HomeMy WebLinkAboutMeier - PSA - CIP C3-11-52-WTR - 2011 Filtration Plant Improvement Storage Building DesignPROFESSIONAL SERVICES AGREEMENT
THIS AGREEMENT, made and entered into between the City of Pasco, hereinafter
referred to as the "City", and Meier Architecture • Engineering hereinafter referred to as the
"Consultant".
WHEREAS, the City desires to engage the professional services and assistance of a
consulting firm to provide structural engineering, civil engineering, and architectural design
services with respect to the development of a storage building/garage at the Butterfield
Water Treatment Plant, and Consultant has demonstrated that it is highly qualified to perform
these services.
NOW, THEREFORE, in consideration of mutual benefits accruing, it is agreed by and
between the parties hereto as follows:
1. Scone of work. The scope of work shall include all services and material necessary to
accomplish the above mentioned objectives in accordance with Exhibit A.
2. Ownership and use of documents.
A. The parties acknowledge that this Agreement shall be governed by RCW Chapter
42.56 and any other State or Federal law relating to confidentiality, intellectual
properties, and public disclosure. The parties shall make a good faith effort to
comply with such laws, and to the fullest extent allowed by law, comply with the
provisions of this section.
B. All research, tests, surveys, preliminary data and any and all other work product
prepared or gathered by the Consultant in preparation for the services rendered
shall not be considered public records, providedhowever, that:
(1) All final reports, presentations and testimony prepared by Consultant shall
become the property of the City upon their presentation to and acceptance
by the City and shall at that date become public records.
(2) The City shall have the right, upon reasonable request, to inspect, review
and, subject to the approval of Consultant, copy any work product.
(3) In the event that Consultant shall default on this Agreement, or in the
event that this Agreement shall be terminated prior to its completion as
herein provided, the work product of Consultant, along with a summary of
work done to date of default or termination, shall become the property of
the City and tender of the work product and summary shall be a
prerequisite to final payment under this Agreement. The summary of
work done shall be prepared at no additional cost, if the Agreement is
terminated through default by Consultant. If the Agreement is terminated
Professional Services Agreement - 1
through convenience by the City, the City agrees to pay Consultant for the
preparation of the summary of work done.
(4) Consultant shall maintain all documents associated with work performed
under this Agreement for a minimum period of three (3) years after
completion of the work. This provision shall survive termination of this
Agreement.
(5) Consultant shall respond to requests by the City for records within five (5)
business days by either providing the records, or by identifying in writing
that additional time is necessary to provide the records with a description
of the reasons why additional time is needed. Records shall be provided to
the City within twenty (20) days of the date of the request. Provisions of
Section 5 in this Agreement shall specifically apply to any claim arising
out of Consultant's failure to properly maintain or timely produce records
as described herein and as otherwise required by law.
3. Payments. The Consultant shall be paid by the City for completed work for services
rendered under this Agreement as provided hereinafter. Such payment shall be full
compensation for work performed or services rendered and for all labor, materials,
supplies, equipment and incidentals necessary to complete the work.
A. Payment for work accomplished under the terms of this Agreement shall be on a
lump sum basis as set forth on the fee schedule found in Exhibit A, provided, in
no event shall the payment for all work performed pursuant to this Agreement
exceed the sum of $ 21,697, without approval from the City.
B. All vouchers shall be submitted by the Consultant to the City for payment
pursuant to the terms of this Agreement. The City shall pay the appropriate
amount for each voucher to the Consultant. The Consultant may submit vouchers
to the City monthly during the progress of the work for payment of completed
phases of the project. Billings shall be reviewed in conjunction with the City's
warrant process.
C. The costs records and accounts pertaining to this Agreement are to be kept
available for inspection by representatives of the City for a period of three (3)
years after final payment. Copies shall be made available upon request.
4. Time of performance. The Consultant shall perform the work authorized by this
Agreement promptly and within 60 days.
