HomeMy WebLinkAbout1915 ResolutionRESOLUTION NO. 1915
A RESOLUTION Providing for the construction of curb,
gutter, and sidewalk on Court Street between 20th
Avenue and 26th Avenue and on 20th Avenue between
Sylvester Street and Court Street and on 4th Avenue
between Marie Street and Court Street at the expense
of abutting property owners; and providing notice of
a public hearing.
WHEREAS, The City Council finds it would promote the
public safety, health, and welfare of the City of Pasco to have
constructed sidewalk, curb and gutter along Court Street between
20th Avenue and 26th Avenue and on 20th Avenue between Sylvester
Street and Court Street and on 4th Avenue between Marie Street
and Court Street , and
WHEREAS, The City Council finds, based upon the report
of the City Engineer, that public convenience and safety require
the construction of sidewalk, curb and gutter along Court Street
between 20th Avenue and 26th Avenue and on 20th Avenue between
Sylvester Street and Court Street and on 4th Avenue between Marie
Street and Court Street , NOW THEREFORE,
THE CITY COUNCIL OF THE CITY OF PASCO, WASHINGTON, DO
RESOLVE AS FOLLOWS:
1. That the owners of the property abutting Court
Street between 20th Avenue and 26th Avenue and on 20th Avenue
between Sylvester Street and Court Street and on 4th Avenue
between Marie Street and Court Street are required to construct
sidewalk, curb, and gutter at each to his own expense according
to the plans and specifications set forth herein.
2. In the event the required construction is not
undertaken and completed within the time specified below, the
City will perform and complete the improvement and assess the
costs against the abutting property owner.
3. PUBLIC HEARING NOTICE. The date set for hearing
persons for or against this Resolution is set for April 16, 1990
at 8:00 p.m., in the Council Chambers of Pasco City Hall, 412
West Clark Street, Pasco, Washington.
4. COMPLETION DATE: The construction must be completed
not later than May 18, 1990.
5. SPECIFICATIONS FOR CONSTRUCTION. The sidewalk,
curb, and gutter shall be constructed as set forth herein and as
set forth in the attachments which are incorporated herein by
reference and which are on file in the office of the City
Engineer and the City Clerk. Curb and gutter shall be type "A"
as per City specifications and the sidewalks shall be four (4)
inches thick and six and five-tenths (6-5/10) feet wide. At
driveways, curb and gutter shall be type "D" sidewalk and shall
be six (6) inches thick and six and five-tenths (6-5/10) feet
wide. Forms shall be set according to the grade established by
the City. Cement concrete shall be five and five-tenths (5-5/10)
sack mix with one-half (1/2) inch maximum size coarse aggregate.
ATTACHMENT "A". Concrete curb, gutter, and walk - Pasco
Engineering Department.
ATTACHMENT "B". Vicinity map of Court Street between
20th Avenue and 26th Avenue and on 2oth Avenue between Sylvester
Street and Court Street and on 4th Avenue between Marie Street
and Court Street .
6. COSTS ESTIMATE. The cost of the required
construction (if constructed by the City) is estimated as set
forth on Attachment "C".
ATT ST: AP OVED AS TO
EVELYN WELLS, City Clerk G EG STEL 0, Ci Attorney
ATTACHMENT "C". Registered owner's name, parcel, legal
description and estimated costs.
PASSED by the City Council and APPROVED by the Mayor
this 26 day of March, 1990.
reso
I
r
m
0 <
m
-0
_
0 <
Cr)
0 z
GENERAL Concrete Class 5(1 -1/2) or 5(3/4), Max Slump 3-1/2 Inches
Joints On Walk Every 5' Feet (Cut 2" Min Deep For Agregate Separation)
Joints On Curb And Gutter Are Spaced 10' (Feet) And Stabbed
At Face Of Gutter And Bock Of Curb, Joints In Walk Shall Match Curb Joints
And Be Perpendicular To Curb
Expansion Joints Required At Curb Returns And Existing Concrete
6"
Type "D" Curb And Gutter Detail
1,---T--- 7' COMMERCIAL
61/2'
5' RESIDENTIAL
4 -1/2'
•
Stab Min 3" Typical
-o c
op
I-
C-)
• ---. —,,
n • , s rh•-• • -- -I --. - • 4 - „, .., . _
:
...MI.
