12                   12                    ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Construction 700                 ‐                       ‐                 700            ‐                  ‐                  ‐                  ‐                  ‐                 700                  Other ‐                       ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Total Expenditures 713                 13                   ‐                 700            ‐                  ‐                  ‐                  ‐                  ‐                 700                  Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Park Development Zone 3 713                 13                   ‐                 700            ‐                  ‐                  ‐                  ‐                  ‐                 700                  ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       ‐                      ‐                       ‐                  ‐                 ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Total Funding 713                 13                   ‐                 700            ‐                  ‐                  ‐                  ‐                  ‐                 700                  Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Expenses 80                   ‐                       ‐                  ‐                 15              15              16              17              17              80                    Net Impact 80                   ‐                       ‐                  ‐                 15              15              16              17              17              80                    Chapel Hill Park  PICTURE Project Number ‐ 18011 Ongoing ACS Parks & Recreation Necessary PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT Quality Improvement Fully Funded Justification This meets the Council Goal of: Summary Project Description 5 Acre community park that is highly desired by this area of the City. Design completed in 2018 and cost estimates for 5 acre park submitted at over $700,000.  2020-2025 Capital Improvement Plan - Page 17 of 117 Page 20 of 152 2020‐2025 Capital Improvement Plan Kurtzman Shelter  Status Department Group Assessment Principal Need Funding Status Quality of Life  Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design ‐                        ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Land & Right‐of‐Way ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Construction 60                    ‐                        ‐                  60               ‐                   ‐                   ‐                   ‐                   ‐                  60                     Other ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Total Expenditures 60                    ‐                        ‐                  60              ‐                   ‐                   ‐                   ‐                   ‐                  60                     Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Capital Improvement Fund REET 160                    ‐                        ‐                  60               ‐                   ‐                   ‐                   ‐                   ‐                  60                     ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Total Funding 60                    ‐                        ‐                  60              ‐                   ‐                   ‐                   ‐                   ‐                  60                     Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                        ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Expenses ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Net Impact ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Kurtzman Shelter  PICTURE Project Number ‐ 19020 New ACS Parks & Recreation Desirable PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT Quality Improvement Fully Funded Justification This meets the Council Goal of: Summary Project Description Installation of a shelter adjacent to the existing splash pad. There is currently no shade or shelter in the park.  2020-2025 Capital Improvement Plan - Page 18 of 117 Page 21 of 152 2020‐2025 Capital Improvement Plan Pasco Sporting Complex Status Department Group Assessment Principal Need Funding Status Quality of Life  Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design 11                    11                    ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Land & Right‐of‐Way ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Construction 240                  ‐                       140            100            ‐                   ‐                   ‐                   ‐                   ‐                  100                   Other ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Total Expenditures 251                  11                    140            100            ‐                   ‐                   ‐                   ‐                   ‐                  100                   Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Park Development Zone 2 240                  ‐                       140            100            ‐                   ‐                   ‐                   ‐                   ‐                  100                   Capital Improvement Fund REET 111                    11                    ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Total Funding 251                  11                    140            100            ‐                   ‐                   ‐                   ‐                   ‐                  100                   Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                        ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Expenses ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Net Impact ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Pasco Sporting Complex PICTURE Project Number ‐ 18022 Ongoing ACS Parks & Recreation Necessary PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT Quality Improvement Fully Funded Justification This meets the Council Goal of: Summary Project Description Remove the volleyball courts and install batting cages at the Pasco Sporting Complex. The batting cages can be rented to serve as a revenue stream for the complex.  The project also includes the installation of shelters, an off‐leash dog area; upgrades to better serve customers. 2020-2025 Capital Improvement Plan - Page 19 of 117 Page 22 of 152 2020‐2025 Capital Improvement Plan Peanuts Park Restoration  Status Department Group Assessment Principal Need Funding Status Quality of Life  Economic Vitality  Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design 678                  361                  317             ‐                      ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Land & Right‐of‐Way ‐                       ‐                       ‐                  ‐                      ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Construction 6,500               ‐                       225             6,275            ‐                   ‐                   ‐                   ‐                   ‐                  6,275                Other ‐                       ‐                       ‐                  ‐                      ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Total Expenditures 7,178               361                  542             6,275            ‐                   ‐                   ‐                   ‐                   ‐                  6,275                Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 CDBG Grant 811                  361                  450              ‐                      ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Section 108 Loan (secured)3,800               ‐                       ‐                  3,800            ‐                   ‐                   ‐                   ‐                   ‐                  3,800                Capital Improvement Fund REET 2 1,207               ‐                       ‐                  1,207            ‐                   ‐                   ‐                   ‐                   ‐                  1,207                Grant Government Capital  Budget 154                  ‐                       92               62                  ‐                   ‐                   ‐                   ‐                   ‐                  62                     General Fund 1,206               ‐                       ‐                  1,206            ‐                   ‐                   ‐                   ‐                   ‐                  1,206                Total Funding 7,178               361                  542             6,275            ‐                   ‐                   ‐                   ‐                   ‐                  6,275                Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                        ‐                        ‐                   ‐                      ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Expenses ‐                       ‐                       ‐                  ‐                      ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Net Impact ‐                       ‐                       ‐                  ‐                      ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Peanuts Park Restoration  PICTURE Project Number ‐ 18023 Ongoing ACS Parks & Recreation Necessary PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT Quality Improvement Fully Funded Justification This meets the Council Goal of: Summary Project Description Peanuts Park is located in downtown Pasco and is a focal point for the area. The restoration of this urban park is a key element to the revitalization and redevelopment of  downtown Pasco. The park as we know it today will be demolished and a new park plan will be put in place for the area. The final project will include the installation of features  such as shade structures, new trees, furniture, green space, restrooms, and a renovated farmers market pavilion. The acquisition of property for replacement parking may also  be included, as well as an area parking study.  2020-2025 Capital Improvement Plan - Page 20 of 117 Page 23 of 152 2020‐2025 Capital Improvement Plan Road 84 Park  Status Department Group Assessment Principal Need Funding Status Quality of Life  Economic Vitality  Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design 50                    ‐                        ‐                  50               ‐                   ‐                   ‐                   ‐                   ‐                  50                     Land & Right‐of‐Way 300                   ‐                        ‐                  300             ‐                   ‐                   ‐                   ‐                   ‐                  300                   Construction 400                   ‐                        ‐                   ‐                  400             ‐                   ‐                   ‐                   ‐                  400                   Other ‐                        ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Total Expenditures 750                  ‐                        ‐                  350            400            ‐                   ‐                   ‐                   ‐                  750                   Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Capital Improvement Fund REET 1 750                   ‐                        ‐                  350            400             ‐                   ‐                   ‐                   ‐                  750                   ‐                        ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Total Funding 750                  ‐                        ‐                  350            400            ‐                   ‐                   ‐                   ‐                  750                   Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Expenses ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Net Impact ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Road 84 Park  PICTURE Project Number ‐ 19023 New ACS Parks & Recreation Desirable PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT Quality Improvement Fully Funded Justification This meets the Council Goal of: Summary Project Description This neighborhood 5 acre park is slated to be built in conjunction with a new school.  2020-2025 Capital Improvement Plan - Page 21 of 117 Page 24 of 152 2020‐2025 Capital Improvement Plan Schlagel Park and Boat Basin Improvements  Status Department Group Assessment Principal Need Funding Status Quality of Life  Economic Vitality  Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design 10                    ‐                       5                 5                 ‐                   ‐                   ‐                   ‐                   ‐                  5                       Land & Right‐of‐Way ‐                        ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Construction 616                  ‐                       308            308            ‐                   ‐                   ‐                   ‐                   ‐                  308                   Other ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Total Expenditures 626                  ‐                       313            313            ‐                   ‐                   ‐                   ‐                   ‐                  313                   Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 RCO Grant 391                  ‐                       195            196            ‐                   ‐                   ‐                   ‐                   ‐                  196                   Capital Improvement Fund REET 1 235                  ‐                       118            117            ‐                   ‐                   ‐                   ‐                   ‐                  117                   ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Total Funding 626                  ‐                       313            313            ‐                   ‐                   ‐                   ‐                   ‐                  313                   Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                       ‐                        ‐                   ‐                   ‐                   ‐                  ‐                   ‐                   ‐                  ‐                        Expenses ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Net Impact ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Schlagel Park and Boat Basin Improvements  PICTURE Project Number ‐ 18027 Ongoing ACS Parks & Recreation Necessary PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT Quality Improvement Fully Funded Justification This meets the Council Goal of: Summary Project Description In 2019, the City of Pasco obtained an RCO grant for $626,000 to repair and replaced the boat launch, upgrade the parking and lighting, and install a new restroom facility.  The boat launch on the north side of the Columbia River is the only boat in the immediate area. Coupled with the marina, it is heavily used. Not only is Schlagel Park vital to  the boating recreation needs of the region, but it is also a gateway to the City of Pasco and its look needs to be improved.  2020-2025 Capital Improvement Plan - Page 22 of 117 Page 25 of 152 2020‐2025 Capital Improvement Plan Sylvester Park Sporting Courts Status Department Group Assessment Principal Need Funding Status Quality of Life  Economic Vitality  Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Land & Right‐of‐Way ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Construction 100                 ‐                        ‐                 100            ‐                 ‐                 ‐                 ‐                 ‐                 100                  Other ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Total Expenditures 100                 ‐                        ‐                 100            ‐                 ‐                 ‐                 ‐                 ‐                 100                  Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Park Development  Zone 1 100                 ‐                        ‐                 100            ‐                 ‐                 ‐                 ‐                 ‐                 100                  ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Total Funding 100                 ‐                        ‐                 100            ‐                 ‐                 ‐                 ‐                 ‐                 100                  Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Expenses ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Net Impact ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Sylvester Park Sporting Courts PICTURE Project Number ‐ 18029 Ongoing ACS Parks & Recreation Necessary PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT Quality Improvement Fully Funded Justification This meets the Council Goal of: Summary Project Description Replace and upgrade deteriorated tennis courts with basketball and/or futsal courts.  2020-2025 Capital Improvement Plan - Page 23 of 117 Page 26 of 152 2020‐2025 Capital Improvement Plan Community Park Northwest Status Department Group Assessment Principal Need Funding Status Quality of Life  Economic Vitality  Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design 200                  ‐                        ‐                  ‐                    ‐                   ‐                  ‐                    200             ‐                     200                   Land & Right‐of‐Way 1,400              ‐                        ‐                  1,400          ‐                   ‐                  ‐                     ‐                  ‐                     1,400               Construction 4,500              ‐                        ‐                  ‐                    ‐                   ‐                  ‐                     ‐                  4,500            4,500               Other ‐                       ‐                        ‐                  ‐                    ‐                   ‐                  ‐                     ‐                  ‐                     ‐                        Total Expenditures 6,100              ‐                        ‐                  1,400          ‐                   ‐                  ‐                    200            4,500           6,100               Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Park Development Zone 2 1,400               ‐                        ‐                  1,400           ‐                   ‐                  ‐                     ‐                  ‐                     1,400               Unsecured Funding 4,700              ‐                        ‐                  ‐                    ‐                   ‐                  ‐                    200            4,500            4,700               ‐                       ‐                        ‐                  ‐                    ‐                   ‐                  ‐                     ‐                  ‐                     ‐                        ‐                       ‐                        ‐                  ‐                    ‐                   ‐                  ‐                     ‐                  ‐                     ‐                        ‐                       ‐                        ‐                  ‐                    ‐                   ‐                  ‐                     ‐                  ‐                     ‐                        Total Funding 6,100              ‐                        ‐                  1,400          ‐                   ‐                  ‐                    200            4,500           6,100               Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                        ‐                        ‐                  ‐                    ‐                   ‐                  ‐                     ‐                  ‐                     ‐                        Expenses ‐                       ‐                        ‐                  ‐                    ‐                   ‐                  ‐                     ‐                  ‐                     ‐                        Net Impact ‐                       ‐                        ‐                  ‐                    ‐                   ‐                  ‐                     ‐                  ‐                     ‐                        Community Park Northwest PICTURE Project Number ‐ 18012 New ACS Parks & Recreation Desirable PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT Quality Improvement Partially Funded Justification This meets the Council Goal of: Summary Project Description Purchase and construct a community park in the northwest area of Pasco or Broadmoor area. This park will be 20‐40 acres and include parking, a playground,  restrooms, walking trails, shelters, and start active and passive recreation. 2020-2025 Capital Improvement Plan - Page 24 of 117 Page 27 of 152 2020‐2025 Capital Improvement Plan Status Department Group Assessment Principal Need Funding Status Quality of Life  Community Transportation Network Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design 55                    ‐                        ‐                   ‐                  55               ‐                   ‐                   ‐                   ‐                  55                     Land & Right‐of‐Way ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Construction 815                  ‐                        ‐                   ‐                   ‐                  360            35               420            ‐                  815                   Other ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Total Expenditures 870                  ‐                        ‐                   ‐                  55              360            35              420            ‐                  870                   Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Capital Improvement Fund REET 290                    ‐                        ‐                   ‐                  55               ‐                  35               ‐                   ‐                  90                     Unsecured RCO Grant 360                  ‐                        ‐                   ‐                   ‐                  360            ‐                   ‐                   ‐                  360                   Unsecured Funding 420                  ‐                        ‐                   ‐                   ‐                   ‐                   ‐                  420            ‐                  420                   ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Total Funding 870                  ‐                        ‐                   ‐                  55              360            35              420            ‐                  870                   Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                        ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Expenses ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Net Impact ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Project Number ‐ 18015 Ongoing ACS Parks & Recreation Franklin County Irrigation District (FCID) Trail Phases 1  and 2  PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT Quality Improvement Partially Funded Justification This meets the Council Goal of: Summary Project Description Construction of a trail on top of the covered FCID canal. Phase 1 from Road 100 to Road 111. Phase 2 from Road 100 to Road 84.  Franklin County Irrigaiton District (FCID) Trail Phases 1 and 2  PICTURE Desirable 2020-2025 Capital Improvement Plan - Page 25 of 117 Page 28 of 152 2020‐2025 Capital Improvement Plan Road 48 Park  Status Department Group Assessment Principal Need Funding Status Quality of Life  Economic Vitality  Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design 54                    4                      ‐                   ‐                  50               ‐                     ‐                      ‐                   ‐                  50                     Land & Right‐of‐Way 922                  922                  ‐                   ‐                   ‐                  ‐                     ‐                      ‐                   ‐                  ‐                        Construction 2,500              ‐                        ‐                   ‐                   ‐                  1,250            1,250            ‐                   ‐                  2,500               Other ‐                       ‐                        ‐                   ‐                   ‐                  ‐                     ‐                      ‐                   ‐                  ‐                        Total Expenditures 3,476              926                  ‐                   ‐                  50               1,250            1,250            ‐                   ‐                  2,550               Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Park Development Zone 3 926                  926                  ‐                   ‐                   ‐                  ‐                     ‐                      ‐                   ‐                  ‐                        Unsecured Funding 2,550              ‐                        ‐                   ‐                  50               1,250            1,250            ‐                   ‐                  2,550               ‐                       ‐                        ‐                   ‐                   ‐                  ‐                     ‐                      ‐                   ‐                  ‐                        ‐                       ‐                        ‐                   ‐                   ‐                  ‐                     ‐                      ‐                   ‐                  ‐                        ‐                       ‐                        ‐                   ‐                   ‐                  ‐                     ‐                      ‐                   ‐                  ‐                        Total Funding 3,476              926                  ‐                   ‐                  50              1,250            1,250           ‐                   ‐                  2,550               Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                        ‐                        ‐                   ‐                   ‐                  ‐                     ‐                      ‐                   ‐                  ‐                        Expenses ‐                       ‐                        ‐                   ‐                   ‐                  ‐                     ‐                      ‐                   ‐                  ‐                        Net Impact ‐                       ‐                        ‐                   ‐                   ‐                  ‐                     ‐                      ‐                   ‐                  ‐                        Road 48 Park  PICTURE Project Number ‐ 18019 New ACS Parks & Recreation Desirable PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT Quality Improvement Partially Funded Justification This meets the Council Goal of: Summary Project Description Recently acquired property in Central Pasco. Serving as a focus for a central community park‐sized development. Early ideas include a splash pad, sports courts,  restrooms parking lots, ropes course, etc.  2020-2025 Capital Improvement Plan - Page 26 of 117 Page 29 of 152 2020‐2025 Capital Improvement Plan Road 54 Erwen Property  Status Department Group Assessment Principal Need Funding Status Quality of Life  Economic Vitality  Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design 20                   ‐                       ‐                  ‐                 20              ‐                  ‐                  ‐                  ‐                 20                    Land & Right‐of‐Way ‐                       ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Construction 400                 ‐                       ‐                  ‐                  ‐                 400            ‐                  ‐                  ‐                 400                  Other ‐                       ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Total Expenditures 420                 ‐                       ‐                  ‐                 20              400            ‐                  ‐                  ‐                 420                  Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Park Development Zone 3 20                    ‐                       ‐                  ‐                 20               ‐                  ‐                  ‐                  ‐                 20                    Unsecured RCO Grant 400                  ‐                       ‐                  ‐                  ‐                 400             ‐                  ‐                  ‐                 400                  ‐                       ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Total Funding 420                 ‐                       ‐                  ‐                 20              400            ‐                  ‐                  ‐                 420                  Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Expenses ‐                      ‐                       ‐                  ‐                 ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Net Impact ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Road 54 Erwen Property  PICTURE Project Number ‐ 18024 Ongoing ACS Parks & Recreation Necessary PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT Quality Improvement Partially Funded Justification This meets the Council Goal of: Summary Project Description This project is to improve the parking and picnic areas at Road 54 and Sylvester Street. Park upgrades will be exercise and recreation focused and offer a hub and  connect for the Heritage Trail.  2020-2025 Capital Improvement Plan - Page 27 of 117 Page 30 of 152 2020‐2025 Capital Improvement Plan Sacajawea Trail BNSF Crossing  Status Department Group Assessment Principal Need Funding Status Quality of Life  Community Transportation Network Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design 50                    ‐                        ‐                  50               ‐                      ‐                   ‐                   ‐                   ‐                  50                     Land & Right‐of‐Way ‐                        ‐                        ‐                   ‐                  ‐                      ‐                   ‐                   ‐                   ‐                  ‐                        Construction 1,600              ‐                        ‐                   ‐                  1,600            ‐                   ‐                   ‐                   ‐                  1,600               Other ‐                       ‐                        ‐                   ‐                  ‐                      ‐                   ‐                   ‐                   ‐                  ‐                        Total Expenditures 1,650              ‐                        ‐                  50              1,600            ‐                   ‐                   ‐                   ‐                  1,650               Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Capital Improvement Fund REET 2 700                   ‐                        ‐                  50               650                 ‐                   ‐                   ‐                   ‐                  700                   Unsecured RCO Grant 200                  ‐                        ‐                   ‐                  200                ‐                   ‐                   ‐                   ‐                  200                   Unsecured Funding 750                  ‐                        ‐                   ‐                  750                ‐                   ‐                   ‐                   ‐                  750                   ‐                       ‐                        ‐                   ‐                  ‐                      ‐                   ‐                   ‐                   ‐                  ‐                        ‐                       ‐                        ‐                   ‐                  ‐                      ‐                   ‐                   ‐                   ‐                  ‐                        Total Funding 1,650              ‐                        ‐                  50              1,600            ‐                   ‐                   ‐                   ‐                  1,650               Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                       ‐                        ‐                   ‐                  ‐                      ‐                   ‐                   ‐                   ‐                  ‐                        Expenses ‐                       ‐                        ‐                   ‐                  ‐                      ‐                   ‐                   ‐                   ‐                  ‐                        Net Impact ‐                       ‐                        ‐                   ‐                  ‐                      ‐                   ‐                   ‐                   ‐                  ‐                        Sacajawea Trail BNSF Crossing  PICTURE Project Number ‐ 18025 Ongoing ACS Parks & Recreation Desirable PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT Quality Improvement Partially Funded Justification This meets the Council Goal of: Summary Project Description Construct a tunnel connecting the existing trail with Schlagel Park, revising the route taking trail users off of State Route 397.  2020-2025 Capital Improvement Plan - Page 28 of 117 Page 31 of 152 2020‐2025 Capital Improvement Plan Sacajawea Levee Lowering  Status Department Group Assessment Principal Need Funding Status Quality of Life  Community Transportation Network Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design 257                  26                    35               196              ‐                    ‐                       ‐                   ‐                   ‐                  196                   Land & Right‐of‐Way ‐                       ‐                       ‐                   ‐                  ‐                    ‐                       ‐                   ‐                   ‐                  ‐                        Construction 4,500               ‐                       ‐                   ‐                  2,500            2,000             ‐                   ‐                   ‐                  4,500                Other ‐                       ‐                       ‐                   ‐                  ‐                    ‐                       ‐                   ‐                   ‐                  ‐                        Total Expenditures 4,757               26                    35               196             2,500            2,000             ‐                   ‐                   ‐                  4,696                Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Capital Improvement Fund REET 1 1,134               26                    35               45               571               457                 ‐                   ‐                   ‐                  1,073                Unsecured State Grant 3,623               ‐                       ‐                  151             1,929            1,543             ‐                   ‐                   ‐                  3,623                ‐                       ‐                       ‐                  ‐                  ‐                    ‐                       ‐                   ‐                   ‐                  ‐                        ‐                       ‐                       ‐                   ‐                  ‐                    ‐                       ‐                   ‐                   ‐                  ‐                        ‐                       ‐                       ‐                   ‐                  ‐                    ‐                       ‐                   ‐                   ‐                  ‐                        Total Funding 4,757               26                    35               196             2,500            2,000             ‐                   ‐                   ‐                  4,696                Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                       ‐                       ‐                   ‐                  ‐                    ‐                       ‐                   ‐                  ‐                  ‐                        Expenses ‐                       ‐                       ‐                   ‐                  ‐                    ‐                       ‐                   ‐                   ‐                  ‐                        Net Impact ‐                       ‐                       ‐                   ‐                  ‐                    ‐                       ‐                   ‐                   ‐                  ‐                        Sacajawea Levee Lowering  Project Number ‐ 18026 Ongoing ACS Parks & Recreation Necessary PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT Quality Improvement Partially Funded Justification This meets the Council Goal of: Summary Project Description The project will lower the existing levee height and widen the trail to improve user safety. The given section is the final portion of the Sacajawea Trail at the original height. The  completion of this project will connect the trail from Road 72 to Road 52. 