Loading...
HomeMy WebLinkAbout3802 Resolution RESOLUTION NO. 31O Z- A RESOLUTION APPROVING A PRELIMINARY PLAT FOR PREAKNESS RIDGE. WHEREAS, RCW 58.17 enables the City to uniformly administer the process of subdividing property for the overall welfare of the community; and, WHEREAS, owners and developers of property situated in the South half of Section 15, Township 9 North, Range 29 East, W.M., have requested approval of a preliminary plat; and, WHEREAS, the Planning Commission held a public hearing on the proposed Preakness Ridge plat and developed findings related thereto and said findings are hereby adopted by the City Council; and, WHEREAS, following a public hearing, the Planning Commission found the proposed plat promoted the general welfare of the community and recommended said preliminary plat be approved with conditions; NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PASCO: That the preliminary plat for Preakness Ridge located in the South half Section 15, Township 9 North, Range 29, East W.M., is hereby approved with the following conditions: 1. No utility vaults, pedestals, or other obstructions will be allowed at street intersections. 2. All corner lots and other lots that present difficulties for the placement of yard fencing shall be identified in the notes on the face of the final plat(s). 3. The developer shall install an eight-foot masonry wall along the freeway right-of-way. The wall details must be included on the subdivision construction drawings. All final Plats shall include a note that clearly indicates the maintenance responsibility for the freeway wall is the responsibility of the property owners adjoining the wall. 4. The final plat(s) shall contain a 10-foot utility easement parallel to all streets unless otherwise required by the Franklin County PUD. 5. The final plat(s) shall contain the following Franklin County Public Utility District statement: "The individual or company making improvements on a lot or lots of this Plat is responsible for providing and installing all trench, conduit, primary vaults, secondary junction boxes, and backfill for the PUD's primary and secondary distribution system in accordance with PUD specifications; said individual or company will make full advance payment of line extension fees and will provide all necessary utility easements prior to PUD construction and/or connection of any electrical service to or within the plat". 6. The Developer must coordinate with the Franklin County PUD to ensure all road and access easements to the substation adjacent the east boundary line of the plat are open and unencumbered. 7. The cul de sac at the east end of Chapel Hill Boulevard must be squared to the southeast to provide additional right-of-way access to the storm water pond to the south. Passed by the City Council of the City of Pasco this 6th day of November, 2017. Matt Watkins, Mayor ATTEST: APPROVED AS TO FORM: 16(/(6,1, (7' ,4497 �+ Daniela Erickson, City Clerk Leland B. Kerr, City Attorney