Loading...
HomeMy WebLinkAboutMeier - PSA - CIP C3-11-52-WTR - 2011 Filtration Plant Improvement Storage Building DesignPROFESSIONAL SERVICES AGREEMENT THIS AGREEMENT, made and entered into between the City of Pasco, hereinafter referred to as the "City", and Meier Architecture • Engineering hereinafter referred to as the "Consultant". WHEREAS, the City desires to engage the professional services and assistance of a consulting firm to provide structural engineering, civil engineering, and architectural design services with respect to the development of a storage building/garage at the Butterfield Water Treatment Plant, and Consultant has demonstrated that it is highly qualified to perform these services. NOW, THEREFORE, in consideration of mutual benefits accruing, it is agreed by and between the parties hereto as follows: 1. Scone of work. The scope of work shall include all services and material necessary to accomplish the above mentioned objectives in accordance with Exhibit A. 2. Ownership and use of documents. A. The parties acknowledge that this Agreement shall be governed by RCW Chapter 42.56 and any other State or Federal law relating to confidentiality, intellectual properties, and public disclosure. The parties shall make a good faith effort to comply with such laws, and to the fullest extent allowed by law, comply with the provisions of this section. B. All research, tests, surveys, preliminary data and any and all other work product prepared or gathered by the Consultant in preparation for the services rendered shall not be considered public records, providedhowever, that: (1) All final reports, presentations and testimony prepared by Consultant shall become the property of the City upon their presentation to and acceptance by the City and shall at that date become public records. (2) The City shall have the right, upon reasonable request, to inspect, review and, subject to the approval of Consultant, copy any work product. (3) In the event that Consultant shall default on this Agreement, or in the event that this Agreement shall be terminated prior to its completion as herein provided, the work product of Consultant, along with a summary of work done to date of default or termination, shall become the property of the City and tender of the work product and summary shall be a prerequisite to final payment under this Agreement. The summary of work done shall be prepared at no additional cost, if the Agreement is terminated through default by Consultant. If the Agreement is terminated Professional Services Agreement - 1 through convenience by the City, the City agrees to pay Consultant for the preparation of the summary of work done. (4) Consultant shall maintain all documents associated with work performed under this Agreement for a minimum period of three (3) years after completion of the work. This provision shall survive termination of this Agreement. (5) Consultant shall respond to requests by the City for records within five (5) business days by either providing the records, or by identifying in writing that additional time is necessary to provide the records with a description of the reasons why additional time is needed. Records shall be provided to the City within twenty (20) days of the date of the request. Provisions of Section 5 in this Agreement shall specifically apply to any claim arising out of Consultant's