2020-2025 Capital Improvement Plan - Page 29 of 117 Page 32 of 152 2020‐2025 Capital Improvement Plan Dog Park  Status Department Group Assessment Principal Need Funding Status Quality of Life Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design 50                     ‐                        ‐                  ‐                   50               ‐                   ‐                   ‐                   ‐                  50                          Land & Right‐of‐Way ‐                        ‐                        ‐                  ‐                    ‐                   ‐                   ‐                   ‐                   ‐                  ‐                             Construction 400                   ‐                        ‐                  ‐                   400            ‐                   ‐                   ‐                   ‐                  400                        Other ‐                       ‐                        ‐                  ‐                    ‐                   ‐                   ‐                   ‐                   ‐                  ‐                             Total Expenditures 450                  ‐                        ‐                  ‐                   450            ‐                   ‐                   ‐                   ‐                  450                       Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Unsecured Funding 450                  ‐                        ‐                  ‐                   450            ‐                   ‐                   ‐                   ‐                  450                        ‐                       ‐                        ‐                  ‐                    ‐                   ‐                   ‐                   ‐                   ‐                  ‐                             ‐                       ‐                        ‐                  ‐                    ‐                   ‐                   ‐                   ‐                   ‐                  ‐                             ‐                       ‐                        ‐                  ‐                    ‐                   ‐                   ‐                   ‐                   ‐                  ‐                             ‐                       ‐                        ‐                  ‐                    ‐                   ‐                   ‐                   ‐                   ‐                  ‐                             Total Funding 450                  ‐                        ‐                  ‐                   450            ‐                   ‐                   ‐                   ‐                  450                       Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                       ‐                        ‐                  ‐                    ‐                   ‐                   ‐                   ‐                   ‐                  ‐                             Expenses ‐                       ‐                        ‐                  ‐                    ‐                   ‐                   ‐                   ‐                   ‐                  ‐                             Net Impact ‐                       ‐                        ‐                  ‐                    ‐                   ‐                   ‐                   ‐                   ‐                  ‐                             PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT Quality Improvement Not Funded Justification This meets the Council Goal of: Summary Project Description Dog parks are sorely needed in both Pasco and the Tri‐Cities region. The tentative plan would be to utilize land near the current and proposed animal shelter in the vicinity  of the Pasco Little League park area along both the river and the trailhead at Riverview Park.  Dog Park PICTURE Project Number ‐ 18013 New ACS Facilities Desirable 2020-2025 Capital Improvement Plan - Page 30 of 117 Page 33 of 152 2020‐2025 Capital Improvement Plan Highland Park Parking and Field Expansion  Status Department Group Assessment Principal Need Funding Status Quality of Life Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design 75                    ‐                        ‐                  ‐                   75               ‐                   ‐                   ‐                   ‐                  75                     Land & Right‐of‐Way ‐                       ‐                        ‐                  ‐                    ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Construction 750                  ‐                        ‐                    ‐                  750            ‐                   ‐                   ‐                  750                   Other ‐                       ‐                        ‐                  ‐                    ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Total Expenditures 825                  ‐                        ‐                  ‐                   75              750            ‐                   ‐                   ‐                  825                   Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Unsecured Funding 825                   ‐                        ‐                  ‐                   75               750            ‐                   ‐                   ‐                  825                    ‐                       ‐                        ‐                  ‐                    ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        ‐                       ‐                        ‐                  ‐                    ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        ‐                       ‐                        ‐                  ‐                    ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        ‐                       ‐                        ‐                  ‐                    ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Total Funding 825                  ‐                        ‐                  ‐                   75              750            ‐                   ‐                   ‐                  825                   Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                        ‐                        ‐                  ‐                    ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Expenses ‐                       ‐                        ‐                  ‐                    ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Net Impact ‐                       ‐                        ‐                  ‐                    ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT Quality Improvement Not Funded Justification This meets the Council Goal of: Summary Project Description This has been a long‐discussed project involving Highland Park, which serves Pasco youth football. This project would include expansion of the parking lot and park  area onto the City‐owned property to the west. In addition, adjacent streetscape improvements and landscaping would be worked into the design.  Highland Park Parking and Field Expansion PICTURE Project Number ‐ 20046 New ACS Facilities Desirable 2020-2025 Capital Improvement Plan - Page 31 of 117 Page 34 of 152 2020‐2025 Capital Improvement Plan Marina Dock Replacement ‐ Dock B Status Department Group Assessment Principal Need Funding Status Quality of Life  Economic Vitality  Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design ‐                      ‐                       ‐                  ‐                  ‐                 ‐                   ‐                  ‐                  ‐                 ‐                       Land & Right‐of‐Way ‐                       ‐                       ‐                  ‐                  ‐                 ‐                   ‐                  ‐                  ‐                 ‐                       Construction 1,650             ‐                       ‐                  ‐                  ‐                 1,650         ‐                  ‐                  ‐                 1,650              Other ‐                       ‐                       ‐                  ‐                  ‐                 ‐                   ‐                  ‐                  ‐                 ‐                       Total Expenditures 1,650             ‐                       ‐                  ‐                  ‐                 1,650         ‐                  ‐                  ‐                 1,650              Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Unsecured Funding 1,650              ‐                       ‐                  ‐                  ‐                 1,650          ‐                  ‐                  ‐                 1,650              ‐                       ‐                       ‐                  ‐                  ‐                 ‐                   ‐                  ‐                  ‐                 ‐                       ‐                      ‐                       ‐                  ‐                  ‐                 ‐                   ‐                  ‐                  ‐                 ‐                       ‐                      ‐                       ‐                  ‐                  ‐                 ‐                   ‐                  ‐                  ‐                 ‐                       ‐                      ‐                       ‐                  ‐                  ‐                 ‐                   ‐                  ‐                  ‐                 ‐                       Total Funding 1,650             ‐                       ‐                  ‐                  ‐                 1,650         ‐                  ‐                  ‐                 1,650              Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                      ‐                       ‐                  ‐                  ‐                 ‐                   ‐                  ‐                  ‐                 ‐                       Expenses ‐                      ‐                       ‐                  ‐                  ‐                 ‐                   ‐                  ‐                  ‐                 ‐                       Net Impact ‐                      ‐                       ‐                  ‐                  ‐                 ‐                   ‐                  ‐                  ‐                 ‐                       Marina Dock Replacement ‐ Dock B PICTURE Project Number ‐ 20002 Ongoing ACS Parks & Recreation Urgent PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT Quality Improvement Not Funded Justification This meets the Council Goal of: Summary Project Description Replace dock damaged in the winter of 2019.  2020-2025 Capital Improvement Plan - Page 32 of 117 Page 35 of 152 Transportation 2020-2025 Capital Improvement Plan - Page 33 of 117 Page 36 of 152 2020‐2025 Capital Improvement Plan Annual Pavement Preservation Program Status Department Group Assessment Principal Need Funding Status Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design ‐                       ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Land & Right‐of‐Way ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Construction 5,499              ‐                        ‐                 850            876            902            929            957            985            5,499               Other ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Total Expenditures 5,499              ‐                        ‐                 850            876            902            929            957            985            5,499               Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Street Overlay Fund 5,499              ‐                        ‐                 850            876            902            929            957            985            5,499               ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Total Funding 5,499              ‐                        ‐                 850            876            902            929            957            985            5,499               Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Expenses ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Net Impact ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       This meets the Council Goal of: Quality of Life Promote a highly‐functional multi‐modal transportation  network Summary Project Description Annual Pavement Preservation Program PICTURE Project Number ‐ 20006 Ongoing Public Works Transportation Necessary Asset Protection Fully Funded Justification The City has implemented a Pavement Preservation Program to assess and maintain quality streets within the City that are free of potholes and provide good  ride quality. This program preserves and extends the life of the streets with low‐cost methods that help avoid reconstruction of those streets. The program  includes crack seal, overlay and microsurfacing of City streets. Prioritization is determined by considering both the Pavement Preservation Program itself and  the pavement rating system. This will also encompass 50% of the Alley Hard Surface project funding.  PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT 2020-2025 Capital Improvement Plan - Page 34 of 117 Page 37 of 152 2020‐2025 Capital Improvement Plan Status Department Group Assessment Principal Need Funding Status Quality of Life Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design 128                  ‐                        ‐                 ‐                 ‐                 128            ‐                 ‐                 ‐                 128                  Land & Right‐of‐Way ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Construction 722                 ‐                        ‐                 ‐                 ‐                 ‐                 722            ‐                 ‐                 722                  Other ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Total Expenditures 850                 ‐                        ‐                 ‐                 ‐                 128            722            ‐                 ‐                 850                  Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Arterial Street Fund 850                 ‐                        ‐                 ‐                 ‐                 128            722            ‐                 ‐                 850                  ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Total Funding 850                 ‐                        ‐                 ‐                 ‐                 128            722            ‐                 ‐                 850                  Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Expenses ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Net Impact ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Argent Road and Road 36 Intersection  Improvements Summary Project Description Argent Road and Road 36 Intersection Improvements PICTURE Project Number ‐ 20011 New Public Works Transportation Desirable Growth Fully Funded Justification This meets the Council Goal of: Promote a highly‐functional multi‐modal transportation  network This project will construct intersection improvements to improve the current level of service.  The intersection improvements will be either a signalized  intersection or a roundabout. PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT 2020-2025 Capital Improvement Plan - Page 35 of 117 Page 38 of 152 2020‐2025 Capital Improvement Plan Status Department Group Assessment Principal Need Funding Status Quality of Life Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design 415                 200                 215             ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Land & Right‐of‐Way ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Construction 1,600              ‐                       1,600         ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Other ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Total Expenditures 2,015              200                 1,815         ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 CBC Grant 800                 ‐                       800            ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Port of Pasco 800                 ‐                       800            ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Arterial Street Fund 415                 200                 215            ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Total Funding 2,015              200                 1,815         ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Expenses ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Net Impact ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Public Safety Fully Funded Justification This meets the Council Goal of: Project Number ‐ 12001 Ongoing Public Works Transportation Argent Road Improvements ‐ 20th Avenue to  Saraceno Way This project was originally considered in its entirety from Road 36 to 20th Avenue. It also includes two important stakeholders in Columbia Basin Community  College (CBC) and the Port of Pasco (Port). Due to the immediate improvements necessary as part of the development of the Port’s property, namely the new  Marriot hotel, it became necessary to break the project into two phases; Phase 1 includes improvements from Varney Lane/Saraceno Way to 20th Avenue while  Phase 2 extends from Road 36 to Varney Lane/Saraceno Way. Improvements include street widening with a new roadway surface along with curb/gutter and sidewalk. Utilities, including stormwater, will also be built as part  of the improvements. PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT Summary Project Description Argent Road Improvements ‐ 20th Avenue to Saraceno  Way PICTURE Desirable Promote a highly‐functional multi‐modal transportation  network 2020-2025 Capital Improvement Plan - Page 36 of 117 Page 39 of 152 2020‐2025 Capital Improvement Plan Status Department Group Assessment Principal Need Funding Status Quality of Life Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design 300                  ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 300            300                  Land & Right‐of‐Way ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Construction ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Other ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Total Expenditures 300                 ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 300            300                  Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Arterial Street Fund 300                 ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 300            300                  ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Total Funding 300                 ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 300            300                  Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Expenses ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Net Impact ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Growth Fully Funded Justification This meets the Council Goal of: Project Number ‐ 20010 New Public Works Transportation Argent Road Improvements ‐ Saraceno Way to Road  36 This project will construct widening, access, and frontage improvements, as well as intersection control improvements at Road 36. These improvements focus on  the needs of the adjacent stakeholders which include the Port of Pasco (Port) and Columbia Basin Community College (CBC). PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT Summary Project Description Argent Road Improvements ‐ Saraceno Way to Road 36 PICTURE Desirable Promote a highly‐functional multi‐modal transportation  network 2020-2025 Capital Improvement Plan - Page 37 of 117 Page 40 of 152 2020‐2025 Capital Improvement Plan Citywide Traffic Signal Controller Upgrades ‐ Phase 2 Status Department Group Assessment Principal Need Funding Status Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Land & Right‐of‐Way 300                 ‐                       300            ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Construction 3,256              ‐                        ‐                 3,256         ‐                 ‐                 ‐                 ‐                 ‐                 3,256               Other ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Total Expenditures 3,556              ‐                       300            3,256         ‐                 ‐                 ‐                 ‐                 ‐                 3,256               Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Arterial Street Fund 415                 ‐                       40              375            ‐                 ‐                 ‐                 ‐                 ‐                 375                  I‐182  Corridor Impact Fund 158                 ‐                        ‐                 158            ‐                 ‐                 ‐                 ‐                 ‐                 158                  Federal STP Grant 2,983              ‐                       260            2,723         ‐                 ‐                 ‐                 ‐                 ‐                 2,723               ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Total Funding 3,556              ‐                       300            3,256         ‐                 ‐                 ‐                 ‐                 ‐                 3,256               Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Expenses ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Net Impact ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       This meets the Council Goal of: Quality of Life Promote a highly‐functional multi‐modal transportation  network Summary Project Description Citywide Traffic Signal Controller Upgrades ‐ Phase 2 PICTURE Project Number ‐ 18031 New Public Works Transportation Desirable Public Safety Fully Funded Justification Replace all obsolete signal equipment with updated signal controllers, signal equipment, signal interconnect equipment, optimized corridor timing plans, vehicle  detection system and emergency vehicle priority system. Pedestrian access will be upgraded to meet the current Americans with Disabilities Act (ADA) right‐of‐way  accessibility design guidelines for the signalized intersections. Phase 1 of this project, which focused on intersections that did not require the acquisition of rights‐of‐way for sidewalk ramp ADA upgrades, was completed in 2018.   This project is Phase 2 of the same project, which includes those intersections that require the acquisition of rights‐of‐way for sidewalk ramp ADA upgrades. PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT 2020-2025 Capital Improvement Plan - Page 38 of 117 Page 41 of 152 2020‐2025 Capital Improvement Plan Status Department Group Assessment Principal Need Funding Status Quality of Life Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design 60                    ‐                        ‐                 ‐                 60              ‐                 ‐                 ‐                 ‐                 60                    Land & Right‐of‐Way ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Construction 472                 ‐                        ‐                 ‐                 ‐                 472            ‐                 ‐                 ‐                 472                  Other ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Total Expenditures 532                 ‐                        ‐                 ‐                 60              472            ‐                 ‐                 ‐                 532                  Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Street Overlay Fund 532                 ‐                        ‐                 ‐                 60              472            ‐                 ‐                 ‐                 532                  ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Total Funding 532                 ‐                        ‐                 ‐                 60              472            ‐                 ‐                 ‐                 532                  Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Expenses ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Net Impact ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Asset Protection Fully Funded Justification This meets the Council Goal of: Project Number ‐ 20025 New Public Works Transportation Industrial Way ‐ Foster Wells to Kartchner  Preservation  This project will resurface Industrial Way between Foster Wells Road and the railroad tracks next to Reser's Fine Foods.  PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT Summary Project Description Industrial Way ‐ Foster Wells to Kartchner Preservation  PICTURE Desirable Promote a highly‐functional multi‐modal transportation  network. 2020-2025 Capital Improvement Plan - Page 39 of 117 Page 42 of 152 2020‐2025 Capital Improvement Plan Status Department Group Assessment Principal Need Funding Status Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design 70                     ‐                       25               15               15               15                ‐                   ‐                   ‐                  45                     Land & Right‐of‐Way ‐                        ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Construction 1,555              ‐                        ‐                  535            535            485            ‐                   ‐                   ‐                  1,555               Other ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Total Expenditures 1,625              ‐                       25              550            550            500            ‐                   ‐                   ‐                  1,600               Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 CDBG Grant 861                  ‐                        ‐                  296            296            269            ‐                   ‐                   ‐                  861                   Capital Improvement Fund REET 1 464                   ‐                       25               154            154            131             ‐                   ‐                   ‐                  439                   Stormwater Utility 300                   ‐                        ‐                  100            100            100             ‐                   ‐                   ‐                  300                   ‐                        ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Total Funding 1,625              ‐                       25              550            550            500            ‐                   ‐                   ‐                  1,600               Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Expenses ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Net Impact ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Quality Improvement Fully Funded Justification Project Number ‐ 20007 New Public Works Transportation Lewis Street Corridor Improvements ‐ 2nd Avenue to 5th  Avenue The project is intended to tie the improvements made with the overpass project into those made under the Peanuts Park Improvement Project. Taking into account the  anticipated increase in pedestrian and bicycle traffic, as well as the positive impact to businesses within this corridor, this project is intended to enhance the accessibility to  businesses and improve the safety and efficiency of the transportation corridor.  PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT This meets the Council Goal of: Quality of Life Promote a highly‐functional multi‐modal transportation network          Summary Project Description Lewis Street Corridor Improvements ‐ 2nd Avenue to 5th Avenue PICTURE Desirable 2020-2025 Capital Improvement Plan - Page 40 of 117 Page 43 of 152 2020‐2025 Capital Improvement Plan Lewis Street Overpass Status Department Group Assessment Principal Need Funding Status Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design 3,498               2,564               934              ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Land & Right‐of‐Way 4,059               4,025               34               ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Construction 21,081            ‐                       1,054         10,540       9,487         ‐                   ‐                   ‐                   ‐                  20,027             Other ‐                       ‐                       ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Total Expenditures 28,639            6,589               2,023         10,540       9,487          ‐                   ‐                   ‐                   ‐                  20,027             Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Arterial Street Fund 1,756               529                  327              ‐                  900             ‐                   ‐                   ‐                   ‐                  900                   Street Overlay Fund 1,000               ‐                       ‐                  1,000         ‐                   ‐                   ‐                   ‐                   ‐                  1,000                I‐182  Corridor Impact Fund 13                    12                    1                  ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Capital Improvement Fund REET 2 1,566               1,244               293             15               14                ‐                   ‐                   ‐                   ‐                  29                     Water Utility 250                  ‐                       12               125             113             ‐                   ‐                   ‐                   ‐                  238                   Stormwater Utility 300                  ‐                       15               150             135             ‐                   ‐                   ‐                   ‐                  285                   Connecting WA Grant 15,000            1,050               1,125         4,500         8,325         ‐                   ‐                   ‐                   ‐                  12,825             TIB Grant 5,000               ‐                       250             4,750         ‐                   ‐                   ‐                   ‐                   ‐                  4,750                Federal STP Grant 3,754               3,754               ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Total Funding 28,639            6,589               2,023         10,540       9,487          ‐                   ‐                   ‐                   ‐                  20,027             Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                             ‐                             ‐                       ‐                       ‐                       ‐                       ‐                       ‐                       ‐                       ‐                             Expenses ‐                             ‐                             ‐                       ‐                       ‐                       ‐                       ‐                       ‐                       ‐                       ‐                             Net Impact ‐                            ‐                             ‐                       ‐                       ‐                       ‐                       ‐                       ‐                       ‐                       ‐                             This meets the Council Goal of: Quality of Life Promote a highly‐functional multi‐modal transportation network           Completion of the Lewis Street Overpass design concept process,  securing gap funding for construction and achievement of "shovel‐ ready" status Summary Project Description Lewis Street Overpass PICTURE Project Number ‐ 13007 Ongoing Public Works Transportation Necessary Public Safety Fully Funded Justification This project will construct a new overpass between 2nd Avenue and Oregon Avenue on Lewis Street to replace the existing underpass, built in 1937, which is deteriorating.  The right‐of‐way acquisition was completed in 2013 and all necessary demolition of existing structures on the west side of the proposed overpass was completed in 2014. The design for this project was completed in 2019 and  construction will be bid in late 2019.  Construction will likely start in early 2020. PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT 2020-2025 Capital Improvement Plan - Page 41 of 117 Page 44 of 152 2020‐2025 Capital Improvement Plan Road 68 Widening ‐ Interstate 182 to Chapel Hill Blvd Status Department Group Assessment Principal Need Funding Status Quality of Life Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design 58                    ‐                       58               ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Land & Right‐of‐Way ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Construction 250                 ‐                        ‐                 250            ‐                 ‐                 ‐                 ‐                 ‐                 250                  Other ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Total Expenditures 308                 ‐                       58              250            ‐                 ‐                 ‐                 ‐                 ‐                 250                  Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Arterial Street Fund 92                   ‐                       58              34              ‐                 ‐                 ‐                 ‐                 ‐                 34                    Federal STP Grant 216                 ‐                        ‐                 216            ‐                 ‐                 ‐                 ‐                 ‐                 216                  ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Total Funding 308                 ‐                       58              250            ‐                 ‐                 ‐                 ‐                 ‐                 250                  Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Expenses ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Net Impact ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Summary Project Description Road 68 Widening ‐ Interstate 182 to Chapel Hill Blvd PICTURE Project Number ‐ 20009 New Public Works Transportation Desirable Growth Fully Funded Justification This meets the Council Goal of: Promote a highly‐functional multi‐modal transportation  network. This project will construct a widening of Road 68 from the Interstate 182 interchange south to Chapel Hill Boulevard. PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT 2020-2025 Capital Improvement Plan - Page 42 of 117 Page 45 of 152 2020‐2025 Capital Improvement Plan Road 76 Overpass Status Department Group Assessment Principal Need Funding Status Quality of Life Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design 300                 ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 300            300                  Land & Right‐of‐Way ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Construction ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Other ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Total Expenditures 300                 ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 300            300                  Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 I‐182  Corridor Impact Fund 300                 ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 300            300                  ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Total Funding 300                 ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 300            300                  Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Expenses ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Net Impact ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Summary Project Description Road 76 Overpass PICTURE Project Number ‐ 19037 New Public Works Transportation Desirable Public Safety Fully Funded Justification This meets the Council Goal of: Promote a highly‐functional multi‐modal transportation  network. An overpass was suggested as part of the Department of Natural Resources (DNR) property improvements. That area is defined as south of Interstate 182, east of  Road 84 and west of Road 68. This overpass would help to take the pressure off of the interchange at Road 68 by providing another access route to the popular  businesses along Road 68. The initial money allocated is to analyze the effectiveness of the overpass and provide a feasibility plan for its construction. PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT 2020-2025 Capital Improvement Plan - Page 43 of 117 Page 46 of 152 2020‐2025 Capital Improvement Plan Sandifur Parkway Widening ‐ Road 52 to Road 60  Status Department Group Assessment Principal Need Funding Status Quality of Life Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design 25                    ‐                        ‐                 25               ‐                 ‐                 ‐                 ‐                 ‐                 25                    Land & Right‐of‐Way ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Construction 400                 ‐                        ‐                 ‐                 400            ‐                 ‐                 ‐                 ‐                 400                  Other ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Total Expenditures 425                 ‐                        ‐                 25              400            ‐                 ‐                 ‐                 ‐                 425                  Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Street Overlay Fund 300                 ‐                        ‐                 18              282            ‐                 ‐                 ‐                 ‐                 300                  Arterial Street Fund 125                 ‐                        ‐                 7                118            ‐                 ‐                 ‐                 ‐                 125                  ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Total Funding 425                 ‐                        ‐                 25              400            ‐                 ‐                 ‐                 ‐                 425                  Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Expenses ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Net Impact ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Summary Project Description Sandifur Parkway Widening ‐ Road 52 to Road 60  PICTURE Project Number ‐ 17001 New Public Works Transportation Desirable Quality Improvement Fully Funded Justification This meets the Council Goal of: Promote a highly‐functional multi‐modal transportation  network                                          This project will complete Sandifur Parkway from Road 52 to Road 60 where there is currently a half street.  Finishing the roadway will improve safety and  provide the same street width for the continuation of Sandifur Parkway. The estimate of 425k includes curb/gutter, sidewalk.  