HomeMy WebLinkAbout3827 Resolution RESOLUTION NO. (3.&I
A RESOLUTION of the City of Pasco, Washington, waiving the
competitive bidding requirements and approving the acquisition of improvements
and related services for their supervisory control and data acquisition (SCADA)
and programmable logic controller (PLC) system from Townsend Controls and
Electric, LLC.
WHEREAS, it is critical for the City of Pasco to have proper equipment to perform
SCADA and PLC system functions; and
WHEREAS, the City has need to acquire improvements and related services to the
SCADA and PLC system; and
WHEREAS,the City has worked with Townsend Controls and Electric, LLC. to develop
and integrate a standardized, straight-forward programming logic which operates PLCs citywide.
City staff has adapted to this standard and is capable of monitoring, operating, and troubleshooting
PLCs using it.
WHEREAS, the use of Townsend Controls and Electric, LLC. services are clearly and
legitimately limited to a single source of services to support current operations standards this
acquisition becomes subject to waiving competitive bidding requirements per RCW
39.04.280(1)(a) and RCW 39.04.280(1)(b) of purchases from a sole source supplier and purchases
involving special facilities.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF PASCO,
WASHINGTON, DO RESOLVE AS FOLLOWS:
Section 1. That the City of Pasco acquire improvements and related services to the
SCADA and PLC system from Townsend Controls and Electric, LLC.
Section 2. The above-described circumstances is justification for the waiver of bidding
requirements under the authority of RCW 39.04.280(1)(a)and RCW 39.04.280(1)(b)for purchases
from a sole source supplier involving special facilities, and, therefore, the bidding requirement is
hereby waived for the acquisition of services from Townsend Controls and Electric, LLC.
PASSED by the City Council of the City of Pasco at its regular meeting this egriciday of
4/0n.
/ , 2018.
Matt Watkins, Mayor
AT EST: APPROVED AS TO FORM:
r
Daniela Erickson, City Clerk Leland B. Kerr, City Attorney
SOLE SOURCE WORKSHEET
Sole source purchases are defined as clearly and legitimately limited to a single supplier. Sole source
purchases are normally not allowed except when based upon strong technological grounds such as
operational compatibility with existing equipment and related parts or upon a clearly unique and cost
effective feature requirement.
Requisition Item: SCADA/PLC Improvements and Related Services Requisition No.
Prior Purchase Order Number(if item had been approved previously): N/A
1. Please describe the items and its function:
This work is for upgrades to the City of Pasco (referred to as City) supervisory control and data
acquisition (SCADA) and programmable logic controller(PLC) system; which allow the process
systems to run autonomously with or without operator presence. Previously the main Irrigation
automation controller was upgraded which included six of the 13 automation controllers at pump
sites by Townsend Controls and Electric, LLC. (referred to as Townsend). There are seven
remaining Irrigation pump sites that need PLCs upgraded and programmed to function with the
main automation controller to completed the project.
2. This is a sole source because:
❑ Sole provider of a licensed or patented good or service
❑x Sole provider of items that are compatible with existing equipment, inventory, systems,
programs or services
CI Sole provider of goods and services for which the City has established a standard
❑ Sole provider of goods or services that will meet the specialized needs of the City or
perform the intended function(please detail below or in an attachment)
L I The vendor/distributor is a holder of a used item that would represent good value and is
advantageous to the City (please attach information on market price survey, availability,
etc.)
3. What necessary features does this vendor provide which are not available from other vendors?
Please be specific.
Townsend Controls has successfully completed PLC upgrades for the City in the following areas:
PWRF: 14 PLCs in circle pivots,IPS building, Screens building, and Foster Wells.
Water Treatment: 4 PLCs at the following pump stations: Eastside,Riverview,Burden,and
Road68 water tank.
Wastewater Treatment: Maitland lift station.
Irrigation: Irrigation Master PLC,USBR,RD108, 1St Place,I-182,Desert Sunset,and Village of
Pasco Heights.
These previous projects were awarded to Townsend by using the city's competitive bid process.
Townsend was most recently awarded the Butterfield Water Treatment Plant PLC Controls
Upgrade Project in 2017 which is in the final stage of completion.
In previous projects,Townsend worked with staff to develop and integrate a standardized,
straight-forwardprogramming logic which operates PLCs citywide. City staff has adapted to this
standard and is capable of monitoring, operating,and troubleshooting PLCs using it.
This standardized programming logic created for the city is the primary factor desired for this
sole source request. By eliminating multiple contractors,who will need to create their own
programing logic for each site,the city will gain consistency and overall efficient use of City
resources.
In addition to winning previous bids, and developing the adopted standard programing, several
other supporting sole source factors include;
• Townsend also has gained in-depth knowledge of the City's overall PLC/SCADA
architecture which allows them to more accurately understand the needs of the system.
• They are a local business which permits the City to efficiently schedule for
implementation needs and provide emergency after hours' response in short notice.
• They are also a Rockwell(Allen-Bradley)recognized integrator,which is the technology
that the City has standardized on.
4. What steps were taken to verify that these features are not available elsewhere?
❑x Other brands/manufacturers were examined (please list phone numbers and names, and
explain why these were not suitable).
Talos Engineering 509 893-5799,previously hired on 3 prior WWTP lift station PLC
upgrades.Programming would not match needed standard.
CREM 509 430-5993,contacted but did not provide quote due to having to outsource
programmer.
❑ Other vendors were contacted (please list phone numbers and names, and explain why
these were not suitable).
5. The city has compared costs of previously awarded projects completed by Townsend to these sole
source upgrade costs to ensure the lowest price is consistently offered for each PLC upgrade in this
request.
Certification of Need
This recommendation for sole source is based upon on objective review of the product/service required and
appears to be in the best interest of the City. I know of no conflict of interest on my part of personal
involvement in any way with this request. No gratuities, favors or comprising actions have been taken.
Neither has my personal familiarity with particular brands, types or equipment, materials or firm been a
deciding influence on my request to sole source this purchase.
By:
v , /2"--e/ z
Date: 3�Z // �?