failure to properly maintain or timely produce records as described herein and as otherwise required by law. 3. Payments. The Consultant shall be paid by the City for completed work for services rendered under this Agreement as provided hereinafter. Such payment shall be full compensation for work performed or services rendered and for all labor, materials, supplies, equipment and incidentals necessary to complete the work. A. Payment for work accomplished under the terms of this Agreement shall be on a lump sum basis as set forth on the fee schedule found in Exhibit A, provided, in no event shall the payment for all work performed pursuant to this Agreement exceed the sum of $ 21,697, without approval from the City. B. All vouchers shall be submitted by the Consultant to the City for payment pursuant to the terms of this Agreement. The City shall pay the appropriate amount for each voucher to the Consultant. The Consultant may submit vouchers to the City monthly during the progress of the work for payment of completed phases of the project. Billings shall be reviewed in conjunction with the City's warrant process. C. The costs records and accounts pertaining to this Agreement are to be kept available for inspection by representatives of the City for a period of three (3) years after final payment. Copies shall be made available upon request. 4. Time of performance. The Consultant shall perform the work authorized by this Agreement promptly and within 60 days. 5. Indemnification. A. The Consultant shall defend, indemnify, and hold harmless the City, its officers, officials, agents, employees, and volunteers from any and all claims and causes of action, including, but not limited to, actions of law or administrative proceedings Professional Services Agreement - 2 for all injuries to persons or damages to property, and all losses, damages, demands, suits, judgments, including attorney fees, arising out of, or as a result of, or in connection with the work performed under this Agreement, or caused or occasioned in whole or in part by reason of errors, negligent acts or omissions, or the presence of the Consultant or its subcontractors in the performance of this Agreement, except for injuries and damages caused by the sole negligence of the City, its officers, employees, agents, and volunteers. B. Should a Court of competent jurisdiction determine that this Agreement is subject to RCW 4.24.115, then, in the event of liability for damages arising out of bodily injuries or damages to property caused by or resulting from the concurrent negligence of the Consultant, and the City, its officers, employees, agents and volunteers, the Consultant's liability and obligation to defend hereunder shall only be the proportionate extent of the Consultant's negligence. C. It is further agreed that the indemnification provided herein constitutes the Consultant's waiver of immunity under Industrial Insurance, Title 51 RCW, solely for the purposes of this indemnification. D. No liability shall attach to the City by reason of entering into this Agreement except as expressly provided herein. E. This indemnification shall include damages, penalties and attorney fees sustained as a result of Consultant's delayed or failed performance of Section 6 above. F. This waiver has been mutually negotiated by the parties, and the provisions of this section shall survive the expiration or termination of this Agreement. 