Loading...
HomeMy WebLinkAboutMurraysmith - Task Order No. 1 Evaluate Capacity Existing Digester Roof and SupportsTASK ORDER NO. 1 Reviewed By: City Project Code: REGARDING GENERAL AGREEMENT BETWEEN CITY OF PASCO AND MURRAYSMITH Project Description: The professional engineering services associated with this Task Order 1 are for assisting the City in evaluating the capacity of the existing digester roof and supports to accommodate a proposed new mixer. Scope of Services: Services are described below: • Collection and review of proposed new mixer general installation and specific structural loading information. • Development of a finite element model for the digester roof. • Evaluation of the capacity of the existing digester roof and supports to accommodate the proposed new mixer using record drawings supplied by the City. This work DOES NOT include the design of roof or support modifications if the existing digester structure is determined to be not able to accommodate the proposed new mixer. • Development of a brief technical memorandum that summarizes the results and recommendations from the analysis performed. Time of Performance: Work will be completed within 45 days of Notice to Proceed. Fee for Services: On call engineering services will be billed on a time and materials basis with a total estimated budget of $4,900, which shall not be exceeded withaUt prior written authorization from the City. Compensation and payment is per the On- 11 M " i n ' eering Services, Professional Services Agreement. Proposed: Murraysmith, Date Craig Anderson, Principal Engineer Approved: 9�� City f-Paseel Dave Zabell, City Manager >$5,000 OR Rick Terway, Interim Public Works Director <$5,000 Professional Services Agreement- Murraysmith On -Call Municipal Engineering Services Dte Page 1 of 1 a q5—^