5. Indemnification.
A. The Consultant shall defend, indemnify, and hold harmless the City, its officers,
officials, agents, employees, and volunteers from any and all claims and causes of
action, including, but not limited to, actions of law or administrative proceedings
Professional Services Agreement - 2
for all injuries to persons or damages to property, and all losses, damages,
demands, suits, judgments, including attorney fees, arising out of, or as a result
of, or in connection with the work performed under this Agreement, or caused or
occasioned in whole or in part by reason of errors, negligent acts or omissions, or
the presence of the Consultant or its subcontractors in the performance of this
Agreement, except for injuries and damages caused by the sole negligence of the
City, its officers, employees, agents, and volunteers.
B. Should a Court of competent jurisdiction determine that this Agreement is subject
to RCW 4.24.115, then, in the event of liability for damages arising out of bodily
injuries or damages to property caused by or resulting from the concurrent
negligence of the Consultant, and the City, its officers, employees, agents and
volunteers, the Consultant's liability and obligation to defend hereunder shall only
be the proportionate extent of the Consultant's negligence.
C. It is further agreed that the indemnification provided herein constitutes the
Consultant's waiver of immunity under Industrial Insurance, Title 51 RCW, solely
for the purposes of this indemnification.
D. No liability shall attach to the City by reason of entering into this Agreement
except as expressly provided herein.
E. This indemnification shall include damages, penalties and attorney fees sustained
as a result of Consultant's delayed or failed performance of Section 6 above.
F. This waiver has been mutually negotiated by the parties, and the provisions of this
section shall survive the expiration or termination of this Agreement.
6. _General and Professional Lability insurance. Consultant shall secure and maintain in
full force and effect during the performance of all work pursuant to this Agreement a
policy of comprehensive general liability insurance providing coverage of at least
$1,000,000 per occurrence and $2,000,000 aggregate for personal injury; $1,000,000 per
occurrence and $2,000,000 aggregate for property damage; errors and omissions
insurance in the amount of $1,000,000; and automobile insurance as required by law.
Each such insurance policy shall name the City as an additional insured and shall include
a provision prohibiting cancellation of said policies, except upon thirty (30) days written
notice to the City. The City shall be named as a certificate holder on each insurance
policy. Certificates of coverage shall be delivered to the City within fifteen (15) days of
execution of this Agreement.
7. Discrimination Prohibited. Consultant shall not discriminate against any employee or
applicant for employment because of race, color, religion, age, sex, national origin or
physical handicap.
8. Consultant is an independent contractor. The parties intend that an independent
contractor relationship will be created by this Agreement. No agent, employee or
Professional Services Agreement - 3
representative of the Consultant shall be deemed to be an agent, employee or
representative of the City for any purpose. Consultant shall be solely responsible for all
acts of its agents, employees, representatives and subcontractor during the performance
of this Agreement. Consultant shall make no claims for benefits for employment against
the City including, but not limited to, sick leave, medical insurance, coverage under the
City's State Department of Labor and Industries policy, vacation benefits, retirement, or
unemployment benefits. Consultant shall comply with all State and Federal laws
including, but not limited to, the requirements of RCW` 50.04.0140 and RCW 51.08.195.
9. City aooroval. Notwithstanding the Consultant's status as an independent contractor,
results of the work performed pursuant to this Agreement must meet the approval of the
City.
10. Termination. This being an Agreement for professional services, either party may
terminate this Agreement for any reason upon giving the other party written notice of
such termination no fewer than ten (10) days in advance of the effective date of said
termination.
11. Integration. The Agreement between the parties shall consist of this document and any
schedules or exhibits listed in this agreement and attached hereto. These writings
constitute the entire Agreement of the parties and shall not be amended except by a
writing executed by both parties. In the event of any conflict between this written
Agreement and any provision of Exhibit A, this Agreement shall control.
12. Non -waiver. Waiver by the City of any provision of this Agreement or any time
limitation provided for in this Agreement shall not constitute a waiver of any other
provision.
13. Non -assignable. The services to be provided by the Consultant shall not be assigned or
subcontracted without the express written consent of the City.
14. Covenant against contingent fees. The Consultant warrants that he has not employed or
retained any company or person, other than a bona fide employee working solely for the
Consultant, to solicit or secure this Agreement, and that he has not paid or agreed to pay
any company or person, other than a bona fide employee working solely for the
Consultant, any fee, commission, percentage, brokerage fee, gifts, or any other
consideration contingent upon or resulting from the award of making of this Agreement.