6. _General and Professional Lability insurance. Consultant shall secure and maintain in full force and effect during the performance of all work pursuant to this Agreement a policy of comprehensive general liability insurance providing coverage of at least $1,000,000 per occurrence and $2,000,000 aggregate for personal injury; $1,000,000 per occurrence and $2,000,000 aggregate for property damage; errors and omissions insurance in the amount of $1,000,000; and automobile insurance as required by law. Each such insurance policy shall name the City as an additional insured and shall include a provision prohibiting cancellation of said policies, except upon thirty (30) days written notice to the City. The City shall be named as a certificate holder on each insurance policy. Certificates of coverage shall be delivered to the City within fifteen (15) days of execution of this Agreement. 7. Discrimination Prohibited. Consultant shall not discriminate against any employee or applicant for employment because of race, color, religion, age, sex, national origin or physical handicap. 8. Consultant is an independent contractor. The parties intend that an independent contractor relationship will be created by this Agreement. No agent, employee or Professional Services Agreement - 3 representative of the Consultant shall be deemed to be an agent, employee or representative of the City for any purpose. Consultant shall be solely responsible for all acts of its agents, employees, representatives and subcontractor during the performance of this Agreement. Consultant shall make no claims for benefits for employment against the City including, but not limited to, sick leave, medical insurance, coverage under the City's State Department of Labor and Industries policy, vacation benefits, retirement, or unemployment benefits. Consultant shall comply with all State and Federal laws including, but not limited to, the requirements of RCW` 50.04.0140 and RCW 51.08.195. 9. City aooroval. Notwithstanding the Consultant's status as an independent contractor, results of the work performed pursuant to this Agreement must meet the approval of the City. 10. Termination. This being an Agreement for professional services, either party may terminate this Agreement for any reason upon giving the other party written notice of such termination no fewer than ten (10) days in advance of the effective date of said termination. 11. Integration. The Agreement between the parties shall consist of this document and any schedules or exhibits listed in this agreement and attached hereto. These writings constitute the entire Agreement of the parties and shall not be amended except by a writing executed by both parties. In the event of any conflict between this written Agreement and any provision of Exhibit A, this Agreement shall control. 12. Non -waiver. Waiver by the City of any provision of this Agreement or any time limitation provided for in this Agreement shall not constitute a waiver of any other provision. 