Right‐of‐way may be required. PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT 2020-2025 Capital Improvement Plan - Page 44 of 117 Page 47 of 152 2020‐2025 Capital Improvement Plan Signage and Striping Improvements at  Road 68  and Burden Boulevard Status Department Group Assessment Principal Need Funding Status Quality of Life Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design 25                    ‐                        ‐                 25               ‐                 ‐                 ‐                 ‐                 ‐                 25                    Land & Right‐of‐Way ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Construction 235                 ‐                        ‐                 235            ‐                 ‐                 ‐                 ‐                 ‐                 235                  Other ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Total Expenditures 260                 ‐                        ‐                 260            ‐                 ‐                 ‐                 ‐                 ‐                 260                  Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Arterial Street Fund 35                   ‐                        ‐                 35              ‐                 ‐                 ‐                 ‐                 ‐                 35                    Federal STP Grant 225                 ‐                        ‐                 225            ‐                 ‐                 ‐                 ‐                 ‐                 225                  ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Total Funding 260                 ‐                        ‐                 260            ‐                 ‐                 ‐                 ‐                 ‐                 260                  Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Expenses ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Net Impact ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Summary Project Description Signage and Striping Improvements at Road 68 &  Burden Boulevard PICTURE Project Number ‐ 20008 New Public Works Transportation Desirable Public Safety Fully Funded Justification This meets the Council Goal of: Promote a highly‐functional multi‐modal transportation  network                                         Continued emphasis on  improvements in Road 68/I‐182/Burden Boulevard  corridor Often identified as Pasco’s most congested corridor, this project, in conjunction with the Wrigley Drive Extension Project, is intended to reduce traffic  congestion, increase efficiency, and improve safety.  This project will include signing, striping, and channelization considerations on Burden Boulevard and Road  68 to reduce the stacking of vehicles in the westbound lanes at the intersection. PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT 2020-2025 Capital Improvement Plan - Page 45 of 117 Page 48 of 152 2020‐2025 Capital Improvement Plan Wrigley Drive Extension Status Department Group Assessment Principal Need Funding Status Quality of Life Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design 53                    ‐                       33              20               ‐                 ‐                 ‐                 ‐                 ‐                 20                    Land & Right‐of‐Way ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Construction 256                 ‐                        ‐                 256            ‐                 ‐                 ‐                 ‐                 ‐                 256                  Other ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Total Expenditures 309                 ‐                       33              276            ‐                 ‐                 ‐                 ‐                 ‐                 276                  Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Water Utility 11                   ‐                       2                9                ‐                 ‐                 ‐                 ‐                 ‐                 9                      Irrigation Utility 11                   ‐                       2                9                ‐                 ‐                 ‐                 ‐                 ‐                 9                      Sewer Utility 13                   ‐                       3                10              ‐                 ‐                 ‐                 ‐                 ‐                 10                    Federal STP Grant 263                 ‐                       24              239            ‐                 ‐                 ‐                 ‐                 ‐                 239                  Arterial Street Fund 11                   ‐                       2                9                ‐                 ‐                 ‐                 ‐                 ‐                 9                      Total Funding 309                 ‐                       33              276            ‐                 ‐                 ‐                 ‐                 ‐                 276                  Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Expenses ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Net Impact ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Summary Project Description Wrigley Drive Extension PICTURE Project Number ‐ 15009 Ongoing Public Works Transportation Desirable Public Safety Fully Funded Justification This meets the Council Goal of: Promote a highly‐functional multi‐modal transportation  network                                                 Continued emphasis  on improvements in Road 68/I‐182/Burden Boulevard  corridor This project, identified by Washington State Department of Transportation (WSDOT) as an important co‐effort with the Road 68 and Burden Road  Intersection/Channelization Improvements Project, in addressing congestion, efficiency, and safety concerns associated with the Road 68 Corridor. This  connection will provide another alternative to residents for accessing Road 68 at a signalized intersection. Although no frontage improvements are being  considered as part of this effort, this project will provide a core‐road, that when adjacent properties develop, those additional improvements will be added. This  improvement will provide an important connection to Road 68 for area residents and will relieve some of the demand placed upon the intersection of Road 68  and Burden Boulevard. Improvements include a new roadway surface without curb/gutter and sidewalk. Utilities, including potable water, irrigation water, and  sanitary sewer, are also being extended. PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT 2020-2025 Capital Improvement Plan - Page 46 of 117 Page 49 of 152 2020‐2025 Capital Improvement Plan Burns Road Pedestrian/Bicycle Pathway ‐  Road 84 to Road 68 Status Department Group Assessment Principal Need Funding Status Quality of Life Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design 11                 ‐                      ‐                11            ‐                 ‐                 ‐                 ‐                 ‐                11                   Land & Right‐of‐Way ‐                    ‐                      ‐                 ‐                ‐                 ‐                 ‐                 ‐                 ‐                ‐                      Construction 91                 ‐                      ‐                 ‐                ‐                 ‐                91             ‐                 ‐                91                   Other ‐                    ‐                      ‐                 ‐                ‐                 ‐                 ‐                 ‐                 ‐                ‐                      Total Expenditures 102               ‐                      ‐                11            ‐                 ‐                91             ‐                 ‐                102                 Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Capital Improvement Fund REET 226                 ‐                      ‐                3               ‐                 ‐                23             ‐                 ‐                26                   Unsecured State Grant (SRTS)76                 ‐                      ‐                8               ‐                 ‐                68             ‐                 ‐                76                   ‐                    ‐                      ‐                 ‐                ‐                 ‐                 ‐                 ‐                 ‐                ‐                      ‐                    ‐                      ‐                 ‐                ‐                 ‐                 ‐                 ‐                 ‐                ‐                      ‐                    ‐                      ‐                 ‐                ‐                 ‐                 ‐                 ‐                 ‐                ‐                      Total Funding 102               ‐                      ‐                11            ‐                 ‐                91             ‐                 ‐                102                 Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                    ‐                      ‐                 ‐                ‐                 ‐                 ‐                 ‐                 ‐                ‐                      Expenses ‐                    ‐                      ‐                 ‐                ‐                 ‐                 ‐                 ‐                 ‐                ‐                      Net Impact ‐                    ‐                      ‐                 ‐                ‐                 ‐                 ‐                 ‐                 ‐                ‐                      Summary Project Description Burns Road Pedestrian/Bicycle Pathway ‐ Road 84 to Rosd 68 PICTURE Project Number ‐ 20033 New Public Works Transportation Desirable Quality Improvement Partially Funded Justification This meets the Council Goal of: Promote a highly‐functional multi‐modal transportation network       Undertaking a comprehensive and inclusive transportation  planning and analysis process to include facilitation of traffic flow  in major corridors, support integration of pedestrian, bicycle and  other non‐vehicular means of transportation This project will construct a 12‐foot wide multi‐use pathway on the south side of Burns Road. PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT 2020-2025 Capital Improvement Plan - Page 47 of 117 Page 50 of 152 2020‐2025 Capital Improvement Plan Burns Road Pedestrian/Bicycle Pathway ‐  Road 90 to Road 84 Status Department Group Assessment Principal Need Funding Status Quality of Life Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design 8                       ‐                        ‐                  8                 ‐                   ‐                   ‐                   ‐                   ‐                  8                       Land & Right‐of‐Way ‐                        ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Construction 63                    ‐                        ‐                   ‐                   ‐                  63               ‐                   ‐                   ‐                  63                     Other ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Total Expenditures 71                    ‐                        ‐                  8                 ‐                  63              ‐                   ‐                   ‐                  71                     Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Capital Improvement Fund REET 2 16                     ‐                        ‐                  2                  ‐                  14                ‐                   ‐                   ‐                  16                     Unsecured State Grant (SRTS)55                    ‐                        ‐                  6                 ‐                  49               ‐                   ‐                   ‐                  55                     ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Total Funding 71                    ‐                        ‐                  8                 ‐                  63              ‐                   ‐                   ‐                  71                     Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Expenses ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Net Impact ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Summary Project Description Burns Road Pedestrian/Bicycle Pathway ‐ Road 90 to Road 84 PICTURE Project Number ‐ 20013 New Public Works Transportation Desirable Quality Improvement Partially Funded Justification This meets the Council Goal of: Promote a highly‐functional multi‐modal transportation network           Undertaking a comprehensive and inclusive transportation planning  and analysis process to include facilitation of traffic flow in major  corridors, support integration of pedestrian, bicycle and other non‐ vehicular means of transportation This project will construct a 12‐foot wide multi‐use pathway on the south side of Burns Road. PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT 2020-2025 Capital Improvement Plan - Page 48 of 117 Page 51 of 152 2020‐2025 Capital Improvement Plan Burns Road Pedestrian/Bicycle Pathway ‐ Road 100 to Road 90 Status Department Group Assessment Principal Need Funding Status Quality of Life Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design 11                     ‐                        ‐                  11                ‐                   ‐                   ‐                   ‐                   ‐                  11                     Land & Right‐of‐Way ‐                        ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Construction 108                  ‐                        ‐                   ‐                  108            ‐                   ‐                   ‐                   ‐                  108                   Other ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Total Expenditures 119                  ‐                        ‐                  11              108            ‐                   ‐                   ‐                   ‐                  119                   Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Capital Improvement Fund REET 2 30                     ‐                        ‐                  3                 27                ‐                   ‐                   ‐                   ‐                  30                     Unsecured State Grant (SRTS)89                    ‐                        ‐                  8                 81               ‐                   ‐                   ‐                   ‐                  89                     ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Total Funding 119                  ‐                        ‐                  11              108            ‐                   ‐                   ‐                   ‐                  119                   Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Expenses ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Net Impact ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Summary Project Description Burns Road Pedestrian/Bicycle Pathway ‐ Road 100 to Road 90 PICTURE Project Number ‐ 20012 New Public Works Transportation Desirable Quality Improvement Partially Funded Justification This meets the Council Goal of: Promote a highly‐functional multi‐modal transportation network          Undertaking a comprehensive and inclusive transportation planning  and analysis process to include facilitation of traffic flow in major  corridors, support integration of pedestrian, bicycle and other non‐ vehicular means of transportation This project will construct a 12‐foot wide multi‐use pathway on the south side of Burns Road. PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT 2020-2025 Capital Improvement Plan - Page 49 of 117 Page 52 of 152 2020‐2025 Capital Improvement Plan Status Department Group Assessment Principal Need Funding Status Quality of Life Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design 75                    ‐                        ‐                 ‐                 ‐                 75              ‐                 ‐                 ‐                 75                    Land & Right‐of‐Way 50                   ‐                        ‐                 ‐                 ‐                 ‐                 50              ‐                 ‐                 50                    Construction 735                 ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 735            ‐                 735                  Other ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Total Expenditures 860                 ‐                        ‐                 ‐                 ‐                 75              50              735            ‐                 860                  Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Arterial Street Fund 100                 ‐                        ‐                 ‐                 ‐                 9                5                86              ‐                 100                  I‐182  Corridor Impact Fund 25                   ‐                        ‐                 ‐                 ‐                 2                2                21              ‐                 25                    Unsecured State Grant 735                 ‐                        ‐                 ‐                 ‐                 64              43              628            ‐                 735                  ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Total Funding 860                 ‐                        ‐                 ‐                 ‐                 75              50              735            ‐                 860                  Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Expenses ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Net Impact ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Court Street and Road 68 Intersection Improvements Summary Project Description Court Street and Road 68 Intersection Improvements PICTURE Project Number ‐ 19043 New Public Works Transportation Desirable Public Safety Partially Funded Justification This meets the Council Goal of: Promote a highly‐functional multi‐modal transportation  network                                                                                   Continued emphasis on improvements in Road 68/I‐ 182/Burden Boulevard corridor Intersection improvements at the intersection of Road 68 and Court Street to improve efficiency and safety.  PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT 2020-2025 Capital Improvement Plan - Page 50 of 117 Page 53 of 152 2020‐2025 Capital Improvement Plan Crescent Road Surface Improvement Status Department Group Assessment Principal Need Funding Status Quality of Life Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design 45                   ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 45              ‐                 45                    Land & Right‐of‐Way ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Construction 355                 ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 355            355                  Other ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Total Expenditures 400                 ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 45              355            400                  Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Arterial Street Fund 100                 ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 11              89              100                  Developer Contribution 300                 ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 34              266            300                  ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Total Funding 400                 ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 45              355            400                  Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Expenses ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Net Impact ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Summary Project Description Crescent Road Surface Improvement PICTURE Project Number ‐ 17012 New Public Works Transportation Desirable Public Safety Partially Funded Justification This meets the Council Goal of: Promote a highly‐functional multi‐modal transportation  network. This project is intended to design and construct an asphalt road from Road 108 to Chapel Hill Boulevard. The existing roadway does not make connection to Chapel  Hill Boulevard in its present extents. Although no frontage improvements are being considered as part of this effort, this project will provide a core‐road. When  adjacent properties develop, those additional improvements will be added. This improvement will provide an important connection to Road 100 for area residents  and will relieve some of the demand placed upon the southern end of Road 100. PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT 2020-2025 Capital Improvement Plan - Page 51 of 117 Page 54 of 152 2020‐2025 Capital Improvement Plan Status Department Group Assessment Principal Need Funding Status Quality of Life Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design 90                  ‐                      ‐                 ‐                90             ‐                 ‐               ‐                  ‐                90                   Land & Right‐of‐Way ‐                      ‐                      ‐                 ‐                 ‐                 ‐                 ‐               ‐                  ‐                ‐                      Construction 780                ‐                      ‐                 ‐                 ‐                360          420          ‐                  ‐                780                 Other ‐                      ‐                      ‐                 ‐                 ‐                 ‐                 ‐               ‐                  ‐                ‐                      Total Expenditures 870                ‐                      ‐                 ‐                90             360          420          ‐                  ‐                870                 Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Capital Improvement Fund REET 2 286                ‐                      ‐                 ‐                30             118          138          ‐                  ‐                286                 Unsecured State Grant 585                ‐                      ‐                 ‐                60             242          282          ‐                  ‐                585                 ‐                      ‐                      ‐                 ‐                 ‐                 ‐                 ‐               ‐                  ‐                ‐                      ‐                      ‐                      ‐                 ‐                 ‐                 ‐                 ‐               ‐                  ‐                ‐                      ‐                      ‐                      ‐                 ‐                 ‐                 ‐                 ‐               ‐                  ‐                ‐                      Total Funding 870                ‐                      ‐                 ‐                90             360          420          ‐                  ‐                870                 Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                      ‐                      ‐                 ‐                 ‐                 ‐                 ‐               ‐                  ‐                ‐                      Expenses ‐                      ‐                      ‐                 ‐                 ‐                 ‐                 ‐               ‐                  ‐                ‐                      Net Impact ‐                      ‐                      ‐                 ‐                 ‐                 ‐                 ‐               ‐                  ‐                ‐                      Public Safety Partially Funded Justification This meets the Council Goal of: Project Number ‐ 20021 New Public Works Transportation Frankin County Irrigation District (FCID) Canal  Bicycle/Pedestrian Pathway Study This project, originally identified in the 2019‐2024 Capital Improvement Plan as FCID Trail – Phase 2, will be further evaluated with new information as to ownership of  the property. As a part of that evaluation, the City will endeavor to coordinate with multiple stakeholders to create a plane to secure and build a 12‐foot wide  pedestrian/bicycle asphalt pathway further extending and connecting those pathways through and around the City of Pasco. PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT Summary Project Description Franklin County Irrigation District Canal Bicycle/Pedestrian  Pathway Study Desirable Promote a highly‐functional multi‐modal transportation network         Undertaking a comprehensive and inclusive transportation planning  and analysis process to include facilitation of traffic flow in major  corridors, support integration of pedestrian, bicycle and other non‐ vehicular means of transportation 2020-2025 Capital Improvement Plan - Page 52 of 117 Page 55 of 152 2020‐2025 Capital Improvement Plan Pedestrian/Bicycle Access ‐ Road 68 Interchange  Status Department Group Assessment Principal Need Funding Status Quality of Life Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design 100                 ‐                        ‐                 ‐                 ‐                 ‐                 100            ‐                 ‐                 100                  Land & Right‐of‐Way ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Construction 1,000              ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 1,000         ‐                 1,000               Other ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Total Expenditures 1,100              ‐                        ‐                 ‐                 ‐                 ‐                 100            1,000         ‐                 1,100               Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 I‐182  Corridor Impact Fund 25                   ‐                        ‐                 ‐                 ‐                 ‐                 2                23              ‐                 25                    Unsecured State Grant 1,075              ‐                        ‐                 ‐                 ‐                 ‐                 98              977            ‐                 1,075               ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Total Funding 1,100              ‐                        ‐                 ‐                 ‐                 ‐                 100            1,000         ‐                 1,100               Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Expenses ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Net Impact ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Summary Project Description Pedestrian/Bicycle Access ‐ Road 68 Interchange  PICTURE Project Number ‐ 20015 New Public Works Transportation Desirable Public Safety Partially Funded Justification This meets the Council Goal of: Promote a highly‐functional multi‐modal transportation  network                                                                                        Undertaking a comprehensive and inclusive transportation  planning and analysis process to include facilitation of traffic  flow in major corridors, support integration of pedestrian,  bicycle and other non‐vehicular means of transportation This project will widen the existing Road 68 overpass to accommodate a pedestrian walkway.  PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT 2020-2025 Capital Improvement Plan - Page 53 of 117 Page 56 of 152 2020‐2025 Capital Improvement Plan Pedestrian/Bicycle Access ‐ Road 100 Interchange  Status Department Group Assessment Principal Need Funding Status Quality of Life Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design 120                 ‐                        ‐                 ‐                 ‐                 120            ‐                 ‐                 ‐                 120                  Land & Right‐of‐Way ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Construction 2,200              ‐                        ‐                 ‐                 ‐                 ‐                 2,200         ‐                 ‐                 2,200               Other ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Total Expenditures 2,320              ‐                        ‐                 ‐                 ‐                 120            2,200         ‐                 ‐                 2,320               Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Arterial Street Fund 300                 ‐                        ‐                 ‐                 ‐                 15              285            ‐                 ‐                 300                  I‐182  Corridor Impact Fund 50                   ‐                        ‐                 ‐                 ‐                 3                47              ‐                 ‐                 50                    Unsecured State Grant 1,970               ‐                        ‐                 ‐                 ‐                 102            1,868         ‐                 ‐                 1,970               ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Total Funding 2,320              ‐                        ‐                 ‐                 ‐                 120            2,200         ‐                 ‐                 2,320               Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Expenses ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Net Impact ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Summary Project Description Pedestrian/Bicycle Access ‐ Road 100 Interchange  PICTURE Project Number ‐ 20014 New Public Works Transportation Desirable Public Safety Partially Funded Justification This meets the Council Goal of: Promote a highly‐functional multi‐modal transportation  network                                                                                       Undertaking a comprehensive and inclusive transportation  planning and analysis process to include facilitation of traffic  flow in major corridors, support integration of pedestrian,  bicycle and other non‐vehicular means of transportation This project will improve the existing Road 100 overpass to accommodate a pedestrian walkway.  PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT 2020-2025 Capital Improvement Plan - Page 54 of 117 Page 57 of 152 2020‐2025 Capital Improvement Plan Status Department Group Assessment Principal Need Funding Status Quality of Life Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design 78                   ‐                        ‐                 ‐                 78              ‐                 ‐                 ‐                 ‐                 78                    Land & Right‐of‐Way ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Construction ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Other ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Total Expenditures 78                   ‐                        ‐                 ‐                 78              ‐                 ‐                 ‐                 ‐                 78                    Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Arterial Street Fund 25                   ‐                        ‐                 ‐                 25              ‐                 ‐                 ‐                 ‐                 25                    Unsecured State Grant 53                   ‐                        ‐                 ‐                 53              ‐                 ‐                 ‐                 ‐                 53                    ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Total Funding 78                   ‐                        ‐                 ‐                 78              ‐                 ‐                 ‐                 ‐                 78                    Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Expenses ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Net Impact ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Pedestrian/Bicycle Access ‐ Sylvester Street  Overpass  Summary Project Description Pedestrian/Bicycle Access ‐ Sylvester Street Overpass  PICTURE Project Number ‐ 20016 New Public Works Transportation Desirable Public Safety Partially Funded Justification This meets the Council Goal of: Promote a highly‐functional multi‐modal transportation  network                                               Undertaking a  comprehensive and inclusive transportation planning  and analysis process to include facilitation of traffic flow  in major corridors, support integration of pedestrian,  bicycle and other non‐vehicular means of transportation This project will provide the design phase of a pedestrian walkway at the Sylvester Street overpass at US 395 to allow for safe pedestrian crossing.  PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT 2020-2025 Capital Improvement Plan - Page 55 of 117 Page 58 of 152 2020‐2025 Capital Improvement Plan Road 44 and Argent Road Intersection Analysis Status Department Group Assessment Principal Need Funding Status Quality of Life Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design 65                    ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 65              ‐                 65                    Land & Right‐of‐Way ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Construction ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Other ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Total Expenditures 65                   ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 65              ‐                 65                    Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 I‐182  Corridor Impact Fund 10                   ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 10              ‐                 10                    Unsecured State Grant 55                   ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 55              ‐                 55                    ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Total Funding 65                   ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 65              ‐                 65                    Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Expenses ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Net Impact ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT Public Safety Partially Funded Justification This meets the Council Goal of: Summary Project Description Connecting a heavily populated residential area of the City with an arterial street, Argent Road, this intersection continues to receive a large volume of traffic with  concerns of the level of service falling below allowable limits. The City will undertake an evaluation with Franklin County to determine the best course of action, if any, to ensure that the intersection continues to perform at an  acceptable level.  Coordination with Franklin County is necessary as the intersection is currently within the County.   Promote a highly‐functional multi‐modal, transportation  network Road 44 and Argent Road Intersection Analysis PICTURE Project Number ‐ 20018 New Public Works Transportation Desirable 2020-2025 Capital Improvement Plan - Page 56 of 117 Page 59 of 152 2020‐2025 Capital Improvement Plan Status Department Group Assessment Principal Need Funding Status Quality of Life Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design 375                 ‐                        ‐                 ‐                 ‐                 ‐                 375            ‐                 ‐                 375                  Land & Right‐of‐Way 500                 ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 500            ‐                 500                  Construction 3,250              ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 1,000         2,250         3,250               Other ‐                       ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Total Expenditures 4,125              ‐                        ‐                 ‐                 ‐                 ‐                 375            1,500         2,250         4,125               Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Arterial Street Fund 2,000              ‐                        ‐                 ‐                 ‐                 ‐                 182            727            1,091         2,000               I‐182  Corridor Impact Fund 500                 ‐                        ‐                 ‐                 ‐                 ‐                 45              182            273            500                  Unsecured State Grant 1,625              ‐                        ‐                 ‐                 ‐                 ‐                 148            591            886            1,625               ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Total Funding 4,125              ‐                        ‐                 ‐                 ‐                 ‐                 375            1,500         2,250         4,125               Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Expenses ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Net Impact ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Growth Partially Funded Justification This meets the Council Goal of: Project Number ‐ 19035 New Public Works Transportation Road 100 Widening ‐ Court Street to Chapel Hill  Boulevard This project is intended to improve both deficiencies in right‐of‐way and road surface width in areas that used to be within the County. Road 100 is a major arterial  providing citizens direct access to the interchange at Interstate 182. The extents of this project are Court Street on the south and Chapel Hill Boulevard on the north. Improvements include street widening with a new roadway surface, along with curb/gutter and sidewalk. Utilities, including stormwater, will also be built as part of  the improvements. PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT Summary Project Description Road 100 Widening ‐ Court Street to Chapel Hill Boulevard PICTURE Desirable Promote a highly‐functional multi‐modal transportation  network 2020-2025 Capital Improvement Plan - Page 57 of 117 Page 60 of 152 2020‐2025 Capital Improvement Plan Status Department Group Assessment Principal Need Funding Status Quality of Life Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design 1,650              ‐                        ‐                 ‐                 ‐                 ‐                 150            1,500           ‐                 1,650               Land & Right‐of‐Way ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                   ‐                 ‐                       Construction ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                   ‐                 ‐                       Other ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                   ‐                 ‐                       Total Expenditures 1,650              ‐                        ‐                 ‐                 ‐                 ‐                 150            1,500           ‐                 1,650               Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Arterial Street Fund 150                 ‐                        ‐                 ‐                 ‐                 ‐                 150            ‐                   ‐                 150                  Developer Contribution 1,500              ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 1,500           ‐                 1,500               ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                   ‐                 ‐                       ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                   ‐                 ‐                       ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                   ‐                 ‐                       Total Funding 1,650              ‐                        ‐                 ‐                 ‐                 ‐                 150            1,500           ‐                 1,650               Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                   ‐                 ‐                       Expenses ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                   ‐                 ‐                       Net Impact ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                   ‐                 ‐                       Public Safety Partially Funded Justification This meets the Council Goal of: Project Number ‐ 20022 New Public Works Transportation Sandifur Parkway Extension ‐ Phase 1 (West of Road  100) This project extends Sandifur Parkway from Road 100 to the east approximately 2,800‐feet to a future north‐south road (name TBD). This north‐south roadway  encompasses the trunk sewer main. This project would include a new asphalt roadway surface, curb/gutter, and sidewalks consistent with Sandifur Parkway as it exists on the west side of Road 100.  