For breach or violation of this warranty, the City shall have the right to annul this
Agreement without liability or, in its discretion to deduct from the Agreement price or
consideration, or otherwise recover, the full amount of such fee, commission, percentage,
brokerage fee, gift, or contingent fee.
15. General Provisions. For the purpose of this Agreement, time is of the essence. In the
event a dispute regarding the enforcement, breach, default or interpretation of this
Agreement, the parties shall first meet in a good faith effort to resolve such dispute. In
the event the dispute cannot be resolved by agreement of the parties, said dispute shall be
Professional Services Agreement - 4
resolved by arbitration pursuant to RCW 7.04A, as amended, and the Mandatory
Arbitration Rules (MAR); venue shall be placed in Franklin County, Washington, the
laws of the State of Washington shall apply; and the prevailing party shall be entitled to
its reasonable attorney fees and cost.
In the event any provision of this Agreement is deemed to be unenforceable, the other
provisions of the Agreement shall remain in full force and effect.
16. Notices. Notices to the City of Pasco shall be sent to the following address:
City of Pasco
P. O. Box 293
Pasco, WA 99301
Notices to the Consultant shall be sent to the following address:
Meier Architecture • Engineering
8697 W. Gage Blvd.
Kennewick, WA 99336
Receipt of any notice shall be deemed effective three (3) days after deposit of written
notice in the U. S. mails, with proper postage and properly addressed.
DATED THIS DAY OF Jan U0 M 2013
CITY OF PASCO
By:G'Gt.�/t�/
Matt Watkins, Mayor
CONSULTANT:
Signature, Printed Name and Title
57j�✓a✓V. P,i
EXHITBIT A
Pagel of 9
ARON ITECTIJ RE . EN R I N E E RI N O
AGREEMENT FOR SERVICES
CLIENT: Teresa K. Reed -Jennings, PE
Senior Engineer - Utilities
City of Pasco
525 N. Third Avenue
Pasco, WA 99301
PROJECT: CIP C3-11-52-WTR — 2011 FILTRATION PLANT IMPROVEMENT
STORAGE BUILDING DESIGN
SCOPE: Meier Architecture • Engineering (Meier) will provide the following services:
Design a storage facility that will be approximately 20 feet x 40 feet long for the
Butterfield Water Treatment Plant adjacent to the existing Chlorine Building adjacent to
S. 13th Street in accordance with Request for Proposal CIP C3-11-52-WTR-2011,
Filtration Plant Improvement Storage Building Design. The Meier design team will meet
with your project personnel to determine optimum arrangements for the site and the
building interior.
2. Specific items included in the design are a site survey performed by a Professional
Surveyor and a revised vehicle entry/exit to accommodate chlorine truck deliveries. The
structural design will not impact the existing clear wells, constructions estimates at the
30%, 60%, and 90% stages of the design, and electrical design for interior and exterior
lighting.
3. Design review submittals will be submitted in PDF form. A review meeting will be held
no later than 10 working days after the submittal.
4. Drawings, specifications, and calculations will be stamped by an engineer registered in
the State of Washington. The deliverables for the design include the following:
A. Architectural Floor/Roof Plan.
B. Architectural Elevations/Building Sections.
C. Architectural Details/Schedules.
D. Civil Plan with Utilities, Grades, and Paving.
E. Civil Details.
F. Structural Foundation/Roof Plan.
G. Structural Details.
H. Electrical Plan.
I. Construction Specification.
J. Stormwater calculations.
K. Structural calculations.
P12-0408
Page I
10/23/2012 8697 Gage Boulevard I Kennewick, WA 99336
P: 509.735.1589 1 F: 509.783.5075
�www.moierine.com
EXHITBIT A
Page 2 of 9
5. The proposal does not include engineering support during the construction period. This
service, if requested, will be performed under a separate proposal.
6. Design of Landscaping has not been included in the proposal.
7. The design does not include heating of the building, water or sewer to the building, floor
drains, or a metal stairway from the main building to the storage building. If these
services are requested, they will be priced under separate cover.
