Loading...
HomeMy WebLinkAbout2017.08.28 Council Workshop PacketWorkshop Meeting AGENDA PASCO CITY COUNCIL 6:00 p.m. August 28, 2017 Page 1. CALL TO ORDER: 2. ROLL CALL: (a) Pledge of Allegiance 3. VERBAL REPORTS FROM COUNCILMEMBERS: 4. ITEMS FOR DISCUSSION: 3 - 143 (a) 2018-2023 Capital Improvement Plan - Proposed 144 - 164 (b) ATV's on City Streets (c) Business License Discussion (d) Ambulance Billing Discussion 165 - 167 (e) CDBG Program Section 108 Guaranteed Loan Program (MF# BGAP 2017-007) 168 - 170 (f) Create Local Improvement District (LID) for Chapel HIll Boulevard 171 - 175 (g) Professional Services Agreement for Design of Lift Station Improvements 176 - 179 (h) Amendment to Legislative Consultant Agreement with Gordon Thomas Honeywell 5. MISCELLANEOUS COUNCIL DISCUSSION: 6. EXECUTIVE SESSION: 7. ADJOURNMENT. Page 1 of 179 Workshop Meeting August 28, 2017 REMINDERS: 1. 4:00 p.m., Monday, August 28, 1000 Columbia Park Trail, Hanford Area Economic Investment Fund Committee Meeting (COUNCILMEMBER AL YENNEY, Rep.; SAUL MARTINEZ, Alt.) This meeting is broadcast live on PSC-TV Channel 191 on Charter Cable and streamed at www.pasco-wa.gov/psctvlive. Audio equipment available for the hearing impaired; contact the Clerk for assistance. City Hall will be closed on Monday, September 4 for the Labor Day Holiday. The next Council Meeting will be held on Tuesday, September 5. Page 2 of 179 Capital Improvement plan 2018 – 2023 DRAFT August 22, 2017 Page 3 of 179 “Good fortune is what happens when opportunity meets with planning.” Thomas A. Edison Page 4 of 179 Table of Contents EXECUTIVE SUMMARY ..................................................................................................................................................................... ii INTRODUCTION ................................................................................................................................................................................ viii DEFINITION AND PURPOSE OF CAPITAL IMPROVEMENTS PLAN ........................................................................................... viii I. Capital Improvements Plan (CIP).......................................................................................................................................... viii II. Capital Projects Budget ......................................................................................................................................................... viii III. Capital Improvement Projects ............................................................................................................................................... viii CIP PROJECT CONSIDERATION FACTORS ..................................................................................................................................... ix I. Public Safety ........................................................................................................................................................................... ix II. Public Health ........................................................................................................................................................................... ix III. Legal Requirement .................................................................................................................................................................. ix IV. Related Project ......................................................................................................................................................................... ix V. Consistency with Current Master Plan ..................................................................................................................................... x VI. Net Impact on Future Operating Budgets ................................................................................................................................. x VII. Other ......................................................................................................................................................................................... x WHY PLAN FOR CAPITAL PROJECTS? ............................................................................................................................................. x I. Good Fiscal Management ......................................................................................................................................................... x II. Managing Growth ..................................................................................................................................................................... x III. Eligibility for Grants and Loans .............................................................................................................................................. xi FISCAL POLICIES ............................................................................................................................................................................... xii FISCAL POLICIES GOAL ................................................................................................................................................................... xii I. Financial Feasibility. .............................................................................................................................................................. xii II. Financial Responsibility ......................................................................................................................................................... xii III. Financing and Debt ................................................................................................................................................................ xii IV. Operating and Maintenance Cost ........................................................................................................................................... xiv V. Revenues Requiring Referendum .......................................................................................................................................... xiv VI. Uncommitted Revenue .......................................................................................................................................................... xiv CIP PROJECTS SUMMARY BY COST ............................................................................................................................................... xv CIP PROJECTS SUMMARY BY REVENUE ...................................................................................................................................... xxi I. Debt Financing ..................................................................................................................................................................... xvii II. Grants and Loans ................................................................................................................................................................. xviii III. On-going Revenue ............................................................................................................................................................... xviii IV. Local Improvement District (LID) ....................................................................................................................................... xviii CAPITAL IMPROVEMENT PROJECTS ............................................................................................................................................ 1 Page 5 of 179 EXECUTIVE SUMMARY The Capital Improvement Plan (CIP) supports the City of Pasco’s comprehensive plan. Capital and major improvements usually have very long useful lives, significant costs, and are generally not mobile. The definition of “Capital Improvement Projects” is provided in the Introductory Section of this CIP. The Capital Improvement Plan (CIP) is presented in three sections: I. Introduction: Purpose, benefits, and methodology of the CIP. II. Fiscal Policies: Statements of requirements and guidelines used to finance the CIP. III. Capital Improvement Projects: List of proposed capital projects, including description, project costs, revenues and timing; as well as future operating costs. Page 6 of 179 City of Pasco, Washington Capital Improvement Plan 2018 – 2023 iii CAPITAL IMPROVEMENT PROJECT COSTS BY PROJECT TYPE The total cost for 2018 – 2023 is: Page 7 of 179 City of Pasco, Washington Capital Improvement Plan 2018 – 2023 iv Page 8 of 179 City of Pasco, Washington Capital Improvement Plan 2018 – 2023 v CAPITAL IMPROVEMENT PROJECT COSTS BY REVENUE SOURCE The total cost for 2018 – 2023 is: Cost Revenue Source (Amount in Thousands) Arterial 1,274 Capital Improvement - REET 1 3,770 Capital Improvement - REET 2 2,907 Current Revenue Bond 816 Economic Development 35 General 2,340 Grant 37,370 Loan 2,826 Park Development 2,492 Private Donations 3,110 Proposed LID 8,806 Sale of Assets 750 Street Overlay 4,800 Traffic Impact Fee 1,210 Unsecured - Future Bond LGTO 10,370 Unsecured - Revenue Bond 51,124 Unsecured Fund 30,294 Utility Rate 11,401 Total 175,696 Page 9 of 179 City of Pasco, Washington Capital Improvement Plan 2018 – 2023 vi Page 10 of 179 City of Pasco, Washington Capital Improvement Plan 2018 – 2023 vii 2018 CAPITAL IMPROVEMENT PROJECT COSTS BY REVENUE SOURCE The total cost for 2018 is: 2018 Cost Revenue Source (Amount in Thousands) Arterial 879 Capital Improvement - REET 1 2,844 Capital Improvement - REET 2 913 Current Revenue Bond 741 Economic Development 35 General 1,025 Grant 9,398 Loan 1,581 Park Development 377 Private Donations 50 Proposed LID 4,670 Street Overlay 800 Traffic Impact Fee 100 Future Revenue Bond 4,853 Utility Rate 4,313 Unsecured 545 Marina Dock Replacement 500 Crescent Road 45 Total 33,124 Page 11 of 179 City of Pasco, Washington Capital Improvement Plan 2018 – 2023 viii INTRODUCTION DEFINITION AND PURPOSE OF CAPITAL IMPROVEMENT PLAN The CIP is a six-year plan for capital and major improvements which support the City of Pasco’s current and future population and economy. The following definitions are presented to distinguish between a capital improvement plan (CIP), Capital Projects Budget, and report of annual spending for capital projects. Types of capital to be included in the CIP are also listed in this section of the CIP. I. Capital Improvement Plan (CIP) The City’s CIP is a long-range schedule of proposed public facilities, infrastructure and major projects which includes estimated costs and sources of funding over a six-year period. The CIP is updated annually for the purpose of confirming and/or reorganizing projects on a priority basis, and to prepare the Capital Projects Budget. Capital project work of a like nature which occurs each year may be included as one project in this plan. The City Council’s adoption of the CIP in no way constitutes an appropriation of funds to a specific project. II. Capital Projects Budget The City’s Capital Projects Budget consists of a list of capital projects, together with amounts and sources of approved projects and creates continuing budget authority for the life of the project without regard to the year the spending occurs. This budget requires Council’s approval to add a new project or to increase the total approved cost of an existing project. This budget also communicates which projects are finished and closed. Capital project work of a like nature which occurs each year and listed together in the CIP may be included as separate projects in the Capital Projects Budget based on such factors as work location and construction start dates. Capital Project Budgets may include related project work which may not meet the accounting definition of “capital” but are directly related to the project. The Capital Projects Budget is contained as a section in the City’s “Annual Operations & Capital Improvement Budget” document. Repair and maintenance work, though it may be significant in dollar amount, is included as part of the annual Operating Budget. The annual “slice” of the Capital Project Budget is also included in the annual Operating Budget. To present an overall view for the year, the annual Operating Budget shows the total budgeted resources and uses for the entire City for the year (including combined annual and continuing authority items). The City’s annual Operating Budget is contained as a section in the City’s “Annual Operations & Capital Improvement Budget” document. III. Capital Improvement Projects Capital Improvement Projects are major, non-recurring expenditures for land, facilities, equipment, or infrastructure with a useful life of five (5) years or more. Capital expenditures which do not meet the criteria stated above and not included in this document are also included in the capital outlay section of the City’s annual Operating Budget. Specific types of Capital Improvement Projects may include one or more of the following: a. Land acquisition for a public purpose; Page 12 of 179 City of Pasco, Washington Capital Improvement Plan 2018 – 2023 ix b. Construction of a new facility, such as a public building, ball field, water treatment plant, or expansion of such a facility; c. Construction relating to the addition or replacement of infrastructure (such as pipes, streets, etc.) d. A non-recurring rehabilitation, or major repair of all or part of a building, its grounds, facility, or major equipment; e. Purchase of major equipment; and f. Planning and feasibility studies. CIP PROJECT CONSIDERATION FACTORS I. Public Safety The project must identify a clear and immediate safety risk. Requests from departments, which deal principally with public safety, such as Fire and Police, do not automatically meet this standard. Another department, such as Parks and Recreation, could have a project which addresses a clear and immediate safety issue. II. Public Health Benefit to the environment and public health is a primary consideration. This consideration is only used when public health is a critical factor; a matter of necessity, rather than a matter of choice. For example, all water or sewer projects concern public health; however, this consideration would be used only when urgent. Continual health hazards, however, would make a water or sewer project virtually mandatory. III. Legal Requirement Many federal and state grants are contingent upon local participation, and such intergovernmental agreements require legal compliance. Court orders and judgments (e.g., annexation, property owner rights, environmental protection), also represent legal requirements which may affect a CIP project. Consideration must be given to both existing legal requirements (e.g., federal/state stipulation that earmarked funds must be spent by a certain date), and anticipated legal requirements (e.g., pending annexation which is expected to be approved by the end of the year). IV. Related Project CIP projects in one category are essential to the success of projects in other categories. In some instances, a street should not be developed until a storm drain has been completed. Obviously, park development cannot proceed until park land has been acquired, but the development may also depend upon the completion of a street project to provide access to the park. In addition, significant federal or state grants might be involved, and the City would be required to provide its matching share or forfeit the grant. Related projects by other agencies may affect a saving which should be pursued. Page 13 of 179 City of Pasco, Washington Capital Improvement Plan 2018 – 2023 x V. Consistency with Current Master Plan A Master Plan for a specific category of public facilities has long-term objectives set during the planning process. City departments have an obligation to request CIP projects which support and implement the stated goals and objectives of the Master Plan. Consideration should not be given here to any project which does nothing to actively implement the plan, or adversely affects the plan. VI. Net Impact on Future Operating Budgets The substantial cost impact of a proposed CIP project on future operating budgets of the City is an important factor in the City's decision to construct the project. In some cases, however, a project may generate enough revenue to offset, or even exceed, future operating costs (e.g., water or sewer treatment plant, stadium, airport, etc.). VII. Other There are additional priority factors which departments may include for evaluation. Some of these additional factors for consideration could include public support, level of service, cost savings to the City, and impact on economic development. WHY PLAN FOR CAPITAL PROJECTS? There are at least three reasons to plan for capital projects: (1) good fiscal management, (2) managing growth, and (3) eligibility for grants and loans. I. Good Fiscal Management Planning for major capital projects and their costs enables City of Pasco to:  Demonstrate the need for facilities and identifying how to pay for them;  Estimate future operations/maintenance costs of new facilities which will impact the annual budget;  Take advantage of various sources of revenue (i.e., available grants and low interest loans, etc.) which may require a CIP in order to qualify for the revenue; and  Receive better ratings on bond issues when the City borrows money for capital (reducing interest rates and the cost of borrowing such money). II. Managing Growth Capital Improvement Plans are necessary in the comprehensive plan in order to:  Provide capital for land development envisioned or authorized by the land use element of the comprehensive plan;  Maintain the quality of life for existing and future development by establishing and maintaining standards for the levels of service of capital and facilities; Page 14 of 179 City of Pasco, Washington Capital Improvement Plan 2018 – 2023 xi  Coordinate and provide consistency among the many plans for capital and improvements, including: i. Other elements of the comprehensive plan (i.e., transportation and utilities elements); ii. Master plans and other studies of the local government; iii. Plans for capital and facilities of state and/or regional significance; iv. Plans of other adjacent local governments; and v. Plans of special districts.  Ensure the timely provision of adequate facilities to support existing populations and future development;  Document all capital projects and their financing (including projects to be financed by impact fees and/or real estate excise taxes authorized by the State of Washington Growth Management Act (GMA)). The CIP is the element which makes the rest of the comprehensive plan real. In reality, the CIP determines the quality of life in the community. III. Eligibility for Grants and Loans The State of Washington Department of Community, Trade and Economic Development's Public Works Trust Fund requires local governments have some type of CIP in order to be eligible for grants and loans. Most other publically funded grant and loan programs have similar requirements (i.e. Interagency for Outdoor Recreation), or give preference to governments which have a CIP. Page 15 of 179 City of Pasco, Washington Capital Improvement Plan 2018 – 2023 xii FISCAL POLICIES FISCAL POLICIES GOAL Provide needed public facilities which are within the ability of the City to fund the facilities, or within the City's authority to require others to provide the facilities. I. Financial Feasibility The estimated costs of all needed capital improvements shall not exceed conservative estimates of revenues from sources that are available to the City pursuant to current statutes, and which have not been rejected by referendum, if a referendum is required to enact a source of revenue. Conservative estimates need not be the most pessimistic estimate, but cannot exceed the most likely estimate. Revenues for Capital Improvement Projects must be financial commitments, which shall be sufficiently assured to be bankable or bondable by the City. II. Financial Responsibility Existing and future development shall both pay for the costs of needed capital improvements. 2.1 Existing development 2.1.a: Existing development shall pay for the capital and improvements which reduce or eliminate existing deficiencies, some or all of the replacement of obsolete or worn out facilities, and may pay a portion of the cost of capital and improvements needed by future development. 2.1.b: Existing development's payments may take the form of user fees, charges for services, special assessments and taxes. 2.2 Future development 2.2.a: Future development shall pay its fair share of the capital and improvements needed to address the impact of such development. Upon completion of construct ion, future development becomes existing development, and shall contribute to paying the costs of the replacement of obsolete or worn out facilities as described in Policy 2.l.a, above. 2.2.b: Future development's payments may take the form of, but are not limited to, voluntary contributions for the benefit of any public facility, impact fees, capacity fees, dedications of land, provision of public facilities, public/private partnerships, voluntary funding agreements, and future payments of user fees, charges for services special assessments and taxes. Future development shall not pay impact fees for the portion of any public facility which reduces or eliminates existing deficiencies. 2.2.c: Both existing and future development may have part of their costs paid by grants, entitlements or public facilities from other levels of government and independent districts. III. Financing and Debt Page 16 of 179 City of Pasco, Washington Capital Improvement Plan 2018 – 2023 xiii Capital and improvements shall be financed, and debt shall be managed as follows: 3.1 Capital and improvements financed by City utility funds shall be financed by: 3.1.a: Debt to be repaid by user fees and charges and/or connection or capacity fees for utility facilities and services, or 3.1.b: Current assets (i.e., reserves, equity or surpluses, and current revenue, including grants, loans, donations and inter-local agreements), or 3.1.c: A combination of debt and current assets. 3.2 The net income of City utility funds shall be at least equal to the annual cost of the following: (a) principal reductions of outstanding bonds; (b) loan requirements to Federal or State agencies; (c) annual operating reserve increases; and (d) bond coverage requirements per bond covenants. 3.3 Fees and charges for utility funds shall be established and maintained at a level sufficient: 3.3.a: To pay the net income requirement in each fiscal year, as described in Policy 3.2 above; 3.3.b: To pay the full cost of operation, and maintain the utility in good repair and working order; 3.3.c: To provide an operating reserve equal to 15% of budgeted operating expenditures; and 3.3.d: To provide a future capital and improvements reserve in an amount equal to the average annual cost (excluding debt financing) of the approved six-year capital and improvement program, considering any changes which, from time to time, may be made in such program. 3.4 Leveled rate increases are preferred for City utility funds, and when possible, should be achieved through leveled expenditures. System user rates should be evaluated regularly and tracked to assure sufficiency. 3.5 Capital and improvements financed by non-utility funds shall be financed from either current asset: (i.e., current revenue, fund equity and reserves), or debt, or a combination thereof. Financing decisions shall include consideration for which funding sources (current assets, debt, or both) will be: a) most cost effective, b) consistent with prudent asset and liability management, c) appropriate to the useful life of the project (s) to be financed, and d) the most efficient use of the City's ability to borrow funds. Page 17 of 179 City of Pasco, Washington Capital Improvement Plan 2018 – 2023 xiv IV. Operating and Maintenance Cost The City shall not provide a public facility, nor shall it accept the provision of a public facility by others, if the City or other provider is unable to pay for the subsequent annual operating and maintenance costs of the facility. V. Revenues Requiring Referendum In the event sources of revenue listed under "Projected Costs and Revenues" require voter approval in a local referendum which has not been held, and a referendum is not held, or is held and is not successful, this Capital Improvement Program (CIP) shall be revised at the next annual amendment to adjust for the lack of such revenues, in any of the following ways: 5.1 Increase the use of other sources of revenue; 5.2 Decrease the cost, and therefore the quality, of some types of public facilities, while retaining the quantity of the facilities required to provide the appropriate level of service; 5.3 Decrease the demand for and subsequent use of capital and facilities; and 5.4 A combination of the above alternatives. VI. Uncommitted Revenue All development permits issued by the City which require capital improvements which will be financed by sources of revenue which have not been approved or implemented (such as future debt requiring referenda) shall be conditioned on the approval or implementation of the indicated revenue sources, or the substitution of a comparable amount of revenue from existing sources. Page 18 of 179 City of Pasco, Washington Capital Improvement Plan 2018 – 2023 xv CIP PROJECTS SUMMARY BY COST City of Pasco will expend $175,696 in CIP projects from year 2018 to 2023 in the following categories: 1. General 2. Parks and Recreation 3. Water 4. Irrigation 5. Sewer 6. Transportation 7. Stormwater 8. Process Water Resource Facility A detailed description of each proposed project is provided in the section “Capital Improvement Projects”. Page 19 of 179 City of Pasco, Washington Capital Improvement Plan 2018 – 2023 xvi Page 20 of 179 City of Pasco, Washington Capital Improvement Plan 2018 – 2023 xvii CIP PROJECTS SUMMARY BY REVENUE Below are major funding sources available to the City to fund CIP projects: I. Debt Financing General and Park Projects A well-managed debt plan can allow one to buy large items when a purchase of such magnitude would not fit into a single year’s annual budget. City of Pasco will require debt financing accomplish similarly large tasks Fire Stations replacement and relocation. Complete list of projects is listed below: Project Name Future Bond Community Center 2,820 Relocation of Station 83 2,950 Station 84 4,600 10,370 The City Council authorizes the City Manager to sell bonds to raise revenue for capital improvements. Those bonds are sold on the open market in exchange for cash payment, essentially functioning as a loan for the City. In selling and managing bonds, the City seeks the advice of both a bond counsel and an outside financial advisor. Interest rates on bond payments are based on market conditions and the City bond rating, as determined by private rating agencies. The City recommends two different types of financial instruments to finance these projects. i. Councilmanic Bonds are issued by a vote of the City Council, backed by general fund revenues when voters have not been asked to pay increased property taxes. These may be used for any City purpose; they do not have to be for capital projects. ii. Limited-Tax General Obligation Bond is a municipal bond secured by some limited taxing power of the issuer. For example, a bond may be secured by a municipality's property tax subject to a maximum rate at which the tax may be levied. Alt hough a limited-tax general obligation bond is considered a general obligation of the issuer, because of the limited taxing power, this bond is considered riskier than a general obligation bond secured by full taxing power by the investors. Page 21 of 179 City of Pasco, Washington Capital Improvement Plan 2018 – 2023 xviii Utility Projects Another debt financing option is Revenue Bonds to finance projects for any City enterprise which is self-supporting like utilities. Payment comes from user fees; so the debt is not backed by the full faith and credit of the City. Investors consider these somewhat less secure than general obligation bonds as well. All CIP projects listed below for water and sewer programs with revenue bonds as anticipated revenue were factored into the Water and Sewer rate increase made in 2016. II. Grants and Loans Some of the funding for larger City capital projects comes from grants and loans made by federal and state agencies. Almost all federal funds are 'passed through' a state agency filter. Some of the major agencies involved in funding grants and loans are Transportation Improvement Board (TIB), Washington State Recreation and Conservation Office, Water Resources Program, Department of Ecology, etc. Parks and Transportation projects are the largest benefactors of such grants and loans at City of Pasco. III. On-Going Revenue Revenue created by services like water, sewer, taxes etc. These revenues are used to fund Capital projects in their respective areas. City follows the applicable regulation around special revenue funds, enterprise funds and general funds. IV. Local Improvement District (LID) A Local Improvement District (LID) is a method by which a group of property owners can share in the cost of infrastructure improvements. LID’s can be used to help finance improvements including:  Street Overlays, Repair, and Construction  Street Lighting  Utility Expansion (Water, Sewer, Storm Drain, Irrigation)  Overhead Power Conversion to Underground  Alleyway Improvements  Street Beautification and Revitalization Projects  Park Construction and Improvements Page 22 of 179 City of Pasco, Washington Capital Improvement Plan 2018 – 2023 xix Page 23 of 179 City of Pasco, Washington Capital Improvement Plan 2018 – 2023 xx Page 24 of 179 Page #Project Name Total Project Cost Project to Date 12/31/16 Current Year Anticipated Cost Plan Year 2018 Plan Year 2019 Plan Year 2020 Plan Year 2021 Plan Year 2022 Plan Year 2023 General 4 Relocation of Station 83 4,000 - - 300 3,700 - - - - 5 Station 84 5,000 - - 400 4,600 - - - - 6 Training Facility Site Work & Modular Building Installation 575 - - 575 - - - - - 7 Animal Control 2,047 - 200 803 1,044 - - - - 8 Community Center 4,050 - - 900 3,150 - - - - 9 City Hall Remodel 1,518 68 350 1,100 - - - - - 10 Downtown Police Substation & Services Facility 100 - - 100 - - - - - 11 Wayfinding and Signage 650 - - 35 190 225 200 - - 12 PSK Facility Upgrades 218 - 122 96 - - - - - General Total 18,158 68 672 4,309 12,684 225 200 - - Parks and Recreation 14 Peanuts Park Restoration 2,615 - 250 1,120 1,245 - - - - 15 1st Avenue Center - Phase 2 180 - - 180 - - - - - 16 Chapel Hill Park 440 - - 20 420 - - - - 17 Community Park in Northwest Quadrant 2,300 - - - - - 1,400 900 - 18 Dog Park 200 - - - 200 - - - - 19 Facilities Shop Remodel 150 - - 150 - - - - - 20 Franklin County Irrigation District (FCID) Trail Development - Phase 1 415 - - - - 55 360 - - 21 Franklin County Irrigation District (FCID) Trail Development - Phase 2 455 - - - - - - 35 420 22 Highland Park Restroom/Concession/Storage Building 210 - - 10 200 - - - - 23 Livingston Park 420 - - - - 420 - - - 24 New Neighborhood Park - Rd 48 & Court 757 - - 757 - - - - - 25 Marina Dock Replacement 1,800 - - 500 - - 1,300 - - 26 Park Restroom Installations 100 - - 100 - - - - - 27 Pasco Sporting Complex - Softball Complex Updates 250 - - 150 100 - - - - 28 Road 54 Improvement (Erwen Property)320 - - - 20 300 - - - 29 Sacajawea Heritage Trail - Burlington Northern Santa Fe (BNSF) Underpass 1,650 - - - 50 1,600 - - - 30 Sacajawea Heritage Trail - Levee Lowering 979 - 79 50 850 - - - - 31 Schlagel Park Improvements 727 16 40 64 607 - - - - 32 Soccer Facility - East side 40 Acre 600 - - - 600 - - - - 33 Sylvester Park Tennis Court Upgrades 80 - - - - - 80 - - Parks and Recreation Total 14,649 16 369 3,101 4,292 2,375 3,140 935 420 CITY OF PASCO CIP COSTS SUMMARY: 2018-2023 (Amounts in Thousands)Page 25 of 179 Page #Project Name Total Project Cost Project to Date 12/31/16 Current Year Anticipated Cost Plan Year 2018 Plan Year 2019 Plan Year 2020 Plan Year 2021 Plan Year 2022 Plan Year 2023 CITY OF PASCO CIP COSTS SUMMARY: 2018-2023 (Amounts in Thousands) Transportation 36 Pavement Preservation Program 4,000 - - - 800 800 800 800 800 37 James Street Improvements 483 3 - 480 - - - - - 38 East B Circle 320 - - 320 - - - - - 39 Road 84 Safe Walking Route Connection 215 - - 215 - - - - - 40 Rowena Chess School Crossing 88 - - 88 - - - - - 41 Oregon Ave (SR397) - Phase 1 7,941 622 305 7,014 - - - - - 42 City Wide Traffic Signal Ph 2 3,300 - - 300 3,000 - - - - 43 Chapel Hill Blvd LID (Rd 68 to Rd 84)8,806 - - 4,670 4,136 - - - - 44 Lewis Street Overpass 32,000 - 150 1,100 5,750 23,000 2,000 - - 45 Argent Road Widening (20th Ave to Road 44)7,661 286 25 150 350 850 6,000 - - 46 Crescent Road 400 - - 45 355 - - - - 47 Road 68 Interchange Improvements 4,317 123 30 114 - 500 3,550 - - 48 Sandifur Widening (Rd 52 to Rd 60)500 - - - 50 450 - - - 49 Wrigley Drive Extension 260 - - - - 40 220 - - 50 Sandifur Parkway Widening (Rd 68 to Convention Drive)335 - - - - - - 50 285 51 Burns Road Extension (f/k/a Powerline Road) (Road 68 to Convention Drive)200 - - - - - - - 200 Transportation Total 70,826 1,035 510 14,496 14,441 25,640 12,570 850 1,285 Water 54 Annual System Improvements - Development 700 - 100 100 100 100 100 100 100 55 Annual Upsize - Development 700 - 100 100 100 100 100 100 100 56 Columbia Water Supply Project 10,252 1,546 6,121 2,584 - - - - - 57 Chapel Hill Boulevard (Rd 68 to Rd 84) - Watermain Main Upsize 920 - - 920 - - - - - 58 Butterfield WTP PLC & Control Upgrades 600 - 100 500 - - - - - 59 Waterline Extension—Schuman Lane (West from Road 96)80 - - 80 - - - - - 60 West Pasco WTP Backwash Recovery Improvements & High Service Pump and Yard Piping 1,426 - 100 - 726 600 - - - 61 East Side Reservoir Storage Tank 11,700 - - - - 1,000 2,000 4,200 4,500 62 Butterfield WTP - Chlorine Safety 325 - - - 75 250 - - - 63 Water Main Installation – Crescent-Chapel Hill/Sandifur Transmission Main 2,507 - - 501 2,006 - - - - 64 Waterline Replacement - Richardson Rd 460 - - - 460 - - - - 65 Water Line Replacement – Road 60 (Court St to W Pearl, 62nd Place, W Agate between Road 60 & 62nd Place)900 - - - - 900 - - - 66 Water Line Replacement—Road 76 (Wernett Road to Court Street) 826 - - - - 826 - - - 67 Water Main Connection—Alton Street (Wehe Avenue to the alley west of Owen Street) 153 - - - - - 153 - - 68 Water Main Connection—Irving Street (Extend East to Road 49) 87 - - - - - - 87 - 69 Water Main Connection—Riverhaven Street (Road 36 to Road 40) 305 - - - - - - - 305 70 Water Main Connection—Road 103 (between Maple Dr to Willow Way) 113 - - - - - - - 113 71 Automated Water Meter Reading 4,750 - - - 750 1,000 1,000 1,000 1,000 Water Total 36,805 1,546 6,521 4,785 4,217 4,777 3,353 5,487 6,118 Page 26 of 179 Page #Project Name Total Project Cost Project to Date 12/31/16 Current Year Anticipated Cost Plan Year 2018 Plan Year 2019 Plan Year 2020 Plan Year 2021 Plan Year 2022 Plan Year 2023 CITY OF PASCO CIP COSTS SUMMARY: 2018-2023 (Amounts in Thousands) Irrigation 74 Annual System Improvements - Development 600 100 100 100 100 100 100 75 Annual Upsize - Development 300 50 50 50 50 50 50 76 Chapel Hill Boulevard (Road 84 to Road 68) - Irrigation Main Upsize 120 120 - - - - - 77 Chapel Hill Boulevard to Interstate 182 - Irrigation Main 180 - - - - - 180 78 Irrigation Main Connection - Sahara Drive to Road 44 51 - 51 - - - - 79 Irrigation Main Installation - Sirocco Drive - Between Sahara Drive and Saguaro Drive 100 - - - - - 100 Irrigation Total 1,351 - - 270 201 150 150 150 430 Sewer 82 Annual System Improvements - Development 700 - 100 100 100 100 100 100 100 83 Annual Upsize - Development 700 - 100 100 100 100 100 100 100 84 9th & WA Lift Station 873 5 39 830 - - - - - 85 Pearl Street Lift Station 1,392 5 75 223 510 580 - - - 86 Road 36 Lift Station Upgrades 1,066 5 46 - - - 500 515 - 87 NW Area Sewer Transmission Main 2,951 91 360 2,500 - - - - - 88 Wastewater Treatment Plant PLCs and Controls Upgrade 750 - - 750 - - - - - 89 West Pasco Trunk Sewer Relining (Transmission Main Rehabilitation – Rd 60 to Rd 100)1,345 - - 50 1,295 - - - - 90 WWTP Facility Plan Capital Improvement Projects 25,000 - - 500 5,000 5,000 5,000 5,000 4,500 91 Road 44 Corrosion & Odor Control 692 - - - - 104 588 - - Sewer Total 35,470 105 720 5,053 7,005 5,884 6,288 5,715 4,700 Stormwater 94 Capital Stormwater Participation Program 600 - - 100 100 100 100 100 100 95 N Sycamore Ave Infiltration Improvements 120 - - - 120 - - - - 96 N Industrial Ave Infiltration Retrofit 110 - - - - 110 - - - 97 1st Avenue Pipe Rehab 190 - - - - - - 190 - 98 Volunteer Park pipe Relining 59 - - - - - - - 59 99 Sylvester North Pipe Relining 180 - - - - - - - 180 100 Sylvester South Pipe Relining 150 - - - - - - 150 - Stormwater Total 1,409 - - 100 220 210 100 440 339 Process Water Resource Facility 102 PWRF Drying Beds 325 - 25 300 - - - - - 103 Kahlotus Hwy Sewer Force Main (Dietrich Lift Station)5,260 - 130 550 4,580 - - - - 103 Industrial Pump Station (IPS) Improvements 3,160 - - 160 3,000 - - - - Process Water Resource Facility Total 8,745 - 155 1,010 7,580 - - - - TOTAL CIP COST 187,413 2,770 8,947 33,124 50,640 39,261 25,801 13,577 13,292 Page 27 of 179 This Page Intentionally Left Blank Page 28 of 179 Page #Project Name Total Fund Contribution Project to Date 12/31/16 Current Year Anticipated Cost Plan Year 2018 Plan Year 2019 Plan Year 2020 Plan Year 2021 Plan Year 2022 Plan Year 2023 General 9 City Hall Remodel 68 68 - - - - - - - 8 Community Center 1,230 - - 900 330 - - - - 20 Franklin County Irrigation District (FCID) Trail Development - Phase 1 55 - - - - 55 - - - 21 Franklin County Irrigation District (FCID) Trail Development - Phase 2 230 - - - - - - 35 195 103 Kahlotus Hwy Sewer Force Main (Dietrich Lift Station)65 - 65 - - - - - - 29 Sacajawea Heritage Trail - Burlington Northern Santa Fe (BNSF) Underpass 700 - - - 50 650 - - - 30 Sacajawea Heritage Trail - Levee Lowering 129 - 79 50 - - - - - 6 Training Facility Site Work & Modular Building Installation 75 - - 75 - - - - - General Total 2,552 68 144 1,025 380 705 - 35 195 Future Bond - LTGO 8 Community Center 2,820 - - - 2,820 - - - - 4 Relocation of Station 83 2,950 - - - 2,950 - - - - 5 Station 84 4,600 - - - 4,600 - - - - Future Bond - LTGO Total 10,370 - - - 10,370 - - - - Arterial Street 45 Argent Road Widening (20th Ave to Road 44)25 - 25 - - - - - - 42 City Wide Traffic Signal Ph 2 435 - - 41 395 - - - - 41 Oregon Ave (SR397) - Phase 1 1,367 309 233 825 - - - - - 47 Road 68 Interchange Improvements 167 123 30 14 - - - - - Arterial Street Total 1,994 432 288 879 395 - - - - Capital Improvement Capital Improvement - REET 1 15 1st Avenue Center - Phase 2 180 - - 180 - - - - - 9 City Hall Remodel 1,450 - 350 1,100 - - - - - 17 Community Park in Northwest Quadrant 600 - - - - - 600 - - 18 Dog Park 115 - - - 115 - - - - 19 Facilities Shop Remodel 150 - - 150 - - - - - 24 New Neighborhood Park - Rd 48 & Court 400 - - 400 - - - - - 26 Park Restroom Installations 100 - - 100 - - - - - 27 Pasco Sporting Complex - Softball Complex Updates 250 - - 150 100 - - - - 4 Relocation of Station 83 300 - - 300 - - - - - 31 Schlagel Park Improvements 231 16 40 64 111 - - - - 5 Station 84 400 - - 400 - - - - - CITY OF PASCO CIP REVENUE SUMMARY: 2018-2023 (Amounts in Thousands)Page 29 of 179 Page #Project Name Total Fund Contribution Project to Date 12/31/16 Current Year Anticipated Cost Plan Year 2018 Plan Year 2019 Plan Year 2020 Plan Year 2021 Plan Year 2022 Plan Year 2023 CITY OF PASCO CIP REVENUE SUMMARY: 2018-2023 (Amounts in Thousands) Capital Improvement - REET 2 7 Animal Control 2,047 - 200 803 1,044 - - - - 10 Downtown Police Substation & Services Facility 100 - - 100 - - - - - 22 Highland Park Restroom/Concession/Storage Building 110 - - 10 100 - - - - 14 Peanuts Park Restoration 125 - 125 - - - - - - 30 Sacajawea Heritage Trail - Levee Lowering 850 - - - 850 - - - - Capital Improvement Total 7,408 16 715 3,757 2,320 - 600 - - Current Revenue Bond 84 9th & WA Lift Station 43 5 39 - - - - - - 62 Butterfield WTP - Chlorine Safety 75 - - - 75 - - - - 58 Butterfield WTP PLC & Control Upgrades 600 - 100 500 - - - - - 85 Pearl Street Lift Station 80 5 75 - - - - - - 102 PWRF Drying Beds 266 - 25 241 - - - - - 86 Road 36 Lift Station Upgrades 51 5 46 - - - - - - Current Revenue Bond Total 1,115 15 285 741 75 - - - - Economic Development Fund 11 Wayfinding and Signage 35 - - 35 - - - - - Economic Development Total 35 - 35 - - - - - Grant Assistance to Firefighters 6 Training Facility Site Work & Modular Building Installation 500 - - 500 - - - - - Community Development Block 14 Peanuts Park Restoration 425 - 125 300 - - - - - 12 PSK Facility Upgrades 218 - 122 96 - - - - - Department of Commerce 103 Kahlotus Hwy Sewer Force Main (Dietrich Lift Station)2,575 - - - 2,575 - - - - Economic Development Administration 56 Columbia Water Supply Project 601 601 - - - - - - - 103 Kahlotus Hwy Sewer Force Main (Dietrich Lift Station)2,620 - 65 550 2,005 - - - - Highway Safety Improvement Program 41 Oregon Ave (SR397) - Phase 1 876 - 28 848 - - - - - Page 30 of 179 Page #Project Name Total Fund Contribution Project to Date 12/31/16 Current Year Anticipated Cost Plan Year 2018 Plan Year 2019 Plan Year 2020 Plan Year 2021 Plan Year 2022 Plan Year 2023 CITY OF PASCO CIP REVENUE SUMMARY: 2018-2023 (Amounts in Thousands) Safe Route to School 39 Road 84 Safe Walking Route Connection 215 - - 215 - - - - - 40 Rowena Chess School Crossing 88 - - 88 - - - - - State Capital Grant 44 Lewis Street Overpass 15,000 - 150 1,100 5,750 8,000 - - - Surface Transportation Program 45 Argent Road Widening (20th Ave to Road 44)209 209 - - - - - - - 42 City Wide Traffic Signal Ph 2 2,642 - - 260 2,383 - - - - 41 Oregon Ave (SR397) - Phase 1 833 313 44 477 - - - - - 47 Road 68 Interchange Improvements 931 - - 100 - 200 631 - - Transportation Improvement Board 41 Oregon Ave (SR397) - Phase 1 4,865 - - 4,865 - - - - - Transportation Alternatives Program 42 City Wide Traffic Signal Ph 2 147 - - - 147 - - - - Unsecured 51 Burns Road Extension (f/k/a Powerline Road) (Road 68 to Convention Drive)200 - - - - - - - 200 17 Community Park in Northwest Quadrant 1,100 - - - - - 700 400 - 18 Dog Park 50 - - - 50 - - - - 20 Franklin County Irrigation District (FCID) Trail Development - Phase 1 360 - - - - - 360 - - 21 Franklin County Irrigation District (FCID) Trail Development - Phase 2 225 - - - - - - - 225 22 Highland Park Restroom/Concession/Storage Building 75 - - - 75 - - - - 28 Road 54 Improvement (Erwen Property)125 - - - - 125 - - - 47 Road 68 Interchange Improvements 2,850 - - - - 300 2,550 - - 29 Sacajawea Heritage Trail - Burlington Northern Santa Fe (BNSF) Underpass 200 - - - - 200 - - - 31 Schlagel Park Improvements 496 - - - 496 - - - - 32 Soccer Facility - East side 40 Acre 200 - - - 200 - - - - 46 Crescent Road 400 - - 45 355 - - - - Grant Total 39,026 1,123 534 9,443 14,036 8,825 4,241 400 425 Page 31 of 179 Page #Project Name Total Fund Contribution Project to Date 12/31/16 Current Year Anticipated Cost Plan Year 2018 Plan Year 2019 Plan Year 2020 Plan Year 2021 Plan Year 2022 Plan Year 2023 CITY OF PASCO CIP REVENUE SUMMARY: 2018-2023 (Amounts in Thousands) I-182 Traffic Impact Fees 45 Argent Road Widening (20th Ave to Road 44)527 77 - 100 350 - - - - 48 Sandifur Widening (Rd 52 to Rd 60)500 - - - 50 450 - - - 49 Wrigley Drive Extension 260 - - - - 40 220 - - I-182 Traffic Impact Fees Total 1,287 77 - 100 400 490 220 - - Park Development 16 Chapel Hill Park 440 - - 20 420 - - - - 17 Community Park in Northwest Quadrant 600 - - - - - 100 500 - 23 Livingston Park 420 - - - - 420 - - - 24 New Neighborhood Park - Rd 48 & Court 357 - - 357 - - - - - 28 Road 54 Improvement (Erwen Property)195 - - - 20 175 - - - 32 Soccer Facility - East side 40 Acre 400 - - - 400 - - - - 33 Sylvester Park Tennis Court Upgrades 80 - - - - - 80 - - Park Development Total 2,492 - - 377 840 595 180 500 - Private Donations 45 Argent Road Widening (20th Ave to Road 44)3,050 - - 50 - - 3,000 - - 18 Dog Park 35 - - - 35 - - - - 22 Highland Park Restroom/Concession/Storage Building 25 - - - 25 - - - - Private Donations Total 3,110 - - 50 60 - 3,000 - - Proposed LID 43 Chapel Hill Blvd LID (Road 68 to Road 84)8,806 - - 4,670 4,136 - - - - Proposed LID Total 8,806 - - 4,670 4,136 - - - - Street Overlay 38 East B Circle 320 - - 320 - - - - - 37 James Street Improvements 483 3 - 480 - - - - - 36 Pavement Preservation Program 4,000 - - - 800 800 800 800 800 Street Overlay Total 4,803 3 - 800 800 800 800 800 800 Page 32 of 179 Page #Project Name Total Fund Contribution Project to Date 12/31/16 Current Year Anticipated Cost Plan Year 2018 Plan Year 2019 Plan Year 2020 Plan Year 2021 Plan Year 2022 Plan Year 2023 CITY OF PASCO CIP REVENUE SUMMARY: 2018-2023 (Amounts in Thousands) Utility Rate 97 1st Avenue Pipe Rehab 190 - - - - - - 190 - 54, 74, 82 Annual System Improvements - Development 2,000 - 200 300 300 300 300 300 300 55, 75, 83 Annual Upsize - Development 1,700 - 200 250 250 250 250 250 250 94 Capital Stormwater Participation Program 600 - - 100 100 100 100 100 100 57 Chapel Hill Boulevard (Road 68 to Road 84) - Watermain Main Upsize 920 - - 920 - - - - - 76 Chapel Hill Boulevard (Road 84 to Road 68) - Irrigation Main Upsize 120 - - 120 - - - - - 77 Chapel Hill Boulevard to Interstate 182 - Irrigation Main 180 - - - - - - - 180 56 Columbia Water Supply Project 2,908 945 140 1,823 - - - - - 103 Industrial Pump Station (IPS) Improvements 160 - - 160 - - - - - 78 Irrigation Main Connection - Sahara Drive to Road 44 51 - - - 51 - - - - 79 Irrigation Main Installation - Sirocco Drive - Between Sahara Drive and Saguaro Drive 100 - - - - - - - 100 96 N Industrial Ave Infiltration Retrofit 110 - - - - 110 - - - 95 N Sycamore Ave Infiltration Improvements 120 - - - 120 - - - - 87 NW Area Sewer Transmission Main 91 91 - - - - - - - 102 PWRF Drying Beds 59 - - 59 - - - - - 91 Road 44 Corrosion & Odor Control 692 - - - - 104 588 - - 99 Sylvester North Pipe Relining 180 - - - - - - - 180 100 Sylvester South Pipe Relining 150 - - - - - - 150 - 98 Volunteer Park pipe Relining 59 - - - - - - - 59 63 Water Main Installation – Crescent-Chapel Hill/Sandifur Transmission Main 2,507 - - 501 2,006 - - - - 59 Waterline Extension—Schuman Lane (West from Road 96)80 - - 80 - - - - - 60 West Pasco WTP Backwash Recovery Improvements & High Service Pump and Yard Piping 100 - 100 - - - - - - Utility Rate Total 13,077 1,036 640 4,313 2,827 864 1,238 990 1,169 Sale of Asset 4 Relocation of Station 83 750 - - - 750 - - - - Sale of Asset Total 750 - - 750 - - - - Loans 56 Columbia Water Supply Project 6,743 - 5,982 761 - - - - - 14 Peanuts Park Restoration 2,065 - - 820 1,245 - - - - Loans Total 8,808 - 5,982 1,581 1,245 - - - - Page 33 of 179 Page #Project Name Total Fund Contribution Project to Date 12/31/16 Current Year Anticipated Cost Plan Year 2018 Plan Year 2019 Plan Year 2020 Plan Year 2021 Plan Year 2022 Plan Year 2023 CITY OF PASCO CIP REVENUE SUMMARY: 2018-2023 (Amounts in Thousands) Future Revenue Bond 86 Road 36 Lift Station Upgrades 1,015 - - - - - 500 515 - 84 9th & WA Lift Station 830 - - 830 - - - - - 62 Butterfield WTP - Chlorine Safety 250 - - - - 250 - - - 61 East Side Reservoir Storage Tank 11,700 - - - - 1,000 2,000 4,200 4,500 103 Industrial Pump Station (IPS) Improvements 3,000 - - - 3,000 - - - - 87 NW Area Sewer Transmission Main 2,860 - 360 2,500 - - - - - 85 Pearl Street Lift Station 1,313 - - 223 510 580 - - - 65 Water Line Replacement – Road 60 900 - - - - 900 - - - 64 Water Line Replacement - Richardson Road 460 - - - 460 - - - - 66 Water Line Replacement - Road 76 826 - - - - 826 - - - 67 Water Main Connection - Alton Street 153 - - - - - 153 - - 68 Water Main Connection - Irving Street 87 - - - - - - 87 - 69 Water Main Connection - Riverhaven Street 305 - - - - - - - 305 70 Water Main Connection - Road 103 113 - - - - - - - 113 89 West Pasco Trunk Sewer Relining (Transmission Main Rehabilitation – Rd 60 to Rd 100)1,345 - - 50 1,295 - - - - 60 West Pasco WTP Backwash Recovery Improvements & High Service Pump and Yard Piping 1,326 - - - 726 600 - - - 90 WWTP Facility Plan Capital Improvement Projects 25,000 - - 500 5,000 5,000 5,000 5,000 4,500 Future Revenue Bond Total 51,484 - 360 4,103 10,991 9,157 7,653 9,802 9,418 Unsecured Fund 45 Argent Road Widening (20th Ave to Road 44)3,850 - - - - 850 3,000 - - 71 Automated Water Meter Reading 4,750 - - - 750 1,000 1,000 1,000 1,000 42 Citywide Traffic Signal Ph 2 75 - - - 75 - - - - 44 Lewis Street Overpass 17,000 - - - - 15,000 2,000 - - 25 Marina Dock Replacement 1,800 - - 500 - - 1,300 - - 47 Road 68 Interchange Improvements 369 - - - - - 369 - - 29 Sacajawea Heritage Trail - Burlington Northern Santa Fe (BNSF) Underpass 750 - - - - 750 - - - 50 Sandifur Parkway Widening (Rd 68 to Convention Drive)335 - - - - - - 50 285 88 Wastewater Treatment Plant PLCs and Controls Upgrade 750 - - 750 - - - - - 11 Wayfinding and Signage 615 - - - 190 225 200 - - Unsecured Fund Total 30,294 - - 1,250 1,015 17,825 7,869 1,050 1,285 TOTAL CIP COST 187,413 2,770 8,947 33,124 50,640 39,261 25,801 13,577 13,292 Page 34 of 179 1 Table of Commonly use Acronyms through out the Capital Improvement Plan ADA - Americans with Disabilities Act AFG - Assistance to Firefighters Grant BNSF - Burlington Northern Santa Fe EPA - Environmental Protection Agency HSIP - Highway Safety Improvement Program LID - Local Improvement District MG - Million Gallon PFD - Pasco Fire Department PPD - Pasco Police Department RCO - Recreation and Conservation Office REET - Real Estate Excise Taxes ROW- Right of Way SRS - Safe Routes to School STP - Surface Transportation Program TAP - Transportation Alternative Program TIB - Transportation Improvement Brand TREC - Tri-Cities Rivershore Enhancement Council WPWTP - West Pasco Water Treatment Plant WSRB - Washington Surveying and Rating Bureau Page 35 of 179 2 This Page Intentionally Left Blank Page 36 of 179 3 General Projects Page 37 of 179 4 Relocation of Station 83 Project #00001 Fire Station 83 on Road 68 is responsible for covering much of the City west of Highway 395. This is a growing area with an increasing call volume. The Washington Survey and Rating Bureau and the Fire and Ambulance Services Master Plan both identified the need for a fire station north of Burden Blvd. and one south of Court Street. The current location of Station 83 is between the identified areas that need fire stations. It is suggested that the current station be relocated to the north. Assessment need is: Urgent Principal need is: Council Goals Page 38 of 179 5 Fire Station 84 Project #00002 As identified by the Washington Survey and Rating Bureau and the recently completed Fire and Ambulance Services Master Plan, an additional fire station is needed in the Riverview Area. Currently, Fire Station 84 is inadequate and does not meet current or future demand projections. Space for the Shift Commander and Fire Department Administration is also inadequate as the Fire Department Administration is located in a rented facility. Assessment need is: Urgent Principal need is: Council Goals Page 39 of 179 6 Training Facility Site Work & Modular Building Installation Project #00003 In collaboration with the Tri-County fire departments, the PFD is party to a grant request for a modular fire training facility. This facility is needed in order to maintain unit availability. The lack of a training facility also negatively affected the WSRB rating for the City and was identified within the WSRB report to Council. The establishment of a training site/facility would improve the ability to achieve the Council goal of attain- ment of a Class 4 rating. A portion of the grant award is earmarked for instructor training and two smaller sites within the Tri-County region. Assessment need is: Necessary Principal need is: Council Goals Page 40 of 179 7 Animal Control Shelter Project #00004 A new facility will be constructed to replace the current outdated facility for the Animal Control Authority. These costs reflect only the City of Pasco's share of the project. Assessment need is: Necessary Principal need is: Council Goals Page 41 of 179 8 Community Center Project #00005 This project will construct a new Community Center in order to have social, active and passive recreational opportunities for the citizens of Pasco. Assessment need is: Desirable Principal need is: Council Goals Page 42 of 179 9 City Hall Renovations Project #00006 City Hall was renovated originally for City use in 1995. Minor renovations have been undertaken in 2003 and 2008. The move of the Police Department into new facilities in early 2017 cleared the way for renovations to accommodate some reconfiguration of spaces to better serve the public, as well as to house growth of staff expected over the next several years. An initial remodel phase was underway in 2017 to house Information Services, relocate the Prosecutor's Office and Human Resources. Additional phases are contemplated to update windows, relocate permitting services to the 1st floor to better serve the public and provide additional space for Finance and Engineering. Assessment need is: Necessary Principal need is: Quality Improvement Page 43 of 179 10 Downtown Police Substation & Services Facility Project #00007 Secure new, more effective location for the Pasco Police Department in downtown Pasco, in coordination with capital improvements proposed for Peanuts Park and Farmers Market. Assessment need is: Necessary Principal need is: Public Safety Page 44 of 179 11 Wayfinding and Signage Project #00008 Project throughout the Tri-Cities in conjunction with TREC to standardize directional signage to guide visitors and residents to City amenities, including downtown, recreational activities, restaurants, parks etc. Assessment need is: Necessary Principal need is: Council Goals Page 45 of 179 12 Pasco Specialty Kitchen Facility Upgrades Project #00009 Continue facility upgrades necessary to accommodate growth and diversify clientele for the PSK, including façade improvement and retrofitting of space within PSK. Assessment need is: Necessary Principal need is: Quality Improvement Page 46 of 179 13 Parks and Recreation Projects Page 47 of 179 14 Peanuts Park/Farmers Market Restoration Project #00023 To restore and develop Peanuts Park. The Park is centrally located in downtown and is a focal point of the ar- ea. The Restoration of the park is a vital part to the restoration and development of the Downtown area. The park as we know it today will be demolished and a brand new park plan put in place for the area. The project will include the installation of features such as trees, green space, a gazebo, raised crosswalk to North Peanuts, restrooms, etc. Assessment need is: Necessary Principal need is: Council Goals Page 48 of 179 15 1st Avenue Center - Phase 2 Project #00010 Phase 2 of the 1st Avenue Center which includes finishing the parking lot, installing sidewalk and landing at the back porch, a dumpster enclosure, security system and a block wall between the Center property and the adjoining property to the East. Assessment need is: Necessary Principal need is: Quality Improvement Page 49 of 179 16 Chapel Hill Park Project #00011 Development of a 5 Acre Park to include trees, green space, playground, picnic area, and other features com- parable to other neighborhood parks throughout the City. Assessment need is: Necessary Principal need is: Council Goals Page 50 of 179 17 Community Park in Northwest Quadrant Project #00012 Purchase and construct a Community Park located in the NW area of Pasco. The park will be 20 -40 acres and include parking, playground, restroom facilities, walking trails, rentable shelters and/or buildings and a variety of active and passive green space and sports fields. Assessment need is: Necessary Principal need is: Council Goals Page 51 of 179 18 Dog Park Project #00013 Build a Dog Park for the community. This location would allow for Animal Control to utilize the park with potential adoptive animals as they are located close by. This location is also located at a trail head to our walking path, allowing for trail users to conveniently access the dog park. The facility would be fenced, irrigated and maintained by City staff. Assessment need is: Necessary Principal need is: Council Goals Page 52 of 179 19 Facilities Shop Remodel Project #00014 Remodel old shop to provide work stations and better space for organization of parts and tools for the Facili- ties division. Currently this shop is being used for storage. Assessment need is: Necessary Principal need is: Service Protection Page 53 of 179 20 Franklin County Irrigation District (FCID) Trail Development - Phase 1 Project #00015 Construction of a trail and/or linear park from Road 100 to Road 111 above the Franklin County Irrigation District's covered irrigation ditch. Assessment need is: Desirable Principal need is: Quality Improvement Page 54 of 179 21 Franklin County Irrigation District (FCID) Trail Development - Phase 2 Project #00016 Construction of a trail and/or linear park from Road. 100 to Road 84 over Franklin County Irrigation District's covered irrigation ditch. Assessment need is: Desirable Principal need is: Quality Improvement Page 55 of 179 22 Highland Park Restroom/Concession/Storage Building Project #00017 Construct a Restroom/Concessions/Storage building at Highland Park positioned centrally between the three football fields. Electricity, water and plumbing are already at the location. This would enable us to eliminate the storage containers and sheds that are now at the park. It would also allow for a better customer experience with more modernized ADA accessible restrooms and permanent concessions. Assessment need is: Necessary Principal need is: Quality Improvement Page 56 of 179 23 Livingston Park Project #00018 Purchase land along Livingston Rd. for a 5 -Acre neighborhood Park. Development of park will occur as funds permit. *The City will pursue this project or the New Neighborhood Park at Rd 48 & Court street dependent on availability, price and other factors. Assessment need is: Desirable Principal need is: Quality Improvement Page 57 of 179 24 New Neighborhood Park - Rd 48 & Court Project #00019 This project is to purchase the land located at Road 48 and Court for the purpose of building a new fire station and developing remaining land into a new neighborhood park. *The City will pursue this project or the Livingston Park on Livingston Rd dependent on availability, price and other factors. Assessment need is: Desirable Principal need is: Quality Improvement Page 58 of 179 25 Marina Docks Replacement Project #00020 Replace remaining outdated dock, which is no longer able to be repaired cost effectively. Replace