HomeMy WebLinkAboutDGK Inc dba Widener & Associates - Task Order No 2018-1 Marina Dock ReplacementTASK ORDER NO. 2018-1
Reviewed By: �(J City Project Code:
REGARDING GENERAL AGREEMENT BETWEEN CITY OF PASCO
AND
DGK INC. DBA WIDENER & ASSOCIATES (Consultant)
Project:
Marina Dock Replacement
Scope of Services:
Boat Basin Master Plan - Aquatic Mitigation and Monitoring Plan
The Consultant will prepare an aquatic mitigation and monitoring plan for the development of the Pasco
Mitigation sites. They will complete the plan according to the requirements of the US Army Corps of Engineers
(USACE) and the Washington State Department of Ecology (DOE).
To complete the plan, the Consultant will:
• Collect on-site data and information about the boundaries of the existing wetlands and streams.
• Analyze groundwater data to identify the hydroperiod and determine the final grading elevation of the
wetland.
• Develop the conceptual planting plan for the mitigation area.
The consultant will prepare a draft of the aquatic mitigation and monitoring plan that includes a narrative
describing the proposed mitigation and monitoring and including accompanying draft special provisions (if
required), a vicinity map, plan view and/or detail maps of the proposed mitigation, and other informational
maps as required by the permitting agencies. The plan will be provided for City review, revised according to
City comments and submitted to the reviewing agencies.
Assumptions and Exclusions
• City comments on the mitigation and monitoring plan will be minor in extent and editorial in nature.
Deliverables
• Three copies of the draft mitigation plan for City review with accompanying draft special provisions if
required.
• Three copies of a draft mitigation plan, incorporating comments, for submittal to USACE
• Three hard copies and one electronic copy of the revised draft mitigation plan, incorporating comments
by USACE
Time of Performance:
All work for this task shall be completed by December 31, 2019.
Professional Services Agreement- DGK Inc. dba Widener & Associates
On -Call Environmental Services Page 1 of 2
Fee for Services:
All work shall be performed on a time -spent basis at the normal hourly billing rate included in the general
agreement with a maximum amount of $24,526.68 (per attached schedule) This maximum amount may be
revised only by written agreement of both parties. A work hour breakdown shall be provided for each invoice
submitted for navoxnt.
t.aA_ C U , o;?, a3 /
Inc. Dba Widener & Associates Date
tte Widener, Chief Financial Officer
Approved: kz�
City of Paso Date
Dave Zabell, City Manager
Professional Services Agreement- DGK Tnc. dba Widener & Associates
On -Call Environmental Services Page 2 of 2