This project would also modify the current connection of Harris Road into Road 100, as well as its potential alignment change to address a future northwest loop  ramp for the interchange improvement as originally identified in the 2017 Feasibility Traffic Study for Interchanges. Although this alignment and connection  change would be made, development is anticipated to finish the necessary frontage improvements. PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT Summary Project Description Sandifur Parkway Extension ‐ Phase 1 (West of Road 100) PICTURE Desirable Promote a highly‐functional multi‐modal transportation  network 2020-2025 Capital Improvement Plan - Page 58 of 117 Page 61 of 152 2020‐2025 Capital Improvement Plan Status Department Group Assessment Principal Need Funding Status Quality of Life Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                    ‐                        Land & Right‐of‐Way ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                    ‐                        Construction 1,650              ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 150            1,500           1,650                Other ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                    ‐                        Total Expenditures 1,650              ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 150            1,500           1,650                Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Arterial Street Fund 150                 ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 150            ‐                    150                   Developer Contribution 1,500              ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 1,500           1,500                ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                    ‐                        ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                    ‐                        ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                    ‐                        Total Funding 1,650              ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 150            1,500           1,650                Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                    ‐                        Expenses ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                    ‐                        Net Impact ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                    ‐                        Public Safety Partially Funded Justification This meets the Council Goal of: Project Number ‐ 20023 New Public Works Transportation Sandifur Parkway Extension ‐ Phase 2 (West of Road  100) This project continues the extension of Sandifur Parkway with a connection to the Pahlisch Homes development. This project would include a new asphalt roadway  surface, curb/gutter, and sidewalks consistent with Sandifur Parkway Phase 1. PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT Summary Project Description Sandifur Parkway Extension ‐ Phase 2 (West of Road  100) PICTURE Desirable Promote a highly‐functional multi‐modal transportation  network 2020-2025 Capital Improvement Plan - Page 59 of 117 Page 62 of 152 2020‐2025 Capital Improvement Plan Status Department Group Assessment Principal Need Funding Status Quality of Life Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design 300                  ‐                        ‐                 ‐                 ‐                 300            ‐                 ‐                 ‐                 300                  Land & Right‐of‐Way ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Construction ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Other ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Total Expenditures 300                 ‐                        ‐                 ‐                 ‐                 300            ‐                 ‐                 ‐                 300                  Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 I‐182  Corridor Impact Fund 60                   ‐                        ‐                 ‐                 ‐                 60              ‐                 ‐                 ‐                 60                    Unsecured State Grant 240                 ‐                        ‐                 ‐                 ‐                 240            ‐                 ‐                 ‐                 240                  ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Total Funding 300                 ‐                        ‐                 ‐                 ‐                 300            ‐                 ‐                 ‐                 300                  Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Expenses ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Net Impact ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Traffic Analysis for Interstate 182 at Road 68  Interchange As a continuing effort associated with the Road 68 corridor and the Interstate 182 interchange, a traffic analysis is proposed that will further study the connectivity of  this critical interchange to determine if improvements can be made to improve efficiency, provide better connectivity for motorists, and reduce congestion.  PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT Promote a highly‐functional multi‐modal transportation  network Summary Project Description Traffic Analysis for Interstate 182 at Road 68 Interchange PICTURE Desirable Project Number ‐ 20017 New Public Works Transportation Public Safety Partially Funded Justification This meets the Council Goal of: 2020-2025 Capital Improvement Plan - Page 60 of 117 Page 63 of 152 2020‐2025 Capital Improvement Plan Traffic Analysis for Interstate 182 at State Route 395 Interchange Status Department Group Assessment Principal Need Funding Status Quality of Life Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design 265                  ‐                        ‐                 ‐                 ‐                 265            ‐                 ‐                 ‐                 265                  Land & Right‐of‐Way ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Construction ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Other ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Total Expenditures 265                 ‐                        ‐                 ‐                 ‐                 265            ‐                 ‐                 ‐                 265                  Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 I‐182  Corridor Impact Fund 60                   ‐                        ‐                 ‐                 ‐                 60              ‐                 ‐                 ‐                 60                    Unsecured State Grant 205                 ‐                        ‐                 ‐                 ‐                 205            ‐                 ‐                 ‐                 205                  ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Total Funding 265                 ‐                        ‐                 ‐                 ‐                 265            ‐                 ‐                 ‐                 265                  Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Expenses ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Net Impact ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Summary Project Description Traffic Analysis for Interstate 182 at State Route 395  Interchange PICTURE Project Number ‐ 20019 New Public Works Transportation Desirable Public Safety Partially Funded Justification This meets the Council Goal of: Promote a highly‐functional multi‐modal transportation  network As a continuing effort associated with the Interstate 182 interchange feasibility study done recently by the City of Pasco, this effort will further study the connectivity  of this critical interchange to determine if improvements can be made to improve efficiency and provide better connectivity for motorists, taking the pressure off of  other areas of the City transportation network.  PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT 2020-2025 Capital Improvement Plan - Page 61 of 117 Page 64 of 152 2020‐2025 Capital Improvement Plan Traffic Analysis for State Route 12 Interchange Status Department Group Assessment Principal Need Funding Status Quality of Life Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design 250                 ‐                        ‐                 ‐                 ‐                 ‐                 250            ‐                 ‐                 250                  Land & Right‐of‐Way ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Construction ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Other ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Total Expenditures 250                 ‐                        ‐                 ‐                 ‐                 ‐                 250            ‐                 ‐                 250                  Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 I‐182  Corridor Impact Fund 60                   ‐                        ‐                 ‐                 ‐                 ‐                 60              ‐                 ‐                 60                    Unsecured State Grant 190                 ‐                        ‐                 ‐                 ‐                 ‐                 190            ‐                 ‐                 190                  ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Total Funding 250                 ‐                        ‐                 ‐                 ‐                 ‐                 250            ‐                 ‐                 250                  Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Expenses ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Net Impact ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Summary Project Description Traffic Analysis for State Route 12 Interchange PICTURE Project Number ‐ 20020 New Public Works Transportation Desirable Public Safety Partially Funded Justification This meets the Council Goal of: Promote a highly‐functional multi‐modal transportation  network Identified as a possible interchange improvement by WSDOT this location serves a large potential industrial area that the City of Pasco has already invested money  in. This analysis, in conjunction with WSDOT and Federal Highways, would provide the information to better prepare a strategic plan in addressing transportation  connectivity with State Route (SR) 12 in this area. PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT 2020-2025 Capital Improvement Plan - Page 62 of 117 Page 65 of 152 2020‐2025 Capital Improvement Plan Status Department Group Assessment Principal Need Funding Status Quality of Life Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design 48                    ‐                        ‐                 ‐                 48              ‐                 ‐                 ‐                 ‐                 48                    Land & Right‐of‐Way ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Construction 435                 ‐                        ‐                 ‐                 ‐                 435            ‐                 ‐                 ‐                 435                  Other ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Total Expenditures 483                 ‐                        ‐                 ‐                 48              435            ‐                 ‐                 ‐                 483                  Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 LID 483                 ‐                        ‐                 ‐                 48              435            ‐                 ‐                 ‐                 483                  ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Total Funding 483                 ‐                        ‐                 ‐                 48              435            ‐                 ‐                 ‐                 483                  Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Expenses ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Net Impact ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Public Safety Not Funded Justification This meets the Council Goal of: Project Number ‐ 20024 New Public Works Transportation James Street Improvements ‐ Oregon Avenue to East  End This project is intended to provide a safe and consistent roadway to many of Pasco’s heavy machinery and agricultural/industrial oriented businesses. James  Street has evolved over time as different businesses located along its sides into what is now an inconsistent mixture of intermingled access points, utility risers,  and poorly lit travel ways.  This project will redefine the heavily used roadway by providing a new heavy duty roadway section, curb/gutter and pedestrian considerations along with right‐ of‐way improvements. These improvements will enhance accessibility and safety for the traveling public and the businesses within this corridor, now and in the  future. PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT Summary Project Description James Street Improvements ‐ Oregon Avenue to East  End PICTURE Desirable Promote a highly‐functional multi‐modal transportation  network 2020-2025 Capital Improvement Plan - Page 63 of 117 Page 66 of 152 This page intentionally left blank. 2020-2025 Capital Improvement Plan - Page 64 of 117 Page 67 of 152 Irrigation 2020-2025 Capital Improvement Plan - Page 65 of 117 Page 68 of 152 2020‐2025 Capital Improvement Plan Status Department Group Assessment Principal Need Funding Status Quality of Life Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design ‐                      ‐                       ‐                  ‐                  ‐                  ‐                 ‐                      ‐                  ‐                 ‐                       Land & Right‐of‐Way ‐                       ‐                       ‐                  ‐                  ‐                  ‐                 ‐                      ‐                  ‐                 ‐                       Construction 350                 ‐                      50              50              50              50              50                  50              50              300                  Other ‐                       ‐                       ‐                  ‐                  ‐                  ‐                 ‐                      ‐                  ‐                 ‐                       Total Expenditures 350                 ‐                      50              50              50              50              50                  50              50              300                  Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Utility Rate 350                  ‐                      50              50              50              50              50                  50              50              300                  ‐                      ‐                       ‐                  ‐                  ‐                  ‐                 ‐                      ‐                  ‐                 ‐                       ‐                      ‐                       ‐                  ‐                  ‐                  ‐                 ‐                      ‐                  ‐                 ‐                       ‐                      ‐                       ‐                  ‐                  ‐                  ‐                 ‐                      ‐                  ‐                 ‐                       ‐                      ‐                       ‐                  ‐                  ‐                  ‐                 ‐                      ‐                  ‐                 ‐                       Total Funding 350                 ‐                      50              50              50              50              50                  50              50              300                  Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                      ‐                       ‐                  ‐                  ‐                  ‐                 ‐                      ‐                  ‐                 ‐                       Expenses ‐                      ‐                       ‐                  ‐                  ‐                  ‐                 ‐                      ‐                  ‐                 ‐                       Net Impact ‐                      ‐                       ‐                  ‐                  ‐                  ‐                 ‐                      ‐                  ‐                 ‐                       Annual Irrigation System Improvements ‐  Development PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT Quality Improvement Fully Funded Justification This meets the Council Goal of: Summary Project Description This is an annual program to address the irrigation system needs and enable the City to extend/improve irrigation lines when an opportunity presents itself  with a private development or other City project. The program anticipates future annexations and the need to extend irrigation services. The implementation  of this program improves irrigation service to the community. This is an ongoing effort to improve efficiency and  effectiveness in the use of public resources in the  delivery of municipal services, programs, and long‐term  maintenance and viability of public facilities.   Annual Irrigation System Improvements ‐  Development PICTURE Desirable Project Number ‐ 20032 New Public Works Irrigation 2020-2025 Capital Improvement Plan - Page 66 of 117 Page 69 of 152 2020‐2025 Capital Improvement Plan Chapel Hill Boulevard to Interstate 182 ‐  Irrigation Main Status Department Group Assessment Principal Need Funding Status Quality of Life Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design 20                   ‐                       ‐                 20              ‐                  ‐                  ‐                  ‐                  ‐                 20                    Land & Right‐of‐Way ‐                       ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Construction 80                   ‐                       ‐                 80              ‐                  ‐                  ‐                  ‐                  ‐                 80                    Other ‐                       ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Total Expenditures 100                 ‐                       ‐                 100            ‐                  ‐                  ‐                  ‐                  ‐                 100                  Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Utility Rate 100                  ‐                       ‐                 100             ‐                  ‐                  ‐                  ‐                  ‐                 100                  ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Total Funding 100                 ‐                       ‐                 100            ‐                  ‐                  ‐                  ‐                  ‐                 100                  Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                      ‐                       ‐                  ‐                  ‐                  ‐                 ‐                  ‐                  ‐                 ‐                       Expenses ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Net Impact ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT Quality Improvement Fully Funded Justification This meets the Council Goal of: Summary Project Description This project will replace an existing 10 inch irrigation main currently under Interstate 182 east of Road 84 with a 12 inch irrigation main.  The existing 10 inch  main under the freeway is connected to a 12 inch main on the north side of Interstate 182 and a 16 inch main on the south side.  This creates a 'pinch point'  in the irrigation system.  Replacing the existing 10 inch main with a larger size pipe will increase the operating pressures within the system to meet the City's  established requirements. This is part of an ongoing effort to improve efficiency  and effectiveness in the use of public resources in the  delivery of municipal services, programs, and long‐term  maintenance and viability of public facilities.   Chapel Hill Boulevard to Interstate 182 ‐ Irrigation  Main PICTURE Project Number ‐ 18054 New Public Works Irrigation Necessary 2020-2025 Capital Improvement Plan - Page 67 of 117 Page 70 of 152 2020‐2025 Capital Improvement Plan Columbia River Intake Capacity Upgrades Status Department Group Assessment Principal Need Funding Status Quality of Life Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design 59                   ‐                      59              ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Land & Right‐of‐Way ‐                       ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Construction 170                 ‐                       ‐                 170            ‐                  ‐                  ‐                  ‐                  ‐                 170                  Other ‐                       ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Total Expenditures 229                 ‐                      59              170            ‐                  ‐                  ‐                  ‐                  ‐                 170                  Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Utility Rate 229                  ‐                      59              170             ‐                  ‐                  ‐                  ‐                  ‐                 170                  ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Total Funding 229                 ‐                      59              170            ‐                  ‐                  ‐                  ‐                  ‐                 170                  Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                      ‐                       ‐                  ‐                 ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Expenses ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Net Impact ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT Quality Improvement Fully Funded Justification This meets the Council Goal of: Summary Project Description Prior to the Columbia Water Intake Project being completed, 75% of the water pumped out of the Columbia River from the existing intake structure went to  the West Pasco Water Treatment Plant (WPWTP) and 25% went to the irrigation system.  With the completion of the new Columbia Water Intake Project,  the previous existing intake structure can now be dedicated 100% to the irrigation system.  However, the condition of the older intake structure needs to be  evaluated and the capacity of the intake structure needs to be increased to accommodate the growth in irrigation needs.  This project will evaluate, design  and construct needed improvements. This is part of an ongoing effort to improve efficiency  and effectiveness in the use of public resources in the  delivery of municipal services, programs, and long‐term  maintenance and viability of public facilities.   Columbia River Intake Capacity Upgrades PICTURE Project Number ‐ 20034 New Public Works Irrigation Necessary 2020-2025 Capital Improvement Plan - Page 68 of 117 Page 71 of 152 2020‐2025 Capital Improvement Plan Irrigation Projects Allocated From Transportation Status Department Group Assessment Principal Need Funding Status Quality of Life Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design 2                     ‐                       ‐                 2                ‐                  ‐                  ‐                  ‐                  ‐                 2                      Land & Right‐of‐Way ‐                       ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Construction 10                   ‐                       ‐                 10              ‐                  ‐                  ‐                  ‐                  ‐                 10                    Other ‐                       ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Total Expenditures 12                   ‐                       ‐                 12              ‐                  ‐                  ‐                  ‐                  ‐                 12                    Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Utility Rate 12                    ‐                       ‐                 12               ‐                  ‐                  ‐                  ‐                  ‐                 12                    ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Total Funding 12                   ‐                       ‐                 12              ‐                  ‐                  ‐                  ‐                  ‐                 12                    Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                      ‐                       ‐                  ‐                  ‐                  ‐                 ‐                  ‐                  ‐                 ‐                       Expenses ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Net Impact ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       This page is intended as a place holder for any or all transportation projects that also require irrigation utility funds. Wrigley Drive Extension $12,000 in 2020 PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT Summary Project Description Irrigation Projects Allocated From Transportation Ongoing Public Works Irrigation Necessary Quality Improvement Fully Funded Justification This meets the Council Goal of: Community Transportation Network Promote a highly‐functional multi‐modal transportation  network. 2020-2025 Capital Improvement Plan - Page 69 of 117 Page 72 of 152 2020‐2025 Capital Improvement Plan Well Capacity Upgrades Status Department Group Assessment Principal Need Funding Status Quality of Life Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design 50                   ‐                       ‐                  ‐                 50              ‐                  ‐                  ‐                  ‐                 50                    Land & Right‐of‐Way ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Construction 1,360             ‐                       ‐                  ‐                 420            470            470            ‐                  ‐                 1,360              Other ‐                      ‐                       ‐                  ‐                  ‐                 ‐                  ‐                  ‐                  ‐                 ‐                       Total Expenditures 1,410             ‐                       ‐                  ‐                 470            470            470            ‐                  ‐                 1,410              Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Utility Rate 1,410             ‐                       ‐                  ‐                 470            470            470            ‐                  ‐                 1,410              ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       ‐                      ‐                       ‐                 ‐                  ‐                  ‐                  ‐                 ‐                  ‐                 ‐                       ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Total Funding 1,410             ‐                       ‐                  ‐                 470            470            470            ‐                  ‐                 1,410              Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Expenses ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Net Impact ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT Quality Improvement Fully Funded Justification This meets the Council Goal of: Summary Project Description This project will refurbish or re‐drill existing wells that have sand or cavitation problems, including Island Estates Well, Village Well, and Northwest  Commons well. This is part of an ongoing effort to improve efficiency  and effectiveness in the use of public resources in the  delivery of municipal services, programs, and long‐term  maintenance and viability of public facilities.   Well Capacity Upgrades PICTURE Project Number ‐ 20035 New Public Works Irrigation Necessary 2020-2025 Capital Improvement Plan - Page 70 of 117 Page 73 of 152 Process Water Reuse Facility 2020-2025 Capital Improvement Plan - Page 71 of 117 Page 74 of 152 2020‐2025 Capital Improvement Plan Columbia East Lift Station and Force Main  Status Department Group Assessment Principal Need Funding Status Quality of Life Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design 694                 622                 72              ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Land & Right‐of‐Way 597                 311                 286             ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Construction 13,838           266                 5,263        8,309        ‐                  ‐                  ‐                  ‐                  ‐                 8,309              Other ‐                       ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Total Expenditures 15,129           1,199              5,621        8,309        ‐                  ‐                  ‐                  ‐                  ‐                 8,309              Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Unsecured Revenue Bond 8,489              ‐                      3,180        5,309         ‐                  ‐                  ‐                  ‐                  ‐                 5,309              Federal EDA Grant 3,065             65                    ‐                 3,000         ‐                  ‐                  ‐                  ‐                  ‐                 3,000              WA State Capital Budget 2,575             134                 2,441         ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Franklin Co .09 Grant 1,000             1,000               ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Total Funding 15,129           1,199              5,621        8,309        ‐                  ‐                  ‐                  ‐                  ‐                 8,309              Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Expenses ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Net Impact ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT Service Protection Partially Funded Justification This meets the Council Goal of: Summary Project Description The Columbia East Lift Station portion of this project has been designed, is under construction and will be completed in 2019. The remainder of this project is for the design and construction of two force mains that will serve multiple food processors in the Commercial Avenue Kahlotus  Highway area and direct food process water (industrial waste) to the City's Process Water Resource Facility (PWRF). Three food processors will have use of this  force main: Simplot, Grimmway and Freeze Pack.  This project will allow for the diversion of 1.5 MGD of industrial waste away from the municipal wastewater  treatment plant to the PWRF. Columbia East Lift Station and Force Main  PICTURE Project Number ‐ 17003 New Public Works PWRF Necessary This is part of an ongoing effort to improve efficiency and  effectiveness in the use of public resources in the delivery of  municipal services, programs, and long‐term maintenance  and viability of public facilities.   2020-2025 Capital Improvement Plan - Page 72 of 117 Page 75 of 152 2020‐2025 Capital Improvement Plan Status Department Group Assessment Principal Need Funding Status Quality of Life Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design 249                 212                 37              ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Land & Right‐of‐Way ‐                       ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Construction 8,502             ‐                      3,402        5,100        ‐                  ‐                  ‐                  ‐                  ‐                 5,100              Other ‐                       ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Total Expenditures 8,751             212                 3,439        5,100        ‐                  ‐                  ‐                  ‐                  ‐                 5,100              Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Unsecured Revenue Bond 8,251              ‐                      3,151        5,100         ‐                  ‐                  ‐                  ‐                  ‐                 5,100              HAEIFIC Loan 500                 212                 288            ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Total Funding 8,751             212                 3,439        5,100        ‐                  ‐                  ‐                  ‐                  ‐                 5,100              Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                      ‐                       ‐                  ‐                 ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Expenses ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Net Impact ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Process Water Reuse Facility (PWRF) Irrigation Pump  Station (IPS) Improvements PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT Service Protection Partially Funded Justification This meets the Council Goal of: Summary Project Description The Process Water Reuse Facility (PWRF) includes an Industrial Pump Station (IPS).  The IPS are in serious need of replacement due to piping that is  deteriorating to the point of failure. If the current pump station were to have a major failure, there would be no way to pump the process water out of the  facility to the crop fields. Complete shut down of all food processor partners would be needed until repairs could be made.  This project was fully designed in 2019.  Construction is anticipated to begin in 2019 and be completed in 2020. Process Water Reuse Facility (PWRF) Irrigation Pump  Station (IPS) Improvements PICTURE Necessary This is part of an ongoing effort to improve efficiency and  effectiveness in the use of public resources in the delivery  of municipal services, programs, and long‐term  maintenance and viability of public facilities.   Project Number ‐ 18070 Ongoing Public Works PWRF 2020-2025 Capital Improvement Plan - Page 73 of 117 Page 76 of 152 2020‐2025 Capital Improvement Plan Status Department Group Assessment Principal Need Funding Status Quality of Life Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design 1,502               ‐                       312            1,190          ‐                 ‐                 ‐                 ‐                 ‐                 1,190               Land & Right‐of‐Way ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Construction 21,454            ‐                        ‐                 2,313         19,141      ‐                 ‐                 ‐                 ‐                 21,454             Other ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Total Expenditures 22,956            ‐                       312            3,503         19,141      ‐                 ‐                 ‐                 ‐                 22,644             Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 State PWB Loan 11,000            ‐                       312            688            10,000      ‐                 ‐                 ‐                 ‐                 10,688             Unsecured Revenue Bond 11,956            ‐                        ‐                 2,815         9,141         ‐                 ‐                 ‐                 ‐                 11,956             ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Total Funding 22,956            ‐                       312            3,503         19,141      ‐                 ‐                 ‐                 ‐                 22,644             Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Expenses ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Net Impact ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Process Water Reuse Facility (PWRF) Primary  Treatment Improvement OPERATING IMPACT ANNUAL OPERATING IMPACT This meets the Council Goal of: Summary Project Description This project will construct improvements to the Process Water Reuse Facility (PWRF) to allow for additional capacity and improved treatment of the food processors'  industrial waste being pumped to the facility.  