a second dock that was damaged in a storm. *The dock damaged in the storm will be paid by a secondary party that we rent the dock from. We will be billed a portion of that dock as contractually obligated. Assessment need is: Necessary Principal need is: Council Goals Page 59 of 179 26 Park Restroom Installations Project #00021 Replace portable toilets located in various neighborhood parks throughout the City with a single stall restroom. This is a pilot project to replace facilities in few parks. Assessment need is: Necessary Principal need is: Council Goals Page 60 of 179 27 Pasco Sporting Complex - Softball Complex Updates Project #00022 Remove volleyball courts and install batting cages at Pasco Sporting Complex. The volleyball courts are under utilized. The batting cages could be rented out, to increase revenue for the Park. The project also includes installation of shelters, an off leash dog area, and other upgrades to better serve customers and make the complex the best in the Tri-cities. Improvements planned in 2019 include the renovation and upgrade of the splash pad. Assessment need is: Necessary Principal need is: Quality Improvement Page 61 of 179 28 Road 54 Improvement (Erwen Property) Project #00024 To improve the parking and picnic area at Road 54 and W. Sylvester Street (Erwen Property). This park will not be a typical neighborhood park. It will be designed as an exercise focused park that will take advantage of its proximity to the river and the trail system. Assessment need is: Desirable Principal need is: Quality Improvement Page 62 of 179 29 Sacajawea Heritage Trail Burlington Northern Santa Fe (BNSF) Bridge Underpass Project #00025 This project is to construct the riverfront bike path under the Railroad bridge and construct the path to Schlagel Park. This will eliminate the need to go up and over the overpass with the trail. The path would then connect to the rest of the existing path through the Port of Pasco property and tie into their redevelopment plan. The proposal would have to be taken to BNSF Railroad for approval. Assessment need is: Desirable Principal need is: Quality Improvement Page 63 of 179 30 Sacajawea Heritage Trail - Levee Lowering Project #00026 This project will provide residents access along the river and connect the trails from Road 52 to Road 72. Additionally, the levee will be lowered to provide wider and safer pedestrian pathways. Assessment need is: Necessary Principal need is: Quality Improvement Page 64 of 179 31 Schlagel Park Improvements Project #00027 Replace the boat launch, upgrade parking and lighting, install new restroom facility. The boat launch has failed on the east side which leaves only one available lane, which is in poor condition itself. This is the only launch within miles and is heavily used by the boating public and is an integral part of the marina operation. The restroom has also failed and should be moved from its present location to a location closer to the boat launch. Seventy percent of the costs will be covered through a grant from RCO. Assessment need is: Urgent Principal need is: Service Protection Page 65 of 179 32 Soccer Facility - East side 40 Acre Project #00028 This project will develop a site capable of providing 8 -14 soccer and multi-use sports fields to help meet rapidly growing demand for field use. Assessment need is: Necessary Principal need is: Council Goals Page 66 of 179 33 Sylvester Park Tennis Court Upgrades Project #00029 To upgrade the aging tennis courts that are in need of repair at Sylvester Park. Because of shifting de- mographics the courts are also under utilized. This project would update fencing and convert one of the three tennis courts as well as the two basketball courts to a combination basketball/futsal courts. Assessment need is: Necessary Principal need is: Service Protection Page 67 of 179 34 This Page Intentionally Left Blank Page 68 of 179 35 Transportation Projects Page 69 of 179 36 Pavement Preservation Program Project #00030 The City has implemented the Pavement Preservation Program to assess and maintain quality streets within the City that are free of potholes and provide good ride quality. This program preserves and extends the life of the streets with low cost methods which help avoid reconstruction of those streets. The program includes crack seal, overlay and microsurfacing of City streets. Prioritization is determined by considering both the Pavement Preservation Program itself and the pavement rating system. This will also encompass 50% of the Alley Hard Surface project funding. *2018 funding allocated to James Street improvements and East B Circle. Assessment need is: Necessary Principal need is: Asset Protection Page 70 of 179 37 James Street Improvements Project #16010 To improve and widen James Street to promote industrial development and better access to the existing business part of the Oregon Avenue project. *Funded by Pavement Preservation Program. Assessment need is: Desirable Principal need is: Public Safety Page 71 of 179 38 East B Circle Roadway Improvements Project #17015 This project improves the surface and cross-section of East B Circle to meet increased traffic. *Funded by Pavement Preservation Program. Assessment need is: Other Principal need is: Asset Protection Page 72 of 179 39 Road 84 Safe Walking Route Connection Project #17017 To provide the missing sidewalk connection along the heavily utilized walking route for students of both the McLoughlin Middle School and Chiawana High School. Private development resulted in a gap between sidewalks that needs to be addressed due to safety concerns as children are forced to walk either along the shoulder of the roadway or along a dirt trail. Both options are unsafe and do not meet minimum ADA re- quirements. As part of network connectivity, the project would also provide a marked school crossing with new ADA compliant curb ramps. Assessment need is: Necessary Principal need is: Public Safety Page 73 of 179 40 Rowena Chess School Crossing Project #17018 The purpose of this project is to provide a designated marked crossing for the students of Rowena Chess Elementary School to safety cross 22nd Avenue as there is no existing crossing on this street. Park Street is located halfway between Sylvester Street and Henry Street. The nearest crossing on 22nd Avenue is on Henry Street, which is over 650 feet north of Park Street. Adding this crossing would also allow students to be able to enter the school grounds directly via the gate opening near the proposed crossing location, which is being used on a regular basis already. Assessment need is: Necessary Principal need is: Public Safety Page 74 of 179 41 Oregon Ave (SR397) - Phase 1 Project #12002 This project will upgrade the existing Oregon Avenue corridor between the I -182/US 12 interchange and ‘A’ Street to provide safety, access management and mobility improvements. A new traffic signal will be added at the intersection of Oregon Ave (SR 397) and Salt Lake Street. Existing traffic signals will be updated at the intersections of Oregon Avenue and Lewis Street and ‘A’ Street. Assessment need is: Urgent Principal need is: Public Safety Page 75 of 179 42 Citywide Traffic Signal Controller Improvements Phase 2 Project #00031 This project will upgrade the City traffic signal control system to establish a consistent and modern system, which in turn will simplify its management while supporting added safety and traffic operations functionality. Among other things, this update will increase the City's ability to prioritized users of the system at the traffic controller through emergency vehicle preemption and transit signal priority. These upgrades will help support the City in developing a safe and efficient transportation system for the movement of goods and people. Phase 2 will focus on areas where right-of-way is necessary to make the improvement. Assessment need is: Necessary Principal need is: Public Safety Page 76 of 179 43 Chapel Hill Blvd LID (Road 68 to Road 84) Project #00032 This project will extend Chapel Hill Blvd from Road 68 to Road 84. It will include the necessary signal improvements at the intersection of Road 68. The extension will provide a circulation route that will help congestion in the Road 68 corridor and, in addition, will promote economic development for the large vacant parcels between Road 68 and Road 84. The City is working on forming an LID with the applicable land owners to assist in the funding of the project. The City's will be heavily involved in the 5th lane planned between Road 68 and Road 76 and in the proposed roundabouts at the intersections of Road 76 and Road 84. Assessment need is: Desirable Principal need is: Quality Improvement Page 77 of 179 44 Lewis Street Overpass Project #13007 This project consists of building a new overpass between 2nd Avenue and Oregon Avenue on Lewis Street to replace the existing underpass, built in 1937, which is deteriorating. Right -of-way acquisition was completed in 2013 and all necessary demolition of existing structures on the west side of the proposed overpass was completed in 2014. Assessment need is: Necessary Principal need is: Council Goals Page 78 of 179 45 Argent Road Widening (20th Ave to Road 44) Project #12001 The project consists of widening the existing 3 lane roadway to 5 lanes as part of mobility improvement for this corridor, which will accommodate future traffic needs including Columbia Basin College traffic and commercial development for Port of Pasco. This project also includes intersection improvements for Road 36 and Argent Road, as well as modifica- tions/upgrades to existing traffic signals at Varney Lane/Saraceno Way and 20th Avenue intersections. As part of this project, an updated traffic corridor study will determine future traffic impacts, allowing staff to confirm or modify the proposed design. Assessment need is: Desirable Principal need is: Quality Improvement Page 79 of 179 46 Crescent Road Project #17012 This project improves the existing gravel surface of Crescent Road, right -of-way, and connecting Road 108 to Chapel Hill Boulevard. Two lanes asphalt only. Curb, gutter and sidewalks to be developer driven. Assessment need is: Desirable Principal need is: Public Safety Page 80 of 179 47 Road 68 Interchange Improvements Project #00033 This project will address weaving traffic and congestion in the Road 68/Burden Blvd/I-182 Interchange vicinity through intersection improvements and channelization. These improvements may include changing the intersection type at the westbound on/off ramp and/or Burden Blvd. Assessment need is: Necessary Principal need is: Council Goals Page 81 of 179 48 Sandifur Parkway Widening (Rd 52 to 60) Project #00034 This project will complete Sandifur Parkway from Road 52 to Road 60 where there is currently a half street. A new elementary school at Sandifur Parkway and Road 60 opened in September 2015 which increased pedestrian and student traffic along Sandifur. Finishing the roadway will improve safety and provide the same street width for the continuation of Sandifur Parkway. Assessment need is: Necessary Principal need is: Quality Improvement Page 82 of 179 49 Wrigley Drive Extension Project #15009 This project will extend Wrigley Drive from Clemente Lane to Convention Drive. This project will design and construct a “core” road, 28-ft in width without curb and gutter, for an approximate length of 500 feet. The project will also require the relocation of an existing center-pivot irrigation system, drilling of a new irrigation well to replace the existing center-pivot well, and acquisition of right-of-way. The intersections at both ends will be designed and constructed to potentially accommodate future roundabouts. Assessment need is: Desirable Principal need is: Public Safety Page 83 of 179 50 Sandifur Parkway Widening (Rd 68 to Convention Drive) Project #15010 This project will widen the existing roadway to the equivalent of a 5 -lane section from Road 68 to Convention Drive to accommodate future growth and traffic impacts. The improvements will include curb and gutter, sidewalks, illumination and landscaping. Assessment need is: Desirable Principal need is: Public Safety Page 84 of 179 51 Burns Road Extension (f/k/a Powerline Road) (Road 68 to Convention Drive) Project #00035 This project consists of designing and constructing a half street from Road 68 to Convention Drive. This section of road will provide continuation of Burns Road (f/k/a Powerline Road) allowing roadway from Broadmoor Boulevard to Road 52. *Developer Driven Assessment need is: Desirable Principal need is: Public Safety Page 85 of 179 52 This Page Intentionally Left Blank Page 86 of 179 53 Water Projects Page 87 of 179 54 Annual System Improvements - Development Project #00036 This is an annual program to address water system needs and enable the City to extend water lines when an opportunity presents itself with a private development or other City project. The program anticipates future annexations and need to extend waterlines. Implementation of this program improves service to the community. Assessment need is: Necessary Principal need is: Reduce Future Cost Page 88 of 179 55 Annual Upsize - Development Project #00037 This project consists of setting aside an annual allotment of funds to be used to pay for potential upsizing of water lines related to developer installed lines. Assessment need is: Necessary Principal need is: Reduce Future Cost Page 89 of 179 56 Columbia Water Supply Project Project #11001 This project will construct a raw water intake facility and pump station to divert water from the Columbia River to the West Pasco Water Treatment Plant (WPWTP) for treatment and distribution to the City rate payers by the end of 2018. The project will also replace an existing 24-inch raw water pipeline with a 30-inch pipeline and add an electrical duct bank between the intake facility and the WPWTP. Design and permitting for the project took 5 years and construction will take an additional 2 years. Partial construction funding is provided by a low interest Drinking Water State Revolving Fund (DWSRF) loan. Completion of this project will provide the City with a reliable source of water capable of supplying 18 million gallons per day to meet the demands of the City’s potable water needs. Assessment need is: Necessary Principal need is: Council Goals Page 90 of 179 57 Chapel Hill Boulevard (Road 68 to Road 84) - Water main Upsize Project #00038 This project is the City’s participation with the developer(s) to install 6400 LF of 16” Domestic Water along Chapel Hill Boulevard (Road 84 to Road 68). Developers are normally required to install 8” Diameter Irrigation, but it is the City’s desire to upsize this main to better serve existing and future customers. Assessment need is: Desirable Principal need is: Reduce Future Cost Page 91 of 179 58 Butterfield WTP PLC & Control Upgrades Project #00039 This project consists of replacing all the aging and out-of-date programmable logic controllers (PLC) in support of the supervisory control and data acquisition (SCADA) system with new equipment throughout the entire Butterfield Water Treatment Plant. The existing technology is from 1989 and was installed in the mid 1990’s. The PLC code no longer offers drivers for any computer operating system that is currently on the market. Upgrading the controls will allow us to take advantage of Ethernet communication and utilize readily available and supported drivers for the software packages staff regularly uses. Additionally, replace- ment hardware for the existing system is almost non-existent and our last major repair required bringing in a retired technician who knew how to troubleshoot and fix this old equipment. This project will upgrade the Butterfield Plant to the same level of control technology as the West Pasco Water Treatment Plant and out- lying facilities. Assessment need is: Urgent Principal need is: Service Protection Page 92 of 179 59 Waterline Extension—Schuman Lane (West from Road 96) Project #00040 This project would install approximately 1,100 linear feet (550 linear feet if ½ of road is done) of 8” ductile iron pipe down the length of Schuman Lane to carry potable water. Either 1 or 2 fire hydrants would be installed to provide fire protection (depending on how far the water line is taken down the length of the street). This street currently does not have water service provided down the length of it. Installing the waterline would allow for development of currently vacant lots, provide existing homes an option to connect to the City drinking water system and allow for the installation of needed fire hydrants in this area as well. There have been several requests made to Engineering to have a water main installed in this roadway for the above mentioned reasons. Getting water service from Court St to Schuman Ln depends on the neighbors be- ing agreeable to allowing the service lines to cross their property. The existing homes that have City water service have the water services and meters on Court St and the service lines to the homes run across the neighboring properties to the north. Not completing this project hinders the development of existing vacant lots along this street and stops the fire department from having an uninterrupted supply of water for fire- fighting purposes on this street. Assessment need is: Urgent Principal need is: Service Protection Page 93 of 179 60 West Pasco WTP Backwash Recovery Improvements & High Service Pump and Yard Piping Project #16008 In addition to the treatment capacity upgrades included in phase 1, the West Pasco WTP will require additional pumping capacity for the high service pump station and additional filter backwash capability. Increasing water output from 6 million to 12 million gallons per day (MGD). This work will coincide with the planned PALL micro-filter expansion project. The additional pump/piping for the high service system will include 460 feet of 24” piping required to connect into the Zone 1 transmission main. The proposed backwash system expansion will recover and neutralize the additional backwash waste generated from the increased filtration required by the additional 6 MPG of capacity. Although the West Pasco WTP Phase 1 expansions will increase potable water output from 6 million gallons per day to 12 million gallons per day, this project will be designed and constructed to process the backwash flows from the ultimate production capacity of 18 million gallons per day at one time, due to the need of obtaining EPA approval to discharge the waste stream to the Columbia River. Assessment need is: Necessary Principal need is: Service Protection Page 94 of 179 61 East Side Reservoir Storage Tank Project #00041 This project would construct a 5.75 million gallon Zone 2 reservoir east of Highway 397. It was identified in the Water Master Plan as being needed to provide additional reliability, improve available fire flows, improve level of service to customers and meet the future required storage volumes and capacity needs for this area. The new East Side Reservoir will also provide the option of pumping to Zone 3, thereby providing an alternate source of supply for the Road 68 reservoir in the event of an emergency or planned maintenance. If this water tank is not constructed and the City continues growing at the current pace, there will not be enough required water storage to meet the Maximum Day Demand and eventually fire flow demands and emergency reserves. Assessment need is: Necessary Principal need is: Service Protection Page 95 of 179 62 Butterfield WTP - Chlorine Safety Project #17004 This project consists of