13. Non -assignable. The services to be provided by the Consultant shall not be assigned or subcontracted without the express written consent of the City. 14. Covenant against contingent fees. The Consultant warrants that he has not employed or retained any company or person, other than a bona fide employee working solely for the Consultant, to solicit or secure this Agreement, and that he has not paid or agreed to pay any company or person, other than a bona fide employee working solely for the Consultant, any fee, commission, percentage, brokerage fee, gifts, or any other consideration contingent upon or resulting from the award of making of this Agreement. For breach or violation of this warranty, the City shall have the right to annul this Agreement without liability or, in its discretion to deduct from the Agreement price or consideration, or otherwise recover, the full amount of such fee, commission, percentage, brokerage fee, gift, or contingent fee. 15. General Provisions. For the purpose of this Agreement, time is of the essence. In the event a dispute regarding the enforcement, breach, default or interpretation of this Agreement, the parties shall first meet in a good faith effort to resolve such dispute. In the event the dispute cannot be resolved by agreement of the parties, said dispute shall be Professional Services Agreement - 4 resolved by arbitration pursuant to RCW 7.04A, as amended, and the Mandatory Arbitration Rules (MAR); venue shall be placed in Franklin County, Washington, the laws of the State of Washington shall apply; and the prevailing party shall be entitled to its reasonable attorney fees and cost. In the event any provision of this Agreement is deemed to be unenforceable, the other provisions of the Agreement shall remain in full force and effect. 16. Notices. Notices to the City of Pasco shall be sent to the following address: City of Pasco P. O. Box 293 Pasco, WA 99301 Notices to the Consultant shall be sent to the following address: Meier Architecture • Engineering 8697 W. Gage Blvd. Kennewick, WA 99336 Receipt of any notice shall be deemed effective three (3) days after deposit of written notice in the U. S. mails, with proper postage and properly addressed. DATED THIS DAY OF Jan U0 M 2013 CITY OF PASCO By:G'Gt.�/t�/ Matt Watkins, Mayor CONSULTANT: Signature, Printed Name and Title 57j�✓a✓V. P,i EXHITBIT A Pagel of 9 ARON ITECTIJ RE . EN R I N E E RI N O AGREEMENT FOR SERVICES CLIENT: Teresa K. Reed -Jennings, PE Senior Engineer - Utilities City of Pasco 525 N. Third Avenue Pasco, WA 99301 PROJECT: CIP C3-11-52-WTR — 2011 FILTRATION PLANT IMPROVEMENT STORAGE BUILDING DESIGN SCOPE: Meier Architecture • Engineering (Meier) will provide the following services: Design a storage facility that will be approximately 20 feet x 40 feet long for the Butterfield Water Treatment Plant adjacent to the existing Chlorine Building adjacent to S. 13th Street in accordance with Request for Proposal CIP C3-11-52-WTR-2011, Filtration Plant Improvement Storage Building Design. The Meier design team will meet with your project personnel to determine optimum arrangements for the site and the building interior. 2. Specific items included in the design are a site survey performed by a Professional Surveyor and a revised vehicle entry/exit to accommodate chlorine truck deliveries. The structural design will not impact the existing clear wells, constructions estimates at the 30%, 60%, and 90% stages of the design, and electrical design for interior and exterior lighting. 3. Design review submittals will be submitted in PDF form. A review meeting will be held no later than 10 working days after the submittal. 