This project will also address the odor issues that currently plague the facility. This is part of an ongoing effort to improve efficiency and  effectiveness in the use of public resources in the delivery of  municipal services, programs, and long‐term maintenance and  viability of public facilities.   PICTURE PROJECT SCOPE ANNUAL ALLOCATION Process Water Reuse Facility (PWRF) Primary Treatment  Improvement Project Number ‐ 19055 New Public Works PWRF Necessary Service Protection Partially Funded Justification 2020-2025 Capital Improvement Plan - Page 74 of 117 Page 77 of 152 Sewer 2020-2025 Capital Improvement Plan - Page 75 of 117 Page 78 of 152 2020‐2025 Capital Improvement Plan 9th and Washington Lift Station Status Department Group Assessment Principal Need Funding Status Quality of Life Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design 60                    53                    7                 ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Land & Right of Way ‐                        ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Construction 620                  ‐                       124            496            ‐                   ‐                   ‐                   ‐                   ‐                  496                   Other ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Total Expenditures 680                  53                    131            496            ‐                   ‐                   ‐                   ‐                   ‐                  496                   Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 2017 Revenue Bond 680                  53                    131            496            ‐                   ‐                   ‐                   ‐                   ‐                  496                   ‐                       ‐                        ‐                   ‐                  ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Total Funding 680                  53                    131            496            ‐                   ‐                   ‐                   ‐                   ‐                  496                   Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Expenses ‐                       ‐                        ‐                   ‐                  ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Net Impact ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        9th and Washington Lift Station Project Number ‐ 16007 Ongoing Public Works Sewer Necessary PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT Service Protection Fully Funded Justification This meets the Council Goal of: Summary Project Description The project will address the following issues: deficient isolation and check valves, wetwell access hatches corrosion and deterioration, drywell access safety  improvements, perimeter security, defective flow meter, transfer switch obsolescence, harmonic conditioner obsolescence, wetwell electrical connection  access safety and drywell motor termination box access safety.  This lift station was originally built in 1964 and rehabilitated in 1999.  It is responsible for conveying sanitary sewer flows from the western portions of the City  to the Waste Water Treatment Plant (WWTP). This is part of an ongoing effort to improve efficiency  and effectiveness in the use of public resources in the  delivery of municipal services, programs, and long‐term  maintenance and viability of public facilities.   2020-2025 Capital Improvement Plan - Page 76 of 117 Page 79 of 152 2020‐2025 Capital Improvement Plan Annual Sewer System Improvements ‐ Development Status Department Group Assessment Principal Need Funding Status Quality of Life Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Land & Right of Way ‐                        ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Construction 1,600              200                  200            200            200            200            200            200            200            1,200               Other ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Total Expenditures 1,600              200                  200            200            200            200            200            200            200            1,200               Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Utility Rate 1,600              200                  200            200            200            200            200            200            200            1,200               ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Total Funding 1,600              200                  200            200            200            200            200            200            200            1,200               Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Expenses ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Net Impact ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT Quality Improvement Fully Funded Justification This meets the Council Goal of: Summary Project Description This is an annual program to address sewer system needs and enable the City to extend/improve sanitary sewer lines when an opportunity presents itself with  a private development or other City project. The program anticipates future annexations and the need to extend sewers. Implementation of this program  improves sanitary sewer service to the community to help address public health issues.  This is part of an ongoing effort to improve efficiency  and effectiveness in the use of public resources in the  delivery of municipal services, programs, and long‐term  maintenance and viability of public facilities.   Annual Sewer System Improvements ‐ Development PICTURE Project Number ‐ 20036 New Public Works Sewer Desirable 2020-2025 Capital Improvement Plan - Page 77 of 117 Page 80 of 152 2020‐2025 Capital Improvement Plan Pearl Street Lift Station Status Department Group Assessment Principal Need Funding Status Quality of Life Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design 247                  141                  106            ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Land & Right of Way 5                       ‐                       5                  ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Construction 897                  ‐                       224            673            ‐                   ‐                   ‐                   ‐                   ‐                  673                   Other ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Total Expenditures 1,149              141                  335            673            ‐                   ‐                   ‐                   ‐                   ‐                  673                   Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 2017 Revenue Bond 1,149              141                  335            673            ‐                   ‐                   ‐                   ‐                   ‐                  673                   ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        ‐                       ‐                        ‐                   ‐                   ‐                  ‐                   ‐                   ‐                  ‐                        Total Funding 1,149              141                  335            673            ‐                   ‐                   ‐                   ‐                   ‐                  673                   Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Expenses ‐                       ‐                        ‐                   ‐                  ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Net Impact ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Pearl Street Lift Station PICTURE Project Number ‐ 15002 Ongoing Public Works Sewer Necessary PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT Quality Improvement Fully Funded Justification This meets the Council Goal of: Summary Project Description This project will completely rebuild the existing sanitary sewer lift station in a nearby location. Originally built in the 1950's, this station has very poor reliability and functionality. It has a track record of failing and backing up into a nearby residence. The  access to the control center for this lift station is in the middle of a sidewalk on a busy street posing significant safety issues. This lift station is a priority.  This is part of an ongoing effort to improve efficiency  and effectiveness in the use of public resources in the  delivery of municipal services, programs, and long‐term  maintenance and viability of public facilities.   2020-2025 Capital Improvement Plan - Page 78 of 117 Page 81 of 152 2020‐2025 Capital Improvement Plan Road 36 Lift Station Upgrades Status Department Group Assessment Principal Need Funding Status Quality of Life Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design 165                  57                    108            ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Land & Right of Way ‐                        ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Construction 528                  ‐                       27               501            ‐                   ‐                   ‐                   ‐                   ‐                  501                   Other ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Total Expenditures 693                  57                    135            501            ‐                   ‐                   ‐                   ‐                   ‐                  501                   Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 2017 Revenue Bond 693                  57                    135            501            ‐                   ‐                   ‐                   ‐                   ‐                  501                   ‐                       ‐                        ‐                   ‐                  ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Total Funding 693                  57                    135            501            ‐                   ‐                   ‐                   ‐                   ‐                  501                   Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Expenses ‐                       ‐                        ‐                   ‐                  ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Net Impact ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Road 36 Lift Station Upgrades Project Number ‐ 16006 Ongoing Public Works Sewer Necessary PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT Asset Protection Fully Funded Justification This meets the Council Goal of: Summary Project Description This project will provide upgrades to the sanitary sewer lift station at Road 36.   In addition to the sewer flows tributary to this lift station, this pump station has two additional lift stations pumping into it. The detention time and pump run  cycles indicate the current configuration is at capacity. Downstream surging is occurring indicating small pipe sizing issues. This pump station has overflowed  onto airport property in the past.    This is part of an ongoing effort to improve efficiency  and effectiveness in the use of public resources in the  delivery of municipal services, programs, and long‐term  maintenance and viability of public facilities.   2020-2025 Capital Improvement Plan - Page 79 of 117 Page 82 of 152 2020‐2025 Capital Improvement Plan Maitland Lift Station ‐ Purchase and Install 4th Pump Status Department Group Assessment Principal Need Funding Status Quality of Life Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design 21                    18                    3                 ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Land & Right of Way ‐                        ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Construction 85                    ‐                       43               42               ‐                   ‐                   ‐                   ‐                   ‐                  42                     Other ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Total Expenditures 106                  18                    46              42              ‐                   ‐                   ‐                   ‐                   ‐                  42                     Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 2017 Revenue Bond 106                  18                    46               42               ‐                   ‐                   ‐                   ‐                   ‐                  42                     ‐                       ‐                        ‐                   ‐                  ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Total Funding 106                  18                    46              42              ‐                   ‐                   ‐                   ‐                   ‐                  42                     Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Expenses ‐                       ‐                        ‐                   ‐                  ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Net Impact ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Maitland Lift Station ‐ Purchase and Install 4th Pump PICTURE Project Number ‐15003 Ongoing Public Works Sewer Necessary PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT Quality Improvement Fully Funded Justification This meets the Council Goal of: Summary Project Description This project includes the installation of a 4th pump and a Variable Frequency Drive (VFD) to accommodate low flows.  This improvement will decrease the  slugging of the headwork's and minimize the ragging of the impellers due to lower flows. Currently, the station pumps are oversized for the existing flows which  cause the pumps to cycle frequently and run at a minimum speed which creates ragging.     This is part of an ongoing effort to improve efficiency  and effectiveness in the use of public resources in the  delivery of municipal services, programs, and long‐term  maintenance and viability of public facilities.   2020-2025 Capital Improvement Plan - Page 80 of 117 Page 83 of 152 2020‐2025 Capital Improvement Plan Sewer Projects Allocated From Transportation Status Department Group Assessment Principal Need Funding Status Quality of Life Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design 2                      ‐                        ‐                  2                 ‐                   ‐                   ‐                   ‐                   ‐                  2                       Land & Right of Way ‐                        ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Construction 11                    ‐                        ‐                  11               ‐                   ‐                   ‐                   ‐                   ‐                  11                     Other ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Total Expenditures 13                    ‐                        ‐                  13              ‐                   ‐                   ‐                   ‐                   ‐                  13                     Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Utility Rate 13                    ‐                        ‐                  13               ‐                   ‐                   ‐                   ‐                   ‐                  13                     ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Total Funding 13                    ‐                        ‐                  13              ‐                   ‐                   ‐                   ‐                   ‐                  13                     Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Expenses ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Net Impact ‐                       ‐                        ‐                   ‐                  ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Sewer Projects Allocated From Transportaiton Ongoing Public Works Sewer Desirable Project Scope ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT Public Safety Fully Funded Justification This meets the Council Goal of: Summary Project Description This page is intended as a place holder for any or all transportation projects that also require sewer utility funds. Wrigley Drive Extension $13,000 in 2020 Promote a highly‐functional multi‐modal transportation  network. 2020-2025 Capital Improvement Plan - Page 81 of 117 Page 84 of 152 2020‐2025 Capital Improvement Plan Northwest Area Lift Station Status Department Group Assessment Principal Need Funding Status Quality of Life Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design 350                 ‐                       ‐                 350            ‐                  ‐                  ‐                  ‐                  ‐                 350                  Land & Right of Way ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Construction 3,150             ‐                       ‐                 3,150        ‐                  ‐                  ‐                  ‐                  ‐                 3,150              Other ‐                       ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Total Expenditures 3,500             ‐                       ‐                 3,500        ‐                  ‐                  ‐                  ‐                  ‐                 3,500              Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Unsecured Revenue Bond 3,000             ‐                       ‐                 3,000        ‐                  ‐                  ‐                  ‐                  ‐                 3,000              Utility Expansion Fees 500                 ‐                       ‐                 500            ‐                  ‐                  ‐                  ‐                  ‐                 500                  ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       ‐                      ‐                       ‐                  ‐                 ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Total Funding 3,500             ‐                       ‐                 3,500        ‐                  ‐                  ‐                  ‐                  ‐                 3,500              Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Expenses ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Net Impact ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Northwest Area Lift Station PICTURE Project Number ‐ 19050 New Public Works Sewer Necessary PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT Growth Partially Funded Justification This meets the Council Goal of: Summary Project Description This project will partner with a private developer to construct a regional sanitary sewer lift station to serve the Northwest area of the City.  The Developer will  construct the lift station to serve their development while the increase in the capacity of the lift station will be this project.  A portion of the Northwest area can  gravity flow to the new Harris Road sewer trunk main.  The remaining area, due to topography, will need to flow to this regional lift station and be pumped to an  extension of the Harris Road Sewer Transmission Main project.  The estimates shown for this project are for the City's portion of the lift station project only.  This is part of an ongoing effort to improve efficiency and  effectiveness in the use of public resources in the delivery of  municipal services, programs, and long‐term maintenance and  viability of public facilities.   2020-2025 Capital Improvement Plan - Page 82 of 117 Page 85 of 152 2020‐2025 Capital Improvement Plan WWTP Improvements ‐ Phase 1 Status Department Group Assessment Principal Need Funding Status Quality of Life Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design 3,462             ‐                      100            3,362        ‐                  ‐                  ‐                  ‐                  ‐                 3,362              Land & Right of Way ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Construction 22,443           ‐                       ‐                 6,678        8,542        7,223        ‐                  ‐                  ‐                 22,443            Other ‐                       ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Total Expenditures 25,905           ‐                      100            10,040      8,542        7,223        ‐                  ‐                  ‐                 25,805            Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Unsecured Local Grant/Loan 10,000           ‐                       ‐                 5,000        3,000        2,000        ‐                  ‐                  ‐                 10,000            Unsecured Revenue Bond 14,221           ‐                       ‐                 3,456        5,542        5,223        ‐                  ‐                  ‐                 14,221            2017 Revenue Bond 1,684             ‐                      100            1,584        ‐                  ‐                 ‐                  ‐                  ‐                 1,584              ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Total Funding 25,905           ‐                      100            10,040      8,542        7,223        ‐                  ‐                  ‐                 25,805            Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Expenses ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Net Impact ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT Asset Protection Partially Funded Justification This meets the Council Goal of: Summary Project Description In 2019, the City completed the Waste Water Treatment Plant (WWTP) Facility Plan.  This plan is required by the Washington Department of Ecology when a facility  approaches its design capacity.  This plan identifies the future needs and expansion requirements to accommodate future growth for the next 20+ years. This  project is the first phase of the WWTP improvements as recommended by the WWTP Facility Plan.  The following projects from the Facility Plan are included in this  phase of the project:   1A Outfall Study; 1B Secondary Treatment Project 1; 1C Outfall Project 1; 1D Mechanical Dewatering; 1E Mechanical Thickening NOTE: Costs for this project shown below have been escalated for inflation and are slightly different from the numbers shown in the Facility Plan. This is part of an ongoing effort to improve efficiency and  effectiveness in the use of public resources in the delivery of  municipal services, programs, and long‐term maintenance and  viability of public facilities.   WWTP Improvements ‐ Phase 1 PICTURE Project Number ‐ 19072 New Public Works Sewer Necessary 2020-2025 Capital Improvement Plan - Page 83 of 117 Page 86 of 152 2020‐2025 Capital Improvement Plan Status Department Group Assessment Principal Need Funding Status Quality of Life Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design 400                  ‐                       ‐                  400             ‐                   ‐                   ‐                   ‐                   ‐                  400                   Land & Right of Way ‐                       ‐                       ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Construction 4,198               ‐                       ‐                  4,198         ‐                   ‐                   ‐                   ‐                   ‐                  4,198                Other ‐                       ‐                       ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Total Expenditures 4,598               ‐                       ‐                  4,598         ‐                   ‐                   ‐                   ‐                   ‐                  4,598                Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 LID 3,798               ‐                       ‐                  3,798         ‐                   ‐                   ‐                   ‐                   ‐                  3,798                Unsecured Revenue Bond 800                  ‐                       ‐                  800             ‐                   ‐                   ‐                   ‐                   ‐                  800                   ‐                       ‐                       ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        ‐                       ‐                       ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        ‐                       ‐                       ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Total Funding 4,598               ‐                       ‐                  4,598         ‐                   ‐                   ‐                   ‐                   ‐                  4,598                Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                        ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Expenses ‐                       ‐                       ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Net Impact ‐                       ‐                       ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Project Number ‐ 20040 New Public Works Sewer Norhtwest Area Trunkline ‐ Sandifur Parkway Extention  to Desiree Street PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT Quality Improvement Not Funded Justification This meets the Council Goal of: Summary Project Description This project will extend the Northwest Area sewer trunkline from Sandifur Parkway Extention to Desiree Street.  This project will provide sewer service to the  Northwest area as it continues to develop. The sewer trunk line from Harris Road to Sandifur Parkway Extention is currently proposed to be constructed by Developers. This is part of an ongoing effort to improve efficiency and  effectiveness in the use of public resources in the delivery of  municipal services, programs, and long‐term maintenance  and viability of public facilities.   Northwest Area Trunkline ‐ Sandifur Parkway Extention to  Desiree Street PICTURE Necessary 2020-2025 Capital Improvement Plan - Page 84 of 117 Page 87 of 152 2020‐2025 Capital Improvement Plan Public Works Operation Center Status Department Group Assessment Principal Need Funding Status Quality of Life Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Land & Right of Way ‐                        ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Construction ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Other ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Total Expenditures ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        ‐                       ‐                        ‐                   ‐                  ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Total Funding ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Expenses ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Net Impact ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        OPERATING IMPACT ANNUAL OPERATING IMPACT Public Works Operations Center PICTURE Project Number ‐ 20037 New Public Works Sewer Necessary Growth Not Funded Justification This meets the Council Goal of: The information for this project is currently being developed as part of the Comprehensive Sewer Plan Update project. There is a need for an Equipment Maintenance Facility. Once the plan is complete we  will be able to present detailed information. Summary Project Description Project Scope ANNUAL ALLOCATION This is part of an ongoing effort to improve efficiency  and effectiveness in the use of public resources, the  delivery of municipal services, programs, and long‐term  maintenance and viability of public facilities.   2020-2025 Capital Improvement Plan - Page 85 of 117 Page 88 of 152 2020‐2025 Capital Improvement Plan Road 52 and Pearl Street Lift Station ‐ Riverview Status Department Group Assessment Principal Need Funding Status Quality of Life Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design 300                  ‐                       ‐                 300             ‐                  ‐                  ‐                  ‐                  ‐                 300                  Land & Right of Way ‐                       ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Construction 2,120             ‐                      336            384            1,400        ‐                  ‐                  ‐                  ‐                 1,784              Other ‐                      ‐                       ‐                  ‐                  ‐                 ‐                  ‐                  ‐                  ‐                 ‐                       Total Expenditures 2,420             ‐                      336            684            1,400        ‐                  ‐                  ‐                  ‐                 2,084              Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Unsecured Revenue Bond 2,420             ‐                      336            684            1,400        ‐                  ‐                  ‐                  ‐                 2,084              ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       ‐                      ‐                       ‐                  ‐                  ‐                 ‐                  ‐                  ‐                  ‐                 ‐                       ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Total Funding 2,420             ‐                      336            684            1,400        ‐                  ‐                  ‐                  ‐                 2,084              Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Expenses ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Net Impact ‐                      ‐                       ‐                  ‐                  ‐                  ‐                 ‐                  ‐                  ‐                 ‐                       Road 52 and Pearl Street Lift Station ‐ Riverview PICTURE Project Number ‐ 19053 Ongoing Public Works Sewer Desirable PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT Quality Improvement Not Funded Justification This meets the Council Goal of: Summary Project Description To sustain development within the E. Riverview area at an appropriate density, the construction of a sanitary sewer lift station is needed. The construction of this  east lift station will make properties within this sub‐basin area (as described in the 2014 Sewer Comprehensive plan)  able to be served by City sanitary sewer.  This is part of an ongoing effort to improve efficiency and  effectiveness in the use of public resources in the delivery of  municipal services, programs, and long‐term maintenance  and viability of public facilities.   2020-2025 Capital Improvement Plan - Page 86 of 117 Page 89 of 152 2020‐2025 Capital Improvement Plan Road 84 and Roberts Drive Lift Station ‐ Riverview Status Department Group Assessment Principal Need Funding Status Quality of Life Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design 500                 ‐                       ‐                  ‐                  ‐                 500            ‐                  ‐                  ‐                 500                  Land & Right of Way ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Construction 2,000             ‐                       ‐                  ‐                  ‐                  ‐                 2,000        ‐                  ‐                 2,000              Other ‐                      ‐                       ‐                  ‐                  ‐                 ‐                  ‐                  ‐                  ‐                 ‐                       Total Expenditures 2,500             ‐                       ‐                  ‐                  ‐                 500            2,000        ‐                  ‐                 2,500              Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Unsecured Revenue Bond 2,500             ‐                       ‐                  ‐                  ‐                 500            2,000        ‐                  ‐                 2,500              ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       ‐                      ‐                       ‐                  ‐                  ‐                 ‐                  ‐                  ‐                  ‐                 ‐                       ‐                      ‐                      ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Total Funding 2,500             ‐                       ‐                  ‐                  ‐                 500            2,000        ‐                  ‐                 2,500              Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Expenses ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Net Impact ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Road 84 and Roberts Drive Lift Station ‐ Riverview PICTURE Project Number ‐ 19052 New Public Works Sewer Desirable PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT Quality Improvement Not Funded Justification This meets the Council Goal of: Summary Project Description To sustain development within the W. Riverview area at an appropriate density, the construction of a sanitary sewer lift station is needed. The construction of this  west lift station will make properties within this sub‐basin area (as described in the 2014 Sewer Comprehensive plan)  able to be served by City sanitary sewer.  This is part of an ongoing effort to improve efficiency and  effectiveness in the use of public resources in the delivery of  municipal services, programs, and long‐term maintenance  and viability of public facilities.   2020-2025 Capital Improvement Plan - Page 87 of 117 Page 90 of 152 2020‐2025 Capital Improvement Plan Southeast Industrial Trunkline  Status Department Group Assessment Principal Need Funding Status Quality of Life Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design ‐                        ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Land & Right of Way ‐                       ‐                       ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Construction ‐                       ‐                       ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Other ‐                       ‐                       ‐                   ‐                   ‐                   ‐                  ‐                   ‐                   ‐                  ‐                        Total Expenditures ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 ‐                       ‐                       ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        ‐                       ‐                       ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        ‐                       ‐                       ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        ‐                       ‐                       ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        ‐                       ‐                       ‐                   ‐                   ‐                  ‐                   ‐                   ‐                   ‐                  ‐                        Total Funding ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                       ‐                       ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Expenses ‐                       ‐                       ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Net Impact ‐                       ‐                       ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Southest Industrial Trunkline  PICTURE Project Number ‐ 20042 New Public Works Sewer Necessary PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT Growth Not Funded Justification This meets the Council Goal of: Summary Project Description This is part of an ongoing effort to improve efficiency  and effectiveness in the use of public resources in the  delivery of municipal services, programs, and long‐term  maintenance and viability of public facilities.   The information for this project is currently being developed by RH2 as part of the Comprehensive  Sewer Plan Update project.  This is a placeholder and this project will be  added to the CIP next year  when we have more detailed information to present. 2020-2025 Capital Improvement Plan - Page 88 of 117 Page 91 of 152 2020‐2025 Capital Improvement Plan Trunkline Deficiency ‐ Court Street Status Department Group Assessment Principal Need Funding Status Quality of Life Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design ‐                        ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Land & Right of Way ‐                       ‐                       ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Construction ‐                       ‐                       ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Other ‐                       ‐                       ‐                   ‐                   ‐                   ‐                  ‐                   ‐                   ‐                  ‐                        Total Expenditures ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 ‐                       ‐                       ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        ‐                       ‐                       ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        ‐                       ‐                       ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        ‐                       ‐                       ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        ‐                       ‐                       ‐                   ‐                   ‐                  ‐                   ‐                   ‐                   ‐                  ‐                        Total Funding ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                       ‐                       ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Expenses ‐                       ‐                       ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Net Impact ‐                       ‐                       ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Trunkline Deficiency ‐ Court Street Project Number ‐ 20041 New Public Works Sewer Necessary PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT Growth Not Funded Justification This meets the Council Goal of: Summary Project Description This is part of an ongoing effort to improve efficiency  and effectiveness in the use of public resources in the  delivery of municipal services, programs, and long‐term  maintenance and viability of public facilities.   