Loading...
HomeMy WebLinkAbout1592 ResolutionEve ATTES We ls, City Clerk RESOLUTION NO. 1592 WHEREAS, North 4th Avenue (Bypass to North City Limit) being a FAUS arterial street within the City of Pasco is in need of structural improvement, and WHEREAS, it has been determined that it would be in the City's best interest to accomplish such improvement by means of asphaltic concrete overlay, and WHEREAS, any delay to future years would potentially result in total structural failure of these roadways, and WHEREAS, the City has budgeted the local matching monies so that the improvements can be made, NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PASCO: That the City of Pasco requests an advance for federal fiscal years 1984 and 1985 (FY-84 & 85) of its annual Federal Aid Metropolitan funds allocation in the amount of one hundred sixty thousand dollars ($160,000), it being understood that if such future allocation is not late/ appropriated, the City would have to reimburse these costs and such reimbursement would be accomplished by the state withholding gas tax monies for a period of eighteen (18) months starting from the date the Federal Aid Metropolitan funds program is discontinued. PASSED by the City Council this 18 day of July , 1983. E A. Snidef, ayor APPROVED AS TO FORM: Greg . Rub ello, City Attorney 3637 38 35 34 PROJECT TERMINI PROJECT MILES 66 67 68 69 1 _7,5 i c 70 4ST w 71 5 lc rS 1 LEGIS 7273 74 5_01_9_0_4 NO R/U AREA 75176 M P 0 77 _B AREA CLR HOUSE 78 79 23 FROM 53 54155 N , TO 56157 58159160 C , I, T, x 61162 63 6465 1-, 1 MI i_T 42 43 44 45 46 47 48 49 50 51 52 S , R,1,21 1 1 l___, I 0 PROJECT mPO PROJ NO ITEM NUMBER (CODED BY mPO) 42 43 45 46 47 48,49 1 50151 1 LJ y APpRN p CODE 30131 29 32 33 I 1 I SAFETY SECTION PROJ CLASS. 39 40 41 ANNUAL ELEMENT NUMBER 28 Ui ‹[. FEDERAL AID PROJECT NUMBER PREFIX ROUTE PREN a_ 14 Di 16 no 19 20 21 22[23 24125126 27 iml I 55L3 I _I__ AGENCY WASHINGTON STATE DEPARTMENT OF TRANSPORTATION FEDERAL-AID PROGRAM FORM (PROJECT PROSPECTUS Page 1) PROJECT IN COUNTY DATE Cow g G 2 NS:11R sE° X 4 R 0 S w : A PROJECT 2214 -242-51261-2-71ii; TITLE 2913-0131 32133134 35 36 37 iii 41 1 1 2 3 41 5 6 1 7 11-3 -1 9 10111 112 13 14 15 16 1711811912021 -iE-3139 40 A i A M LA 01 961 0 1 1 3 L N q RI T1 li I F., OLUL.R Ta_H, I AISLE, NI_U E i , I , MUNICIPAL AGREEMENT AMOUNT 52153154155156157158159 AC 1 A D AE APPROVED FUNDS 62 63 64 6516.6 1 67 _L_ it 1 ti II til PERCENT ;OBLIGATION 14 I FEDERAL MO L DAE FUNDS yR L e ,14 16117 18119120121 22 25[2_6_1 27126129,30[i-J3213 -31,3413-5_136137 38j3914041 nn=;43d41‘,51461 PC , , 8, 0,0 ; 14 , 1_4 ; L2 0_5-81.6 2, 4 _1 1 1 LA I I 4 I V 1 1 V TOTALS Z 5 5, 2 0_0 4 3 3 s8 2,1_11 4.L2 1 , 1 , I 28 00 00 , 4 7L2 2 3 4 4 2_8 REMARKS 60 61 TOTAL ESTIMATED COST LOCAL AGENCY FUNDS FEDERAL FUNDS 15 23 KEYPUNCH DESCRIPTION OF PROPOSED WORK _Place_ F_ab_r ic_Material_mi_er_ent ire _exis ting_22_f oo _ _roasiway surface„excavate_sho_ulder„place_ _5/_8_rock ,___over_lay_to_30_foot_ i_2___inch _thick. ENVIRONMENTAL IMPACT This project is categorically excluded It does not impact archaeological or historic sites. RIGHT OF WAY 8, RELOCATION No_right-of-way is required or necessary on_this _pro e_ct No p_e_rson_will_ be dislocated from_his_homeor_business_as_ a_ result of this project. WATER AREA INVOLVEMENT