RESOLUTION NO N-3
A RESOLUTION adopting the revised and extended
Comprehensive Street, Storm Drain and Bridge Programs for the City
of Pasco
WHEREAS, RCW 35 77 010 provides for annual revision and
extension of the Comprehensive Street Program of each city and
town, after holding public hearings thereon, and
WHEREAS, it is now time to revise and extend the
Comprehensive Street, Storm Drain and Bridge Programs, and
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF PASCO,
WASHINGTON, DO RESOLVE AS FOLLOWS
That the City Council of the City of Pasco hereby adopts the
revision and extension of the Comprehensive Street, Storm Drain and
Bridge Programs for the ensuing six years as attached hereto and
labeled "Recommended Street Construction Program, Calendar Years
"1996-2001" incorporated by this reference as though fully set forth
herein, and
That the Comprehensive Street, Storm Drain and Bridge
Programs shall be filed with the Department of Transportation
PASSED by the City Council and APPROVED by the Mayor this
19th Day of June, 1995
Catherine D Seaman,
Deputy City Clerk
APPROVED AS TO FORM
Six Year Transportation Improvement Program
Projects selected by County, Agency &/or MPO
In Order by TIP YEAR & Priority
Printed 06/13/95
TIPRPT1 FRX
Six Year Transportation Improvement Program
1996 to 2001
06/13/95
Page 1
Hearing Date 06/19/95
Adoption Date 06/19/95
MPO All Resolution Number
Project Costs in Thousands of Dollars
Func Project Imp Total Util Phase Data
Cl Pri Identification Type Length Codes Expenditure Schedule
Phase Federal RAP,etc Local/ (Local Agency Use)
Start Date Fund Code Cost Code Cost State Total 1st 2nd 3rd 4th-6th
Agency PASCO 01 0 240 GCPSTW
19 1 95301 SR 395/HILLSBORO INTERCHANGE
AT INTERSECTION
MP 000 TO MP 0000
NEW CONSTRUCTION
PE
RW
CN
Total
100 200
8,000
100 200 8,000
PE 01/1996 300 300
CN 06/1997 8,000 8,000
TOTAL 8,300 8,300
Agency PASCO 01 1 850 GCPSTW PE 95
17 2 95302 BURDEN ROAD RW 150
RD 44 TO RD 60 CN 705
MP 0 0 TO MP 0 0 Total 950
NEW CONSTRUCTION
PE 07/1995 95 95
RW 10/1996 150 150
CN 10/1996 705 705
TOTAL 950 950
Agency PASCO 01 2 500 GCPSTWO PE 15
14 3 95303 LEWIS STREET UNDERPASS RW
LEWIS STREET & SR 395 CN 235
MP 0 0 TO MP 0 0 Total 250
UNDERPASS REPAIR
PE 10/1995 15 15
CN 07/1996 235 235
TOTAL 250 250
Agency PASCO 12 0 000 GCPSTW PE 100
00 4 95001 MULTI-MODAL FACILITY RW 60
ON SITE CN 1,340
MP 0 0 Total 1,500
TRANSPORTATION & FACILITY
PE 10/1995 STP(E) 20 80 100
RW 01/1996 60 60
CN 01/1996 STP(E) 130 TIB 415 795 1,340
TOTAL 150 415 935 1,500
Agency PASCO 07 3 670 GCPSTWO PE 15
19 5 96301 ANNUAL OVERLAYS RW
VARIOUS CITY STREETS CN 145
MP 0 0 TO MP 0 0 Total 160
Page 1
