HomeMy WebLinkAboutNorthPoint Electrical Contracting - Change Order No. 2 CP9-SE-1A-17-01 WWTP Immediate Needs - ElectricalCITY OF PASCO
PUBLIC WORKS DEPARTMENT
CONTRACT CHANGE ORDER NO.2
Project No: CP9-SE-1A-17-01
Project Title: WWTPImmediateNeeds- Electrical
Contractor: NorthPoint Electrical Contracting, Inc.
Description of Change: Proposal 2 - NEC Corrections per RFI #5 ($1,106
Detail as Appropriate: See Attached Proposals
Contract Bid Amount: $ 82,495.82
SALES TAX @ 8.6%: $ 7,094.64
Total: $ 89,590.46
PREVIOUS CHANGE ORDER
CURRENT CHANGE ORDER
Subtotal $ 1,736.00
Subtotal $ 2,474.80
Sales tax @ 8.69/0 $ 149.30
Sales tax @ 8.6% $ 212.83
Total $ 1,885.30
Total $ 2,687.63
Total Change Orders To Date $ 4,572.93
Now Contract Amount $ 94.163.39
IS CONTRACT TIME AFFECTED BY THIS CHANGE ORDER YES NO
Contract Time Prior to this Change Order .................................
Modification to Contract time by this Change Order ............... _...
revised Total Contract Time .................................................... 0
It is mutually agreed by both parties that this Change Order fully describes the change(s) that is (are)
being made and that the compensation for this Change Order Is full and complete and is the only
compensation due or owing for this Change Order. Further, it is mutually agreed that this document will
supplement the present Contract Documents and that the provisions of the previously executed Contract
Documents shall apply to this Change Order.
AGREED TO AND ACCEPTED: APPROVED:
ONTRACT Date PROJECT MANAGER Date
'_2S()&2
ND'tITPuh-yt+Electrical Contractin
2213 Henderson Loop, Richland, WA 99352 (509) 375-9700 fax (509) 375-9701
Change Order Proposal 02 (option 2)
TITLE:
NEC Corrections per RFI #5
PROJECT:
Pasco WWTP
TO:
City of Pasco
Item Description Units
0001 Correction of NEC deficiencies per RFI x5. 1
Includes the provision of a motor rated
toggle switch with PVC box and cover
switch and the associated labor for
installation. This installation option
eliminates the need to rework conduit
and repull wire.
DATE: 9/6/2017
JOB: 1726
CONTRACT NO.
Inc.
Unit Price Tax Rate Tax Amount NetAmount
$1,106.43 8.60% $10.51 $1,106.43
Unit Cost $1,106.43
Unit Tax $10.51
TOTAL $1,116.94
G"/ .
This change order is only valid with an approved, authorized signature from the an authorized designee of said
Customer and NorthPoint Electrical. The signed approval of this change order will be completed no later than 7
calendar days after its issuance. An ammended change order will be required to perform any work scope identified in
this document, if the approval date is after September 13, 2017.
P RPYAL:
AY F- �/s
40
By: I."ejj-71
Date:
NorthPoint Electrical Contracting Inc.
By:
Date:
N- DA P01 iA T Electrical Contracting, Inc.
2213 Henderson Loop, Richland, WA 99352 (509) 375-9700 fax (509) 375-9701
Change Order Proposal 03 (rv3)
TITLE: NEC Corrections per RFI k4 DATE: 11/21/2017
PROJECT: Pasco WWTP JOB: 1726
TO: Craig Anderson CONTRACT NO.
Murray Smith
Item Description Units
0001 Correction of NEC deficiencies per RFI #4. 1
Includes removing of wiringto motor
actuated valves and motors, plug conduit
and safe wires off. Also includes adding
jumpers to Ferric Chloride control panel
and reinspection by L & I inspector
Unit Price Tax Rate Tax Amount Net Amount
$1,368.37 8.60% $83.76 $1,368.37
1
Unit Cost $1,368.37
Unit Tax $83.76 _
TOTAL $1,452.13
�4J
This change order is only valid with an approved, authorized signature from the an authorized designee of said
Customer and NorthPoint Electrical. The signed approval of this change order will be completed no later than
7 calendar days after its issuance. An ammended change order will be required to perform any work scope
identified in this document, if the approval date is after November 28, 2017.