4. Drawings, specifications, and calculations will be stamped by an engineer registered in the State of Washington. The deliverables for the design include the following: A. Architectural Floor/Roof Plan. B. Architectural Elevations/Building Sections. C. Architectural Details/Schedules. D. Civil Plan with Utilities, Grades, and Paving. E. Civil Details. F. Structural Foundation/Roof Plan. G. Structural Details. H. Electrical Plan. I. Construction Specification. J. Stormwater calculations. K. Structural calculations. P12-0408 Page I 10/23/2012 8697 Gage Boulevard I Kennewick, WA 99336 P: 509.735.1589 1 F: 509.783.5075 �www.moierine.com EXHITBIT A Page 2 of 9 5. The proposal does not include engineering support during the construction period. This service, if requested, will be performed under a separate proposal. 6. Design of Landscaping has not been included in the proposal. 7. The design does not include heating of the building, water or sewer to the building, floor drains, or a metal stairway from the main building to the storage building. If these services are requested, they will be priced under separate cover. All services not specifically outlined in the scope of work above shall be considered additional services, and shall be subject to a commensurate adjustment to the agreed compensation, which shall be determined by way of a written addendum, signed by the parties, prior to proceeding with the additional work. COMPENSATION: Meier will perform these services for a firm fixed fee of $21,697. Invoices will be submitted monthly. A 1.5% interest charge will be added for late payment beyond the normal 30 day billing period. Agreement to provide services, as stated, is valid if approved within 30 days of date submitted. Approvals beyond 30 days are subject to re -negotiation of scope and fee. OTHER TERMS AND CONDITIONS: The City of Pasco Standard Business Conditions as mutually agreed by both parties will form a part of this Agreement. Thank you for the opportunity to submit this agreement. We look forward to working with you on this Project. If the scope of work above does not adequately reflect your expectations, please let us know. It is our goal to meet your needs and budget on this Project. If you have any other questions, please feel free to contact the undersigned directly. Sincerely g£ — Steve Palmrose Sr. Project Manager, PE SVP:sjm Proposal No. P12-0408 Letter No. 12-0703 P12-0408 Page 2 10/232012 Global Excellence by Design www.meierinc.com EXHITBIT A Page 3 of 9 Meier Architecture • Engineering Project Title: 2011 Filtration Plan Improvement Storage 8uliding Design Project/Proposel No: 1012.0400 Task No: Project Manager: S. Pelmrose Task Description: Date: 40/1/2012 Client Name: City of Pasco A/E SERVICES Services Expenses Sub -Total GENERAL $3,440,00 $79.92 $3,519.92 ARCHITECTURE $7,084.00 $60.00 $7,144.00 CIVIL $3,112.00 $1,698.60 $4,810.60 ELECTRICAL $1,722.00 $0.00 $1,722.00 MECHANICAL $0.00 $0.00 $0.00 STRUCTURAL $4,500.00 $0.00 $4,500.00 519,858.00 $1,838.52 $21,696.52 PROJECT EXPENSES BREAKDOWN MILEAGE $91.02 CAD STATION $0.00 CONSULTANT EXPENSE $1,687.50 REPRODUCTION $60.00 TRAVEL / LODGING $0.00 AIRLINE COSTS $0.00 MISCELLANEOUS $0.00 Total Expenses $1,838.52 Total Project Cost $21,696.52 Project Manager Approval: Date: Authorized Approval: Dale: EXHITBIT A Page 4 of 9 Meier ASOhicture• Engineering GENERAL NE SERVICES PROJECT TITLE 2011 Flilration Pian_ Improvement Storage Building Design PROJECTJPROPOSAL NO. P12.0408 PROJECT MANAGER: S. Palmrose TASK NO. TASK DESCRIPTION: DATE PREPARED- 10/1/2012 CLIENT NAME! City of Pasco _. .. TOTAL TOTAL ,. _.. COST HOURS ACTIVITY g CODE DESCRIPTION IGSM 1 7:03 G010 PROJECT MANAGEMENT B _ _ 1.040 GO 9020 WORK PLANS/ DESIGN CRIT ER IA _ _B B 6030 MEETINGS 8 1,040W 6010 SITE INVESTIGATION lOBSERVATION q 62003 4 GD50 ARCHITECTURE/ENGINEERING COBO CHECK DOCUMENTS 6070 WCORPORATE REVIEW COMMENTS GOBO__ 6000 GENERAL 20 I 70 G101_TITLEPAGE G102 FLOOR PLANS G102E_NL_AR_GEDPLANE— G104 ROOFPLAN G105___ELEVATIONS G1G8 SECTIONS _— _ __ .. _ —_ _ _ — 6107 DETAILS 6108 SCHEDULES _ _ _ S _ _ 66000 8 G109 ESTIMATES 6110 G111 61G12 GIN ORAYANGS III I I I I BB40.00 B G210 SPECIFICATIONS (3220 CONSTRUCTION—COST TIMATE 6230 MODELING IANMATIONATION - _.--_ 6240 REPORTS 6250 DMENT CONTROL 6260 RENRENDERINGS 6270 BIDDING 6ERVICFS 0200 MISC. SERVICES G310 PROJECT ADMINISTRATION 6320 WORK PLANS I DESIGN CRITERIA _ G_330 MEETINGS 0 Ga40 SITE INVESTIGATION OBSERVATION 6350 SUBMITTAL REVIEWS RFP4ECOR HANGEOWB _6380 6370 RECORD DOCUMENTS 6_90 380 PROJECT CLOSEOUT 33COMMISSIONING 0700 CORSTRUC"ON MANAGEMENT GSGG.GI NG200.G3W= SUBTOTAL MANHOURS 20 9 25 GENERAL ENGINEERING SERVICES COST $3,440.00 EXPENSES 6_210 MILEAGE 144_ MILES®.1 0555 ——_ - - S7992 -- 5245 CAO STATION HOURS® b00 51W CONSULTANT EXPENSE PLUS 12876 B,5A11 52W REPRODUCTION-NumSef Of Copies __ COLOR 708476 24x30 Bono 11%178RM 6210 TRAVEL/LODGING 5210 AIRLINE COSTS 6280 MISCEtUNEW6 •^HoLft employees In0mnn9 ewl9me wA W NIIeO 01 IN WNIINd rete pWe 25% EXPENSES COST 576.02 TOTAL GENERAL NE SERVICES S EXPENSE COST - 9,618.82 DISCIPLINE APPROVAL _ DATE. PROJECT MANAGER APPROVAL DATE, F:/ProposallEstimate/Estimate Foun-General-2012 xis EXHITBIT A Page 5 of 9 Meier Arehioturs- Engineering ARCIErWTURAL DISCIPLINE PROJECT TITLE 2011 FIIUatlon Pian Improvement Storage Building Design PROJECTIPROPOSAL NO. P12-0408 PROJECTaAimmum S. Palmrose TARN NO. TAER DESCRIPTION: OATS PREPARING.- 10/112012 CLIENT NAME CRY Of PB$CO ''T"I!•F SPId'O^. ALICU11,.T SPN:O? ARCIIRPCT IN-PfiOR AOIINKECY TOTAL TOTAL 4RC,..Tf(-7.RCH IECT _ 0ESIG`iER2 INT RN CESGNER E)IOR COST HOURS ACTwma1 0 a m? 4 Q CODE DESCRIPTION 12000 113 DO 15 C0 66 L9 Fa 00 ?55'0 ED 00 A010 PROJECT MANAGEMENT _ . WORK A020 WORK PLANSIDESIGN CRITERIA A030 MEETINGS 4 _ 44000 4 A040 SITE INVESTIGATION I OBSERVATION A060 ARCHITECTURE A060 CHECK DOCUMENTS 2 2 AD70 INCORPORATE REVIEW COMMENTS 2 4 _ _ _22000 56400 6 ADBO A090 I A000 GENERAL 1 81 Al91.2u.00 12— A101 THLEPAGE__ 4 6 95800 10 A102 FLOORIROOP PLANS 0 6 1.34800 14 A103 ENLARGED PLANS AIN ROOF PLAN A105 ELEVATIONS 4 8 1.12800 12 AIDS SECTIONS _ _ _ 8 B 1.58000 16 A107 DETAILS _ AIDS SCHEDULES A109 A11D A111 AT 12 _ -1 1 1-1 11 --- All DRAWINGS 221 1 30 55000A0 52 5210 SPECIFICATIONS tp? _ 86000 10 5245 CONSTRUCTION COST ESTIMA_TE.- 5100 MODELING IANIMA110N i 5230 REPORTS 5210 DOCUMENT CONTROL _ ERRESERB_- 5210 RENDERINGS 529C BIDDING SERVICES A200 MISC. SERVICES 10 S88D.00 10 A310 PROJECT ADMINISTRATION A311 WORK PLAINS IDESIGN CRITERIA A330 _MEETIN_GS_ A340 SITE INVES_TIG_ATION O_ BSER_VA_TION_ A350 SUBMITTAL REVIEWS A380 RF"S I CHANGE ORDERS .RBBB_—RBBB.—.