All services not specifically outlined in the scope of work above shall be considered additional
services, and shall be subject to a commensurate adjustment to the agreed compensation, which
shall be determined by way of a written addendum, signed by the parties, prior to proceeding
with the additional work.
COMPENSATION:
Meier will perform these services for a firm fixed fee of $21,697. Invoices will be submitted
monthly. A 1.5% interest charge will be added for late payment beyond the normal 30 day billing
period. Agreement to provide services, as stated, is valid if approved within 30 days of date
submitted. Approvals beyond 30 days are subject to re -negotiation of scope and fee.
OTHER TERMS AND CONDITIONS:
The City of Pasco Standard Business Conditions as mutually agreed by both parties will form a
part of this Agreement.
Thank you for the opportunity to submit this agreement. We look forward to working with you
on this Project. If the scope of work above does not adequately reflect your expectations, please
let us know. It is our goal to meet your needs and budget on this Project. If you have any other
questions, please feel free to contact the undersigned directly.
Sincerely
g£ —
Steve Palmrose
Sr. Project Manager, PE
SVP:sjm
Proposal No. P12-0408
Letter No. 12-0703
P12-0408
Page 2
10/232012
Global Excellence by Design
www.meierinc.com
EXHITBIT A
Page 3 of 9
Meier Architecture • Engineering
Project Title: 2011 Filtration Plan Improvement Storage 8uliding Design
Project/Proposel No: 1012.0400 Task No:
Project Manager: S. Pelmrose Task Description:
Date: 40/1/2012 Client Name: City of Pasco
A/E SERVICES
Services
Expenses
Sub -Total
GENERAL
$3,440,00
$79.92
$3,519.92
ARCHITECTURE
$7,084.00
$60.00
$7,144.00
CIVIL
$3,112.00
$1,698.60
$4,810.60
ELECTRICAL
$1,722.00
$0.00
$1,722.00
MECHANICAL
$0.00
$0.00
$0.00
STRUCTURAL
$4,500.00
$0.00
$4,500.00
519,858.00
$1,838.52
$21,696.52
PROJECT EXPENSES BREAKDOWN
MILEAGE
$91.02
CAD STATION
$0.00
CONSULTANT EXPENSE
$1,687.50
REPRODUCTION
$60.00
TRAVEL / LODGING
$0.00
AIRLINE COSTS
$0.00
MISCELLANEOUS
$0.00
Total Expenses
$1,838.52
Total Project Cost $21,696.52
Project Manager Approval: Date:
Authorized Approval: Dale:
EXHITBIT A
Page 4 of 9
Meier ASOhicture• Engineering
GENERAL NE SERVICES
PROJECT TITLE
2011 Flilration Pian_ Improvement Storage Building Design
PROJECTJPROPOSAL NO.
P12.0408 PROJECT MANAGER: S. Palmrose
TASK NO.
TASK DESCRIPTION:
DATE PREPARED-
10/1/2012 CLIENT NAME! City of Pasco
_. ..
TOTAL
TOTAL
,. _..
