Loading...
HomeMy WebLinkAboutNorthPoint Electrical Contracting - Change Order No. 2 CP9-SE-1A-17-01 WWTP Immediate Needs - ElectricalCITY OF PASCO PUBLIC WORKS DEPARTMENT CONTRACT CHANGE ORDER NO.2 Project No: CP9-SE-1A-17-01 Project Title: WWTPImmediateNeeds- Electrical Contractor: NorthPoint Electrical Contracting, Inc. Description of Change: Proposal 2 - NEC Corrections per RFI #5 ($1,106 Detail as Appropriate: See Attached Proposals Contract Bid Amount: $ 82,495.82 SALES TAX @ 8.6%: $ 7,094.64 Total: $ 89,590.46 PREVIOUS CHANGE ORDER CURRENT CHANGE ORDER Subtotal $ 1,736.00 Subtotal $ 2,474.80 Sales tax @ 8.69/0 $ 149.30 Sales tax @ 8.6% $ 212.83 Total $ 1,885.30 Total $ 2,687.63 Total Change Orders To Date $ 4,572.93 Now Contract Amount $ 94.163.39 IS CONTRACT TIME AFFECTED BY THIS CHANGE ORDER YES NO Contract Time Prior to this Change Order ................................. Modification to Contract time by this Change Order ............... _... revised Total Contract Time .................................................... 0 It is mutually agreed by both parties that this Change Order fully describes the change(s) that is (are) being made and that the compensation for this Change Order Is full and complete and is the only compensation due or owing for this Change Order. Further, it is mutually agreed that this document will supplement the present Contract Documents and that the provisions of the previously executed Contract Documents shall apply to this Change Order. AGREED TO AND ACCEPTED: APPROVED: ONTRACT Date PROJECT MANAGER Date '_2S()&2 ND'tITPuh-yt+Electrical Contractin 2213 Henderson Loop, Richland, WA 99352 (509) 375-9700 fax (509) 375-9701 Change Order Proposal 02 (option 2) TITLE: NEC Corrections per RFI #5 PROJECT: Pasco WWTP TO: City of Pasco Item Description Units 0001 Correction of NEC deficiencies per RFI x5. 1 Includes the provision of a motor rated toggle switch with PVC box and cover switch and the associated labor for installation. This installation option eliminates the need to rework conduit and repull wire. DATE: 9/6/2017 JOB: 1726 CONTRACT NO. Inc. Unit Price Tax Rate Tax Amount NetAmount $1,106.43 8.60% $10.51 $1,106.43 Unit Cost $1,106.43 Unit Tax $10.51 TOTAL $1,116.94 G"/ . This change order is only valid with an approved, authorized signature from the an authorized designee of said Customer and NorthPoint Electrical. The signed approval of this change order will be completed no later than 7 calendar days after its issuance. An ammended change order will be required to perform any work scope identified in this document, if the approval date is after September 13, 2017. P RPYAL: AY F- �/s 40 By: I."ejj-71 Date: NorthPoint Electrical Contracting Inc. By: Date: N- DA P01 iA T Electrical Contracting, Inc. 2213 Henderson Loop, Richland, WA 99352 (509) 375-9700 fax (509) 375-9701 Change Order Proposal 03 (rv3) TITLE: NEC Corrections per RFI k4 DATE: 11/21/2017 PROJECT: Pasco WWTP JOB: 1726 TO: Craig Anderson CONTRACT NO. Murray Smith Item Description Units 0001 Correction of NEC deficiencies per RFI #4. 1 Includes removing of wiringto motor actuated valves and motors, plug conduit and safe wires off. Also includes adding jumpers to Ferric Chloride control panel and reinspection by L & I inspector Unit Price Tax Rate Tax Amount Net Amount $1,368.37 8.60% $83.76 $1,368.37 1 Unit Cost $1,368.37 Unit Tax $83.76 _ TOTAL $1,452.13 �4J This change order is only valid with an approved, authorized signature from the an authorized designee of said Customer and NorthPoint Electrical. The signed approval of this change order will be completed no later than 7 calendar days after its issuance. An ammended change order will be required to perform any work scope identified in this document, if the approval date is after November 28, 2017. APPPPRO AL: �Jd (/ i t)>� r /r ���!/J NorthPoint Electrical Contracting Inc. Date: �f-/� /(� Date: