Loading...
HomeMy WebLinkAboutCulbertson Construction - Change Order No 1 - CP5-ST-3A-12-57 Oregon Ave (SR 397) Corridor Imp Ph 1Project No: CITY OF PASCO PUBLIC WORKS DEPARTMENT CONTRACT CHANGE ORDER NO. 1 CP5-ST-3A-12-57 Project Title: Oregon Ave (SR 397) Corridor Improvement, Ph 1 Contractor: Culbert Construction, Inc. Description of Change: Field Directives 01, 03, 06, 08 and 10 Detail as Appropriate: FD 01 - Relocate existing catch basin ($1,745.00); FD 03 - Increase drive entrance 20'($1,290.71); FD 06 - Remove existing storm manhole ($2,164.00); FD 08 - Add drive entrance ($1,044.02); and FD 10 - Adjust manhole ($1,134.68) Contract Bid Amount: SALES TAX @ 8.6%: Total: $ 6,622,707.52 N/A $ 6,622,707.52 PREVIOUS CHANGE ORDER CURRENT CHANGE ORDER Subtotal Subtotal $ 7,378.41 Sales tax @ 8.6% N/A Sales tax @ 8.6% N/A Total $ Total $ 7,378.41 Total Change Orders To Date $ 7,378.41 New Contract Amount $ 6,630,085.93 IS CONTRACT TIME AFFECTED BY THIS CHANGE ORDER Contract Time Prior to this Change Order ................................. Modification to Contract time by this Change Order .................... revised Total Contract Time .................................................... r—Y—E—S-1 NO Add 3.5 Working Days It is mutually agreed by both parties that this Change Order fully describes the change(s) that is (are) being made and that the compensation for this Change Order is full and complete and is the only compensation due or owing for this Change Order. Further, it is mutually agreed that this document will supplement the present Contract Documents and that the provisions of the previously executed Contract Documents shall apply to this Change Order. AGREED TO AND ACCEPTED: y%� CONTACTOR — Date APPROVED. / j AP 01 MAN GER DateCIN ENG Dat PUBLIC Wi DIRECTOR Ii& Washington State �0 Oepaetment of Transportation Change Order Contract Number Contract Title Federal Aid Number CP5-ST-3A-12-57 Oregon Ave (SR397) Corridor Improvement -Phase 1 STPUS-0397 Change Order Number Change Description Date 001 Field Directives 01, 03, 06, 08 and 10 07/03/2018 Prime Contractor / Design -Builder Culbert Construction ✓ Ordered by Engineer under the terms of Section 1-04.4 of the Standard Specifications ❑ Change proposed by Contractor / Design -Builder Change Description Field Directive 01, Relocate existing catch basin. (See attached Field Directive 001) $1,745.00 + 1.0 days Field Directive 03, Increase Drive entrance 20 feet at STA 147+96.8 (See attached Field Directive 003) $1,290.71 +0.5 days Field Directive 06, Remove existing storm manhole at STA 143+16 RT (See attached Field Directive 006) $2,164.00 + 1.0 days Field Directive 08, Add Drive entrance at STA 147+22.00 to STA 147+87.00 RT (See attached Field Directive 008) $1,044.02 + 0.5 days Field Directive 10, Adjust manhole at STA 153+75.00 out of the curb line (See attached Field Directive 010) $1,134.68 + 0.5 days Verbal Approval Given By Verbal Approval Date Working Days +/- Alan Heiman for Kent McCue city of Pasco 6-26-2018 +3.5 Original Contract Amount Current Contract Amount Est. Net Change This C.O. Est. Contract Amount 6,622,707.52 6,622,707.52 7,378.41 6,63085.93 WSDOT Form 140-005 Page 1 Revised 04/2015