6" Thick For Driveway
n
41
0 4.
Zr. .".- ...
. I• ' -.
.• 4* -f g.
.C. - • .•
t ' • 4 4 A _ _ .
7. Property Development Assoc. W 257 FT. OF E 297 FT., S
7677 Oakport, Suite 520 1/2, SE 1/4, SE 1/4, NE
Oakland, CA 94621 1/4, SEC. 25, T9N, R29E,
LESS S 30 FT. & E. 40 FT &
EXC PTN TO CITY OF PASCO
FOR SYLVESTER ST. 119-361-
049.
ESTIMATED COST: $3,841.83
8. Calvin & Lona Hendricks
822 Bantry way
Benicio, CA 94510
W 320 FT OF E 360 FT. OF S
1/2, NE 1/4, SE 1/4, NE
1/4, & W 320 FT. OF E 360
FT. OF N 1/2, SE 1/4, SE
1/4, NE 1/4 OF SEC. 25,
T9N, R29E. 119-361-094
ESTIMATED COST: $3,856.22
9. Emanuel Baptist Church
1116 N. 20th
Pasco, WA 99301
S 1/2, E 1/2, NE 1/4, NE
1/4, EXC S 106 FT. OF W
139 FT. OF SEC. 25, T9N,
R29E LESS ROADS. 119-331-
134.
10. Stephen E. Nail
SHORT PLAT 79-21, LOT 2
P.O. Box 3125
112-023-079
Tr-Cities, WA 99302
ESTIMATED COST: $1,076.40
Following are the names of the owners and their respective
parcels of land abutting on that portion of the street where the
required construction must be completed:
1. Ruby Poland
W 1/2, W 1/2, NE 1/4, NW
525 W. Grande Ronde 1/4, NE 1/4, EXC. S 430
Kennewick, WA 99336
FT. THEREOF & EXC. PTN TO
ST. HWY 119-341-061.
ESTIMATED COST: $6,389.57
2. Ruby Poland
525 W. Grande Ronde
Kennewick, WA 99336
W 40 FT. OF N 230 FT. OF E
1/2, W 1/2, NE 1/4, NW
1/4, NE 1/4, OF SEC. 25,
T9N,R29E, EXC PTN TO ST.
HWY 119-341-043.
ESTIMATED COST: $1,281.85
3. Thomas & Henry Kidwell
SHORT PLAT 80-18, LOT 1,
4505 W. Octave SEC. 25, T9N, R293, 119-
Pasco, WA 99301
341-249.
ESTIMATED COST: $2,702.08
4. Abby Kidwell Estate
4320 Riverhaven
Pasco, WA 99301
and
Albert & Elaine Tomich
P.O. Box 2246
Pasco, WA 99301
N 1/2, E 1/2, NE 1/4, NW
1/4, NE 1/4, LESS R/W &
RDS & EXC. PTN FOR PSH #3.
119-341-016
ESTIMATED COST: $4,016.42
5. Copeland Lumber Yard
E. 83 FT. OF W 291.7 FT.
901 N.E. Glisan OF N 208.71 FT. OF NW 1/4,
Portland, OR 97232
NE 1/4, NE 1/4, SEC. 25,
T9N, R29E 119-332-035
ESTIMATED COST: $1,515.36
6. Copeland Lumber Yard, Inc.
901 N.E. Glisan
Portland, OR 97232
ESTIMATED COST: $4,233.46
PTN. NW 1/4, NE 1/4, NE
1/4, NW 1/4, NE 1/4, NE
1/4, TH N 338.16 FT. TH E
208.7 FT. TO POB; TH N
104.35 FT. TH E 83 FT.;
TH N 208.7 FT; TH E 197.6
FT.; TH E 197.6 FT.; TH S
280 FT.; TH 2 100 FT. TH
S 330.05 FT.; TH W 180.6
FT. TO POB 119-332-124.