__.. - A370 RECORD DOCUMENTS ___ ._____. _ A380 PROECT CLOSEOUT A380 COMMISSIONING A000 CONSTRUCTION MANAGEMENT AW0+A100*A200+a300= SUBTOTAL MANHOURS 30 d4 77— SUB-TOTAL ARCHITECTURAL SERVICES COST STAB4AD 74 EXPENSES 5210 MILEAGE MILES® 0555 5245 CAD STATION HOU_kS a 500 5100 CONSULTANTLXP_ _ _ PLUS 125% -LNSE - -.- 5230 REPROOULTION Numoerol C4pa9 E6000 COLOR 50112 BpW 40 124M Bon.od 11%17804 5210 TRAVEL/LODGING 5210 AIRLINE COSTS 5280 MISCELLANEOUS "'NOwly employaea ldumeg overtime All be billed at the published rale iuu 25% EXPENSES COST E10.U0 TOTALARCHITECTURAL SERVICES S EXPENSE COST f7,1M.00 DISCIPLINE APPROVAL _ _ JATE PROJECT MANAGER APPROVAL DATE F'./Proposal/Estimate/Estimate Form -General -2012 As EXHITBIT A Page 6 of 9 Molar Amhleture • Engineering CML ENOINEEMNO SERVICES PROJECTTRLE 2011 Filtration Plan Improvement Storage Building Design PROJECTIPROPOSALNO. P12-0408 PRQIECTMANAOIR: S. P8lmrose TASK NO. TASK DESCRIPTION: DATE PR MED: 10111202 CLIENT MAINE: Cky Of Paeco PRS;.C':9L - SENIOR SENIOR ADGVNRECH TOTAL TOTAL pm Ic^� FNG N -e F.R2 DESIGWM 3 M SIGAEP FERN -()INR COST HOURS ACTIVITY Fly C ,- OP 4� _ 9 9 CODE DESCRIPTION 14.500 120 f> 1C7W 9200 50 GO 500:1 1-010 PROJECT MANAGEMENT CO20 WORK PLANS I DESIGNCRITERIA C030 MEETINGS _ ? _ _ '6000 2 0040 SITE INVESTIGATION I OBSERVATION CG50 ENGINEERING 8 97,000 0 C050 CHECKDOCUMENTS COTO INCORPORATE REVIEW COMMENTS C080 CD90 CMD GENERAL 21 10 0101 TITLE PAGE C 10 DEMOLITION PLAN 010.9 EROSION CONTROL PLAN - - - - _ _ - CIN SITE PLAN-- —_�— 4 I6 1.03.10c 20 C105 GRADING PLAN 0106 UTI LITVPLAN ,,IW SIGw NG ANO STRIPING PLAN 6106 ❑Ei-hlLS C109 0110 CIH C112 '-1, 0100 DRAWINGS 4 let i r-si.932.0ul20 C210 SPECIFICATIONS __._ C220 CONSIRUC I ION COST EST MATE I 1 1 6240 RLRORIS I C250 DOCUMENTCONTROL C200 MISC. SERVICES 1 1 C310 PRWECTADMINISTRATION r 0270 BIDDING SERVICES ' C330 MEETINGS 0340 SITE INVESTIGATIOWOSSERVALON C350 SURMITTAL REVIEWS C3BO RFtS I CHANGE ORDERS _ C370 RECORD DOCUMENTS_ _ - 0380 PROJECT CLOSEOUT C]00 CONSTRUCTION MANAGEMENT I C000+0100<200rC300 = SUBTOTAL MANHOURS 2 12 16 30 CIVIL ENGINEERING SERVICES COST 5],112.00 30 EXPENSES b0 MILEAGE 20 MILES 0555 _ _ $1110 5245 CAD STATION HOURS _ 500_ ___ O 5100 CONSULTANT EXPENSE 8150000 _ __ PLUS 12.% _ SSN11 _ , �]a14?Baia I ]1,68750 5230 REPRODUCTIONNumberof Copes _ COLOR 21%96B� 11X170orxf 5210 TRAVEL/LODGING 5210 AIRLINE COSTS 5200 NISCELTANFOCS ...Haat, emp1ye85 A•Carrrp oA9Rllnn.'i he 1X1nel AI the PWIm"l,10 F ue 25% EXPENSES COW ]1,880.80 TOTAL CIVIL ENGINEERING 6 EXPENSE OST _ _54810.80 DISCIPUNE APPROVAL DATE PROJECT MANAGER APPROVAL DATE F: IPropmal/E]timetelEstimate Form -General -2012 As EXHITBIT A Page 7 of 9 Meier Archleturs • Engineering ELECTRICAL ENGNEERING SERVICES PROJECT TITLE 2011 Flitragon Plan Improvement Storage Building Design - PROJECTIPROPORALNO. P12-0408 PROJECTMANAGER: S. Palmrose TASK NO. TASK DESCRIPTION: DATE PREPARED: 10/1/2012 CLIENT NAME: C4 Of PBSCO PRINCIPAU PROJECTSFNIDH ADWNITI TOTAL TOTAL PM MGR FNGINEEn FOITCF COST HOURS ACTIVITY a a a Q 15 a COOS DESCRIPTION 14500 10500 11500 10700 0400 6000 E010 PROJECT MANAGEMENT E920 WORKPLANS I DESIGN CRITERIA E030 _MEETINGS 2 _ _ Z 210 00 EWO SITE INVESTIGATIONIOBSERVATION _ E050 ENGINEERING _ EO_50 _CHECK OOCUMEWS 5070 INCORPORATE REVIEW COMMENTS E090 E000 GENERAL B $440.02 & E101 GENERAL NOTES &LEGEND E102 ONE -LINE DIAGRAMS E103 POWER PLANS E104 LIGHTING PLANS _ _ _ 2 _ B &&200 10 Et O5 SPECIAL SYSTEMS PLANS E100 DETAILS -- E107 SCHEDULES - E100 EtOB E110 -- - -- E111 - -- - - - - E100 DRAWINGS 2 e S002.40 10 E210_ SPECIFICATIONS E220 CONSTRUCTION COST ESTIMATE E230 MODELING/ANIMATION _ E240 REPORTS E250 OOCUMEM CONTROL E260_ RENDERINGS U70 BIDDING SERVICES 080 CALCULATIONS E200 MISC. SERVICES E310 PROJECT ADMINISTRATION _ E311 WORK PLANS DESIGN CRITERIA E330 MEETINGS E340 SITE INVESTIGgTION OBSERVATION E350 SUBMITTAL REVIEWS E360 RFI'S / CHANGE ORD_ER_S E370 RECORD DOCUMENTS E300 PROJECT CLOSEOUT-- - ---_ - - -- — E O COMMISSIONING E300 CONSTRUCTION MANAGEMENT E0004Et00-E200"e = SUBTOTAL MANHOURS 10 a 19 ELECTRICAL ENGINEERING SERVICES COST $1,72200 18 EXPENSES 5210 MILEAGE —..____ _ __— _— MILES® 0555 5245 CAO STATION _ HOURS 500 5100 CONSULTANT EXPENSE 0 REPRODUCTION - Nanfier M CVges _ _ _ PLUS COLOR_ 30x42 SaM _ 24x3&Bap�_ 11%17 Sap _52_10__ TRAVEU_LODOING _ AIRLINECOST_S _5210 5290 MISCELLANEOUS ••'Fbwly and4yeea inalmng oveNme wR be billed e1 Ne Pe ISAeE rete plw 25% EXPENSES COST TOTAL ELECTRICAL ENGINEERING & E%TENSE COST - _ 61.72200 DISCIPLINE APPROVAL DATE PROJECT MANAGER APPROVAL DATE F:/Pmposal/Estimete/Estimate Form -General -2012 xis EXHITBIT A Page 8 of 9 Meier Archicture• Engineering STRUCTURAL MQINEERINO SERVICES PR"CTMTLE 2011 Filtration Plan Improvement Storage Building Design PROIECTIPROPOSN-N0. P12-0408 PROJECT MANAGER: S. PMImr088 TASK NO. TASKOESCIMPTION: DATE PREPARED; 10/1/2012 CLIENT NAME: City Of PRI =.eI SFNI'IR r._ =E, ENG.<Prh ., E'I ., ;. C'_U TOTAL TOTAL :' [ 11 .,^ `r, d .. _ COST HOURS ACTIVITY@ 'a La Cl.. C4 L G c CODE DESCRIPTION 14l- LJ JJ ICP G; 930J A)er. KO 33 92 P] 6G 00 5010 PROJECT MANAGEMENT l S020 WORK PLAINS 1DESIGN CRITERIA 5030 MEETINGS 2 2UOm 2 SOW SI fE INVESTIGATION I OBSERVAT ION 0 ..5050 26000 2 ENGINEERING I B 1.040 CO 5030 CHECK DGCUMFNTS 2 26003 2 S070 INCORPORATE REVIEW COMMENTS $080 So9n 5000 GENERAL 1 14 I 19211 MI /4 5101 TITLE AGE S10_2 FLOOR PLANS S103 ENLARGED PLANS 5104 FOUNDATION PIANS 2 0 _ 9900 10 5105 ELEVATIONS_ 5106 SECTIONS 2 16 1 7X100 19 _5107 DETAILS_ 5100 SCHEDULES .. __....— —. 5109 5110 5111 I $112 -- — 8100 DRAWNGB 1 41 1 1 24 62860.00 26 $210 SPECIFICATIONS 1 _ 5220 CONSTRUCTION COST ESTIMATE 5230 MODELING /ANIMATION 5240 _REPORTS 5250 DOCUMENTOONTROL _ 5200 .RENDERINGS 5270 BIDDINGSERVICES SMO MISMSERMCES 5310 PROJECT ADMINISTRATION 5311 WORK PLANS I DESIGN CRITERIA 5330 MEETINGS __..SERV.....— 5340 SITE INVESTIGNTION OBSERVATION 5350 SUBMITTAL REVIEWS 5360 RFI'S I CHANGE ORDERS 5370 RECORD DOCUMENTS 5300 PROJECT CLOSEOUT_ _ S390 COMMISSIONING 8300 CONSTRUCTION MANAGEMENT SODO-S1COIS200+5300= SUBTOTAL MANHOIIRS 10 24 42 STRUCTURAL ENGINEERING SERVICES COST 64,600.110 42 EXPENSES 5210 MILEAGE MILES0 0556 _ 5245 CAD STA ION HOURS ® 5, ENSE 5100 CNSULTAT 5230 ROPNOWC010N PNumber of Lople3 _ COORS 125% �Ux{280002036 Bill 11X17 Bond 5210 TRAVEL I LODGING 5210 AIRLINE COSTS_ - 5290 MISCELLANEOUS ...Hal r employees Ineurneq overtime MIT be billed al the pu5liebed rale plus 25% EXPENSES COST TOTAL STRUCTURAL ENGINEERING S EXPENSE COST DISCIPLINE APPROVAL PAIL PROJEC T MANAGER APPROVAL DATE. F'./ProposallEatimate/Estimate Form -General -2012 AS EXHITBIT A Paae 9 of 9 LL m N NI �Ir A >�M ( f QI N II 1 E v VIM C N f N N C N Q N r b a 0 2� � m E E m in r Z in � m Ti a N N N N N N N N N M M M Y p� ❑ � m' a c v E r ❑ ,co 3 a m 3 n m = o i t E e2 m L `m_ D V aN m H Yj o E Z fn Q U t01 N® b N W N LL I i ❑ � N M Q b b r b OJ O W N 1❑