Loading...
HomeMy WebLinkAboutCulbertson Construction - Change Order No 3 - CP5-ST-3A-12-57 Oregon Ave (SR 397) Corridor Imp Ph 1CITY OF PASCO PUBLIC WORKS DEPARTMENT CONTRACT CHANGE ORDER NO. 3 Project No: CP5-ST-3A-12-57 Project Title: Oregon Ave (SR 397) Corridor Improvement, Ph 1 Contractor: Culbert Construction, Inc. Description of Change: Field Directives 12, 14, 15, 16, 17 and 19 Detail as Appropriate: FD 12 - Additional excavation and grading, Reddaway Trucking ($1,636.12); FD 14 - Additional excavation and grading, Coast Crane ($2,089.46); FD 15 - Grade and place drain rock, Monarch Machine ($1,316.74); FD 16 - Remove and replace curb to avoid catch basin ($659.83); , ✓ i , -I Xcivua,c a+ -i ivui mow, w rviai , , i uun . LUP aiyn kW I ,uay.a i h a iu r ✓ i a - r u, i ivw cnwui iy i u waterline to verifv desian chances ($2.549.171 Contract Bid Amount: $ 6,622,707.52 SALES TAX @ 8.6%: N/A Total: $ 6,622,707.52 PREVIOUS CHANGE ORDER CURRENT CHANGE ORDER Subtotal $ 14,754.41 Subtotal $ 9,578.23 Sales tax @ 8.6% N/A Sales tax @ 8.6% N/A Total $ 14,754.41 Total $ 9,578.23 Total Change Orders To Date $ 24,332.64 New Contract Amount $ 6,647,040.16 IS CONTRACT TIME AFFECTED BY THIS CHANGE ORDER YES NO Contract Time Prior to this Change Order ................................. Modification to Contract time by this Change Order .................... Add 4.5 Working Days revised Total Contract Time .................................................... It is mutually agreed by both parties that this Change Order fully describes the change(s) that is (are) being made and that the compensation for this Change Order is full and complete and is the only compensation due or owing for this Change Order. Further, it is mutually agreed that this document will supplement the present Contract Documents and that the provisions of the previously executed Contract Documents shall apply to this Change Order. AGREED TO AND ACCEPTED: APPROVED: f_— CONTRACTOR Dates P6tOJEor mmxt APPROVED: DIRECTOR Aft lmstme f�.. of Thmsvortafian Contract Number Contract Title Federal Aid Number CP5-ST-3A-12-57 Oregon Ave (SR397) Corridor Improvement -Phase 1 STPUS-0397 Change Order Number Change Description Date 003 Field Directives 12, 14, 15, 16, 17 and 19 08/23/2018 Prime Contractor/ Design -Builder Culbert Construction ✓ Ordered by Engineer under the terms of Section 1-04.4 of the Standard Specifications ❑ Change proposed by Contractor / Design -Builder Change Description Field Directive 12, Additional excavation and grading between STA 147+83 and STA 148+38 RT (Reddaway Trucking) (See attached Field Directive 012) $1,636.12 + 1.0 day Field Directive 14, Additional excavation and grading between STA 139+63 and STA 141+21 RT (Coast Crane) (See attached Field Directive 014) $2,089.46 + 1.0 day Field Directive 15, Grade and place Drain rock between STA 145+24 and STA 146+29 LF (Monarch Machine) (See attached Field Directive 015) $1,316.74 + 1.0 day Field Directive 16, Remove and replace curb to avoid catch basin at STA 1154+75 RT (See attached Field Directive 016) $659.83 + 0 days Continued next page. LVerb�af Given By Verbal Approval Date Working Dayseiman for Kent McCue Fity of Pasco See Field Directives +4.5 Original Conhact Amount Current Contract Amount Est. Net Change This C.O. Est. Contract Amount 6,622,707.52 6,637,461.93 9,578.23 6,647,040.16 Approvalnd v( Approved Approved ) Project Engineer > Appri) Authority per C.A. Agreement 2e /U Date Date ✓ Approval Recommended Other Approval As Required By Prime Contractor Signature Date Date IF LZ Representing WSDOT Form 140-005 Page 1 Revised 04/2015 Contract Number Contract Title Change Order Number CP5-ST-3A-12-57 Oregon Ave (SR397) Corridor Improvement -Phase 1 003 Change Description Cont. Field Directive 017, Relocate 24 hour Econo Mart Truck Stop sign STA 158+44.59, 80.72, LT (See attached Field Directive 017) $1,326.91 + 0.5 days Field Directive 019, Pot Hole Existing 16" water line to verify design changes (See attached Field Directive 019) $2,549.17 + 1 day vvauu i rorm 14u-uua Page 2 Revised 0412015