The information for this project is currently being developed by RH2 as part of the Comprehensive  Sewer Plan Update project.  This is a placeholder and this project will be  added to the CIP next year  when we have more detailed information to present. 2020-2025 Capital Improvement Plan - Page 89 of 117 Page 92 of 152 2020‐2025 Capital Improvement Plan WWTP Improvements ‐ Phase 2 Status Department Group Assessment Principal Need Funding Status Quality of Life Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design 2,570             ‐                       ‐                  ‐                  ‐                  ‐                 2,570        ‐                  ‐                 2,570              Land & Right of Way ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Construction 12,797           ‐                       ‐                  ‐                  ‐                  ‐                  ‐                 6,273        6,524        12,797            Other ‐                       ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Total Expenditures 15,367           ‐                       ‐                  ‐                  ‐                  ‐                 2,570        6,273        6,524        15,367            Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Unsecured Local Grant/Loan 10,000           ‐                       ‐                  ‐                  ‐                  ‐                 2,570        3,000        4,430        10,000            Unsecured Revenue Bond 5,367             ‐                       ‐                  ‐                  ‐                  ‐                  ‐                 3,273        2,094        5,367              ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       ‐                      ‐                      ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Total Funding 15,367           ‐                       ‐                  ‐                  ‐                  ‐                 2,570        6,273        6,524        15,367            Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Expenses ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Net Impact ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT Asset Protection Not Funded Justification This meets the Council Goal of: Summary Project Description In 2019, the City completed the Waste Water Treatment Plant (WWTP) Facility Plan.  This plan is required by the Washington Department of Ecology when a facility  approaches its design capacity.  This plan identifies the future needs and expansion requirements to accommodate future growth for the next 20+ years. This  project is the second phase of the WWTP improvements as recommended by the WWTP Facility Plan.  The following projects from the Facility Plan are included in  this phase of the project:   2A Secondary Treatment Project 2; 2B Outfall Project 2; 2C UV Expansion Project NOTE: This phase extends to 2026. This is part of an ongoing effort to improve efficiency and  effectiveness in the use of public resources in the delivery of  municipal services, programs, and long‐term maintenance and  viability of public facilities.   WWTP Improvements ‐ Phase 2 PICTURE Project Number ‐ 19075 New Public Works Sewer Necessary 2020-2025 Capital Improvement Plan - Page 90 of 117 Page 93 of 152 Stormwater 2020-2025 Capital Improvement Plan - Page 91 of 117 Page 94 of 152 2020‐2025 Capital Improvement Plan 1st Avenue Pipe Rehab Status Department Group Assessment Principal Need Funding Status Quality of Life Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Land & Right‐of‐Way ‐                       ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Construction 249                 ‐                       ‐                  ‐                  ‐                 249            ‐                  ‐                  ‐                 249                  Other ‐                       ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Total Expenditures 249                 ‐                       ‐                  ‐                  ‐                 249            ‐                  ‐                  ‐                 249                  Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Utility Rate 249                  ‐                       ‐                  ‐                  ‐                 249             ‐                  ‐                  ‐                 249                  ‐                       ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Total Funding 249                 ‐                       ‐                  ‐                  ‐                 249            ‐                  ‐                  ‐                 249                  Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                      ‐                       ‐                  ‐                  ‐                  ‐                 ‐                  ‐                  ‐                 ‐                       Expenses ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Net Impact ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       1st Avenue Pipe Rehab PICTURE Project Number ‐ 18065 New Public Works Stormwater Desirable This is part of an ongoing effort to improve efficiency  and effectiveness in the use of public resources in the  delivery of municipal services, programs, and long‐term  maintenance and viability of public facilities.   PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT Quality Improvement Fully Funded Justification This meets the Council Goal of: Summary Project Description This project will reline 348 linear foot of 30 inch concrete pipe under 1st Avenue between West Lewis Street and West Columbia Street, repair joint offsets  with couplings between West Sylvester Street and West Bonneville Street, repair 3 slightly offset joints located north of West Bonneville Street and reline  842 linear feet of 18 inch pipe tributary to Volunteer Park.  THIS PROJECT MAY BE PARTIALLY ADDRESSED BY LEWIS STREET OVERPASS PROJECT. FURTHER RESEARCH IS NEEDED 2020-2025 Capital Improvement Plan - Page 92 of 117 Page 95 of 152 2020‐2025 Capital Improvement Plan Annual Stormwater Improvements ‐ Development Status Department Group Assessment Principal Need Funding Status Quality of Life Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Land & Right‐of‐Way ‐                       ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Construction 350                 ‐                      50              50              50              50              50              50              50              300                  Other ‐                       ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Total Expenditures 350                 ‐                      50              50              50              50              50              50              50              300                  Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Utility Rate 350                  ‐                      50              50              50              50              50              50              50              300                  ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Total Funding 350                 ‐                      50              50              50              50              50              50              50              300                  Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Expenses ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Net Impact ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Annual Stormwater Improvements ‐ Development Project Number ‐ 20043 New Public Works Stormwater Desirable This is part of an ongoing effort to improve efficiency  and effectiveness in the use of public resources in the  delivery of municipal services, programs, and long‐term  maintenance and viability of public facilities.   PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT Quality Improvement Fully Funded Justification This meets the Council Goal of: Summary Project Description This is an annual program to address stormwater system needs and enable the City to extend or improve storm sewer lines when an opportunity presents  itself with a private development or other City project. The program anticipates future annexations and the need to extend storm sewers. Implementation o this program improves stormwater service to the community and addresses public health issues.  2020-2025 Capital Improvement Plan - Page 93 of 117 Page 96 of 152 2020‐2025 Capital Improvement Plan Stormwater Projects Allocated From Transportation Status Department Group Assessment Principal Need Funding Status Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Land & Right‐of‐Way ‐                        ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Construction 600                  ‐                       15               250            235            100            ‐                   ‐                   ‐                  585                   Other ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Total Expenditures 600                  ‐                       15              250            235            100            ‐                   ‐                   ‐                  585                   Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Utility Rate 600                  ‐                       15               250            235            100            ‐                   ‐                   ‐                  585                   ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Total Funding 600                  ‐                       15              250            235            100            ‐                   ‐                   ‐                  585                   Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Expenses ‐                       ‐                        ‐                   ‐                  ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Net Impact ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Stormwater Projects Allocated From Transportation Ongoing Public Works Stormwater Necessary Public Safety Fully Funded Justification This meets the Council Goal of: Quality of Life Community Transportation Network Summary Project Description This page is intended as a place holder for any or all transportation projects that also require stormwater utility funds. Lewis Street Overpass $15,000 in 2019, $150,000 in 2020 and $135,000 in 2021 Lewis Street Corridor Improvements $100,000 in 2020, $100,000 in 2021 and $100,000 in 2022 PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT 2020-2025 Capital Improvement Plan - Page 94 of 117 Page 97 of 152 2020‐2025 Capital Improvement Plan North Industrial Way Infiltration Retrofit Project Status Department Group Assessment Principal Need Funding Status Quality of Life Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Land & Right‐of‐Way ‐                       ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Construction 150                 ‐                       ‐                 150            ‐                  ‐                  ‐                  ‐                  ‐                 150                  Other ‐                       ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Total Expenditures 150                 ‐                       ‐                 150            ‐                  ‐                  ‐                  ‐                  ‐                 150                  Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Utility Rate 150                  ‐                       ‐                 150             ‐                  ‐                  ‐                  ‐                  ‐                 150                  ‐                       ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Total Funding 150                 ‐                       ‐                 150            ‐                  ‐                  ‐                  ‐                  ‐                 150                  Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                      ‐                       ‐                  ‐                  ‐                  ‐                 ‐                  ‐                  ‐                 ‐                       Expenses ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Net Impact ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       North Industrial Way Infiltration Retrofit Project PICTURE Project Number ‐ 18064 New Public Works Stormwater Desirable This is part of an ongoing effort to improve efficiency  and effectiveness in the use of public resources in the  delivery of municipal services, programs, and long‐term  maintenance and viability of public facilities.   PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT Asset Protection Fully Funded Justification This meets the Council Goal of: Summary Project Description This project consists of installing two 2‐stage drywells, comprised of 72 inch modified drywells with modified Type 1 catch basins for pretreatment, along  North Industrial Way to reduce flows to the existing infiltration facility. Drywell overflows will surface flow to the existing infiltration facility. Additional  analysis is recommended to identify any existing onsite stormwater management within the tributary area (i.e. infiltration facilities at upstream properties)  and update the infiltration facility tributary area to reflect the findings.      The existing infiltration pipe and facility handles an estimated contributing area of 37 acres. It currently does not have enough capacity during peak  precipitation events, resulting in flooding that covers up to half of the North Industrial Way and downstream driveways.  2020-2025 Capital Improvement Plan - Page 95 of 117 Page 98 of 152 2020‐2025 Capital Improvement Plan Sylvester Pipe Relining Status Department Group Assessment Principal Need Funding Status Quality of Life Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Land & Right‐of‐Way ‐                       ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Construction 330                 ‐                       ‐                  ‐                  ‐                 330            ‐                  ‐                  ‐                 330                  Other ‐                       ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Total Expenditures 330                 ‐                       ‐                  ‐                  ‐                 330            ‐                  ‐                  ‐                 330                  Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Utility Rate 330                  ‐                       ‐                  ‐                  ‐                 330             ‐                  ‐                  ‐                 330                  ‐                       ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Total Funding 330                 ‐                       ‐                  ‐                  ‐                 330            ‐                  ‐                  ‐                 330                  Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                      ‐                       ‐                  ‐                  ‐                  ‐                 ‐                  ‐                  ‐                 ‐                       Expenses ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Net Impact ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       OPERATING IMPACT ANNUAL OPERATING IMPACT This meets the Council Goal of: Summary Project Description This project includes the following relining:  • 8th Avenue from West Margaret to West Park of 15" = 302.5 LF                • West Sylvester from 8th to 6th of 15” = 673 LF • West Park from 8th to 5th of 15” = 958 LF                                                            • West Sylvester from 6th to 5th of 21” = 497 LF • West Park from 5th to 4th of 18” = 520 LF                                                            • 6th Avenue from Sylvester to Yakima of 15” = 140 LF • 5th Avenue from West Park to West Henry of 15” = 656 LF • 10th Avenue from West Irving to West Sylvester of 10” (Relined) = 364 LF, (Replaced) = 20 LF • West Sylvester from 10th to 8th of 12” = 738 LF This is part of an ongoing effort to improve efficiency  and effectiveness in the use of public resources in the  delivery of municipal services, programs, and long‐term  maintenance and viability of public facilities.   PICTURE PROJECT SCOPE ANNUAL ALLOCATION Sylvester Pipe Relining Project Number ‐ 18067 New Public Works Stormwater Desirable Quality Improvement Fully Funded Justification 2020-2025 Capital Improvement Plan - Page 96 of 117 Page 99 of 152 Water 2020-2025 Capital Improvement Plan - Page 97 of 117 Page 100 of 152 2020‐2025 Capital Improvement Plan Status Department Group Assessment Principal Need Funding Status Quality of Life  Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design ‐                       ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Land & Right‐of‐Way ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Construction 1,400              ‐                       200            200            200            200            200            200            200            1,200               Other ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Total Expenditures 1,400              ‐                       200            200            200            200            200            200            200            1,200               Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Utility Rate 1,400              ‐                       200            200            200            200            200            200            200            1,200               ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Total Funding 1,400              ‐                       200            200            200            200            200            200            200            1,200               Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Expenses ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Net Impact ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Annual Water System Improvements  ‐ Development Summary Project Description Annual Water System Improvements  ‐ Development Project Number ‐ 20026 Ongoing Public Works Water Necessary Service Protection Fully Funded Justification This meets the Council Goal of: This is an ongoing efforts to improve efficiency and  effectiveness in the use of public resources in the  delivery of municipal services, programs and long‐term  maintenance and viability of public facilities.   As private developments occurs, it is sometimes  necessary to financially assist with the increase in water  system sizes to accommodate further development  beyond the Developer's current project. This project will provide necessary funds to improve the City's water system to accommodate future development.  For example, a developer may be required  to install an 8 inch water line to and through their development.  The City's Water Comprehensive Plan identifies that a 24 inch water line is needed in this area  to provide water system improvements and efficiencies for all customers.  This project allows for reimbursement to developers for the upsize improvements  beyond those needed for private development. PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT 2020-2025 Capital Improvement Plan - Page 98 of 117 Page 101 of 152 2020‐2025 Capital Improvement Plan Butterfield Water Treatment Plant (WTP) ‐ Chlorine Safety Status Department Group Assessment Principal Need Funding Status Quality of Life Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design 75                   ‐                      75              ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Land & Right‐of‐Way ‐                       ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Construction 275                 ‐                       ‐                 275            ‐                  ‐                  ‐                  ‐                  ‐                 275                  Other ‐                       ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Total Expenditures 350                 ‐                      75              275            ‐                  ‐                  ‐                  ‐                  ‐                 275                  Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 2017 Revenue Bonds 350                  ‐                      75              275             ‐                  ‐                  ‐                  ‐                  ‐                 275                  ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Total Funding 350                 ‐                      75              275            ‐                  ‐                  ‐                  ‐                  ‐                 275                  Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                      ‐                       ‐                  ‐                 ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Expenses 50                   ‐                       ‐                  ‐                 10              10              10              10              10              50                    Net Impact 50                   ‐                       ‐                  ‐                 10              10              10              10              10              50                    PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT Quality Improvement Fully Funded Justification This meets the Council Goal of: Summary Project Description The Butterfield Water Treatment Plant uses chlorine gas for disinfection during the water treatment process.  This project will construct an emergency air  scrubber system that will protect staff and citizens should there ever be a leak in the chlorine system.  The system will include detectors, vacuum, and duct  systems and a scrubber that will absorb the chlorine so it does not get released into the air.              Butterfield Water Treatment Plant (WTP) ‐ Chlorine  Safety PICTURE Project Number ‐ 17004 Ongoing Public Works Water Necessary This is an ongoing efforts to improve efficiency and  effectiveness in the use of public resources in the  delivery of municipal services, programs and long‐term  maintenance and viability of public facilities.   2020-2025 Capital Improvement Plan - Page 99 of 117 Page 102 of 152 2020‐2025 Capital Improvement Plan Emergency Power Improvements Status Department Group Assessment Principal Need Funding Status Quality of Life Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design 200                 ‐                       ‐                 50              50              50              50              ‐                  ‐                 200                  Land & Right‐of‐Way ‐                       ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Construction 2,000             ‐                       ‐                 500            500            500            500            ‐                  ‐                 2,000              Other ‐                       ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Total Expenditures 2,200             ‐                       ‐                 550            550            550            550            ‐                  ‐                 2,200              Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Utility Rate 2,200              ‐                       ‐                 550            550            550            550             ‐                  ‐                 2,200              ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Total Funding 2,200             ‐                       ‐                 550            550            550            550            ‐                  ‐                 2,200              Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                      ‐                       ‐                  ‐                 ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Expenses ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Net Impact ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       OPERATING IMPACT ANNUAL OPERATING IMPACT This meets the Council Goal of: Summary Project Description There is currently major back‐up power deficiencies in the water system.  The existing systems that lack back‐up power include: the Butterfield Intake, Road  36 Booster Station, Riverview Booster Station, and Eastside Booster Station. Eastside Booster Station currently has generator hook‐ups and a manual  transfer switch for the towable generator at the Foster Wells Lift Station. All other stations mentioned above require both the generator hook‐ups and  automatic transfer switches, as well as a generator, to ensure continued full operation in the event of a power loss. PICTURE PROJECT SCOPE ANNUAL ALLOCATION Emergency Power Improvements Project Number ‐ 20031 New Public Works Water Necessary Quality Improvement Fully Funded Justification This is an ongoing effort to improve efficiency and  effectiveness in the use of public resources in the  delivery of municipal services, programs, and long‐term  maintenance and viability of public facilities.   2020-2025 Capital Improvement Plan - Page 100 of 117 Page 103 of 152 2020‐2025 Capital Improvement Plan Status Department Group Assessment Principal Need Funding Status Quality of Life Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design 300                 ‐                        ‐                 300            ‐                 ‐                 ‐                 ‐                 ‐                 300                  Land & Right‐of‐Way 200                 ‐                        ‐                 200            ‐                 ‐                 ‐                 ‐                 ‐                 200                  Construction 2,500              ‐                        ‐                 ‐                 2,500         ‐                 ‐                 ‐                 ‐                 2,500               Other ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Total Expenditures 3,000              ‐                        ‐                 500            2,500         ‐                 ‐                 ‐                 ‐                 3,000               Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Utility Rate 3,000              ‐                        ‐                 500            2,500         ‐                 ‐                 ‐                 ‐                 3,000               ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Total Funding 3,000              ‐                        ‐                 500            2,500         ‐                 ‐                 ‐                 ‐                 3,000               Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Expenses ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Net Impact ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Transmission Main ‐ West Pasco Water Treatment  Plant (WPWTP) to Zone 3 PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT Growth Fully Funded Justification This meets the Council Goal of: Summary Project Description With the completion of the new Columbia Water Intake project, which pumps water from the Columbia River to the WPWTP, a new transmission main from the  WPWTP can now be installed to Pressure Zone 3.  This will provide the necessary flows and pressures to accommodate the growing northwest area of the City.  This  main will cross under Interstate 182.  The amounts shown represents the City's participation for this project. Since this project was anticipated, an additional steel  casing was installed under Interstate 182 for this water line as part of the Harris Road Sewer Project (which also went under Interstate 182).  It was determined more  efficient to have both the sewer casing and the casing for this future water main to be installed at the same time, thus saving the City money. This project will be done in conjunction with the WPWTP Improvement project as this will be the discharge pipe for the new filter banks. Transmission Main ‐ WPWTP to Zone 3 PICTURE Necessary This is an ongoing efforts to improve efficiency and  effectiveness in the use of public resources in the delivery of  municipal services, programs and long‐term maintenance and  viability of public facilities.   Project Number ‐ 20028 New Public Works Water 2020-2025 Capital Improvement Plan - Page 101 of 117 Page 104 of 152 2020‐2025 Capital Improvement Plan Water Main Extension ‐ Road 103  (Maple Street to Willow Way)  Status Department Group Assessment Principal Need Funding Status Quality of Life Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design 13                   ‐                       ‐                  ‐                  ‐                 13              ‐                  ‐                  ‐                 13                    Land & Right‐of‐Way ‐                       ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Construction 100                 ‐                       ‐                  ‐                  ‐                 100            ‐                  ‐                  ‐                 100                  Other ‐                       ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Total Expenditures 113                 ‐                       ‐                  ‐                  ‐                 113            ‐                  ‐                  ‐                 113                  Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Utility Rate 113                  ‐                       ‐                  ‐                  ‐                 113             ‐                  ‐                  ‐                 113                  ‐                       ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Total Funding 113                 ‐                       ‐                  ‐                  ‐                 113            ‐                  ‐                  ‐                 113                  Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                      ‐                       ‐                  ‐                  ‐                  ‐                 ‐                  ‐                  ‐                 ‐                       Expenses ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Net Impact ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT Quality Improvement Fully Funded Justification This meets the Council Goal of: Summary Project Description This project will construct approximately 825 linear feet of 8 inch ductile iron water main along Road 103 connecting the water mains on Maple Drive and  Willow Way.  This connection will loop the water system and improve the flow characteristics of the system and eliminate dead ends in the area. Looping the system with  properly sized water mains provides increased flows and pressures that help with fire protection.  This project will also improve water quality to customers  in this area by reducing the need to flush the system due to the existing dead‐end lines.   Water Main Extension ‐ Road 103 (Maple Street to  Willow Way)  PICTURE Project Number ‐ 20029 New Public Works Water Desirable This is an ongoing effort to improve efficiency and  effectiveness in the use of public resources in the  delivery of municipal services, programs, and long‐term  maintenance and viability of public facilities.   2020-2025 Capital Improvement Plan - Page 102 of 117 Page 105 of 152 2020‐2025 Capital Improvement Plan West Pasco Water Treatment Plant  (WPWTP) Improvements Status Department Group Assessment Principal Need Funding Status Quality of Life Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design 645                  ‐                        ‐                 645             ‐                 ‐                 ‐                 ‐                 ‐                 645                  Land & Right‐of‐Way ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Construction 3,975              ‐                        ‐                 1,500         1,475         1,000         ‐                 ‐                 ‐                 3,975               Other ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Total Expenditures 4,620              ‐                        ‐                 2,145         1,475         1,000         ‐                 ‐                 ‐                 4,620               Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Utility Rate 4,620              ‐                        ‐                 2,145         1,475         1,000         ‐                 ‐                 ‐                 4,620               ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Total Funding 4,620              ‐                        ‐                 2,145         1,475         1,000         ‐                 ‐                 ‐                 4,620               Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Expenses ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Net Impact ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT Growth Fully Funded Justification This meets the Council Goal of: Summary Project Description This project will provide the necessary improvements to increase treatment capacity at the WPWTP.  This project includes adding a new bank of micro‐filters (along  with all other related improvements) to increase water treatment capacity from the current 6 million gallons per day (MGD) to 12 MGD. Includes (2) banks of  micro filters, high service pumping, automatic strainers, backwash facility improvements (river discharge?), intake pumping, plant/intake backup power.  NOTE: The cost of this project has been scaled for inflation.  Therefore, the numbers shown below will be slightly different from the numbers shown in the Facility  Plan.    West Pasco Water Treatment Plant (WPWTP)  Improvements PICTURE Project Number ‐ 16008 New Public Works Water Necessary This is an ongoing efforts to improve efficiency and  effectiveness in the use of public resources in the delivery  of municipal services, programs and long‐term maintenance  and viability of public facilities.   2020-2025 Capital Improvement Plan - Page 103 of 117 Page 106 of 152 2020‐2025 Capital Improvement Plan Status Department Group Assessment Principal Need Funding Status Quality of Life Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Land & Right‐of‐Way ‐                       ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Construction 140                 ‐                       ‐                 140            ‐                  ‐                  ‐                  ‐                  ‐                 140                  Other ‐                       ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Total Expenditures 140                 ‐                       ‐                 140            ‐                  ‐                  ‐                  ‐                  ‐                 140                  Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Utility Rate 140                  ‐                       ‐                 140             ‐                  ‐                  ‐                  ‐                  ‐                 140                  ‐                       ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Total Funding 140                 ‐                       ‐                 140            ‐                  ‐                  ‐                  ‐                  ‐                 140                  Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                      ‐                       ‐                  ‐                  ‐                  ‐                 ‐                  ‐                  ‐                 ‐                       Expenses ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Net Impact ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Water Main Replacement ‐ Alley East of Wehe  Avenue PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT Quality Improvement Fully Funded Justification This meets the Council Goal of: Summary Project Description This project will construct approximately 470 linear feet of 8 inch ductile iron water main (to replace an existing 2 inch main) in the alley directly east of  Wehe Avenue, south of East Alton Street and north of East Helena Street. One fire hydrant will be installed at the intersection of the alley and East Alton  Street.  This connection will install a properly sized water main for the existing and new homes in the area and provide an opportunity to install a fire hydrant. When  the water main is installed later on East Alton Street this line will be connected to form a looped system in the area and eliminate the existing dead‐end  pipes. Making this connection will also provide better flows in the distribution system and improves water quality for the customers in the area. Water Main Replacement ‐ Alley East of Wehe  Avenue PICTURE Desirable This is an ongoing effort to improve efficiency and  effectiveness in the use of public resources in the  delivery of municipal services, programs, and long‐term  maintenance and viability of public facilities.   