the installation of emergency air cleaning equipment at the Butterfield Water Treatment Plant. The system is designed to remove contaminants from the atmosphere in the event of an accidental chlorine release. This safety improvement will bring the facility into compliance with the provisions of the 2015 International Fire Code. The proposed improvements bring the facility into current fire code compliance. The existing ventilation and abatement system was installed in 1987 and is no longer adequate to meet current standards. Without these improvements, a sheared valve or punctured cylinder could not be repaired before the contents of the one-ton chlorine cylinder had been discharged, thereby endangering both employees and the public. This safety improvement provides greater protection to the public and first responders should such an event occur. This equipment is used to contain the toxic atmosphere thereby eliminating the active risk to the public and emergency services personnel. Assessment need is: Necessary Principal need is: Public Safety Page 96 of 179 63 Water Main Installation – Crescent-Chapel Hill/Sandifur Transmission Main Project #00042 This project would install approximately 10,000 linear feet of 24” transmission main leaving the West Pasco Water Treatment Plant and connecting to the 16” main at the west end of Chapel Hill Blvd and the 16” main at the west end of Sandifur Parkway. Further development of the design and confirmation of the exact route and needs of the project need to be verified to build a cost estimate and better description. This transmission main will be needed to efficiently deliver water from the West Pasco Water Treatment Plant to Pressure Zones 2 & 3 after the second West Pasco Water Treatment Plant expansion. Having another line leaving the plant would also allow for part of the plant to be shut down for maintenance while still delivering water to the distribution system. If this line is not installed, the velocity of the water in the existing main leaving the plant will approach or exceed the limits of safe delivery of water. If the transmission main were to break there would be a significant amount of damage cause before the plant could be shut down. This project can wait until the second WPWTP expansion. *Possible inclusion in Chapel Hill LID Assessment need is: Desirable Principal need is: Reduce Future Cost Page 97 of 179 64 Water Line Replacement—Richardson Road (Road 92 to Road 96) Project #00043 This project would replace approximately 1,400 linear feet of existing 4” and 6” thin wall irrigation class PVC water line and replace it with 8” ductile iron pipe in Richardson Road between Road 60 and Road 64. The project would include the installation of 3 fire hydrants to provide fire protection. Having the proper distribution of fire hydrants can help elevate our rating with the Washington Surveying and Rating Bureau and may help improve the fire insurance rates that property owners pay. Assessment need is: Necessary Principal need is: Public Safety Page 98 of 179 65 Water Line Replacement – Road 60 (Court St to W Pearl, 62nd Place, W Agate between Road 60 & 62nd Place) Project #00044 This project would replace approximately 3,000 linear feet of existing 6” thin wall PVC water line with approximately 1,400 linear feet of 16” ductile iron pipe along Road 60 and approximately 1,600 linear feet of 8” ductile iron pipe along W Pearl St, W Agate St and 62nd Pl. This project would not install any new fire hydrants. Not completing this project puts the City at higher risk of having a property damage claim from a future leak. When there is a water main break the ground tends to wash out and settle in the area of the leak which can put more strain on the pipe remaining in the ground and lead to more leaks. The undersized pipe also does not provide optimum water flow to the hydrants in this area. Assessment need is: Desirable Principal need is: Quality Improvement Page 99 of 179 66 Water Line Replacement—Road 76 (Wernett Road to Court Street) Project #00045 This project would replace approximately 1,700 linear feet of existing 4” and 6” thin wall irrigation class PVC water line and replace it with 12” ductile iron pipe. The project would also install 4 new fire hydrants. Road 76 is intended to be one of the larger water mains that supplies some of the residential areas that are now beginning to see substantial development. The project would also help loop the 12” main that extends down from Argent Road to the main in Court Street. Having the proper distribution of fire hydrants can help elevate our rating with the Washington Surveying and Rating Bureau and may help improve the fire insurance rates that property owners pay. Water mains made of thin wall PVC pipe cannot be worked on in the same manner as ductile iron pipe and thicker C900 class PVC pipe due to the fragile nature of the pipe. Not completing this project could hinder the ability of any new properties from being able to connect to the City Water, and stops the fire department from having an uninterrupted supply of water for firefighting purposes on this street. This line is currently a pinch point in the water distribution system due to the smaller size. Assessment need is: Desirable Principal need is: Quality Improvement Page 100 of 179 67 Water Main Connection—Alton Street (Wehe Avenue to the alley west of Owen Street) Project #00046 This project would install approximately 700 linear feet of 8” ductile iron water main along Alton St. from Wehe Ave. to the alley west of Owen Ave. One fire hydrant would be installed at the intersection of Wehe Ave and Alton St. The hydrant on Alton between Owen St and Beech St would be relocated to the new line. This connection would help loop the water system and eliminate dead ends in the area. Looping the system with a properly sized water main will provide opportunity to relocate a fire hydrant installed on an undersized main and install an additional fire hydrant. Having the proper distribution of fire hydrants can help elevate our rating with the Washington Surveying and Rating Bureau and may help improve the fire insurance rates that property owners pay. Making this connection will also provide better flows in the distribution system and improve water quality for the customers in this area. If this water main is not extended, there will continue to be a deficiency in fire hydrants and uninterrupted water for firefighting purposes in this area as well as continued need for additional flushing of the dead ends. Assessment need is: Desirable Principal need is: Quality Improvement Page 101 of 179 68 Water Main Connection—Irving Street (Extend East to Road 49) Project #00047 This project would install approximately 325 linear feet of 8” ductile iron water main along Irving St. connecting the water main coming from Road 52 to the main on Road 49. This connection would help loop the water system in this area. It was identified as an area of improvement in the Water Master Plan. This area has many undersized mains and dead ends which cause water quality issues that require more frequent flushing than other areas. It would also help improve the fire flow availability to the hydrants in the area. If this water main is not extended, there will continue to be a deficiency in fire hydrant flow and as well as continued need for flushing maintenance at the dead end. Assessment need is: Desirable Principal need is: Quality Improvement Page 102 of 179 69 Water Main Connection—Riverhaven Street (Road 36 to Road 40) Project #00048 This project would install approximately 1,400 linear feet of 8” ductile iron water main along Riverhaven St. from Road 36 to Road 40. The dead end water mains at the southern end of these streets would be connected to the new water main. This connection would help loop the water system which would improve flow characteristics of the system and eliminate dead ends in the area. Looping the system with a properly sized water main will provide better flow for the fire hydrants in the vicinity. Having the proper distribution of fire hydrants can help elevate our rating with the Washington Surveying and Rating Bureau and may help improve the fire insurance rates that property owners pay. Making this connection will also provide better flows in the distribution system and improve water quality for the customers in this area. This will also reduce the amount of flushing maintenance required to keep the water quality high. If this water main is not extended, there will continue to be a deficiency in fire flow to the fire hydrants and the continued need for additional flushing of the dead ends. Assessment need is: Desirable Principal need is: Quality Improvement Page 103 of 179 70 Water Main Connection—Road 103 (between Maple Dr to Willow Way) Project #00049 This project would install approximately 825 linear feet of 8” ductile iron water main along Road 103 connecting the water mains on Maple Drive and Willow Way. This connection would help loop the wa- ter system, and improve fire flow availability. Making this connection will also provide better flows in the distribution system and improve water quality for the customers in this area. If this water main is not extended, there will continue to be a deficiency in flow characteristics of the water system. Assessment need is: Desirable Principal need is: Quality Improvement Page 104 of 179 71 Automated Meter Reading Project #00050 This project would replace approximately 19,000 mechanical water meters and/or meter registers with new electronic encoder type meters and registers to allow for automated meter reading which is faster, more accurate and provides more information regarding leaks and high consumption. Assessment need is: Desirable Principal need is: Quality Improvement Page 105 of 179 72 This Page Intentionally Left Blank Page 106 of 179 73 Irrigation Projects Page 107 of 179 74 Annual System Improvements - Development Project #00051 This is an annual program to address irrigation system needs and enable the City to extend/improve irrigation lines when an opportunity presents itself with a private development or other City project. The program anticipates future annexations and need to extend irrigation services. Implementation of this program improves irrigation service to the community. Assessment need is: Necessary Principal need is: Reduce Future Cost Page 108 of 179 75 Annual Upsize - Development Project #00052 This project consists of setting aside an annual allotment of funds to be used to pay for potential upsizing of irrigation lines related to development installed lines. Implementation of this program improves irrigation service to the community. The program will enable the City to upsize irrigation lines when an opportunity presents itself with a private development or other City project and decrease potable water usage. Assessment need is: Necessary Principal need is: Reduce Future Cost Page 109 of 179 76 Chapel Hill Boulevard (Road 84 to Road 68) - Irrigation Main Upsize Project #00053 This project is the City’s participation with the developer(s) to install 6,750 LF of 12” irrigation from Mes- sara Lane and Road 84 intersection east to Chapel Hill Boulevard and Road 68 Intersection. Developers are normally required to install 8” diameter irrigation but it is the City’s desire to upsize this main to better serve both existing and future customers. Assessment need is: Necessary Principal need is: Reduce Future Cost Page 110 of 179 77 Chapel Hill Boulevard to Interstate 182 – Irrigation Main Project #00054 This project includes the design and construction of a 1,600 LF or 12” irrigation from Chapel Hill Boulevard Main Upsize project and extends northerly to a point just south of Interstate 182 for connection to the existing system. This project will connect both the south and north zones to better serve existing and future customers. Assessment need is: Necessary Principal need is: Service Protection Page 111 of 179 78 Irrigation Main Connection - Sahara Drive to Road 44 Project #00055 This project consists of connecting the existing two 4” irrigation mains approx. 360’ (720 ft total) on Sahara Drive west to the existing 12” main on Road 44. It would provide a redundant connection to the rest of the system if the connection at Burden Blvd. is out of service for any reason. This looping of the system would help provide consistent pressure in the area and reduce the amount of dead end flushing maintenance that is required. Although identified in the Master Plan, this project would be more beneficial if further irrigation system development happens in the area. Assessment need is: Desirable Principal need is: Quality Improvement Page 112 of 179 79 Irrigation Main Installation – Sirocco Drive – Between Sahara Drive And Saguaro Drive Project #00056 This project consists of installing approx. 1,200 linear feet of new 6” irrigation distribution piping near the discharge of the Sirocco Well. The new pipes would be installed in the public right -of-way. The existing pipes would be abandoned to eliminate pipe crossings in the rear of private lots. This project is intended to improve system pressures and move the irrigation main from back yards to the front yards of the residences. This project was identified in the 2013 Irrigation Master Plan. The modeling completed during the master plan suggested this improvement was needed. Assessment need is: Desirable Principal need is: Quality Improvement Page 113 of 179 80 This Page Intentionally Left Blank Page 114 of 179 81 Sewer Projects Page 115 of 179 82 Annual System Improvements - Development Project #00057 This is an annual program to address sewer system needs and enable the City to extend/improve sewer lines when an opportunity presents itself with a private development or other City project. The program anticipates future annexations and need to extend sewers. Implementation of this program improves sanitary service to the community and addresses public health issues. Assessment need is: Necessary Principal need is: Reduce Future Cost Page 116 of 179 83 Annual Upsize - Development Project #00058 This project consists of setting aside an annual allotment of funds to be used to pay for potential upsizing of sewer lines related to development installed lines. Implementation of this program improves sanitary system service to the community. The program will enable the City to upsize sewer lines when an opportunity presents itself with a private development or other City project. Assessment need is: Necessary Principal need is: Reduce Future Cost Page 117 of 179 84 9th & WA Lift Station Project #16007 Currently this lift station has inoperable suction valves, which make it unsafe for staff to perform mainte- nance or un-plug check valves. They are forced to do this maintenance when raw wastewater continues to flow instead of properly isolating. Access hatches pose safety issues due to old design or worn out hatches. Safety and the fact that this is the City’s largest lift station make this lift station priority 1. Pumps and associated piping replacement (to be determined in the assessment portion) will be needed to keep up with increased flows. Assessment need is: Urgent Principal need is: Council Goals Page 118 of 179 85 Pearl Street Lift Station Project #15002 Originally built in the 1950’s, this station has very poor reliability and functionality. It has a track record of failing and backing up into a residence. The access to the control center for this lift station is in the middle of a sidewalk on a busy street posing significant safety issues. This lift station is 2nd in priority on this list. Assessment need is: Necessary Principal need is: Service Protection Page 119 of 179 86 Road 36 Lift Station Upgrades Project #16006 Besides normal flows, this pump station has two additional lift stations pumping into it. The detention time and pump run cycles indicates the current configuration is at capacity. Downstream surging is occur- ring indicating pipe sizing issues. This pump station has overflowed onto the airport land making it 3rd on this list for priority. Assessment need is: Necessary Principal need is: Service Protection Page 120 of 179 87 NW Area Sewer Transmission Main Project #14001 This project includes the design and construction of approximately 5,290 LF of new sewer transmission main from the existing sewer transmission main located on the north side of Interstate 182 on West Court Street northeasterly to a point within Harris Road. Local development is anticipated to extend this sewer transmission main north to Burns Road as this will provide for future development of the Northwest area of the City. Assessment need is: Urgent Principal need is: Council Goals Page 121 of 179 88 Wastewater Treatment Plant PLCs and Controls Upgrade Project #00059 This project will replace the existing Programmable Logic Control (PLC) and all WWTP remote I/O racks located on the premises, which is a total of 8 racks. The current technology is from 1989 and was installed in the mid 1990’s. The software that operations uses for animations to view their processes references the PLC code. The PLC code no longer has drivers for any computer operating system that is currently on the market. We now have to rely on 3rd party drivers to allow the software to communicate with the controls by forcing information back and forth between the devices. Upgrading the controls will allow us to take advantage of Ethernet communication and have drivers readily available and supported for the software packages we use. It will also allow us to be less dependent on 3rd party drivers, which is a common point of failure. This hardware and technology has outlasted its useful lifespan. New parts are cost prohibitive due to the hardware upgrades required to support and integrate new parts therefore we have been using used parts to band aid repairs. Assessment need is: Urgent Principal need is: Service Protection Page 122 of 179 89 West Pasco Trunk Sewer Relining (Transmission Main Rehabilitation – Rd 60 to Rd 100) Project #14002 This project consists of repairing and relining portions of the 30” trunk line and manholes from Road 100 to approximately Ivy Glades to repair damage from corrosion due to age and sulfide gas. The most damage is on the downstream side of the manholes where rebar is currently showing. These will need to be repaired to prevent future failure. The manhole repairs should be completed to avoid failure due to exposed rebar from corrosion. This is a high sulfide gas area that is causing corrosion to the system. The project can be completed in phases as funds allow to avoid future problems. Assessment need is: Necessary Principal need is: Asset Protection Page 123 of 179 90 WWTP Facility Plan Capital Improvement Projects Project #00060 WWTP Facility planning in progress will determine the CIP projects that will help us continue com- pliance of WWTP NPDES Permit (National Pollution Discharge Elimination Permit) and meet future capacity needs. Facility Plan will identify the required projects, that the is expected to total $25,000,000. The Facility Planning will align with our future NPDES permit to fulfill future capaci- ties. This planning will alter, eliminate or confirm previous planning efforts. Assessment need is: Necessary Principal need is: Regulatory Mandate Page 124 of 179 91 Road 44 Corrosion & Odor Control Project #00061 This project is to address the hydrogen sulfide gas buildup and corrosion along the upper portion of Road 44. Initial steps are to complete further evaluation on Road 44 to monitor hydrogen sulfide gas and collec- tion system pressures at multiple locations