HomeMy WebLinkAboutMoreno & Nelson - Change Order No. 4 - CP5-ST-3A-14-06 20th Ave Safety ImrpovementsCITY OF PASCO PUBLIC WORKS DEPARTMENT CONTRACT CHANGE ORDER NO.4 Project No: CP5-ST-3A-14-06 Project Title: 20th Ave Safety Improvements Contractor: Moreno & Nelson Construction Co. Description of Change: 1) Field Item #41 Detail as Appropriate: 1) Push button relocation at NE Pearl & 20th 2) Per Section 1-04.6.2 of the 2016 Standarc Tor sne nem saT was aalustea Trom zi�4a.6u to robb.barsr (see attacnea breakdown). Contract Bid Amount: SALES TAX @ 8.6%: Total: $ 2,002,384.50 N/A $ 2,002,384.50 PREVIOUS CHANGE ORDER CURRENT CHANGE ORDER Subtotal $ 29,033.00 $ 7,549.74 Sales tax @ 8.6% N/A Sales tax @ 8.6% N/A Total $ 29,033.00 Total $ 7,549.74 Total Change Orders To Date $ 36,582.74 New Contract Amount $ 2,038,967.24 IS CONTRACT TIME AFFECTED BY THIS CHANGE ORDER Contract Time Prior to this Change Order ................................. Modification to Contract time by this Change Order .................... revised Total Contract Time .................................................... YES NO 109 2 111 It is mutually agreed by both parties that this Change Order fully describes the change(s) that is (are) being made and that the compensation for this Change Order is full and complete and is the only compensation due or owing for this Change Order. Further, it is mutually agreed that this document will supplement the present Contract Documents and that the provisions of the previously executed Contract Documents shall apply to this Change Order. AGREED TO AND ACCEPTED: .c9QitBIL �a�%xyr>, 1/3/2018 CONTRACTOtV Date APPROVED: u7�lGi J/5/ 2018 // iI)//OC- Moreno & Nelson Construction Project: Customer: Date: Scope: RFC - Push Button Relocatoin at NE Pearl / 20th N 20th Ave City of Pasco Job No.: 2680 10/23/2017 Mobilize, remove obstructions, relocate push button as part of final punch list received 10/23/17. Push )utton relocation proposal is attached to this request (2 sheets). If push button cannot be relocated the cost o remove and repour base would be submitted for additional payment. Push button is installed per the fesign files and per staking completed by White Shield. Schedule: 2 Working Days Dates of Work: TBD Description Traffic Control Sawcut Vac Truck Mob by Ffrazure and M&N Demo by Ffrazure or M&N Sierra Electric Relocation Expense Pour Back ADA / flatwork as required Traffic Control Credit Sawcut Credit Vat Truck Credit Pour Back ADA / concrete as requied (credit) Approved by: 1 LS $ 350.00 $ 350.00 1 LS $ 350.00 $ 350.00 2 HRS $ 290.00 $ 580.00 1 LS $ 350.00 $ 350.00 1 LS $ 650.00 $ 650.00 1 LS $ 500.00 $ 500.00 1 LS $ 1,430.00 $ 1,430.00 1 LS $ (350.00) $ (350.00) 1 LS $ (350.00) $ (350.00) 2 HRS $ (290.00) $ (580.00) 1 LS $ (1,430.00) $ (1,430.00) Subtotal $ 1,500.00 TotalRFC $ 1,500.00 Aaron Grimm Date Moreno & Nelson Constructioylnc. G C Name and Signatureat� City of Pasco C N 01 M 'i N OI N h O V m L 4 O ` U s C C a0 a0 p 0 C a1 1 d n m �i n m H n w w c d •� _ c m c y $> d ani ; W V O O u C O Z 1 M M W U n O in MM N -I C 08C O 01 p O O ci S CMN rvN� m YMI W l- Z m ^ N N vl tri N � of yZ i U � N Lq a v aG m a m m a N ut H � N �I d a n m m m d a 0 M M > > � u N 1O c n a v c 6 > c O Nl m LL d h V O a N N 6 L 6 n .y 0 ti W O C O i Q m m d }I c c y O y O U w h a m v a m a Y Y m n Cf � o n � `o a v 'v+ y N } a w O n Y n « 0 H V