Project Number ‐ 19073 New Public Works Water 2020-2025 Capital Improvement Plan - Page 104 of 117 Page 107 of 152 2020‐2025 Capital Improvement Plan Water Main Replacement ‐ Maple Drive, AC Main  (Road 100 to Road 103)  Status Department Group Assessment Principal Need Funding Status Quality of Life Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design 30                    ‐                        ‐                  30               ‐                   ‐                   ‐                   ‐                   ‐                  30                     Land & Right‐of‐Way ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Construction 220                  ‐                        ‐                  220            ‐                   ‐                   ‐                   ‐                   ‐                  220                   Other ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Total Expenditures 250                  ‐                        ‐                  250            ‐                  ‐                   ‐                   ‐                   ‐                  250                   Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Utility Rate 250                  ‐                        ‐                  250            ‐                   ‐                   ‐                   ‐                   ‐                  250                   ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Total Funding 250                  ‐                        ‐                  250            ‐                  ‐                   ‐                   ‐                   ‐                  250                   Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Expenses ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Net Impact ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT Quality Improvement Fully Funded Justification This meets the Council Goal of: Summary Project Description This project will replace approximately 1,200 linear feet of existing 6 inch asbestos concrete water line with 8 inch ductile iron pipe. The project would also  install 1 or 2 new fire hydrants. At this time, the pipe is in decent condition and is not in a deteriorated state. Water Main Replacement ‐ Maple Drive, AC Main  (Road 100 to Road 103)  PICTURE Project Number ‐ 20030 New Public Works Water Desirable This is an ongoing effort to improve efficiency and  effectiveness in the use of public resources in the  delivery of municipal services, programs, and long‐term  maintenance and viability of public facilities.   2020-2025 Capital Improvement Plan - Page 105 of 117 Page 108 of 152 2020‐2025 Capital Improvement Plan Water Main Replacement ‐ South 18th Avenue (Court Street to WA Street) Status Department Group Assessment Principal Need Funding Status Quality of Life Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Land & Right‐of‐Way ‐                        ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Construction 79                    ‐                        ‐                   ‐                  79               ‐                   ‐                   ‐                   ‐                  79                     Other ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Total Expenditures 79                    ‐                        ‐                   ‐                  79              ‐                   ‐                   ‐                   ‐                  79                     Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Utility Rate 79                    ‐                        ‐                   ‐                  79               ‐                   ‐                   ‐                   ‐                  79                     ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Total Funding 79                    ‐                        ‐                   ‐                  79              ‐                   ‐                   ‐                   ‐                  79                     Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Expenses ‐                       ‐                        ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        Net Impact ‐                       ‐                        ‐                   ‐                  ‐                   ‐                   ‐                   ‐                   ‐                  ‐                        PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT Quality Improvement Fully Funded Justification This meets the Council Goal of: Summary Project Description This project will replace an undersized 2 inch water service with 8 inch ductile iron water main and install a new hydrant for better fire protection.                          Water Main Replacement ‐ South 18th Avenue (Court  Street to WA Street) PICTURE Project Number ‐ 19074 New Public Works Water Desirable This is an ongoing effort to improve efficiency and  effectiveness in the use of public resources in the  delivery of municipal services, programs, and long‐term  maintenance and viability of public facilities.   2020-2025 Capital Improvement Plan - Page 106 of 117 Page 109 of 152 2020‐2025 Capital Improvement Plan Status Department Group Assessment Principal Need Funding Status Quality of Life Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design 10                   ‐                        ‐                 ‐                 10              ‐                 ‐                 ‐                 ‐                 10                    Land & Right‐of‐Way ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Construction 226                 ‐                        ‐                 ‐                 226            ‐                 ‐                 ‐                 ‐                 226                  Other ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Total Expenditures 236                 ‐                        ‐                 ‐                 236            ‐                 ‐                 ‐                 ‐                 236                  Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Utility Rate 236                 ‐                        ‐                 ‐                 236            ‐                 ‐                 ‐                 ‐                 236                  ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Total Funding 236                 ‐                        ‐                 ‐                 236            ‐                 ‐                 ‐                 ‐                 236                  Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Expenses ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Net Impact ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Water Main Replacement ‐ Star Lane (Road 100 to  Road 97) PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT Quality Improvement Fully Funded Justification This meets the Council Goal of: Summary Project Description This project will replace an existing 2 inch water line with an 8 inch main and install a fire hydrant to serve this area.  This will increase reliability and fire flow.   This project will improve the flow characteristics of the system in the area. Replacing the existing system with properly sized water mains provides increased flows  and pressures that help with fire protection.      Water Main Replacement ‐ Star Lane (Road 100 to Road 97) PICTURE Desirable This is an ongoing effort to improve efficiency and  effectiveness in the use of public resources in the delivery of  municipal services, programs, and long‐term maintenance  and viability of public facilities.   Project Number ‐ 19046 New Public Works Water 2020-2025 Capital Improvement Plan - Page 107 of 117 Page 110 of 152 2020‐2025 Capital Improvement Plan Water Projects Allocated From Transportation Status Department Group Assessment Principal Need Funding Status Quality of Life Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design 14                   ‐                      14              ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Land & Right‐of‐Way ‐                       ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Construction 247                 ‐                       ‐                 134            113            ‐                  ‐                  ‐                  ‐                 247                  Other ‐                       ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Total Expenditures 261                 ‐                      14              134            113            ‐                  ‐                  ‐                  ‐                 247                  Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Utility Rate 261                  ‐                      14              134            113             ‐                  ‐                  ‐                  ‐                 247                  ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Total Funding 261                 ‐                      14              134            113            ‐                  ‐                  ‐                  ‐                 247                  Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                      ‐                       ‐                  ‐                 ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Expenses ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Net Impact ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Summary Project Description Water Projects Allocated From Transportation Ongoing Public Works Water Necessary Quality Improvement Fully Funded Justification This meets the Council Goal of: Community Transportation Network Promote a highly‐functional multi‐modal transportation  network. This page is intended as a place holder for any or all transportation projects that also require water utility funds. Lewis Street Overpass $12,000 in 2019, $125,000 in 2020 and $113,000 in 2021 Wrigley Drive Extension $2,000 in 2019, $9,000 in 2020 PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT 2020-2025 Capital Improvement Plan - Page 108 of 117 Page 111 of 152 2020‐2025 Capital Improvement Plan Reservoir Storage Tank ‐ Zone 3 Status Department Group Assessment Principal Need Funding Status Quality of Life Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design 650                 ‐                        ‐                 150            500            ‐                 ‐                 ‐                 ‐                 650                  Land & Right‐of‐Way 500                 ‐                        ‐                 ‐                 500            ‐                 ‐                 ‐                 ‐                 500                  Construction 10,550            ‐                        ‐                 ‐                 1,850         4,200         4,500         ‐                 ‐                 10,550             Other ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Total Expenditures 11,700            ‐                        ‐                 150            2,850         4,200         4,500         ‐                 ‐                 11,700             Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Unsecured Revenue Bond 7,700              ‐                        ‐                 ‐                 ‐                 3,700         4,000         ‐                 ‐                 7,700               Utility Rate 2,500              ‐                        ‐                 150            2,350         ‐                 ‐                 ‐                 ‐                 2,500               Utility Expansion Fees 1,500              ‐                        ‐                 ‐                 500            500            500            ‐                 ‐                 1,500               ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Total Funding 11,700            ‐                        ‐                 150            2,850         4,200         4,500         ‐                 ‐                 11,700             Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Expenses 30                   ‐                        ‐                 ‐                 ‐                 ‐                 10              10              10              30                    Net Impact 30                   ‐                        ‐                 ‐                 ‐                 ‐                 10              10              10              30                    PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT Growth Partially Funded Justification This meets the Council Goal of: Summary Project Description This project will design and construct a new 5.75 million gallon water storage tank in the Water Zone 3 to accommodate growth in the northwest area of the City.           Reservoir Storage Tank ‐ Zone 3 PICTURE Project Number ‐ 18041 New Public Works Water Necessary This is an ongoing effort to improve efficiency and  effectiveness in the use of public resources in the delivery of  municipal services, programs, and long‐term maintenance and  viability of public facilities.   2020-2025 Capital Improvement Plan - Page 109 of 117 Page 112 of 152 2020‐2025 Capital Improvement Plan Automated Meter Reading Status Department Group Assessment Principal Need Funding Status Quality of Life Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design 150                 ‐                       ‐                 150            ‐                  ‐                  ‐                  ‐                  ‐                 150                  Land & Right‐of‐Way ‐                       ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Construction 5,600             ‐                       ‐                 600            1,000        1,000        1,000        1,000        1,000        5,600              Other ‐                       ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Total Expenditures 5,750             ‐                       ‐                 750            1,000        1,000        1,000        1,000        1,000        5,750              Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Unsecured Revenue Bond 5,750             ‐                       ‐                 750            1,000        1,000        1,000        1,000        1,000        5,750              ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Total Funding 5,750             ‐                       ‐                 750            1,000        1,000        1,000        1,000        1,000        5,750              Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Expenses ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Net Impact ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT Reduce Future Cost Not Funded Justification This meets the Council Goal of: Summary Project Description This project will begin the process of installing automatic water meter readers.  As the City continues to grow and the number of water accounts increases, it is  important to begin installing automatic reading meters.  This will save money in the future, as each new meter will be able to be read automatically either by 1)  simply driving by the house or business with a data collector that receives the meter signal Automated Meter Reading (AMR) or 2) the water meter signal will be  received remotely at City offices Advanced Metering Infrastructure (AMI).  The goal is to add drive‐by AMR system to new accounts as they come online and  move to an AMI system as the necessary telemetry infrastructure can be developed. This project will reduce the cost of future meter reading.  It will also increase  reliability and accuracy in meters read, as well as provide early detection of leaks so they can be addressed immediately.       Automated Meter Reading PICTURE Project Number ‐ 18050 New Public Works Water Desirable This is an ongoing effort to improve efficiency and  effectiveness in the use of public resources in the delivery of  municipal services, programs, and long‐term maintenance  and viability of public facilities.   2020-2025 Capital Improvement Plan - Page 110 of 117 Page 113 of 152 2020‐2025 Capital Improvement Plan Reservoir Storage Tank ‐ Zone 2 Status Department Group Assessment Principal Need Funding Status Quality of Life Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design 500                 ‐                       ‐                  ‐                  ‐                  ‐                  ‐                 500            ‐                 500                  Land & Right‐of‐Way 500                  ‐                       ‐                  ‐                  ‐                  ‐                  ‐                 500            ‐                 500                  Construction 6,500             ‐                       ‐                  ‐                  ‐                  ‐                  ‐                 1,000        5,500        6,500              Other ‐                       ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Total Expenditures 7,500              ‐                       ‐                  ‐                  ‐                  ‐                  ‐                 2,000        5,500        7,500              Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Unsecured Revenue Bond 7,500              ‐                       ‐                  ‐                  ‐                  ‐                  ‐                 2,000        5,500        7,500              ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Total Funding 7,500             ‐                       ‐                  ‐                  ‐                  ‐                  ‐                 2,000        5,500        7,500              Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                      ‐                       ‐                  ‐                 ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Expenses ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Net Impact ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Summary Project Description Reservoir Storage Tank ‐ Zone 2 PICTURE Project Number ‐ 20027 New Public Works Water Necessary Growth Not Funded Justification This meets the Council Goal of: This is an ongoing effort to improve efficiency and  effectiveness in the use of public resources in the delivery of  municipal services, programs, and long‐term maintenance  and viability of public facilities.   This project will design and construct a new 3.5 million gallon water storage tank in the Water Zone 2 (industrial area) to accommodate growth in the northeast  area of the City. PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT 2020-2025 Capital Improvement Plan - Page 111 of 117 Page 114 of 152 2020‐2025 Capital Improvement Plan Water Main Extension ‐ Alton Street  (Wehe Ave to the alley west of Owen St)  Status Department Group Assessment Principal Need Funding Status Quality of Life Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design 27                   ‐                        ‐                 ‐                 ‐                 27              ‐                 ‐                 ‐                 27                    Land & Right‐of‐Way ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Construction 300                 ‐                        ‐                 ‐                 ‐                 300            ‐                 ‐                 ‐                 300                  Other ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Total Expenditures 327                 ‐                        ‐                 ‐                 ‐                 327            ‐                 ‐                 ‐                 327                  Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Unsecured Revenue Bond 327                 ‐                        ‐                 ‐                 ‐                 327            ‐                 ‐                 ‐                 327                  ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                      ‐                       ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Total Funding 327                 ‐                        ‐                 ‐                 ‐                 327            ‐                 ‐                 ‐                 327                  Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Expenses ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Net Impact ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT Public Safety Not Funded Justification This meets the Council Goal of: Summary Project Description This project will construct approximately 1,000 linear feet of 8 inch ductile iron water main along Alton Street from Wehe Avenue to the alley west of Owen Avenue.  One fire hydrant would be installed at the intersection of Wehe Avenue and Alton Street. The existing fire hydrant on Alton Street between Owen Street and Beech  Street would be relocated to this new line.  This connection will loop the water system and eliminate dead end pipes in the area. Looping the system with properly sized water mains provides increased flows  and pressures that help with fire protection.  The existing undersized main (approximately 470 linear feet) in the alley located directly west of Owen Street will also be  replaced by 8 inch ductile iron water main between Alton Street and Helena Street.   Water Main Extension ‐ Alton Street (Wehe Ave to the alley  west of Owen St)  PICTURE Project Number ‐ 18046 New Public Works Water Necessary This is an ongoing effort to improve efficiency and  effectiveness in the use of public resources in the delivery of  municipal services, programs, and long‐term maintenance and  viability of public facilities.   2020-2025 Capital Improvement Plan - Page 112 of 117 Page 115 of 152 2020‐2025 Capital Improvement Plan Water Main Extension ‐ Riverhaven Street (Road 36 to Road 40)  Status Department Group Assessment Principal Need Funding Status Quality of Life Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design 20                   ‐                         ‐                 ‐                 ‐                 ‐                 ‐                 20              ‐                 20                    Land & Right‐of‐Way ‐                      ‐                         ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Construction 285                 ‐                         ‐                 ‐                 ‐                 ‐                 ‐                 285            ‐                 285                  Other ‐                      ‐                         ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Total Expenditures 305                 ‐                         ‐                 ‐                 ‐                 ‐                 ‐                 305            ‐                 305                  Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Unsecured Revenue Bond 305                 ‐                         ‐                 ‐                 ‐                 ‐                 ‐                 305            ‐                 305                  ‐                      ‐                         ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                      ‐                         ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                      ‐                         ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Total Funding 305                 ‐                         ‐                 ‐                 ‐                 ‐                 ‐                 305            ‐                 305                  Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                      ‐                         ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Expenses ‐                      ‐                         ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Net Impact ‐                      ‐                         ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT Quality Improvement Not Funded Justification This meets the Council Goal of: Summary Project Description This project will construct approximately 1,400 linear feet of 8 inch ductile iron water main along Riverhaven Street from Road 36 to Road 40. The dead‐end water  mains at the southern end of these streets would be connected to the new water main.  This connection will loop the water system and improve the flow characteristics of the system and eliminate dead ends in the area. Looping the system with properly  sized water mains provides increased flows and pressures that help with fire protection.  This project will also improve water quality to customers in this area by  reducing the need to flush the system due to the existing dead‐end lines.        Water Main Extension ‐ Riverhaven Street (Road 36 to Road  40)  PICTURE Project Number ‐ 18048 New Public Works Water Desirable This is an ongoing effort to improve efficiency and  effectiveness in the use of public resources in the delivery of  municipal services, programs, and long‐term maintenance and  viability of public facilities.   2020-2025 Capital Improvement Plan - Page 113 of 117 Page 116 of 152 2020‐2025 Capital Improvement Plan Water Main Replacement ‐ Richardson Road  (Road 92 to Road 96)  Status Department Group Assessment Principal Need Funding Status Quality of Life Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design 50                   ‐                        ‐                 ‐                 ‐                 50              ‐                 ‐                 ‐                 50                    Land & Right‐of‐Way ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Construction 410                 ‐                        ‐                 ‐                 ‐                 410            ‐                 ‐                 ‐                 410                  Other ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Total Expenditures 460                 ‐                        ‐                 ‐                 ‐                 460            ‐                 ‐                 ‐                 460                  Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Unsecured Revenue Bond 460                 ‐                        ‐                 ‐                 ‐                 460            ‐                 ‐                 ‐                 460                  ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       ‐                      ‐                       ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Total Funding 460                 ‐                        ‐                 ‐                 ‐                 460            ‐                 ‐                 ‐                 460                  Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Expenses ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       Net Impact ‐                      ‐                        ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                       PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT Quality Improvement Not Funded Justification This meets the Council Goal of: Summary Project Description The water main in Richardson Road between Road 92 and Road 96 is currently not connected and they are undersized thin wall PVC pipe. This project was identified in the 2009 water master plan but was not completed. The project would improve the flow characteristics of the area (approximately 1,800‐ feet of 8 inch water main, eliminating 3 dead end lines) and could possibly even extend over to Road 88 (approximately 1,350‐feet of 8 inch water main, eliminating  another dead end line). Eliminating the dead end lines requires less annual flushing maintenance and improves water quality for those residents. An 8 inch main  would also allow for the installation of fire hydrants (there is currently only 1 fire hydrant on a 6 inch line to cover about 4‐6 blocks of houses). Water Main Replacement ‐ Richardson Road (Road 92 to  Road 96) PICTURE Project Number ‐ 18043 New Public Works Water Necessary This is an ongoing effort to improve efficiency and  effectiveness in the use of public resources in the delivery of  municipal services, programs, and long‐term maintenance and  viability of public facilities.   2020-2025 Capital Improvement Plan - Page 114 of 117 Page 117 of 152 2020‐2025 Capital Improvement Plan Water Main Replacement ‐ Road 60  (Court Street to West Pearl)  Status Department Group Assessment Principal Need Funding Status Quality of Life Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design 30                   ‐                       ‐                  ‐                  ‐                  ‐                 30              ‐                  ‐                 30                    Land & Right‐of‐Way ‐                       ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Construction 900                 ‐                       ‐                  ‐                  ‐                  ‐                 900            ‐                  ‐                 900                  Other ‐                       ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Total Expenditures 930                 ‐                       ‐                  ‐                  ‐                  ‐                 930            ‐                  ‐                 930                  Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Unsecured Revenue Bond 930                  ‐                       ‐                  ‐                  ‐                  ‐                 930            ‐                  ‐                 930                  ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Total Funding 930                 ‐                       ‐                  ‐                  ‐                  ‐                 930            ‐                  ‐                 930                  Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                      ‐                       ‐                  ‐                  ‐                  ‐                 ‐                  ‐                  ‐                 ‐                       Expenses ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Net Impact ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT Quality Improvement Not Funded Justification This meets the Council Goal of: Summary Project Description This project will replace approximately 3,000 linear feet of existing 6 inch thin wall PVC water line with approximately 1,400 linear feet of 12 inch ductile iron  pipe along Road 60 and approximately 1,600 linear feet of 6 inch ductile iron pipe along West Pearl Street, West Agate Street and 62nd Place. This project will  also install three new fire hydrants.  Not completing this project puts the City at a higher risk of having a property damage claim from a future leak. When there is a water main break the ground  tends to wash out and settle in the area of the leak, which can put more strain on the pipe remaining in the ground and lead to more leaks.  The undersized pipe  also does not provide optimum water flow to the hydrants in this area. Water Main Replacement ‐ Road 60 (Court Street to West  Pearl) PICTURE Project Number ‐ 18044 New Public Works Water Desirable This is an ongoing effort to improve efficiency and  effectiveness in the use of public resources in the delivery  of municipal services, programs, and long‐term  maintenance and viability of public facilities.   2020-2025 Capital Improvement Plan - Page 115 of 117 Page 118 of 152 2020‐2025 Capital Improvement Plan Water Main Replacement ‐ Road 76  (Wernett Road to Court Street) Status Department Group Assessment Principal Need Funding Status Quality of Life Total Project to Scheduled Plan Plan Plan Plan Plan Plan Total Expenditures Project Date Year Year Year Year Year Year Year Request Expenses 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Design 26                   ‐                       ‐                  ‐                  ‐                  ‐                 26              ‐                  ‐                 26                    Land & Right‐of‐Way ‐                       ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Construction 800                 ‐                       ‐                  ‐                  ‐                  ‐                 800            ‐                  ‐                 800                  Other ‐                       ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Total Expenditures 826                 ‐                       ‐                  ‐                  ‐                  ‐                 826            ‐                  ‐                 826                  Total Project to Plan Plan Plan Plan Plan Plan Plan Total Funding Sources Project Date Year Year Year Year Year Year Year Request Revenue 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Unsecured Revenue Bond 826                  ‐                       ‐                  ‐                  ‐                  ‐                 826            ‐                  ‐                 826                  ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Total Funding 826                 ‐                       ‐                  ‐                  ‐                  ‐                 826            ‐                  ‐                 826                  Total Plan Plan Plan Plan Plan Plan Plan Plan Total Operating Impact Operating Year Year Year Year Year Year Year Year Request Impact 12/31/2018 2019 2020 2021 2022 2023 2024 2025 2020 ‐ 2025 Revenue ‐                      ‐                       ‐                  ‐                  ‐                  ‐                 ‐                  ‐                  ‐                 ‐                       Expenses ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       Net Impact ‐                      ‐                       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                 ‐                       PROJECT SCOPE ANNUAL ALLOCATION OPERATING IMPACT ANNUAL OPERATING IMPACT Quality Improvement Not Funded Justification This meets the Council Goal of: Summary Project Description This project will replace approximately 1,700 linear feet of existing 4 inch and 6 inch thin wall irrigation class PVC water line and replace it with 12 inch ductile  iron pipe. The project would also install 4 new fire hydrants. Road 76 is intended to be one of the larger water mains that supply some of the residential areas  that are now beginning to see substantial development. The project would also help loop the 12 inch main that extends down from Argent Road to the main in  Court Street.  Water mains made of thin wall PVC pipe cannot be worked on in the same manner as ductile iron pipe and thicker C900 class PVC pipe due to the  fragile nature of the pipe. Not completing this project could hinder the ability of any new properties from being able to connect to the City water, and stops the  fire department from having an uninterrupted supply of water for firefighting purposes on this street.  This line is currently a pinch point in the water distribution system due to the smaller size. Water Main Replacement ‐ Road 76 (Wernett Road to  Court Street) PICTURE Project Number ‐ 18045 New Public Works Water Desirable This is an ongoing effort to improve efficiency and  effectiveness in the use of public resources in the delivery  of municipal services, programs, and long‐term  maintenance and viability of public facilities.   