to determine the effectiveness of the bioxide system that the City has installed. Recommended Phase 2 of improvements is to improve the confluence at the north end of Road 44 to reduce the turbulence at this location by realigning 90 feet of sewer, replacing two manholes and abandoning one of the existing pipe segments. This phase assumes an easement does not need to be obtained. Assessment need is: Necessary Principal need is: Asset Protection Page 125 of 179 92 This Page Intentionally Left Blank Page 126 of 179 93 Stormwater Projects Page 127 of 179 94 Capital Stormwater Participation Program Project #00062 This project provides opportunity for participation in various street and development projects to include the implementation of Stormwater elements. Such as: • 13007 - Lewis Street Overpass • 12002 - Oregon Avenue Ph 1 • 16014 - Peanuts Park Assessment need is: Desirable Principal need is: Quality Improvement Page 128 of 179 95 N Sycamore Ave Infiltration Improvements Project #00063 The existing drywell manages a contributing area of 0.478 acres and has received high sediment loads during the past storm events resulting in frequent and costly sediment removal. The sediment load during prior years may have been generated when properties within the drainage basin were under construction. If the source of the sediment is determined to be chronic and not related to ongoing development in the neighborhood over the last ten years, and infiltration potential cannot be restored, replace the existing drywell system with three 72-inch drywells with catch basin pretreatment and 10 LF of solid 10 -inch pipe on N. Sycamore Avenue be- tween E. Adelia and E. Alvina Streets. The three drywells are sized to mitigate the 25 -year storm event for a total of 0.478 acres or 0.16 cfs. Any overflow would surface flow to downstream inlets. Assessment need is: Urgent Principal need is: Public Safety Page 129 of 179 96 N Industrial Ave Infiltration Retrofit Project #00064 The existing City owned infiltration pipe and facility manages an estimated contributing area of 37 acres. It currently does not have enough capacity during every rain event, resulting in flooding that covers up to half of the N. Industrial Way and downstream driveway. This projects consists of installing two 2 -stage drywells, comprised of 72-inch modified drywells with modified Type 1 catch basins for pretreatment, along N. Industrial Way to reduce flows to the existing infiltration facility. Drywell overflows will surface flow to the existing infiltration facility. Additional analysis is recommended to identify any existing onsite stormwater management within the tributary area (i.e. infiltration facilities at upstream properties) and update the infiltration facility tributary area to reflect the findings. Assessment need is: Necessary Principal need is: Quality Improvement Page 130 of 179 97 1st Avenue Pipe Rehab Project #00065 Clean 1,878 LF of pipe between W. Sylvester and W. Columbia Streets. Reline 348 LF of 30 -inch concrete pipe between W. Lewis and W. Columbia Streets with cast-in-place pipe (CIPP). Repair joint offsets with couplings between W. Sylvester and W. Bonneville Streets with (3) localized trenches and shoring. Repair the three slightly offset joints located 179.8 to 195.4 LF north of W. Bonneville Street in one trench. Cut and replace existing pipe with 18 LF of 15 -inch PVC pipe and couplings on each end. *Updated cost for 2019 CIP. Combine with Volunteer Park Pipe Relining Assessment need is: Necessary Principal need is: Asset Protection Page 131 of 179 98 Volunteer Park Pipe Relining Project #00066 Reline 842 linear feet of 18-inch pipe tributary. *Combine with 1st Ave Pipe Rehab Assessment need is: Necessary Principal need is: Asset Protection Page 132 of 179 99 Sylvester North Pipe Relining Project #00067 Reline 1,900 linear feet of 15-inch pipe, 513 linear feet of 18-inch pipe, and 318 LF of 21-inch pipe. *Combine with Sylvester South Pipe Relining Assessment need is: Necessary Principal need is: Asset Protection Page 133 of 179 100 Sylvester South Pipe Relining Project #00068 Replace at least 20 linear foot segment of the 10-inch pipe segment on N. 10th Avenue at the intersection with Sylvester Street. Reline 361 linear feet of 10-inch pipe, 738 linear feet of 12-inch pipe, 809 linear feet of 15-inch pipe, and 497 linear feet of 21-inch pipe. *Combine with Sylvester North Pipe Relining Assessment need is: Necessary Principal need is: Asset Protection Page 134 of 179 101 Process Water Resource Facility Projects Page 135 of 179 102 PWRF Drying Beds Project #00069 This project would construct a drying bed area to dewater the material that is removed from the sand traps, clarifier and ponds at the PWRF. Ground will need to be leveled out and a short access road built between the area inside the fence and the location of the drying beds. The proposed drying beds would be approxi- mately 300’ X 100’ and would be constructed in the vacant 40 acres to the west of the current facility. The drying beds would be constructed of 4” thick asphalt with concrete “gutters” to collect runoff water and be surrounded by an ecology block border. The beds would slope slightly to the south where runoff water would be collected in 2 catch basins connected to drain pipe. The currently discussed method of getting rid of the water that collects in the catch basins and drain pipe is to use a vactor truck to remove the water that drains to the catch basins and dump that water back into the system. If the drying beds work as designed and become a permanent part of the process, the drain pipe would eventually be extended to bring the run- off water back into the process via a pump instead of vactor truck. Assessment need is: Urgent Principal need is: Quality Improvement Page 136 of 179 103 Kahlotus Hwy Sewer Force Main (Dietrich Lift Station) Project #17003 This project is for the design and construction of a lift station that will serve multiple food processors in the Commercial Ave-Kahlotus Highway area, a force main to the City's Process Water Resource Facility (PWRF), and upgrades at the PWRF to increase the capacity to treat more process water. Included in the project is a lift station with a 12-foot diameter wet well complete with a triplex pumping system and associated electrical and mechanical equipment. Three food processors have expressed interest in this lift station. Also included is the force main from the lift station to the PWRF and the purchase and installation of equipment to treat the process water at the PWRF. This can potentially divert 1.5 MGD from the municipal WWTP. The City is set to receive $2,525,000 from WA State EDA and $2,620,000 from Federal EDA grants. The City has already obligated approx. $65,000 for the Alternative Analysis Project, along with $65,000 in City funds. Not completing this project will hinder the ability to expand the operation, take on flows from the Grimmway Farms facility and take on new processors. It will also limit the ability increase the current operations capacity and solve some current operational issues. Assessment need is: Necessary Principal need is: Council Goals Page 137 of 179 104 Industrial Pump Station (IPS) Improvements Project #00070 The Process Water Resource Facility pump station is in need of repairs or replacement. The piping at the fa- cility is beginning to deteriorate to the point of failure and if the pump station were to have a major failure, there would be no way to pump the process water out of the facility and to the crop spray fields. Processor shutdowns would be needed until repairs could be made. This will provide funding for the PS&E and should be considered in conjunction with the upcoming facility plan. Depending on the design of the IPS that comes out of the Facility Plan, there could also be needed work on the 115 MG pond to relocate the point of withdrawal out of the pond and re-grading of the bottom of that pond. That effort will determine capital costs. Assessment need is: Necessary Principal need is: Council Goals Page 138 of 179 105 Equipment Page 139 of 179 106 Ambulance Stretcher Replacement Project #00071 The cost for replacement of the ambulance stretcher package includes the stretcher and powerlift system. These units are integral. Replacement cycles are 6 years. The department is recommending an annual assessment to the ambulance utility of $50,000 to the equipment replacement fund. Assessment need is: Other Principal need is: Public Safety Page 140 of 179 107 Automated Fire and Ambulance Dispatching Project #00072 As part of the move to a single dispatching system, the Fire Department is recommending the implementation of an automated dispatching system. This system will reduce the impact of the additional call volume on the dispatchers, decrease the time to dispatch calls and improve the voice quality, clarity and pronunciation of all the additional streets being added to the system. This will result in a decrease in the overall response time. This project is dependent upon a merger with SECOMM. Assessment need is: Urgent Principal need is: Quality Improvement Page 141 of 179 108 Fire Station Alerting Project #00073 The current fire stations were not constructed with an integrated firefighter alerting system that provides for a rapid response to alarms. Updating the fire station alerting will decrease turnout times which should contribute to an overall reduction in response times. This upgrade is dependent upon a merger with SECOMM. Completion of this project will help achieve Council Goal of a class 4 WSRB rating. Assessment need is: Necessary Principal need is: Quality Improvement Page 142 of 179 109 Self Contained Breathing Apparatus Replacement Project #00074 The Fire Department maintains compliance with NFPA 1981, WAC 296 -305-04001 and WAC 296-842. To maintain compliance the Fire Department has initiated a program in which SCBA are replaced after two NFPA 1981 evaluation cycles, when technological improvements warrant the change or 15 years. NFPA evaluation cycles are usually 4 years. The department will own approximately 50 SCBA with the purchase of the two additional apparatus. The department is recommending that $40,000 be placed in the equipment replacement fund annually and additional $10,000 will be placed in the ambulance utility equipment re- placement fund. Assessment need is: Necessary Principal need is: Public Safety Page 143 of 179 AGENDA REPORT FOR: City Council August 25, 2017 TO: Dave Zabell, City Manager Workshop Meeting: 8/28/17 FROM: Bob Metzger, Police Chief Police Department SUBJECT: ATV's on City Streets I. REFERENCE(S): RCW 46.09.360 Allows Cities to authorize ATV use on city streets II. ACTION REQUESTED OF COUNCIL / STAFF RECOMMENDATIONS: Discussion III. FISCAL IMPACT: IV. HISTORY AND FACTS BRIEF: Several months ago, Council was emailed by a citizen requesting information on whether the city would consider allowing ATVs to be used on city streets and roads. Staff has taken time since the request to research the question and provide information to Council. In brief, state law provides the following: 46.09.360 Regulation by local political subdivisions or state agencies. (1) Notwithstanding any of the provisions of this chapter, any city, town, county, or other political subdivision of this state, or any state agency, may regulate the operation of nonhighway vehicles on public lands, waters, and other properties under its jurisdiction, and on streets, roads, or highways within its boundaries by adopting regulations or ordinances of its governing body, provided such regulations are not less stringent than the provisions of this chapter. 46.09.455 Authorized and prohibited uses for wheeled all-terrain vehicles. (d)(i) A person may not operate a wheeled all-terrain vehicle on a public roadway Page 144 of 179 within the boundaries of a city or town, not including nonhighway roads and trails, unless the city or town by ordinance has approved the operation of wheeled all-terrain vehicles on city or town roadways, not including nonhighway roads and trails. (ii) Any public roadways, not including nonhighway roads and trails, authorized by a legislative body of a city or town under (d)(i) of this subsection must be listed publicly and made accessible from the main page of the city or town web site. Cities are allowed under Washington Law to allow ATV’s on city streets with a speed limit under 35 MPH. They are required to follow the regulations listed here. The city has been approached by some residents that would like the city to consider allowing this. From the staff review it appears that communities that allow ATV’s on city streets seem to be in areas where ATV trails are in abundance (surrounding, typically a small town) and are possibly a visitor/tourist/recreation draw. Groups in these communities seek authorization for the ATVs on public roads/streets to facilitate continued recreation by creating convenience and interconnectivity. Staff was unable to find any city the size of Pasco in Washington that allows ATV’s on public roads. Staff was unable to find a national standard for ATV use on public roadways. In the interest of providing both sides to Council, the following statements embody advocacy of the topic: “Rural Tippecanoe County, Ind., is considering opening more country roads to ATVs. Jay Jackson, executive director of American Bikers Aimed Toward Education (ABATE) Indiana, a motorcyclists’ rights group that also represents off-road riders, has spoken in favor of the measure. He said accidents often involve alcohol use or reckless riding, and that risks can be managed through education and regulations such as requiring driver’s licenses, as Indiana law does. “We’re not suggesting you see these in downtown Chicago driving around and mixing with taxis,” he said.” “ATV enthusiasts acknowledge the vehicles can be dangerous if not driven properly, but they say the risks are overstated. Thirty-five states allow local jurisdictions to authorize ATVs on some roads or road shoulders, according to a study by the Consumer Federation of American. While no one tracks how many local governments have offered ATVs access to local roads, the number is rising, as are ATV sales." “In Iowa, at least 17 counties allow all-terrain vehicles on public roads, and a state official said that number could climb to 30 counties by next fall. It’s a similar trend in Minnesota, where at least a dozen counties permit some ATVs on r oads, and in Indiana, where about half of counties do so." “West Virginia and Montana allow ATV use on most roads other than highways. Utah lawmakers voted in 2015 to allow street-legal ATVs on the shoulders of all roads except interstate freeways.” Page 145 of 179 “Riders say manufacturers’ warnings are more about limiting liability than averting serious danger. They regard opening up public roads as a common-sense move that carries little risk and can spur desperately needed economic growth in rural areas by attracting riders and increasing vehicle sales." “Michael Rygh, who co-owns an ATV shop in Algona, Iowa, said a recent decision to open up Kossuth County roads to the vehicles has already boosted sales. He’s confident accidents will be rare.” “In Iowa’s Louisa County, Tim Gerst said he had little trouble rounding up 400 signatures on a petition asking supervisors to permit ATVs on county roads. He acknowledges that people get hurt on the vehicles but insists “there’s nothing you can do in life that doesn’t carry risk.” Perhaps the opposition for allowing ATVs on public roadways and streets is best summarized in the attached statement from the Specialty Vehicle Institute of America, which cites a number of statistics and studies which inform its position. V. DISCUSSION: Staff would like Council to discuss and give direction. Page 146 of 179 7/26/2017 Quick Facts For a Safer Ride | CPSC.gov https://www.cpsc.gov/Safety-Education/Safety-Education-Centers/ATV-Safety-Information-Center/Quick-Facts-for-a-Safer-Ride/1/1 Quick Facts For a Safer Ride United States CONSUMER PRODUCT SAFETY COMMISSION MAY 22, 2014 There are more than 700 deaths and 100,000 injuries each year involving ATVs, according to CPSC’s most recent data. By following the key safety tips below, hundreds of deaths and thousands of injuries related to ATVs could be prevented. Stay Off of Paved Roads ATVs are designed to be driven on off-road terrain and are difficult to control on paved roads where they are at risk of overturning or colliding with cars and trucks. In some states, it is illegal to ride ATVs on paved roads. Check the state or local laws and regulations where you plan to ride. CPSC is deeply concerned that some states and local governments are changing their laws and ordinances to allow ATVs to be used on paved roads. CPSC, the ATV industry, and consumer advocates are united in our belief that riding an ATV on a paved road can result in tragedy. Never Allow Children Younger Than 16 on Adult ATVs More than 90 percent of ATV-related injuries involving children can be attributed to a lack of developmental skills needed to maneuver the faster, more powerful adult ATVs. Children younger than 16 should be on one of the age-appropriate youth models, which are required to travel at lower speeds than adult ATVs and to have an adjustable speed limiter. All ATVs should be equipped with a label that indicates the manufacturer’s recommended age for that particular model. Children younger than 6 years of age should never be on any ATV -- either as a driver or passenger. Don’t Allow More People on the Vehicle Than It Was Designed to Carry A single-rider ATV should only have one person on it -- the driver. ATVs are designed for interactive riding. The driver must be able to shift his or her weight freely in all directions. Passengers can inhibit the driver’s ability to safely control the ATV and it could roll over or crash. Most ATVs sold today are single-rider ATVs, which are not equipped with handholds or footrests for passengers. Always Wear a Helmet and Other Protective Gear CPSC and the ATV Safety Institute recommend U.S. Department of Transportation (DOT) and/or the Snell Memorial Foundation (Snell) certified helmets. Riders should also wear goggles, gloves, long pants and a long-sleeved shirt, and over-the-ankle boots. Get Hands-On Training CPSC recommends that all ATV drivers -- adults and children -- take a hands-on ATV safety course from a qualified instructor. Many deaths and injuries occur when an inexperienced driver loses control of an ATV, is thrown from an ATV, overturns the vehicle, or collides with a fixed object or a motor vehicle. Hands-on training can give experienced and first-time riders the skills to handle multiple riding situations that can happen in off-road conditions. Courses are offered by the ATV Safety Institute. Riders can also check with the National 4-H Council, local ATV rider groups, state agencies and some ATV manufacturers. ATV Safety Information Center ATVs are not toys! They are powerful and potentially dangerous vehicles. Learn the hazards and how to be safe. View the ATV Safety Information Center Additional Resources for ATV Safety Information National 4-H Council's ATV Safety Program Specialty Vehicle Institute of America / ATV Safety Institute Page 147 of 179 1235 South Clark Street, Suite 600, Arlington, Virginia 22202 • PH: (703) 416-0444 • FAX: (703) 416-2269 POSITION IN OPPOSITION TO ON-ROAD OPERATION OF ATVs The Specialty Vehicle Institute of America (SVIA) is the national not-for-profit trade association representing manufacturers and distributors of all-terrain vehicles (ATVs) in the United States. SVIA's major goal is