COST
HOURS
ACTIVITY
g
CODE DESCRIPTION
IGSM 1 7:03
G010 PROJECT MANAGEMENT
B
_ _
1.040 GO
9020 WORK PLANS/ DESIGN CRIT ER IA
_
_B
B
6030 MEETINGS
8
1,040W
6010 SITE INVESTIGATION lOBSERVATION
q
62003
4
GD50 ARCHITECTURE/ENGINEERING
COBO CHECK DOCUMENTS
6070 WCORPORATE REVIEW COMMENTS
GOBO__
6000 GENERAL
20
I
70
G101_TITLEPAGE
G102 FLOOR PLANS
G102E_NL_AR_GEDPLANE—
G104 ROOFPLAN
G105___ELEVATIONS
G1G8 SECTIONS _— _
__ ..
_
—_
_
_
—
6107 DETAILS
6108 SCHEDULES _ _
_ S
_ _
66000
8
G109 ESTIMATES
6110
G111
61G12
GIN ORAYANGS
III
I
I
I I BB40.00
B
G210 SPECIFICATIONS
(3220 CONSTRUCTION—COST TIMATE
6230 MODELING IANMATIONATION
-
_.--_
6240 REPORTS
6250 DMENT CONTROL
6260 RENRENDERINGS
6270 BIDDING 6ERVICFS
0200 MISC. SERVICES
G310 PROJECT ADMINISTRATION
6320 WORK PLANS I DESIGN CRITERIA
_
G_330 MEETINGS
0
Ga40 SITE INVESTIGATION OBSERVATION
6350 SUBMITTAL REVIEWS
RFP4ECOR HANGEOWB
_6380
6370 RECORD DOCUMENTS
6_90 380 PROJECT CLOSEOUT
33COMMISSIONING
0700 CORSTRUC"ON MANAGEMENT
GSGG.GI NG200.G3W= SUBTOTAL MANHOURS 20 9 25
GENERAL ENGINEERING SERVICES COST $3,440.00
EXPENSES
6_210 MILEAGE
144_
MILES®.1 0555 ——_ - -
S7992
--
5245 CAO STATION
HOURS® b00
51W CONSULTANT EXPENSE
PLUS 12876 B,5A11
52W REPRODUCTION-NumSef Of Copies
__
COLOR 708476 24x30 Bono 11%178RM
6210 TRAVEL/LODGING
5210 AIRLINE COSTS
6280 MISCEtUNEW6
•^HoLft employees In0mnn9 ewl9me wA W NIIeO 01 IN WNIINd rete pWe 25% EXPENSES COST 576.02
TOTAL GENERAL NE SERVICES S EXPENSE COST - 9,618.82
DISCIPLINE APPROVAL _ DATE.
PROJECT MANAGER APPROVAL DATE,
F:/ProposallEstimate/Estimate Foun-General-2012 xis
EXHITBIT A
Page 5 of 9
Meier Arehioturs- Engineering
ARCIErWTURAL DISCIPLINE
PROJECT TITLE
2011 FIIUatlon Pian Improvement Storage Building Design
PROJECTIPROPOSAL NO.
P12-0408 PROJECTaAimmum S. Palmrose
TARN NO.
TAER DESCRIPTION:
OATS PREPARING.-
10/112012 CLIENT NAME CRY Of PB$CO
''T"I!•F SPId'O^. ALICU11,.T SPN:O? ARCIIRPCT IN-PfiOR AOIINKECY
TOTAL
TOTAL
4RC,..Tf(-7.RCH IECT _ 0ESIG`iER2 INT RN CESGNER E)IOR
COST
HOURS
ACTwma1
0 a m? 4 Q
CODE DESCRIPTION
12000 113 DO 15 C0 66 L9 Fa 00 ?55'0 ED 00
A010 PROJECT MANAGEMENT
_ .