City Pasco 0960
County Franklin 11
TIPRPT1 FRX
Six Year Transportation Improvement Program
1996 to 2001
06/13/95
Page 2
Hearing Date 06/19/95
Adoption Date 06/19/95
MPO All Resolution Number
Project Costs in Thousands of Dollars
Func Project Imp Total Util Phase Data
Cl Pri Identification Type Length Codes Expenditure Schedule
Phase Federal RAP,etc Local/ (Local Agency Use)
Start Date Fund Code Cost Code Cost State Total 1st 2nd 3rd 4th-6th
ASPHALT OVERLAYS
PE 01/1996
15 15
CN 06/1996
145
145
TOTAL
160
160
Agency PASCO
14 6 96302
INTERSECTION
MP 0 0
TRAFFIC SIGNAL
12 0 230 GCPSTW
20TH AVENUE @ SUN WILLOWS
PE 6
RW
CN 100
Total 106
PE 01/1996 6 6
CN 08/1996 100 100
TOTAL 106 106
Agency PASCO 12 0 100 GCPSTW PE 10
16 7 96303 COURT & RD 26 RW
AT INTERSECTION CN 100
MP 0 Total 110
TRAFFIC SIGNAL
PE 01/1996 10 10
CN 06/1996 100 100
TOTAL 110 110
Agency PASCO 01 0 000 GCPSTW PE 150
00 8 97301 STUDY EXTENSION OF COURT OR SYLVESTER RW
OVER RAILROAD TRACKS TO OREGON AVENUE CN
MP 0 0 Total 150
STUDY
PE 01/1997
150 150
TOTAL
150 150
Agency PASCO 07 4 110 GCPSTW PE 25
19 9 97302 ANNUAL OVERLAYS RW
VARIOUS CITY STREETS CN 225
MP 0 0 Total 250
ASPHALT OVERLAY
PE 01/1997 25 25
CN 06/1997 225 225
TOTAL 250 250
Agency PASCO 12 1 850 GCPSTWO PE 6
14 10 97303 COURT STREET & RD 32 RW
AT INTERSECTION CN 94
, MP 0 0 TO MP 0 0 Total 100
Page 2
•
City Pasco 0960
County Franklin 11
I
TIPRPT1 FRX
Six Year Transportation Improvement Program
1996 to 2001
06/13/95
Page 3
Hearing Date 06/19/95
Adoption Date 06/19/95
Resolution Number
0960
11
Project Costs in Thousands of Dollars
Func Project Imp Total Util Phase Data
Cl Pri Identification Type Length Codes Expenditure Schedule
Phase Federal RAP,etc Local/ (Local Agency Use)
Start Date Fund Code Cost Code Cost State Total 1st 2nd 3rd 4th-6th
TRAFFIC SIGNAL
PE 08/1997
CN 07/1997
TOTAL
6
94
100
6
94
100
Agency PASCO 07 2 067 GCPSTWO PE 18
19 11 98301 ANNUAL OVERLAYS RW
VARIOUS CITY STREETS CN 222
MP 0 0 Total 240
ASPHALT OVERLAY
PE 01/1998 24 24
CN 06/1998 216 216
TOTAL 240 240
Agency PASCO 07 8 670 GCPSTWO PE 30
19 12 99301 ANNUAL OVERLAYS RW
VARIOUS CITY STREETS CN 460
MP 0 0 Total 490
ASPHALT OVERLAY
PE 01/1999 30 30
CN 06/1999 460 460
TOTAL 490 490
Agency PASCO 07 2 670 GCPSTWO PE 20
19 13 00301 ANNUAL OVERLAYS RW
VARIOUS CITY STREETS CN 280
MP 0 0 Total 300
ASPHALT OVERLAYS
PE 01/2000 20 20
CN 06/2000 280 280
TOTAL 300 300
Agency PASCO 07 2 700 GCPSTWO PE 20
17 14 01301 ANNUAL OVERLAYS RW
VARIOUS STREETS CN 280
MP 0 0 Total 300
ASPLHALT OVERLAYS
ASPHALT OVERLAYS
PE 01/2001 20 20
CN 06/2001 280 280
TOTAL 300 300
GRAND TOTAL 150 415 12,641 13,206
Page 3
MPO All
City Pasco
County Franklin