to promote the safe and responsible use of ATVs. Tens of millions of ATV users ride their ATVs in a safe and appropriate manner every day. In addition to their popularity for responsible outdoor recreation, they are tremendously useful products and have become an essential tool for farmers, law enforcement officials, the military and others. The majority of accidents and injuries are caused by misuse of the ATV. Ninety-two percent of ATV- related fatalities involve behaviors that the Industry warns against in its rider education programs, in all literature and on vehicle labels. These behaviors include children riding adult-sized ATVs, operating on paved roads, operating without a helmet or other protective safety gear, carrying passengers on single- rider ATVs and operating under the influence of alcohol. ATVs are designed, manufactured and sold for off-road use only. On-road vehicles must be manufactured and certified to comply with U.S. Department of Transportation Federal Motor Vehicle Safety Standards (FMVSS). These safety standards consist of extensive and detailed compliance requirements. Since ATVs are not intended to be used on-road, they are not designed, equipped or tested to meet such standards. Permitting on-road use of ATVs, including modified ATVs, would be in conflict with manufacturers’ intentions for their proper use, and would be contrary to federal safety requirements. The Insurance Institute for Highway Safety has analyzed U.S. Department of Transportation’s Fatality Analysis Reporting System (FARS) data on ATV rider fatalities occurring on public roads. In 2013, the most recent year for which the data is available, 319 ATV riders were killed on public roads. This is an increase from 2012 when 304 riders were killed on public roads and from 2011 when there were 305 ATV rider fatalities occurring on public roads. Eighty-nine percent of the fatalities occurring on public roads were on rural roads. Of those, sixty-eight percent were on minor roads. ATV fatalities occurring on public roads comprise a significant portion of total ATV-related fatalities, as reported by the Consumer Product Safety Commission. If ATVs could be kept off of public roads, as urged by SVIA and as contained in our Model State ATV Legislation, a large percentage of ATV-related injuries and deaths would be prevented. CPSC’s 2014 Annual Report of ATV Deaths and Injuries, the most recent available, found that estimated ATV-related fatalities have declined each year from 2007 through 2014 but noted that data collection for 2012-2014 is ongoing. As a percentage of total ATV-related fatalities, on-road fatalities were an alarming 48.7 percent of the total in 2011 (the latest year of complete data available from CPSC). This is even though ATVs are not manufactured for or intended to be operated on highways and vehicle labels and owner’s manuals clearly warn against such use. Imagine the progress that could be made in reducing ATV-related injuries and deaths if states were to enact and enforce laws to prohibit ATV use on highways. Riding on public roads introduces the possibility of the ATV colliding with a car or truck, an obviously dangerous situation. Another CPSC study of 3,200 ATV-related deaths that occurred between 1985 and Page 148 of 179 1996 found that the most frequently reported hazard pattern (56 percent of all ATV incidents) involved collisions and 35 percent of these involved collisions with motorized vehicles. SVIA emphasizes that ATVs are not designed, manufactured, or in any way intended for use on public streets, roads or highways and urges that on-highway use of ATVs be prohibited and that law enforcement efforts be strengthened to eliminate this dangerous practice. It should be noted that for purposes of prohibiting ATV use on public roads, SVIA does not consider such public thoroughfares as logging roads, woodland trails or other unimproved ways to be public streets, roads, or highways and the prohibition on allowing on-road use of ATVs should not be meant to apply to a road that is part of a designated trail system permitting ATV operation. Page 149 of 179 Specialty Vehicle Institute of America Special Report Summer 2007 Page 150 of 179 Table of Contents About the Specialty Vehicle Institute of America. . . . . . . . . . . . . . . . .1 What is an All-Terrain Vehicle?. . . . . . . . . . . . . . . . . . . . . . . . . . . . .2 All-Terrain Vehicle Sizes. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3 Youth ATV Models.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 All-Terrain Vehicle Market Information. . . . .. . . . . . . . . . . . . . . . . . .5 Lifetime Learning Program Reaches Out to Children and Parents . . . . .6 ATV Industry’s Call-to-Action for Improving ATV Safety . . . . . . . . . . . .7 Specialty Vehicle Institute of America’s Model State ATV Legislation. . .8-9 Conclusions. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .10 Warned Against Behaviors. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11 Specialty Vehicle Institute of America . . . . . . . . . . . . . . . . . . . . . . . .11 Endnotes. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .12 Page 151 of 179 1 About the Specialty Vehicle Institute of America The Specialty Vehicle Institute of America, based in Irvine, California, is a not-for-profit trade association sponsored by Arctic Cat, BRP, Bush Hog, Honda, John Deere, Kawasaki, KYMCO, Polaris, Suzuki, Tomberlin and Yamaha. The organization was formed in 1983, to promote the safe and responsible use of All-Terrain Vehicles (ATVs) through rider training programs, public awareness campaigns, and state legislation, and serves as a resource for ATV research, statistics, and vehicle standards. Page 152 of 179 2 What is an All-Terrain Vehicle? In 1985, the Specialty Vehicle Institute of America began development of a standard, which established the requirements for equipment, configuration, and performance of four-wheel all-terrain vehicles in the United States. In 1990, the American National Standards Institute approved the first standard for all-terrain vehicles. In 2001, the standard was revised to modify certain definitional language and add several provisions to enhance and clarify the standard. SVIA is currently engaged in maintaining the 2001 standard as required by ANSI to ensure it reflects the ATV marketplace. An all-terrain vehicle is defined as a motorized off-highway vehicle designed to travel on four low pressure tires, having a seat designed to be straddled by the operator and handlebars for steering control. ATVs are subdivided into two types as designated by the manufacturer. Type I ATVs are intended for use by a single operator and no passenger. Type II ATVs are intended for use by an operator or an operator and a passenger, and are equipped with a designated seating position behind the operator designed to be straddled by no more than one passenger. Page 153 of 179 3 All-Terrain Vehicle Sizes ATVs are not one size fits all. The ATV industry has recommendations for the age of the rider and the size of ATV. It is recommended that youth 6 and older ride an ATV with an engine size less than 70 cubic centimeters. Youth 12 and older should only ride an ATV with an engine size of 90 cubic centimeters or less. Only youth aged 16 years or older should be allowed to ride an ATV with an engine size greater than 90 cubic centimeters. Age 6 and older (Y6) Age 12 and older (Y12) Age 16 and older (Adult) Nearly 90 percent of all youth ATV-related injury incidents involve a youth riding an adult-sized ATV, meaning an ATV with an engine size greater than 90 cubic centimeters. Even though a child is of the recommended age to ride a particular size ATV, not all children have the strength, skill or judgment needed to operate an ATV. Parents should supervise a child’s operation of the ATV at all times and should allow continued use only if they determine that their child has the ability and judgment to operate an ATV safely. There is no sure way to predict whether a child will be able to ride an ATV safely. However, to aid in the decision-making process, parents and guardians should carefully consider their child’s: • Physical development • Social and emotional development • Reasoning and decision-making ability • Visual perception and motor development Page 154 of 179 4 Youth ATV Models Youth model ATVs are manufactured with the following features: • Speed Limiting Device • Requires tool to adjust • Limits speed to a maximum of 10 mph (Y6) and 15 mph (Y12) • Set to limited speed when delivered from manufacturer • Maximum Unrestricted Speed • 15 mph for Y6 category • 30 mph for Y12 category • Lighting • No headlamp or taillamp • Remote Engine Cut-Off Switch (Selected Models) Page 155 of 179 5 ATV Market Information Annual sales of ATVs have increased over 200 percent since 1995 to an estimated 856,000 units in 2006. There are over 7 million ATVs in use in the United States, being operated by more than 16 million Americans. The median age of an ATV owner is 37 years old, and nearly a third of owners are between the ages of 24-38. ATV owners have a median annual household income of $52,800. Over a quarter of ATV owners classified themselves as blue-collar laborers, and more than half gave their level of education as high school or less. Other facts about ATV owners: • 58 percent are married • 86 percent are male • 23 percent have professional/managerial occupations • 75 percent ride as a family recreational activity 0 1000000 2000000 3000000 4000000 5000000 6000000 7000000 8000000 1989 1997 2001/02 2003 2004 2005 U.S. ATV Population Trend Page 156 of 179 6 Lifetime Learning Program Reaches Out to Children and Parents Working with Lifetime Learning Systems, a division of Weekly Reader, SVIA’s member companies sponsored a public education program initiative to reduce ATV accidents and injuries among children and adolescents. The goal of the program is to educate young ATV operators, their families and community leaders about the safe and responsible use of ATVs and the impact that ATV use has on the environment. Teachers, parents and students, as well as community agencies and organizations such as police and fire departments, 4-H clubs and ATV rider groups have used the program. Lifetime Learning has developed and distributed “Protect Yourself. Protect the Planet.” kits to 20,000 middle schools and high schools in rural areas nationwide that were used in the classroom in the spring of 2005. The kits include a teacher and community leader guide, student activity booklet, parent take-home brochure and classroom poster designed to enhance awareness among young people in grades 5 – 12 about the important safety and environmental considerations of ATV use. The program materials also remind parents of their responsibility in ensuring their child is properly trained and supervised when riding an ATV. Based on historical experience, Lifetime Learning estimates that each school kit is used by three teachers, seen by 300 students, and by one parent or guardian per child. This means the program has the potential of reaching more than 5.4 million children and adults with messages regarding the appropriate size ATVs for children, the need for helmets and protective gear, and the “golden rules” for safe ATV operation. Page 157 of 179 7 ATV Industry’s Call-to-Action for Improving ATV Safety ATV rider safety is the top priority of the major ATV manufacturers, their dealers, distributors, and the riding community. Collectively, the industry believes the most effective way to reduce ATV-related injuries is through a three-pronged approach that includes: 1. Enforceable State and Federal Legislation 2. Rider Training and Education 3. Parental Supervision The most effective way to further strengthen ATV safety is through state legislation. As with safety measures for other motorized vehicles such as automobiles and motorcycles, state legislation is needed to regulate ATV use. Reinforced by federal legislation focusing on the product to make sure they are in compliance with the current vehicle standard and provided with appropriate product support. The ATV industry strongly supports the enactment and enforcement of state legislation that enhances ATV rider safety, and has long promoted the Specialty Vehicle Institute of America’s model state legislation that imposes age limits and other restrictions on ATV operation. Member companies of the ATV Safety Institute offer free training nationwide to purchasers of new ATVs. The ATV Safety Institute’s ATV RiderCourse is a hands-on training course conducted by a licensed Instructor. The course offers students an opportunity to increase their safety knowledge and to practice basic riding skills in a controlled environment. Since 1989, the ATV Safety Institute has trained 750,387 students. The final important element is parental or adult supervision for all riders under the age of 16. Parents and guardians literally hold the key to a child’s safety. Every ATV has an ignition key, and the person who controls the key, controls the use. Parental supervision is a key element for a child’s safety; children under the age of 16 should be supervised at all times when riding an ATV. Page 158 of 179 8 Specialty Vehicle Institute of America’s Model State ATV Legislation The majority of ATV-related accidents and fatalities involve behaviors that the industry warns against in its rider education programs, in all its literature, and on-vehicle labels. Since 1986, the ATV industry has advocated for state legislation that aims to regulate these problematic behaviors. The primary safety components of the model law include: Education and Training Provides for state implementation of a comprehensive ATV safety education and training program. The program shall provide for the hands-on training of ATV operators. All persons operating an ATV on public land shall have a safety certificate. Except as provided, all operators seeking a safety certificate must receive training. Provides for certification of safety instructors. Fees collected for training and certificates shall be retained in a dedicated fund to support the ATV safety training and education program. Age Restrictionsi (a) ATVs with engine capacity 70 cc up to and including 90 cc shall be operated on public land only by those aged 12 and older. (b) ATVs with engine capacity greater than 90 cc shall be operated on public land only by those aged 16 and older. (c) Persons under age 16 shall be under continuous adult supervision while operating an ATV on public land. ATV Equipment Requirements when Operated on Public Land (a) Lighted headlamp and tail lamp when operated during hours of darkness; (b) Brake system maintained in good operating condition; (c) Effective muffler system in good working condition; (d) Effective spark arrester in good working condition. Page 159 of 179 9 ATV Operator Prohibitions on Public Land (a) Operation in a careless or reckless manner so as to endanger or to cause injury or damage to any person or property. (b) Operation on any public street, road, or highway of this state except for purposes of crossing, as specified. (c) Operation unless wearing eye protection and an approved safety helmet. (d) Carrying of a passenger, unless designed by manufacturer to carry one passenger. (e) Operation while under the influence of alcohol or any controlled substance, or under the influence of a prescription or non-prescription drug that impairs vision or motor coordination. ATV Retailer Prohibitionsii (a) No person shall knowingly sell or offer to sell at retail an ATV of 70cc or greater for use by a person under 12 years of age. (b) No person shall knowingly sell or offer to sell at retail an ATV of greater than 90cc for use by a person under 16 years of age. Provides penalties for violations Page 160 of 179 10 Conclusions The CPSC's recently issued 2005 Annual Report of ATV Deaths and Injuries ("2005 Annual Report") shows that the estimated injuries per 10,000 ATVs declined for the fourth year in a row and is now at its lowest point since 1998. These declines have occurred even while the number of four wheel ATVs in use increased by 700,000 units between 2004 and 2005. The 4- wheel ATV injury rate declined 9 percent over the same time period. The 2005 Annual Report also shows that the number of estimated all-terrain vehicle injuries involving children under 16 fell 10 percent between 2004 and 2005, and has fallen from 37 percent of all ATV-related injuries in 1998 to 30 percent in 2005. The risk of fatality per 10,000 ATVs has likewise declined from 1.4 per 10,000 in use in 1999 to 1.1 per 10,000 in use in 2004. Since 1998, the number of ATVs in use has more than doubled. Yet, for the eight year time period since the CPSC’s new injury sample and methodology has been in place, there has been no appreciable upward trend in injury risk and, as noted, the injury risk has declined since 2001 and is now at its lowest point since 1998. When the rising population of ATVs in use is taken into account, there has been no appreciable upward trend in either injury or fatality risk since 1998 and 1999, respectively. With that said, while the ATV injury trend is improving, the industry believes that even one injury is one too many. The ATV industry is committed to the safety of its customers and will continue to work with the CPSC, user groups, retail dealerships, and all others interested in promoting ATV safety through model state legislation, rider training and education, parental supervision, and rider responsibility. The vast majority of ATV-related accidents and fatalities involve behaviors that the ATV industry warns against in its rider education programs, in all its literature, and on vehicle labels. In fact an analysis of a random sample of CPSC in-depth investigations (IDIs) of ATV fatalities in the U.S. during 1997- 2002 showed that 92 percent of the fatalities were associated with one or more “warned against behaviors.” Page 161 of 179 11 Warned Against Behaviors • Not wearing a helmet • Carrying at least one passenger on single rider ATVs. • Riding on a public road • Alcohol and other drug use • Operating at an excessive speed • Youth riding adult-sized ATVs Specialty Vehicle Institute of America Since 1983, the Specialty Vehicle Institute of America® (SVIA) has promoted the safe and responsible use of All-Terrain Vehicles (ATVs) through rider training programs, public awareness campaigns, and state legislation. The SVIA also serves as a resource for ATV research, statistics, and vehicle standards. The SVIA, based in Irvine, California, is a not-for-profit trade association sponsored by Arctic Cat, BRP, Bush Hog, Honda, John Deere, Kawasaki, KYMCO, Polaris, Suzuki, Tomberlin and Yamaha. For membership information, call 949.727.3727; for safety information or to enroll in the ATV RiderCourseSM nearest you, visit www.atvsafety.org and click on “Online Enrollment,” or call 800.887.2887. Page 162 of 179 12 Endnotes i The following language neither is currently part of SVIA’s Model State ATV Legislation, nor is it language that SVIA is currently advocating since the proposed update to the ANSI/SVIA voluntary standard, on which the language is based, has not yet been finalized. The current age/cc restrictions in the Model, however, likely will be outdated in the future, requiring any law enacted with the current age/size provisions to be amended. For this reason, we also offer the following alternative language for future consideration: (a) No person under age 6 may operate an ATV. (b) When operating on public land, a person under age 10 shall only operate a Y-6 Model ATV, a person age 10 to 11 shall