2020-2025 Capital Improvement Plan - Page 116 of 117 Page 119 of 152 ADA Americans with Disabilities Act AMI Advanced Metering Infrastructure AMR Automated Meter Reading BNSF Burlington Northern Santa Fe CBC Columbia Basin Community College CDBG Community Development Block Grant CIP Capital Improvement Plan EDA Economic Development Administration DNR Department of Natural Resources FCID Franklin County Irrigation District I-182 Interstate 182 IPS Irrigation Pump Station LID Low Impact Development LTGO Limited Tax General Obligation MGD Million gallons per day PVC Polyvinyl chloride PORT Port of Pasco PWRF Process Water Resource Facility RCO Recreation and Conservation Office REET Real Estate Excise Taxes SR State Route SRTS Safe Routes to School STP Surface Transportation Program TBD To Be Determined TIB Transportation Improvement Brand UGB Urban Growth Boundary VFD Variable Frequency Drive WPWTP West Pasco Water Treatment Plant WSDOT Washington State Department of Transportation WSRB Washington Surveying and Rating Bureau WTP Water Treatment Plant WWTP Wastewater Treatment Plant Table of Acronyms 2020-2025 Capital Improvement Plan - Page 117 of 117 Page 120 of 152 AGENDA REPORT FOR: City Council September 4, 2019 TO: Dave Zabell, City Manager Workshop Meeting: 9/9/19 FROM: Steve Worley, Director Public Works SUBJECT: Interlocal Agreements - Columbia Basin College & Port of Pasco for Argent Road Project I. REFERENCE(S): Vicinity Map Draft Interlocal Agreement II. ACTION REQUESTED OF COUNCIL / STAFF RECOMMENDATIONS: Discussion III. FISCAL IMPACT: None IV. HISTORY AND FACTS BRIEF: The City of Pasco along with partners Columbia Basin Community College (CBC) and The Port of Pasco (Port) worked together to envision necessary improvements to the Argent Road corridor from Road 36 to 20th Avenue. These improvements will add width and frontage enhancements, including curb/gutter and sidewalk as well as intersection improvements to this critical transportation corridor. Together the partners decided to phase the improvements out to first focus on a smaller more critical portion, that portion of Argent Road from Saraceno/Varney to 20th Avenue. Phase 2 will be completed in the future with its limits being from Road 36 to Saraceno/Varney. These Inter-Local Agreements (ILA) are with CBC and Port detailing their financial involvement in the project(s). Page 121 of 152 V. DISCUSSION: The City along with its partners CBC and the Port, desire to construct improvements to Argent Road, which is a phased project. Phase 1 extends from Saraceno/Varney to 20th Avenue, and Phase 2 from Road 36 to Saraceno/Varney. These improvements will include, but are not limited to, road widening, curb/gutter, sidewalk, drainage facilities, and street lighting. The responsibilities associated with the anticipated costs of these improvements are identified in the ILA’s with both CBC and the Port. Specific to the Port ILA and consistent with PMC 3.40.050, the agreement provides that the Port’s financial contribution to the project will be credited toward any traffic impact fees associated with the future development of Port-owned property abutting Argent Road within the project limits, excepting the value of right of way dedicated by the Port to complete the project. Page 122 of 152 Page 123 of 152 ILA – Port of Pasco Argent Road - Phase 1, No. 12001 Page 1 of 6 INTERLOCAL AGREEMENT WITH THE PORT OF PASCO FOR THE ARGENT ROAD PROJECT, PHASE 1, NO. 12001 THIS INTERLOCAL AGREEMENT is entered _____ day of ______________ 2019, by and between Port of Pasco, Washington, a Washington Municipal Corporation, (hereinafter referred to as "Port"), and the City of Pasco, Washington, a Washington Municipal Corporation (hereinafter referred to as "City"), and are sometimes referred to collectively as the “Parties,” for the purpose of designing and constructing the Argent Road Project, No. 12001. WHEREAS, the City of Pasco (City) together with The Port of Pasco (Port) and Columbia Basin Community College (CBC), also known as stakeholders, have collaborated to undertake improvements to Argent Road, from 20th Avenue up to and including the intersection at Road 36 (“the Project”); and WHEREAS, the Port and CBC have previously committed to help fund the Project in the amounts of $1,500,000 and $1,250,000 respectfully; and WHEREAS, the City and Port recognize that the Port has also donated right-of-way to the Project for the benefit of the Airport with a fair market value of $203,534 (2.67 Acres at $76,230/Acre), which donation is in addition to the committed funds of $1,500,000; and WHEREAS, the City and Port recognize that the money committed of $1,500,000 is directly attributed as a credit to the Traffic Impact Fees (TIF) associated with the Port’s “Tri-Cities Airport Business Center” development shown in Exhibit A and also recognize that in the case that the TIFs for above-mentioned Project do not reach an amount of $1,500,000 that the City shall not be required to make any reimbursement to the Port; and WHEREAS, the City, as part of their agreed financial commitment associated with this Project is responsible for the Design, Construction and Project Management of this Project; and WHEREAS, the stakeholders agreed that to get Phase 1 completed, all or a portion of the committed funds from the Port and CBC would be utilized to fund this portion of the Project, with any remainder of committed funds to be used for subsequent phases of the Project; and WHEREAS, the Interlocal Cooperation Act, Chapter 39.34 RCW, authorizes cooperative efforts between agencies in the providing of such services and financing considerations; and WHEREAS, the Parties, desire by this agreement, to jointly participate in the costs associated with the Project that provides benefits to the stakeholders and the regional transportation system. Page 124 of 152 ILA – Port of Pasco Argent Road - Phase 1, No. 12001 Page 2 of 6 NOW, THEREFORE, in consideration of the mutual covenants contained herein, the parties agree as follows: 1.PORT OBLIGATIONS. The Port shall: A. Reimburse the City by making payments as described below, for a total amount of $1,500,000 plus interest for Project costs including but not limited to the expenses relating to engineering, design, construction, administration, management, legal, labor, permits, reviews, and/or approvals from all applicable jurisdictions, and any other Project related costs. The amount of $1,500,000 paid by Port satisfies all of Port’s financial obligations associated with all phases of the Project, including but not limited to Phases 1 and 2 unless it is mutually agreed by all parties to add additional funding in the future. B. The terms of reimbursement shall be based on annual payments to be made from the Port to the City over a 10-year period and a 4% interest rate. Each annual payment shall be made to the City prior to December 31 of each year, beginning in 2019. C. Transfer ownership by dedication of necessary right-of-way from the Port to the City prior to the award date in a manner that is consistent with the policies of the City. 2.CITY OBLIGATIONS. City shall: A. Be responsible for the design, Project management, administration, and construction management of the Project. B. Provide inspection services during the course of construction consistent with the level of effort utilized on other capital and development projects within the City, or as may be required to ensure the required quality of the completed work. C. Provide Port’s construction representative with a copy of any and all printed and electronic construction documents related to each phase of the Project and invite said representative to all construction and pre-construction meetings. D. Upon satisfactory completion of each phase of the improvements described above, work to provide Port with a breakdown of all costs associated with the Project as well as a complete set of physical and electronic as-built drawings at the conclusion of each phase. E. Pay for and complete all portions of the Project not covered by the committed funds of the Port and CBC, unless it is mutually agreed by all parties to add additional funding in the future. F. Grant the Port credit of up to $1,500,000 in TIFs attributable to the “Tri-Cities Airport Business Center” Project. The City shall not be obligated to refund or pay to the Port any portion of the $1,500,000 credit that is not utilized for the “Tri-Cities Airport Business Center” Project, should the total required TIF’s attributable to that Project not reach $1,500,000. Page 125 of 152 ILA – Port of Pasco Argent Road - Phase 1, No. 12001 Page 3 of 6 3.TERM. This Agreement shall be effective commencing on the day _____ of ______________ 2019, and all improvements, conveyances and obligations of the parties for Phase 1 of the Project shall be complete on or before 18 months immediately following the commencement date of this Agreement. The Agreement shall terminate upon the satisfaction of the Port’s obligations identified in Section 1 of this Agreement, or with the completion of the Project, whichever is later, except that the TIF credit to the Port for improvements related to the “Tri-Cities Airport Business Center” shall not expire until all the credit has been utilized or is no longer needed. 4.AUTHORITY TO APPROVE AGREEMENT. The parties represent and warrant that all steps necessary for the approval of this Agreement have been completed by: A. The Port of Pasco: Resolution approved by the Port of Pasco Commission B. The City of Pasco: Resolution approved by the City of Pasco Council The officers signing below are authorized to do so and that the execution of this Interlocal Agreement with the Port of Pasco to execute payment for the Argent Road Project – Phase 1, No. 12001 is valid and binding for all purposes. 5.DISPUTE RESOLUTION. In the event of a dispute between the parties regarding the interpretation, breach or enforcement of this Agreement, the parties shall first meet in a good faith effort to resolve the dispute by themselves or with the assistance of a mediator. The remaining dispute shall be resolved by arbitration pursuant to RCW 7.04A, as amended, the Mandatory Rules of Arbitration (MAR), with all parties waiving the right of a jury trial upon de novo review, with the substantially prevailing party being awarded its reasonable attorney fees and costs against the other. 6. INDEMNITY. Each Party hereto shall assume the risk of, be liable for, and pay for damage, loss, cost and expense arising out of the performance of this Agreement, caused by its negligence and/or willful misconduct and the negligence and willful misconduct of its employees acting within the scope of employment. Each Party hereto shall hold harmless from and indemnify the other Party against all claims, losses, suits, action, cost, counsel fees, litigation costs, expenses, damages, judgments, or decrees by reason of damage to any property of business, and/or any death, injury or disability to or of any person or party, including any employee, arising out of or suffered, directly or indirectly, by reason of or in connection with any negligent act, error or omission of said Party, its, employees, agents, contractors or subcontractors. A Party’s obligation shall include but not be limited to investigation, adjusting, and defending all claims alleging loss from negligent action, error or omission or breach of any common law, statutory or other delegated duty. 7. GENERAL PROVISIONS. Page 126 of 152 ILA – Port of Pasco Argent Road - Phase 1, No. 12001 Page 4 of 6 A. This Interlocal Agreement constitutes the entire agreement between the parties, and no prior oral or written agreement shall be valid, and any modifications of this Agreement must be in writing signed by all parties. B. This Interlocal Agreement shall be binding on the parties, and their heirs, successors and assigns. C. For the purpose of this Agreement, time is of the essence. D. All recitals contained within this Agreement shall be binding provisions of this Agreement. 8.MUTUAL COOPERATION AND FURTHER AGREEMENTS. The parties agree to cooperate in good faith, with regard to each and every aspect required for the completion of the construction of this Project which is the object of this Agreement, and the transfer of property, and to further sign all documents, deeds and permits reasonably necessary to accomplish the purposes of this Agreement. 9.INTERLOCAL COOPERATION ACT PROVISIONS. All vehicles, equipment, inventory and any improvement thereon or fixtures purchased by the City, shall remain the sole property of the City. All personnel utilized by the City in the fulfillment of this Agreement shall be solely within the supervision, direction and control of the City and shall not be construed as "loan servants" or employees of the Port. The City Manager of the City of Pasco, Washington, shall be designated as the Administrator of this Interlocal Agreement. No independent special budget or funds are anticipated other than those identified in this Agreement, nor shall be created without the prior written agreement of the parties. It is not intended that a separate legal or administrative entity be established to conduct this cooperative undertaking, nor is the acquiring, holding, or disposing of real or personal property other than as specifically provided within the terms of this Agreement. A copy of this Agreement shall be filed with the Franklin County Auditor's office or posted on the City or Port's website as required by RCW 39.34.040. Page 127 of 152 ILA – Port of Pasco Argent Road - Phase 1, No. 12001 Page 5 of 6 CITY OF PASCO, WASHINGTON PORT OF PASCO, WASHINGTON By: __________________________ By: ______________________________ Dave Zabell, City Manager Attest: ________________________________ Debby Barham, City Clerk Approved as to Form: _________________________________ Kerr Ferguson Law, PLLC, City Attorney STATE OF WASHINGTON ) : ss. County of Franklin ) On this day personally appeared before me Dave Zabell, City Manager of the City of Pasco, to be known to be the individual described in and who executed the within and foregoing instrument, and acknowledged that he signed the same as his free and voluntary act and deed for the uses and purposes therein mentioned. GIVEN under my hand and official seal this _____ day of _____________, 2019. ____________________________________________ NOTARY PUBLIC in and for the State of Washington Residing at: __________________________________ My Commission Expires: _______________________ STATE OF WASHINGTON ) : ss. County of Franklin ) On this day personally appeared before me ___________________, _________, Port of Pasco, Washington, to be known to be the individual described in and who executed the within and foregoing instrument, and acknowledged that he signed the same as his free and voluntary act and deed for the uses and purposes therein mentioned. GIVEN under my hand and official seal this _____ day of _____________, 2019. ____________________________________________ NOTARY PUBLIC in and for the State of Washington Residing at: __________________________________ My Commission Expires: _______________________ Page 128 of 152 ILA – Port of Pasco Argent Road - Phase 1, No. 12001 Page 6 of 6 Exhibit A - Tri-Cities Airport Business Center PHASE 3 Page 129 of 152 ILA – Columbia Basin Community College Argent Road - Phase 1, No. 12001 Page 1 of 5 INTERLOCAL AGREEMENT WITH COLUMBIA BASIN COLLEGE FOR THE ARGENT ROAD PROJECT, PHASE 1, NO. 12001 THIS INTERLOCAL AGREEMENT is entered _____ day of ______________ 2019, by and between Columbia Basin College, a Washington Educational Institution, (hereinafter referred to as "CBC"), and the City of Pasco, Washington, a Washington Municipal Corporation (hereinafter referred to as "City"), and are sometimes referred to collectively as the “Parties,” for the purpose of designing and constructing the Argent Road Project, No. 12001. WHEREAS, the City of Pasco together with The Port of Pasco (Port) and Columbia Basin Community College (CBC), also known as stakeholders, have collaborated to undertake improvements to Argent Road, from 20th Avenue to Road 36; and WHEREAS, the Port and CBC have previously committed to provide funding for the project in the amounts of $1,500,000 and $1,250,000 respectfully; and WHEREAS, the City of Pasco, as part of their agreed financial commitment associated with this project is responsible for the Design, Construction and Project Management of this project; and WHEREAS, the stakeholders agree that to complete Phase 1 the committed funds from the Port and CBC would be utilized to fund this portion of the project; and WHEREAS, the Parties desire to establish a written agreement of the aforementioned financial support prior to the award of the construction bid; and WHEREAS, the Interlocal Cooperation Act, Chapter 39.34 RCW, authorizes cooperative efforts between agencies in the providing of such services and financing considerations; and WHEREAS, the parties, desire by this agreement, to jointly participate in the costs associated with the project that provides benefits to the stakeholders and the regional transportation system. NOW, THEREFORE, in consideration of the mutual covenants contained herein, the parties agree as follows: 1.CBC OBLIGATIONS. CBC shall: A. Reimburse the City a total of $1,250,000 for project costs including but not limited to the expenses relating to engineering, design, construction, administration, management, legal, labor, permits, reviews, and/or approvals from all applicable Page 130 of 152 ILA – Columbia Basin Community College Argent Road - Phase 1, No. 12001 Page 2 of 5 jurisdictions, and any other project related costs. The lump sum amount of $1,250,000 shall be paid by CBC prior to the advertised bid date for the Argent Road Project and also satisfies all of CBC’s financial obligations associated with all phases of the project, including but not limited to Phases 1 and 2, unless otherwise mutually agreed upon in writing signed by both parties. B. Make lump sum payment of $1,250,000, listed in subsection A above, prior to the advertised bid date for this project. C. Transfer ownership of all dedicated land from CBC in the form of a Right-of-Way Dedication, Public Utility Easement and Temporary Construction Easement, prior to the advertised bid date of the Argent Road Project in a manner that is consistent with the policies of the City. 2.CITY OBLIGATIONS. City shall: A. Be responsible for the design, project management, administration, and construction management of the project, and for any and all future costs associated with the project, unless otherwise mutually agreed upon in writing signed by both parties. B. Provide inspection services during the course of construction consistent with the level of effort utilized on other capital and development projects within the City, or as may be required to ensure the required quality of the completed work. C. Provide CBC’s construction representative with a copy of any and all printed and electronic construction documents related to each phase of the project and invite said representative to all construction and pre-construction meetings. D. Upon satisfactory completion of each phase of the improvements described above, work to provide CBC with a breakdown of all costs associated with the project as well as a complete set of physical and electronic as-built drawings at the conclusion of each phase. 3.TERM. This Agreement shall be effective commencing on the day _____ of ______________ 2019, and all improvements, conveyances and obligations of the parties shall be complete on or before 18 months immediately following the commencement date of this Agreement. The Agreement shall terminate no later than two years following the commencement date of this Agreement, or with the completion of the project, whichever is sooner. 4.AUTHORITY TO APPROVE AGREEMENT. The parties represent and warrant that all steps necessary for the approval of this Agreement have been completed by: A. CBC: Resolution approved by CBC Board of Trustees accepting this Interlocal Page 131 of 152 ILA – Columbia Basin Community College Argent Road - Phase 1, No. 12001 Page 3 of 5 Cooperative Agreement and all terms herein. B. The City of Pasco: Resolution approved by the City of Pasco Council The officers signing below are authorized to do so and that the execution of this Interlocal agreement with CBC to execute payment for the Argent Road project – Phase 1, No. 12001 is valid and binding for all purposes. 5.DISPUTE RESOLUTION. In the event of a dispute between the parties regarding the interpretation, breach or enforcement of this Agreement, the parties shall first meet in a good faith effort to resolve the dispute by themselves or with the assistance of a mediator. The remaining dispute shall be resolved by arbitration pursuant to RCW 7.04A, as amended, the Mandatory Rules of Arbitration (MAR), with all parties waiving the right of a jury trial upon de novo review, with the substantially prevailing party being awarded its reasonable attorney fees and costs against the other. 6. INDEPENDENT CAPACITY A. The employees or agents of each party engaged in the performance of this Agreement shall continue to be the employees or agents of that party and shall not be considered for any purpose to be employees or agents of the other party. Each party to this agreement shall be responsible for its own acts or omissions and those of its officers, employees and agents in the performance of this Agreement. 7. GENERAL PROVISIONS. A. This Interlocal Agreement constitutes the entire agreement between the parties, and no prior oral or written agreement shall be valid, and any modifications of this Agreement must be in writing signed by all parties. B. This Interlocal Agreement shall be binding on the parties, and their heirs, successors and assigns. C. For the purpose of this Agreement, time is of the essence. 8.MUTUAL COOPERATION AND FURTHER AGREEMENTS. The parties agree to cooperate in good faith, with regard to each and every aspect required for the completion of the construction of this project which is the object of this Agreement, and the transfer of property, and to further sign all documents, deeds and permits reasonably necessary to accomplish the purposes of this Agreement. 9.INTERLOCAL COOPERATION ACT PROVISIONS. All vehicles, equipment, inventory and any improvement thereon or fixtures purchased by the City, shall remain the sole property of the City. All personnel utilized by the City in the fulfillment of this Page 132 of 152 ILA – Columbia Basin Community College Argent Road - Phase 1, No. 12001 Page 4 of 5 Agreement shall be solely within the supervision, direction and control of the City and shall not be construed as "loan servants" or employees of CBC. The City Manager of the City of Pasco, Washington, shall be designated as the Administrator of this Interlocal Agreement. No independent special budget or funds are anticipated other than those identified in this Agreement, nor shall be created without the prior written agreement of the parties. It is not intended that a separate legal or administrative entity be established to conduct this cooperative undertaking, nor is the acquiring, holding, or disposing of real or personal property other than as specifically provided within the terms of this Agreement. A copy of this Agreement shall be filed with the Franklin County Auditor's office or posted on the City or Port's website as required by RCW 39.34.040.\ CITY OF PASCO, WASHINGTON COLUMBIA BASIN COMMUNITY COLLEGE, WASHINGTON By: __________________________ By: ______________________________ Dave Zabell, City Manager Attest: ________________________________ Debby Barham, City Clerk Approved as to Form: _________________________________ Kerr Ferguson Law, PLLC, City Attorney Page 133 of 152 ILA – Columbia Basin Community College Argent Road - Phase 1, No. 12001 Page 5 of 5 STATE OF WASHINGTON ) : ss. County of Franklin ) On this day personally appeared before me Dave Zabell, City Manager of the City of Pasco, to be known to be the individual described in and who executed the within and foregoing instrument, and acknowledged that he signed the same as his free and voluntary act and deed for the uses and purposes therein mentioned. GIVEN under my hand and official seal this _____ day of _____________, 2019. ____________________________________________ NOTARY PUBLIC in and for the State of Washington Residing at: __________________________________ My Commission Expires: _______________________ STATE OF WASHINGTON ) : ss. County of Franklin ) On this day personally appeared before me ___________________, _________, Columbia Basin Community College, Washington, to be known to be the individual described in and who executed the within and foregoing instrument, and acknowledged that he signed the same as his free and voluntary act and deed for the uses and purposes therein mentioned. GIVEN under my hand and official seal this _____ day of _____________, 2019. ____________________________________________ NOTARY PUBLIC in and for the State of Washington Residing at: __________________________________ My Commission Expires: _______________________ Page 134 of 152 AGENDA REPORT FOR: City Council September 4, 2019 TO: Dave Zabell, City Manager Rick White, Director Community & Economic Development Workshop Meeting: 9/9/19 FROM: Darcy Bourcier, Planner I Community & Economic Development SUBJECT: Code Amendment: Maximum Dwelling Height in R-3 & R-4 Zones I. REFERENCE(S): Proposed Ordinance Memo to Planning Commission Dated: 7/18/2019 Planning Commission Minutes Dated: 6/20/2019 and 7/18/2019 II. ACTION REQUESTED OF COUNCIL / STAFF RECOMMENDATIONS: Discussion III. FISCAL IMPACT: None IV. HISTORY AND FACTS BRIEF: The City of Pasco can anticipate the addition of almost 50,000 new residents within the span of 20 years. Considering this, staff is exploring various avenues in which to facilitate the development of denser housing to accommodate this growth. Increasing dwelling height in the medium and high density zoning districts will ultimately provide an opportunity for the creation of more dwelling units within one building as well as give builders/developers more flexibility with the design and layout of a development. The Planning Commission has considered this proposal in a workshop and in a public hearing and have concluded that the proposal will increase the opportunity to provide additional housing opportunities and has forwarded a recommendation of approval to City Council. V. DISCUSSION: Page 135 of 152 The proposed Ordinance provides the following revisions to the Zoning Code: R-3 Zone: Increase maximum dwelling height to 40 feet (measured to midpoint of gable), and allow for a greater dwelling height via Special Permit R-4 Zone: Increase maximum dwelling height to 45 feet (measured to midpoint of gable), and allow for a greater dwelling height via Special Permit "Building height" is “… the vertical distance from grade plane to the average height of the highest roof surface …" Thus, the measurement to the peak of a dwelling may be greater than the PMC's definition of "building height." It is important to consider that the adoption of this proposal may result in dwellings/apartment buildings that may measure 50 feet to peak (within the R-4 zone), which is roughly four stories. After consulting with the Pasco Fire Department and the Pasco Fire Marshal/Building Official, it has been determined that the proposal will not compromise the City's ability to provide emergency response and fire safety operations. Page 136 of 152 MF# CA 2019-009 Page 1 of 2 ORDINANCE NO._____ AN ORDINANCE AMENDING PMC TITLE 25 TO INCREASE THE MAXIMUM DWELLING HEIGHT IN R-3 AND R-4 ZONING DISTRICTS WHEREAS, cities have the responsibility to regulate and control physical development within their borders and to ensure public health, safety and welfare are maintained; and, WHEREAS, the regulations must be driven by conformance with State and local law that protect public interest, health and safety; and, WHEREAS, to accommodate Pasco’s forecasted population growth in a limited Urban Growth Area, City staff believe increasing the maximum dwelling height in the medium and high density zoning districts will facilitate housing development; and, WHEREAS, no conflicts with the adopted International Building Code or any other adopted local or State law have arisen or are anticipated; and, WHEREAS, in order to provide for the health, safety, and welfare of the community by regulating building height the City Council hereby approves the recommendation of the Planning Commission to amend the City of Pasco Municipal Code; NOW THEREFORE, THE CITY COUNCIL OF THE CITY OF PASCO, WASHINGTON, DOES ORDAIN AS FOLLOWS: Section 1. That Pasco Municipal code 25.65.050 (R-3 Medium Density Residential District) shall be amended as follows: 25.65.050 Development Standards (6) Maximum Building Height. (a) Principal building: 3540 feet, except a greater height may be approved by special permit; Section 2. That Pasco Municipal code 25.70.050 (R-4 High Density Residential District) shall be amended as follows: 25.65.050 Development Standards (6) Maximum Building Height. (a) Principal building: 3545 feet, except a greater height may be approved by special permit; Section 3. This ordinance shall be in full force and effect five days after passage and publication as required by law. PASSED by the City Council of the City of Pasco, Washington, and approved as provided by law this ____ day of _________________, 2019. Page 137 of 152 MF# CA 2019-009 Page 2 of 2 ______________________________ Matt Watkins, Mayor ATTEST: APPROVED AS TO FORM: _____________________________ ____________________________ City Clerk Kerr Ferguson Law Group Page 138 of 152 MEMO TO PLANNING COMMISSION PLANNING COMMISSION MEETING City Hall – 525 North Third Avenue – Council Chambers THURSDAY, JULY 18, 2019 7:00 PM 1 TO: Planning Commission FROM: Darcy Bourcier, Planner I SUBJECT: Increasing Building Height in the R-3 & R-4 Zoning Districts (CA2019-009) To accommodate Pasco’s forecasted population growth in a limited Urban Growth Area (UGA), Planning staff believe it necessary to rework zoning provisions specifically within medium and high density residential zoning districts. Below is a table showing the current building height standard of dwellings in R-3 (Medium Density Residential) and R-4 (High Density Residential) zoning districts: City of Pasco (current standard) R-3 (Medium Density Residential) R-4 (High Density Residential) Max dwelling height 35 feet 35 feet With the UGA under scrutiny for a proposed expansion, the potential for low-density residential sprawl is problematic. To help mitigate this potential and provide more opportunity for housing units, the following revisions have been proposed: R-3 Zone: Increase maximum dwelling height to 40 feet (measured to midpoint of gable), and allow for a greater dwelling height via Special Permit R-4 Zone: Increase maximum dwelling height to 45 feet (measured to midpoint of gable), and allow for a greater dwelling height via Special Permit It should be noted that the definition of “building height” according to the Zoning Code is “[…] the vertical distance from grade plane to the average height of the highest roof surface […]”. Below is a simplified representation of this provision. Midpoint of highest roof surface Page 139 of 152 2 For example, according to current provisions, a building in an R-4 zoning district is permitted at 35 feet to the midpoint of the gable, but the resulting height to the peak of the building is 40 feet (plus or minus). Thus, if the proposed code revisions are adopted, a building in an R-4 zone will be permitted at 45 feet to the midpoint, and around 50 feet to the peak. Both Richland and Kennewick permit dwelling heights in excess of what Pasco currently permits, at least in their versions of the R-4 (High Density Residential) zoning district. City of Richland R-2S (Medium Density Residential) R-3 (Multiple- Family Residential) Max dwelling height 30 feet 40 feet *Dwelling height is measured to midpoint of highest roof surface (same as PMC) City of Kennewick RM (Medium Density Residential) RH (High Density Residential) Max dwelling height 35 feet 45 feet *Dwelling height is measured to highest point on roof Richland and Kennewick measure this distance differently; however, these measurements result in comparable dwelling height due to the height of the average gable. Should the proposed standard be adopted, the City of Pasco will permit the tallest buildings in the Tri-Cities MSA (at least in the R-4 zoning district). Increasing dwelling height in these zoning districts will ultimately provide an opportunity for the creation of more dwelling units within one building. Builders/developers of property zoned R-4 will be permitted to construct four-story buildings, when previously, the 35-foot height limit restricted buildings to three stories. Further, an additional story may give builders/developers more flexibility with the design and layout of a development, as building vertically lends the opportunity to reserve more ground area for parking or open space. Planning staff has discussed this proposed code revision with the Fire Marshal/Building Official regarding any building implications by increasing building height, and no contradictions with the International Building Code or other adopted codes have arisen. It should be noted that because the rear setback of a dwelling in an R-3 or R-4 zoning district must be at least equal to the dwelling height (as shown above), the rear setback in these zones will increase proportionally. Page 140 of 152 3 RECOMMENDATION MOTION: I move the Planning Commission recommend to City Council the adoption of the proposed amendment to increase maximum dwelling height in the R-3 and R-4 zoning districts as contained in the July 18, 2019 memorandum. Page 141 of 152 MINUTES PLANNING COMMISSION MEETING City Hall – 525 North Third Avenue – Council Chambers THURSDAY, JUNE 20, 2019 7:00 PM Planning Commission Meeting Page 1 June 20, 2019 PUBLIC HEARINGS: E. Code Amendment Code Amendment Regarding Maximum Dwelling Height in R-3 and R-4 Zoning Districts (MF# CA 2019-009) Chairperson Myhrum read the master file number and asked for comments from staff. Darcy Bourcier, Planner I, discussed the code amendment regarding maximum dwelling height in R-3 and R- 4 zoning districts. Staff has adjusted the proposed heights since the Planning Commission previously viewed this item. The current standard for maximum dwelling height in R-3 and R-4 is 35 feet. With the Urban Growth Area (UGA) under scrutiny for a proposed expansion, the potential for low-density residential sprawl is problematic. To help mitigate this potential and provide more opportunity for housing units, the following revisions have been proposed; R-3 Zone: Increase maximum dwelling height to 40 feet measured to the midpoint of the gable and allow for a greater dwelling height via special permit; R-4 Zone: Increase maximum dwelling height to 45 feet measured to the midpoint of the gable and allow for a greater dwelling height via special permit. There were questions and discussion between Commissioners and Staff regarding the content in the staff report. The public hearing was opened for public testimony but no public testimony was given. Commissioner Bykonen moved, seconded by Commissioner Bowers, to close the hearing on the proposed code amendment and set July 18, 2019 as the date for deliberations and the development of a recommendation for the City Council. The motion passed unanimously. Page 142 of 152 MINUTES PLANNING COMMISSION MEETING City Hall – 525 North Third Avenue – Council Chambers THURSDAY, JULY 18, 2019 7:00 PM Planning Commission Meeting Page 1 July 18, 2019 OLD BUSINESS: A. Code Amendment Code Amendment Regarding Maximum Dwelling Height in R-3 and R-4 Zoning Districts (MF# CA 2019-009) Chairperson Roach read the master file number and asked for comments from staff. Rick White, Community & Economic Development Director, discussed the code amendment regarding maximum dwelling height in R-3 and R-4 zoning districts. Staff did not have further discussion to add since previous meetings. Commissioner Cochran moved, seconded by Commissioner Bowers, the Planning Commission recommend to City Council the adoption of the proposed amendment to increase maximum dwelling height in the R-3 and R-4 zoning districts as contained in the July 18, 2019 memorandum. The motion passed unanimously. Page 143 of 152 AGENDA REPORT FOR: City Council September 4, 2019 TO: Dave Zabell, City Manager Workshop Meeting: 9/9/19 FROM: Zach Ratkai, Director Administrative & Community Services SUBJECT: Pasco City Hall Renovation Progress and Cost Update I. REFERENCE(S): II. ACTION REQUESTED OF COUNCIL / STAFF RECOMMENDATIONS: Discussion III. FISCAL IMPACT: $1,667,554 - CIP- Real Estate Excise Tax Fund (Original Approved Construction Budget Amount) $500,000 - Supplement Request - Real Estate Excise Tax Fund $2,167,5544 - Proposed Revised Total Project Budget (Includes additional security improvements and furnishings. IV. HISTORY AND FACTS BRIEF: In 2016, the Police department vacated City Hall to move into a new facility, leaving behind much needed vacant office for other City Hall services. Shortly thereafter, plans to renovate the empty space and then update current work areas were designed. An initial phase, that provided renovation for the Information Services Division was completed in a previous project, and a larger phase was approved for 2019 in the 2019 - 2020 biennial budget. Current renovation efforts began in January and are about 60% complete. The current renovation provides significant improvements, including the addition of offices to the first floor area, renovation of the Finance Department spaces, and Administrative and Community Services areas. On the second floor of City Hall, Engineering and Permitting will see renovation as well. The 3rd floor will see the Human Resources offices get updated as the last portion of the project. Page 144 of 152 The primary goal for the project is to focus on enabling better and more transparent access to the public for the more externally-focused departments of the City, while also addressing access and security measures to protect city staff and assets, while remaining open to the public. Heavily staffed divisions such as Public Works and Finance will see updates to their office spaces to allow for greater collaboration, while remaining flexible to accommodate future staff growth. In January of this year, a contract was awarded to Booth and Sons Construction, Inc., and work on the initial phases commenced shortly thereafter. The original contract for construction (2) "adwith $1,170,000, was two -of consisting projects alternate" additional carpeting in the City Council Chambers and select stairwells as well as wall protection work was approved for $58,500 and $1,100, respectively. In addition, a 20% contingency cost was included which amounted to $234,000. Renovation of existing and historic buildings can be challenging as they were originally designed for one purpose and now being used for another; materials, codes, technology, security needs also change significantly over time. A priority was placed on the remodel in costing out this project with only a minimal amount provided for Furniture, Fixtures & Equipment (FF&E) and security upgrades with the thought being that if project held no surprises once the contractor began demolishing and modifying portions and be could package security FF&E a more building, the of robust considered. While the initial phases of the construction project, materials, equipment, design changes, and other factors have added to the overall cost of the project, they have been modest leaving head room to vastly improve security and replace current furnishings well past useful life. Through of number a identified staff construction and design the project, vulnerabilities in the facility that could adversely impact not only the safety of the staff, but also the visiting public at large. Accordingly, the City Manager has authorized significant security improvements, which have been designed and incorporated within early phases of construction. Security improvements are a significant driver for requested increase in project budget. Improvements such as proximity card readers and associated cards for security access through doors leading to staff areas were procured, as well as additional cameras in public hallways, the City Council Chambers, and areas where money is handled. With these purchases, wiring and technology upgrades that were not originally specified in the design were purchased as well. Additionally, some security upgrades required architectural upgrades and design changes, which warranted additional architectural work and will add work for the contractor in the later phases of the project. V. DISCUSSION: While the project has addressed most of the high risk areas, other phases remain to be completed and an extensive remodel like the City Hall will always uncover unknown issues and changes that frequently lead to change orders and additional costs. As the City progresses through the project, the age of the facility and addressing new realities Page 145 of 152 in employee safety have had cumulative impacts of overall project costs. Additionally, as noted above, there was minimal allowance in the original scope for Furniture, Fixtures, and Equipment, including security. Staff is seeking authorization for an additional $500,000 to accomplish needed security upgrades as well as additional FF&E needs for new workspace design. Work on the overall renovation is about 60% complete. Page 146 of 152 Page 147 of 152 City Hall Renovations Additional Security and Safety Page 148 of 152 Funding for Project Original Bid Award Project Budget (REET)$1,667,554.00 GS Contract ($1,170,000.00) Contingency (20%)($234,000.00) Design and Const. Admin ($178,415.50) Add Alternates ($59,600.00) TOTAL Remaining $25,538.50 Supplement to be Requested ($500,000) -Additional Contingency (For unknowns) -Furniture, Fixtures, and Equipment ($400,000) -Security Measures ($100,000)Page 149 of 152 FF & E NEW OFFICE AREA (FORMER POLICE) Office to Workstation Conversion (allows for growth in staffing) Cust. Service: New Window Quieter Workspace Better Visibility Fewer Hazards Page 150 of 152 Proximity Card Readers Provides access to badged employees Safety from public hallways Allows staff to control who enters sensitive areas Allows staff to close parts of City Hall Cards allow for Employee Identification Page 151 of 152 Cameras Additional cameras: -Customer Service counter -Incl. new cameras above each window -New Permit Center -City Council Chamber/Public Hallways -Single System -Tie-ins with First Responders Page 152 of 152