WORK
A020 WORK PLANSIDESIGN CRITERIA
A030 MEETINGS
4
_
44000
4
A040 SITE INVESTIGATION I OBSERVATION
A060 ARCHITECTURE
A060 CHECK DOCUMENTS
2
2
AD70 INCORPORATE REVIEW COMMENTS
2
4
_ _
_22000
56400
6
ADBO
A090
I
A000 GENERAL
1
81
Al91.2u.00
12—
A101 THLEPAGE__
4
6
95800
10
A102 FLOORIROOP PLANS
0
6
1.34800
14
A103 ENLARGED PLANS
AIN ROOF PLAN
A105 ELEVATIONS
4
8
1.12800
12
AIDS SECTIONS
_ _
_ 8
B
1.58000
16
A107 DETAILS
_
AIDS SCHEDULES
A109
A11D
A111
AT 12 _ -1
1
1-1
11
---
All DRAWINGS
221
1 30
55000A0
52
5210 SPECIFICATIONS
tp? _
86000
10
5245 CONSTRUCTION COST ESTIMA_TE.-
5100 MODELING IANIMA110N
i
5230 REPORTS
5210 DOCUMENT CONTROL
_ ERRESERB_-
5210 RENDERINGS
529C BIDDING SERVICES
A200 MISC. SERVICES
10
S88D.00
10
A310 PROJECT ADMINISTRATION
A311 WORK PLAINS IDESIGN CRITERIA
A330 _MEETIN_GS_
A340 SITE INVES_TIG_ATION O_ BSER_VA_TION_
A350 SUBMITTAL REVIEWS
A380 RF"S I CHANGE ORDERS
.RBBB_—RBBB.—.__.. -
A370 RECORD DOCUMENTS
___ ._____.
_
A380 PROECT CLOSEOUT
A380 COMMISSIONING
A000 CONSTRUCTION MANAGEMENT
AW0+A100*A200+a300= SUBTOTAL MANHOURS 30 d4 77—
SUB-TOTAL ARCHITECTURAL SERVICES COST STAB4AD 74
EXPENSES
5210 MILEAGE
MILES® 0555
5245 CAD STATION
HOU_kS a 500
5100 CONSULTANTLXP_
_ _
PLUS 125%
-LNSE
- -.-
5230 REPROOULTION Numoerol C4pa9
E6000
COLOR 50112 BpW 40 124M Bon.od 11%17804
5210 TRAVEL/LODGING
5210 AIRLINE COSTS
5280 MISCELLANEOUS
"'NOwly employaea ldumeg overtime All be billed at the published rale iuu 25% EXPENSES COST E10.U0
TOTALARCHITECTURAL SERVICES S EXPENSE COST f7,1M.00
DISCIPLINE APPROVAL _ _ JATE
PROJECT MANAGER APPROVAL DATE
F'./Proposal/Estimate/Estimate Form -General -2012 As
EXHITBIT A
Page 6 of 9
Molar Amhleture • Engineering
CML ENOINEEMNO SERVICES
PROJECTTRLE
2011 Filtration Plan Improvement Storage Building Design
PROJECTIPROPOSALNO.
P12-0408 PRQIECTMANAOIR: S. P8lmrose
TASK NO.
TASK DESCRIPTION:
DATE PR MED:
10111202 CLIENT MAINE: Cky Of Paeco
PRS;.C':9L - SENIOR SENIOR ADGVNRECH
TOTAL
TOTAL
pm Ic^� FNG N -e F.R2 DESIGWM 3 M SIGAEP FERN -()INR
COST
HOURS
ACTIVITY
Fly C ,- OP 4� _ 9 9
CODE DESCRIPTION
14.500 120 f> 1C7W 9200 50 GO 500:1
1-010 PROJECT MANAGEMENT
CO20 WORK PLANS I DESIGNCRITERIA
C030 MEETINGS _
?
_
_
'6000
2
0040 SITE INVESTIGATION I OBSERVATION
CG50 ENGINEERING
8
97,000
0
C050 CHECKDOCUMENTS
COTO INCORPORATE REVIEW COMMENTS
C080
CD90
CMD GENERAL
21
10
0101 TITLE PAGE
C 10 DEMOLITION PLAN
010.9 EROSION CONTROL PLAN
- -
-
-
_ _ -
CIN SITE PLAN-- —_�—
4
I6
1.03.10c
20
C105 GRADING PLAN
0106 UTI LITVPLAN
,,IW SIGw NG ANO STRIPING PLAN
6106 ❑Ei-hlLS
C109
0110
CIH
C112
'-1,
0100 DRAWINGS
4
let
i
r-si.932.0ul20
C210 SPECIFICATIONS
__._
C220 CONSIRUC I ION COST EST MATE
I
1
1
6240 RLRORIS
I
C250 DOCUMENTCONTROL
C200 MISC. SERVICES
1
1
C310 PRWECTADMINISTRATION
r
0270 BIDDING SERVICES
'
C330 MEETINGS
0340 SITE INVESTIGATIOWOSSERVALON
C350 SURMITTAL REVIEWS
C3BO RFtS I CHANGE ORDERS
_
C370 RECORD DOCUMENTS_ _ -
0380 PROJECT CLOSEOUT
C]00 CONSTRUCTION MANAGEMENT
I
C000+0100<200rC300 = SUBTOTAL MANHOURS 2 12 16 30
CIVIL ENGINEERING SERVICES COST 5],112.00 30
EXPENSES
b0 MILEAGE
20
MILES 0555 _ _
$1110
5245 CAD STATION
HOURS _ 500_ ___
O
5100 CONSULTANT EXPENSE
8150000
_
__
PLUS 12.% _ SSN11 _
, �]a14?Baia I
]1,68750
5230 REPRODUCTIONNumberof Copes
_
COLOR 21%96B� 11X170orxf
5210 TRAVEL/LODGING
5210 AIRLINE COSTS
5200 NISCELTANFOCS
...Haat, emp1ye85 A•Carrrp oA9Rllnn.'i he 1X1nel AI the PWIm"l,10 F ue 25% EXPENSES COW ]1,880.80
TOTAL CIVIL ENGINEERING 6 EXPENSE OST _ _54810.80
DISCIPUNE APPROVAL DATE
PROJECT MANAGER APPROVAL DATE
F: IPropmal/E]timetelEstimate Form -General -2012 As
EXHITBIT A
Page 7 of 9
Meier Archleturs • Engineering
ELECTRICAL ENGNEERING SERVICES
PROJECT TITLE
2011 Flitragon Plan Improvement Storage Building Design -
PROJECTIPROPORALNO.
