Loading...
HomeMy WebLinkAboutCooper Zietz Engineers Inc - WSDOT Supplemental Agreement No. 1 - Oregon Avenue (SR 397) Ph 1Washington State �AP Department of Transportation Supplemental Agreement Organization and Address Number I Cooper Zietz Engineers, Inc. 320 N. 20th Avenue Original Agreement Number Pasco, WA 99301 CP5-ST-3A-12-57 Phone: Project Number Execution Date Completion Date STPUS-0397(008) December 6, 2016 Project Title New Maximum Amount Payable Oregon Avenue (SR 397) Corridor Improvements Ph 1 $440,194.00 Description of Work This contract provides for the value engineering and construction management for the improvement of Oregon Avenue (SR397) beginning at the intersection of East "A" Street and terminating 350 feet north of the intersection with James Street. The project consists of HMA Removal and replacement, new traffic signal systems, pedestrian ramps, sidewalk and driveway reconstruction, illumination removal and replacement, relocation of existing signage and new signage, new striping, landscaping, and irrigation and other work, all in accordance with the attached Con tract provisions, and the Standard Specifications. The Local Agency of City of Pasco desires to supplement the agreement entered in to with Cooper Zietz Engineers. Inc. and executed on December 6. 2016 and identified as Agreement No. CP5-ST-3A-12-57 All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: Section 1, SCOPE OF WORK, is hereby changed to read: Additional scope shall include the consultant providing a night inspector for the length of project due to the contractor's work schedule. Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for completion of the work to read: Section V, PAYMENT, shall be amended as follows: Original Contract Total: $256,006.00 Supplement Agreement#1: $184,188.00 New Agreement Total: $440,194.00 as set forth in the attached Exhibit A, and by this reference made a part of this supplement. If you concur with this supplement and agree to the changes as stated above, please sign in the Appropriate spaces below and return to this office for final action. By: Cooper Zietz Engineers, Inc. BY�Ci!y of Pasco / �� Consultant Signature proving t ority Signatu 7 5/I B Date DOT Form 140-063 Revised 09/2005 Exhibit "A" Summary of Payments DOT Form 140-063 Revised 09/2005 Basic Agreement Supplement #1 Total Direct Salary Cost 79,078 65,301 144,379 Overhead (Including Payroll Additives) 108,218 89,374 197,592 Direct Non -Salary Costs 44,987 9,923 54,910 Fixed Fee 23,723 19,590 43,313 Total $ 256,006 $ 184,188 $ 440,194 DOT Form 140-063 Revised 09/2005