No water___area _shoreline or wet_land be__involved_or_ __af fected_by this_ project. FEDERAL PROGRAM TITLE _URBAN_SYSTEM_PROGRAM__(FAUS) FEDERAL AGENCY DEPARTMENT_OF___TRANSP_ORTATION__,_ F HWA___ LOCAL AGENCY CONTACT PERSON _DENNIS_WRIGHT TITLE P 0 Box 293 ASSISTANT_ ENG INEER_ MAILING ADDRESS ___ PHONE (5_0_9)7.7.5_45-34_41 Pasco 99301. CITY , WASHINGTON ZIP CODE DOT :::17,:g°4,1 0 0 0 0 0 IS ANY AIRPORT LOCATED WITHIN 2 MILES OF THE PROPOSED PROJECT' YES X NO AGENCY PROJECT TITLE IDATE PAcr0 NORTH FOURTH AVENUE 7-15-83 GEOMETRIC DESIGN DATA DESCRIPTION THROUGH ROUTE CROSSROAD FEDERAL ROADWAY CLASSIFICATION TERRAIN LEVEL DESIGN SPEED 50 EXISTING ADT 7414 ESTIMATED ADT 15,000 DESIGN YEAR 2.000 DESIGN HOURLY VOLUME (DHV) 1.500 ACCIDENTS —3 YEAR EXPERIENCE YEAR PROPERTY DAMAGE ACCIDENTS INJURY ACCIDENTS FATAL ACCIDENTS TOTAL NUMBER OF ACCIDENTS NUMBER OF ACCIDENTS NUMBER OF INJURIES NUMBER OF ACCIDENTS NUMBER OF FATALITIES NUMBER OF ACCIDENTS 1980 5 0 n 5 1981 3 1 1 0 0 4 1982 2 0 0 9 TOTAL 10 1 11 TOTAL NUMBER OF ACCIDENTS ATTRIBUTABLE TO LACK OF HAVING THE PROPOSED IMPROVEMENT PERFORMANCE OF WORK PRELIMINARY ENGINEERING FOR THIS PROJECT WILL BE PERFORMED BY CONSULTANT % AGENCY 100 % CONSTRUCTION OF THIS PROJECT WILL BE PERFORMED BY CONTRACT 100 % AGENCY % DESCRIPTION OF EXISTING FACILITY 1 EXISTING DESIGN 2 PRESENT CONDITION (1) The existing surface has developed extensive alligator cracking and has deteriorated to the point of being substandard. (2) Subgrade is in satisfactory condition. (3) The overlay shell consists of placing fabric material and overlay with 2 1/2 inches of asphalt concrete, Class "B". FAA INVOLVEMENT DOT FORM 100 009A REVISED 3/81 Page 2 15 .0 01 NO TRAINS/DAY NO TRAINS/DAY OPERATING SPEED OPERATING SPEED MAINLINE NO TRACKS SPUR NO TRACKS 1 RAILROAD DATA RAILROAD NAME Private line, Port of Pasco CROSSING NO ROAD OR STREET NAME North 4th Avenue NO LANES 2 POSTED SPEED 45 NOTE Attach required photos for railroad projects COAST GUARD, CORPS OF ENGINEERS INVOLVEMENT ETC COORDINATION NONE DESCRIPTION OF UTILITY RELOCATIONS OR ADJUSTMENTS AND EXISTING MAJOR STRUCTURES INVOLVED IN THE PROJECT USE ADDITIONAL SHEETS IF NECESSARY NONE EXPLANATION OF TYPES AND AMOUNTS OF FUNDS OTHER THAN FA FUNDS AND MATCHING FUNDS ASSOCIATED WITH THE PROJECT NONE ESTABLISHED SOURCES OF MATCHING FUNDS ASSOCIATED WITH THE PROPOSED PROJECT FROM GENERAL FUND AND STREET OVERLAY FUND NORTH FOURTH AVENUE DATE AtENCV. PASCO PROJECT TITLE CERTIFICATION IS HEREBY GIVEN THAT MATCHING FUNDS AND OTHER FUNDS ASSOCIATED WITH THE PROJECT AS REFLECTED ABOVE ARE AVAILABLE TO COORDINATE WITH THE PROPOSED PROJECT DEVELOPMENT THIS PROJECT HAS BEEN REVIEWED BY THE LEGISLATIVE BODY OF THE ADMINISTERING AGENCY OR AGENCIES OR ITS DESIGNEE AND IS NOT INCONSISTENT WITH THE AGENCY S COMPREHENSIVE PLAN FOR COMMUNITY DEVELOPMENT SUBMITTING CITIES AND/OR COUNTIES PRIMARY INTEREST AGENCY BY (Mayor/Chairman) JOINT AGENCY BY (mayor/CnaIrman) JOINT AGENCY BY (Mayot/Chaltman) ATTACHMENTS A Attach additional comments if necessary B Attach a sketch of the type& roach:ray section. FINV to R/W C Attach a winced bridge section, if necessary O Attach 0 vicinity map E Attach photos of railroad crowing if necessary F Attach the program supporting data checklist DATE DATE DATE DO T FORM 100 0098 REVISED 3/79 (\ Page 3