HomeMy WebLinkAbout2017.08.14 Council Workshop PacketWorkshop Meeting AGENDA PASCO CITY COUNCIL 7:00 p.m. August 14, 2017 Page 1. CALL TO ORDER: 2. ROLL CALL: (a) Pledge of Allegiance 3. VERBAL REPORTS FROM COUNCILMEMBERS: 4. ITEMS FOR DISCUSSION: 3 - 4 (a) Award and Acceptance of SAFER Grant 5 - 12 (b) Professional Services Agreement Conceptual Design Services for Fire Station 83 & 84 13 - 20 (c) I-182 Interchange Feasibility Study Presentation 21 - 28 (d) Possible Sale of City Real Properties 5. MISCELLANEOUS COUNCIL DISCUSSION: 6. EXECUTIVE SESSION: 7. ADJOURNMENT. REMINDERS: 1. 11:30 a.m., Monday, August 14, Richland Red Lion – TRIDEC Membership Luncheon featuring Senator Maria Cantwell. (COUNCILMEMBER REBECCA FRANCIK) 2. 11:45 a.m., Monday, August 14, Pasco Red Lion – Pasco Chamber of Commerce Membership Luncheon. (Dr. Wanda Good, Lourdes Heath Network to present “Robotics and Bariatric Surgery Advancements”) 3. 5:30 p.m., Wednesday, August 16, Clover Island Inn – Benton, Franklin & Walla Walla Counties Good Roads & Transportation Association Meeting. Page 1 of 28 Workshop Meeting August 14, 2017 (COUNCILMEMBER BOB HOFFMANN, Rep.; REBECCA FRANCIK, Alt.) 4. 11:30 a.m., Friday, August 18 – Benton-Franklin Council of Governments Board Meeting. (MAYOR MATT WATKINS, Rep.; COUNCILMEMBER REBECCA FRANCIK, Alt.) This meeting is broadcast live on PSC-TV Channel 191 on Charter Cable and streamed at www.pasco-wa.gov/psctvlive. Audio equipment available for the hearing impaired; contact the Clerk for assistance. Page 2 of 28 AGENDA REPORT FOR: City Council August 8, 2017 TO: Dave Zabell, City Manager Workshop Meeting: 8/14/17 FROM: Bob Gear, Fire Chief Fire Department SUBJECT: Award and Acceptance of SAFER Grant I. REFERENCE(S): 2017 City Council Goals for Public Safety Pasco Fire Department Strategic Plan II. ACTION REQUESTED OF COUNCIL / STAFF RECOMMENDATIONS: Presentation to Council members and discussion III. FISCAL IMPACT: The City's share for match is estimated to be approximately $680,000 over the three year period. First 12-Month Period Second 12- Month Period Third 12- Month Period Total Personnel Cost $ 592,380 $ 592,380 $ 592,380 $ 1,777,140 Total Federal Share $ 444,285 $ 444,285 $ 207,333 $ 1,095,903 Total City Share (General Fund) $ 148,095 $ 148,095 $ 385,047 $ 681,237 IV. HISTORY AND FACTS BRIEF: City Council 2016-2017 public safety goals included reducing fire and ambulance response times and achieving a WSRB protection class 4. V. DISCUSSION: Page 3 of 28 The area in the City commonly referred to as Riverview has consistently had response times that exceed the City Council adopted 90% time of 6 minutes. In addition the Washington Survey and Rating Bureau (WSRB) and statistical data have identified the Riverview area as needing increased fire protection services. In order to meet City Council response time goals we have acquired a fire station in that area using a former fire district facility and residential house combination. However, funding provided to staff this station (8 4) was limited to a two personnel operating a medic unit. While not optimal, this measure will greatly improve medical response times to the Riverview area. With City Manager’s approval the Fire Department applied for federal funding assistance through a competitive grant to the SAFER program. The grant proposal requested the additional personnel necessary to staff the station with four people allowing for the operation of a fire engine and ambulance. This will significantly improve response times to the area, reduce overlapping call percentages and provide credit from the WSRB for a staffed fire unit, essentially taking a major step towards meeting these major City Council goals. The grant will provide 75% of the personnel costs in years one and year two and 35% of the personnel costs in year three. After the third year, the full personnel costs would be funded between the ambulance utility and the general fund or through staffing adjustments, or a combination thereof. While the local match match amount is significant, particularly for year 2020, the City's investment would leverage a much greater grant amount. The SAFER grant award, if accepted, represents a rare opportunity to greatly accelerate progress on two major Council goals which benefit all of Pasco with faster response times and the possibility of an improved community fire rating, and do so at less than 40 percent of the cost of going it alone. Further, the three year program would allow the City to explore long-term sustainability and make adjustments to assure sustainability. Staff looks forward to a more detailed discussion with Council and direction as to the grant. Page 4 of 28 AGENDA REPORT FOR: City Council August 7, 2017 TO: Dave Zabell, City Manager Workshop Meeting: 8/14/17 FROM: Stan Strebel, Deputy City Manager Executive SUBJECT: Professional Services Agreement Conceptual Design Services for Fire Station 83 & 84 I. REFERENCE(S): Proposed Agreement II. ACTION REQUESTED OF COUNCIL / STAFF RECOMMENDATIONS: Discussion III. FISCAL IMPACT: $63,714; included in 2017 budget IV. HISTORY AND FACTS BRIEF: Council recently approved the Fire