•:*
14
1 I 2
10
• • I
uJ "NMI
I !
U,
1JfflcL-L=
VACATED
• •
r-• r
l y . r
!ffilld1111111 r. "% 1 .•( f
SIDEWALK
CONSTRUCTION
VINICITY MAP ft*
ooTti toaW°
%so otsti
ii 1 1111111-d 42J 7 I __J
— ST
.4m ‘ I l l 111111 1 121 '1 -1-7171-5 1
RUBY
••n
u.1
> '
1 P1 4:11
••• . •• %
16.21
ROWN
I
11
mummuloo
1111111111111 II
r
-.11
PROJECT
SITE'
4.
MARIE
32
014111110
NINE
:)1111111
IM III IM
1
Z2
II
• • . •
e •• •
ST
IL.. .011
• 11110
IIfflflIl
6
ST
•••
•• • •-•••"- • • •• t
• I , it). I
I' •
• •
ST
V' • -7f
'ST
sotto
ST
ST-R-EET
10 '
WAPY 113
Ig•
.
•\-\\\-\\
II
.n•n••••••••••••••
k-
A
• 1 •
• ••••
I r l ill Wel 1 Ii {
MEM
1111d
10 1111111MM
••• •
101111111111
1111111NIIIIr
211111011111M
to
j .
.•••^••••• 11•••••••
IM711 cc I sm."5,;aa ME 1E1 1E4
Lw
a
9— n 0
•
PEARL
, I " di n 9
alicR4t4:4913
SIZE scs El in
Nol
11181SINO
4 COMM
!AMC
CM=
5 1 • 1 7 • 2
Ii C1111111111311
allancen cimmozas
II
I5 • •
5
_ 13
12
4 .1/ _7
• 1 1
9 , .„)__
r.1.1,1 I r -r-Ir-wirtriffrin 00,11
BO It 0
PROJECT
SITES
—COURT
LI 110310112 ao%I0a 000
D I IOU
V. 3, 4021111Ufalla 1.1-I-I1 1q
anCIUUD:hil
sT
SP1 ,E 1 •
=C NOMPICOMI
00111d1821
611055
10 9
BROw • it E l ' I N I OEM 0
4
5
A IE S T =Mir • MIME OC 2 II 10 9 // • OEIA VE ST
FIUME
AMNION
0E11 ) • um
110111111113111 iK
--Fi 7 10,41TT ▪ ENR Y
111111111116
Milli
11111110
11101013,1" nn•• •
M ARCA 5 maim
OEM!
B2111111111
1111111fig PARK
a HUM lIIHflhlC
o-
' Ailf
1. flQ 4
•-• HA.;! ▪ r
3
N 30 J
OHM
BUM
SYLVESTER
014 ON 1C
Ttho•LE MIRE
MOW
.1 1 1 1111
II J 0111
5
ammo
n RVINC AT 29 I
.81111 II
1_ =Or IRII 111111 ltII ••
II III 3. „ 1;1
• YAHI NA
NUE 111111
A K IA4 A
711% LT421 F-
ir.
MI MI
III I I!
MPH "
5.4 19IU I $40514051
SHOSHONE XF9 e,71I, 1111',1 H! I
SIDEWAL K
CONSTRUCTION
dillilil
nil I II rE
l
14 0 P.51 111 01 HOPKINS minumir trall1111 00 .0 0111 .
VINICITY MAP
.0 or, c• r
mtmori,AL
j -
5*401 55 , C
rti Oh WW FM I So,
L"
I B
14
9