P12-0408 PROJECTMANAGER: S. Palmrose
TASK NO.
TASK DESCRIPTION:
DATE PREPARED:
10/1/2012 CLIENT NAME: C4 Of PBSCO
PRINCIPAU PROJECTSFNIDH ADWNITI
TOTAL
TOTAL
PM MGR FNGINEEn FOITCF
COST
HOURS
ACTIVITY
a a a Q 15 a
COOS DESCRIPTION
14500 10500 11500 10700 0400 6000
E010 PROJECT MANAGEMENT
E920 WORKPLANS I DESIGN CRITERIA
E030 _MEETINGS
2
_
_
Z
210 00
EWO SITE INVESTIGATIONIOBSERVATION
_
E050 ENGINEERING _
EO_50 _CHECK OOCUMEWS
5070 INCORPORATE REVIEW COMMENTS
E090
E000 GENERAL
B
$440.02
&
E101 GENERAL NOTES &LEGEND
E102 ONE -LINE DIAGRAMS
E103 POWER PLANS
E104 LIGHTING PLANS
_ _
_ 2
_
B
&&200
10
Et O5 SPECIAL SYSTEMS PLANS
E100 DETAILS
--
E107 SCHEDULES
-
E100
EtOB
E110
--
-
--
E111
-
-- - - -
-
E100 DRAWINGS
2
e
S002.40
10
E210_ SPECIFICATIONS
E220 CONSTRUCTION COST ESTIMATE
E230 MODELING/ANIMATION
_
E240 REPORTS
E250 OOCUMEM CONTROL
E260_ RENDERINGS
U70 BIDDING SERVICES
080 CALCULATIONS
E200 MISC. SERVICES
E310 PROJECT ADMINISTRATION
_
E311 WORK PLANS DESIGN CRITERIA
E330 MEETINGS
E340 SITE INVESTIGgTION OBSERVATION
E350 SUBMITTAL REVIEWS
E360 RFI'S / CHANGE ORD_ER_S
E370 RECORD DOCUMENTS
E300 PROJECT CLOSEOUT--
-
---_ -
- -- —
E O COMMISSIONING
E300 CONSTRUCTION MANAGEMENT
E0004Et00-E200"e = SUBTOTAL MANHOURS 10 a 19
ELECTRICAL ENGINEERING SERVICES COST $1,72200 18
EXPENSES
5210 MILEAGE
—..____ _ __— _—
MILES® 0555
5245 CAO STATION
_
HOURS 500
5100 CONSULTANT EXPENSE
0 REPRODUCTION - Nanfier M CVges
_
_
_
PLUS
COLOR_ 30x42 SaM _ 24x3&Bap�_ 11%17 Sap
_52_10__ TRAVEU_LODOING
_
AIRLINECOST_S
_5210
5290 MISCELLANEOUS
••'Fbwly and4yeea inalmng oveNme wR be billed e1 Ne Pe ISAeE rete plw 25% EXPENSES COST
TOTAL ELECTRICAL ENGINEERING & E%TENSE COST - _ 61.72200
DISCIPLINE APPROVAL DATE
PROJECT MANAGER APPROVAL DATE
F:/Pmposal/Estimete/Estimate Form -General -2012 xis
EXHITBIT A
Page 8 of 9
Meier Archicture• Engineering
STRUCTURAL MQINEERINO SERVICES
PR"CTMTLE
2011 Filtration Plan Improvement Storage Building Design
PROIECTIPROPOSN-N0.