only operate a Y-6 or Y-10 Model ATV, a person age 12 to 13 shall only operate a Y-6, Y-10 or Y-12 Model ATV, and a person age 14 to 16 shall only operate a Category Y or a Category T ATV, as those terms are defined in the most current American National Standard for Four Wheel All-Terrain Vehicles. ii The following language neither is currently part of SVIA’s Model State ATV Legislation, nor is it language that SVIA is currently advocating since the proposed update to the ANSI/SVIA voluntary standard, on which the language is based, has not yet been finalized. The current ATV retailer prohibitions in the Model, however, likely will be outdated in the future, requiring any law enacted with the current retailer provisions to be amended. For this reason, we also offer the following alternative language for future consideration: (a) No person shall knowingly sell or offer to sell at retail an ATV other than a Y-6 Model ATV for use by a person under 10 years of age. (b) No person shall knowingly sell or offer to sell at retail an ATV other than a Y-6 or Y-10 Model ATV for use by a person under 12 years of age. (c) No person shall knowingly sell or offer to sell at retail an ATV other than a Y-6, Y-10, or Y-12 Model ATV for use by a person under 14 years of age. (d) No person shall knowingly sell or offer to sell at retail an ATV other than a Category Y or Category T ATV, for use by a person under 16 years of age. Page 163 of 179 Specialty Vehicle Institute of America 2 Jenner Suite 150 Irvine, CA 92618 949.727.3727 Page 164 of 179 AGENDA REPORT FOR: City Council August 22, 2017 TO: Dave Zabell, City Manager Workshop Meeting: 8/28/17 FROM: Rick White, Director Community & Economic Development SUBJECT: CDBG Program Section 108 Guaranteed Loan Program (MF# BGAP 2017- 007) I. REFERENCE(S): II. ACTION REQUESTED OF COUNCIL / STAFF RECOMMENDATIONS: Discussion III. FISCAL IMPACT: IV. HISTORY AND FACTS BRIEF: The Department of Housing and Urban Development (HUD) has established the Section 108 Loan Guarantee Program ("Program") in order to provide below market rate loans for qualified projects that serve the needs of low and moderate income persons. This program may be instrumental in accomplishing important pieces of Downtown Revitalization. As a Grantee receiving funds through the HUD Community Development Block Grant Program (CDBG), the City of Pasco meets the criteria to participate in the Program. Recipients may borrow up to five times their annual CDBG grant, enabling them to maximize the impact of available public funds by leveraging grant resources into private loans. Section 108 is a loan guarantee program, not a grant. It offers lower rates both variable and fixed, and flexible repayment terms to meet project-specific needs and provides funding to finance a wide variety of eligible activities. The maximum Section 108 loan capacity would be $3,475,000, based on the program year 2017 award of $695,000. The CDBG entitlement annual allocation would be pledged in addition to other collateral. Repayment of the loan would be over twenty (20) years. Loan repayment may be made from program income, repayment of loans, or from the CDBG annual entitlement. If the loan were repaid strictly from the CDBG entitlement funds, the annual allocation typically awarded by Council for infrastructure projects would be reduced for the amount of the loan repayment. For example, instead of allocating Page 165 of 179 $200,000 each year for the next five (5) years for infrastructure projects, the total amount of $1,000,000 may be used to complete projects in one year, and repaid over time. V. DISCUSSION: Eligibility for the Section 108 program is substantially the same as participation in CDBG. Proposed projects must be eligible activities per 24 CFR 570 and meet National Objectives (24 CFR 570.208) such as job creation/retention, area benefit, limited clientele and housing. The Downtown Revitalization Plan and Peanuts Park renovation projects are eligible activities which would qualify as area benefit. Purchasing a vacant building for the purpose of renting space to a small business would qualify as low-moderate job creation. Other examples of eligible projects: 1. Real Estate/site-specific gap financing, projects promote additional private investment in target area. 2. Location based loan pool to encourage neighborhood development, leverages existing programs, request for applications to identify potential projects, market research and stakeholder analysis. a. Redevelopment of vacant/historic properties for reuse; b. Mixed use commercial and retail development; c. Gateway development; and d. Flagship business. 3. Strategies to cultivate healthy markets a. Infrastructure and public facilities; b. Transit-Oriented development; c. Mixed use commercial and retail development; d. Business development loans; and e. Focus on downtown through additional incentives. Interest rates charged on interim borrowing is priced at the three-month London Interbank Offered (LIBO) rate, plus 20 basis points. Permanent financing is pegged to yields on Treasury obligations of similar maturity to the principal amount. A small additional basis point spread, depending on maturity, will be added to the Treasury yield to determine the actual rate. The Section 108 Program can be a strong tool for economic revitalization of the Pasco Downtown Staff would benefit from Council discussion on this issue. If Council concurs with moving forward, Staff will begin work on a detailed application package for Council Page 166 of 179 consideration and approval and submittal to HUD. Page 167 of 179 AGENDA REPORT FOR: City Council August 25, 2017 TO: Dave Zabell, City Manager Rick Terway, Interim Public Works Director Workshop Meeting: 8/28/17 FROM: Dan Ford, City Engineer Public Works SUBJECT: Create Local Improvement District (LID) for Chapel HIll Boulevard, between Road 68 and Road 84, and possibly for Road 76 north from Argent Road to Chapel Hill Boulevard I. REFERENCE(S): Vicinity Map II. ACTION REQUESTED OF COUNCIL / STAFF RECOMMENDATIONS: Discussion III. FISCAL IMPACT: Capital Facility Fund(s) for upsizing roadway and City utilities IV. HISTORY AND FACTS BRIEF: This property is bounded by Interstate 182 on the north, West Argent Road on the south, North Road 84 on the west, and North Road 68 on the east. This propert y was formerly owned by the Department of Natural Resources (DNR). The City of Pasco recognizes the need for maintaining a level of development standard and connectivity through this property, not only for these potential new property owners, but also its citizens that will utilize these streets for ingress and egress through this expansive development. To that end the City has a vested interest in the development of the DNR property, hiring an engineering consulting firm, Trantech, Inc., to create preliminary design alternatives for both Chapel Hill Boulevard and North Road 76 to better guide development of this property. The need to provide safe and consistent ingress, egress, and continuity to the citizens of Pasco also makes the formation of a capital improvement LID a viable consideration. Page 168 of 179 V. DISCUSSION: Staff believes a project needs to be created to complete Chapel Hill Boulevard between Road 68 and Road 84. Landowners in the area are considering road improvements associated with the development of their property. As property is developed, the owners would be required to construct the adjacent section of the roadway. However, this approach could lead to piecemeal construction of the proposed roadway. Therefore, City staff and landowners believe the area would be best served if Chapel Hill Boulevard is constructed in its entirety as a single project. Chapel Hill Boulevard abuts five (5) parcels owned by two (2) separate entities. The project would also facilitate development of three (3) additional parcels by improving access to the City's roadway and utility system. Since the benefits of constructing Chapel Hill Boulevard will extend beyond the immediate roadway, it is proposed the LID assessments be based on parcel area. Construction of Chapel Hill Boulevard and the associated utilities have an area -wide significance, in addition to the meeting needs of the adjacent development. Therefore, an additional traffic lane will be required, as will upsizing of the water and sewer pipelines. Reliability and redundancy of the irrigation system will also be improved. Staff recommends the city pay for the added traffic lane, upsizing the utilities, and irrigation system improvements outside the limits of the roadway project. Construction of Road 76 from Argent Road north of Chapel Hill Boulevard may also be included in the LID. Road 76 is abutted by three (3) developable parcels, two (2) of which also abut Chapel Hill Boulevard, and a Pasco School District parcel. The decision to include Road 76 in the LID will be determined after discussion with property owners. Staff will be meeting with property owners in September to discuss the project. Staff is also refining roadway cross sections and the upsizing requirements to meet area-wide needs. Page 169 of 179 8125117 Page 170 of 179 AGENDA REPORT FOR: City Council August 25, 2017 TO: Dave Zabell, City Manager Rick Terway, Interim Public Works Director Workshop Meeting: 8/28/17 FROM: Dan Ford, City Engineer Public Works SUBJECT: Professional Services Agreement for Design of Lift Station Improvements I. REFERENCE(S): Vicinity Map Professional Services Agreement Summary II. ACTION REQUESTED OF COUNCIL / STAFF RECOMMENDATIONS: Discussion: III. FISCAL IMPACT: Sewer Utility Fund: $312,900 IV. HISTORY AND FACTS BRIEF: This Professional Services Agreement is for the design of a complete lift station to replace the Pearl Street Lift Station; a preliminary design for upgrades to the Road 36 Lift Station; and furnishing technical non-design services to assess the existing conditions at the 9th and Washington and Maitland Avenue Lift Stations including identifying improvements and equipment replacement necessary (with participation of City of Pasco (COP) Engineering and Operations Personnel), and preparing equipment and electrical procurement specifications/technical descriptions for execution under maintenance activities. All four lift stations were identified as needing improvements in the Comprehensive Sewer Plan adopted by the City Council in May of 2014. The Pearl Street Lift Station improvements will include replacement of the existing lift station with a new lift station located in the immediate vicinity. Additionally, the existing force main pipeline will be replaced by slip -lining the Page 171 of 179 existing force main with a smaller diameter pipe. Preliminary design work for the Road 36 Lift Station included in this PSA includes the following: • Define design flows • Identify replacement or interim pump • Develop partial preliminary plans • Recommend procurement method for a replacemen t pump Technical non-design services for the 9th and Washington and Maitland Avenue Lift Stations included in this PSA include the following: • Observe, assess and photo document the existing conditions • Review COP provided records, drawings, manuals, and maintenance records • Facilitate and participate in meetings with COP personnel to make “field based” engineering decisions on needs and priorities • Investigate and evaluate equipment upgrade options • Develop specifications for the COP to use to procure equipment and materials • Provide limited technical observation of replacements/improvements • Provide limited troubleshooting support It is anticipated that the Maitland Lift Station improvements will be limited to the installation of a new small capacity jockey pump with a variable frequency drive to reduce pump cycling during low flow periods. The Maitland Lift Station improvements will be included in the 9th & Washington contract documents as an additive alternative. A Request for Qualifications (RFQ) was distributed to members of the City of Pasco Municipal Research and Services Center Consultant Roster. The City received seven submittals considered to be responsive which were subsequently reviewed and scored by a Consultant Selection Committee comprised of City staff from Engineering and Operations Divisions. The top three consultants were invited to interview, and ultimately the Committee chose HDR, Inc., to prepare the design plans based on both the scored submittals and the interviews. The original HDR proposal exceeded the COP design budget and several months of negotiations were conducted to reach agreement on a revised technical approach, work scope, and budget to accomplish the tasks. HDR will provide engineering, technical assistance, and project management services for the development of the proposed lift station improvements at each of the four locations. The fee for the work proposed is the Not To Exceed Sum of $312,900 and the proposed schedule provides for completed designs in Page 172 of 179 early 2018 with Bidding and Construction to follow on each of the projects, as funding is available, beginning in 2018. V. DISCUSSION: Staff recommends approval of the proposed Professional Services Agreement with HDR, Inc. Page 173 of 179 Page 174 of 179 Page 175 of 179 AGENDA REPORT FOR: City Council August 22, 2017 TO: Dave Zabell, City Manager Workshop Meeting: 8/28/17 FROM: Stan Strebel, Deputy City Manager Executive SUBJECT: Amendment to Legislative Consultant Agreement with Gordon Thomas Honeywell I. REFERENCE(S): Proposed Amendment to Legislative Consultant Agreement II. ACTION REQUESTED OF COUNCIL / STAFF RECOMMENDATIONS: Discussion III. FISCAL IMPACT: For the year ending 08/31/17 - $13,334 additional Beginning 09/01/17 - $55,000 annual cost, plus expense not to exceed $3,000 IV. HISTORY AND FACTS BRIEF: The City has employed the services of a legislative consultant for each of the past twelve years. In doing so, the City has realized several accomplishments which likely would not have happened but for the particular services of the consultant's work. In the 2015 Legislative Session, the City was awarded $26 million in (2019-2021) funding for the Lewis Street Overpass and $2.625 million for the Kahlotus Lift Station projects. In the recently completed 2017 Legislative and Special Sessions, Gordon Thomas Honeywell (GTH) assisted in helping to secure $2 million in advanced funding for the Lewis Street project, enabling the City to complete environmental and design work critical to the project. GTH also assisted in making progress on the release of the Road 68 DNR property and fiscal and policy reforms for the Main Street Program. It is proposed to continue to contract with Gordon Thomas Honeywell (GTH) on an ongoing basis, unless either party gives 60 days prior notice of termination for the ensuing year. Total compensation is proposed to change from the prior agreement of Page 176 of 179 $40,000/year. The proposed agreement provides for payments of $4,583.33/month resulting in total annual compensation of $55,000. Expenses are limited to $3,000 annually, the same as previous agreements with GTH. While the consultant will perform the general legislative duties listed, the greatest value will be the consultant's effort to obtain additional state funding assistance for the Lewis Street overpass, a priority project of the City which is simply too costly for the City to construct on its own, as well as other priority capital projects and/or policy initiatives, such as the revitalization of Peanuts Park and the Farmer’s Market and advocacy on legislation for the Public Facility District; the City’s reimbursement for its Safe Drinking Water Revolving Fund Loan or for protecting the City’s authority in certain areas when State pre-emption is proposed. V. DISCUSSION: The value of an effective legislative consultant is clear when measured by the success the City has realized over the past several years. Continuing such a relationship is imperative if the City desires to continue to seek assistance via the State Le gislature (whether by appropriation or statutory language). The additional compensation for the current ending year is justified by the fact that the Legislature held these special sessions, greatly increasing the effort required of GTH to maintain its presence in Olympia. It is anticipated, that with a longer list of projects and priorities, the time and effort of GTH on behalf of the City will need to be increased correspondingly for the upcoming year. GTH has the advantage of a Washington DC office; thus, the opportunity to pursue a coordinated effort (state and federal) to obtain the funding assistance necessary for construction of the Lewis Street Overpass project. The proposed scope of work will address the City's 2018 legislative agenda, though it may be revised by year-end. In view of the potential 2018 legislative benefits, staff recommends approval of the proposed agreement. Page 177 of 179 AMENDMENT NO. 2 TO CITY OF PASCO CONSULTING AGREEMENT (7/2015) SECTION 1. Part “A Scope of Work” of ATTACHMENT “A” is hereby amended to read as follows: A. Scope of Work: Consultant shall provide the City of Pasco with the following governmental affairs services: General Washington State Legislative Services • Identify and track all relevant legislation. • During the legislative session, provide the City with weekly reports and tracking lists. • Attend all relevant legislative hearings. • Attend all relevant legislative meetings. • Coordinate City officials to testify at relevant legislative hearings. • Lobby to amend, defeat or pass legislation or budgets that directly affect the City’s interests. • Strengthen relevant legislative relationships between the City, state legislators, and executive offices. • Work with the City to develop a state budget request and lobby the Legislature to fund the request. Specific Legislative Issues: • Advocate for increased and expedited funding for the Lewis Street Overpass within the Connecting Washington transportation package and state grant programs. • Proactively advance legislation amending statutes related to public facility districts. • Facilitate the development of DNR-owned property in key areas within the city • Pursue funding for the revitalization of Peanuts Plaza. • Protect and restore state-shared revenues that Pasco receives from the state. • Advocate for increased funding for the Main Street Tax Incentive Program • Pursue increased funding for the Basic Law Enforcement Academy • Defend against legislation that would preempt city authority, particularly in the area of regulating telecommunications. • Advocate that any statewide regulation of Transportation Network Companies adequately meets public safety needs. • Lobby to ensure the city is reimbursed for its Safe Drinking Water Revolving Fund loan. SECTION 2. Part B of “Compensation” of ATTACHMENT “A” is hereby amended to read as follows: B. Compensation/Expenses: For the months of May, June, July, and August of 2017, the City of Pasco shall pay consultant a monthly fee of $5,000 for services provided. Page 178 of 179 Effective September 1, 2017, the City of Pasco shall pay Consultant a monthly fee of $4,583.33 for the services listed in part A. Consultant shall bill expenses, including communication expenses, travel to Pasco, and travel to Olympia. The expenses shall not exceed $3,000 per calendar year. SECTION 3. All other provisions of the AGREEMENT and ATTACHMENT “A” shall remain as originally written. Consultant: City of Pasco: Gordon Thomas Honeywell Governmental Affairs Briahna Murray, Vice President Dave Zabell, City Manager Date: ______________________ Date: ___________________ Page 179 of 179