P12-0408 PROJECT MANAGER: S. PMImr088
TASK NO.
TASKOESCIMPTION:
DATE PREPARED;
10/1/2012 CLIENT NAME: City Of PRI
=.eI SFNI'IR r._ =E, ENG.<Prh ., E'I ., ;. C'_U
TOTAL
TOTAL
:' [ 11 .,^ `r, d .. _
COST
HOURS
ACTIVITY@
'a La Cl..
C4 L G c
CODE DESCRIPTION
14l- LJ JJ ICP G; 930J A)er. KO 33 92 P] 6G 00
5010 PROJECT MANAGEMENT
l
S020 WORK PLAINS 1DESIGN CRITERIA
5030 MEETINGS
2
2UOm
2
SOW SI fE INVESTIGATION I OBSERVAT ION
0
..5050
26000
2
ENGINEERING
I
B
1.040 CO
5030 CHECK DGCUMFNTS
2
26003
2
S070 INCORPORATE REVIEW COMMENTS
$080
So9n
5000 GENERAL
1 14
I
19211 MI
/4
5101 TITLE AGE
S10_2 FLOOR PLANS
S103 ENLARGED PLANS
5104 FOUNDATION PIANS
2
0
_ 9900
10
5105 ELEVATIONS_
5106 SECTIONS
2
16
1 7X100
19
_5107 DETAILS_
5100 SCHEDULES
..
__....—
—.
5109
5110
5111
I
$112 -- —
8100 DRAWNGB
1 41
1
1 24
62860.00
26
$210 SPECIFICATIONS
1
_
5220 CONSTRUCTION COST ESTIMATE
5230 MODELING /ANIMATION
5240
_REPORTS
5250 DOCUMENTOONTROL
_
5200 .RENDERINGS
5270 BIDDINGSERVICES
SMO MISMSERMCES
5310 PROJECT ADMINISTRATION
5311 WORK PLANS I DESIGN CRITERIA
5330 MEETINGS __..SERV.....—
5340 SITE INVESTIGNTION OBSERVATION
5350 SUBMITTAL REVIEWS
5360 RFI'S I CHANGE ORDERS
5370 RECORD DOCUMENTS
5300 PROJECT CLOSEOUT_
_
S390 COMMISSIONING
8300 CONSTRUCTION MANAGEMENT
SODO-S1COIS200+5300= SUBTOTAL MANHOIIRS 10 24 42
STRUCTURAL ENGINEERING SERVICES COST 64,600.110 42
EXPENSES
5210 MILEAGE
MILES0 0556 _
5245 CAD STA ION
HOURS ® 5,
ENSE
5100 CNSULTAT
5230 ROPNOWC010N PNumber of Lople3
_
COORS 125% �Ux{280002036 Bill 11X17 Bond
5210 TRAVEL I LODGING
5210 AIRLINE COSTS_
-
5290 MISCELLANEOUS
...Hal r employees Ineurneq overtime MIT be billed al the pu5liebed rale plus 25% EXPENSES COST
TOTAL STRUCTURAL ENGINEERING S EXPENSE COST
DISCIPLINE APPROVAL PAIL
PROJEC T MANAGER APPROVAL DATE.
F'./ProposallEatimate/Estimate Form -General -2012 AS
EXHITBIT A
Paae 9 of 9
LL
m
N
NI
�Ir
A
>�M
(
f
QI
N
II 1
E
v
VIM
C
N
f
N N C
N
Q
N
r b
a
0
2�
�
m
E
E
m
in
r
Z in
� m Ti
a
N N
N
N
N
N
N
N
N
M
M
M
Y p�
❑
� m' a
c
v
E
r
❑
,co
3
a
m
3
n
m
=
o i
t
E
e2
m
L
`m_
D
V
aN
m
H
Yj o
E
Z
fn
Q
U
t01
N®
b
N
W
N
LL
I
i
❑
� N
M
Q
b
b
r
b
OJ
O
W
N
1❑