Department Stretegic Plan which includes goals for the construction of a new Station 84 and the relocation of Station 83 to improve overall emergency response times and better serve the growing community. When the City first acquired the Road 48 Fire Station from Fire District N o. 3, as part of the 2015 annexation, the City secured the services of TCA Architects Planning to help evaluate the feasibility of using the acquired property for Station 84. TCA is well qualified to continue the process of determining conceptual design a pproaches for both stations. While properties have not yet been secured for the anticipated future station, the conceptual design process can proceed through most of the Phase 1 services and will provide information that should be of value in ultimate site selection/configuration. V. DISCUSSION: As the budget includes the necessary funding and it will be advantageous for the City Page 5 of 28 to commence the work at this time, staff recommends approval of the agreement. Page 6 of 28 Professional Services Agreement (Summary Sheet) Project: Station 83 (Road 68) and Station 84 (Road 48) Conceptual Design Project Consultant: TCA Architecture Planning Address: 6211 Roosevelt Way, NE, Seattle, WA 98115 Scope of Services: Please see attached Exhibit A and B. Term: 120 Days Completion Date: Payments to Consultant: ☐ Hourly Rate: $ ☐ Fixed Sum of: $63,714.00 ☐ Other: Insurance to be Provided: 1. Commercial General Liability: ☐ $1,000,000 each occurrence; ☐ $2,000,000 general aggregate; or ☒ $1,000,000 each occurrence; and $2,000,000 general aggregate 2. Professional Liability: ☐ $1,000,000 per claim; ☐ $1,000,000 policy aggregate limit; or ☒ $1,000,000 per claim; and $2,000,000 per policy aggregate limit Other Information: Signature by: ☐ Mayor ☒ City Manager Page 7 of 28 CITY OF PASCO Station 83 (Road 68) & Station 84 (Road 48) Conceptual Design Exh ibit A Approximate assumed stabon s1zes for fee calculation Station 83 l)tation 84 Fee Breakdown by Phase Schematic Design Design Development Construction Documents Bidding Construction Admin istration PHASE 1 SERVICES Task 1 Conceptual Design Station 83 & 84 l!-ltHI81T Conceptual Design/Programming (5) meetings-see exhibit A for scope description •assumes programming and conceptual design can be done concurrently Civil Engineering Station 83 Civil Engineering Station 84 Conduct site visit to assess and document existing conditions Meet and coordinate with TCA, City of Pasco, utilities regarding site development Research site zoning and utility availability for location Develop civil engineering narrative Develop conceptual/preliminary storm drainage design for unit cost estimation Prepare conceptual site layout plans and submit for review and comment Revise and finalize conceptual site layout plans based on City of Pasco feedback Conceptual Design Estimate Station 83 Conceptual Design Estimate Station 84 Divisions 1-14, 31 -33 Divisions 21-23, 26-2 8 Consultant Mark-up 15 %-Management & Handling Fee Reimbursable Expense Allowance Total Phase 1 PHASE 2-BASE DESIGN SERVICES Schematic Design Station 84-see exhibit A for scope description Station 84-see exhibit A for scope description Civil Engineering Station 83 C ivil Engineering Station 84 Meet and coordinate with TCA, City of Pasco, utilities regarding schematic design % 18 20 31 2 29 Develop schematic site grading and storm drainage designs per Storm water Manual and City requirements Develop schematic civil site plan based on Phase 1 and City feedback Prepare SEPA checklist for submittal to the City Planning Department Prepare CUP Application Schematic Design Estimate Station 83 Schematic Design Estimate Station 84 Divisions 1-14, 31 -33 Divisions 21-23, 26-28 Consultant Mark-up 15%-Management & Handling Fee Reimbursable Expense Allowance Total Phase 2 Consultants by City Survey Geotechnical Engineering Phase 1 Environmental Survey Ground Penetrating Radar General Assumptions Assumes a design I bid I build process Assumes a single bid phase $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 7-9,000 SF 11 -13,000 SF N/A N/A N/A N/A Fee 34,500 3,400 3,400 7,125 8,000 3,289 4 ,000 63,714 Fee 38,880 58,320 3,700 3,700 8,000 9,000 3,660 5,000 130,260 Page 8 of 28 CITY OF PASCO Station 83 (Road 68) & Station 84 (Road 48) Conceptual Design Exhibit B arc h i t ectur e • pla n n i ng PHASE 1 TASK 1 Conceptual Design Services in this phase include: Services to develop a detailed facility program, obtain and analyze site information, develop conceptual site and floor plan diagrams, prepare a cost estimate and project budget. • Provide project administration (project management, meeting coordination, consultant coordination, client correspondence, meeting minutes). • Program questionnaire development and distribution. • Administer a project kick-off meeting to id entify and review project goals, schedule, and potential risks. Programming questionnaire review. • Refine project schedule, inclusion plan and risk framework from project kick-off meeting. • Work with the City to coordinate on-site investigations. (see below for responsibility) • Programming meeting-space needs and diagram review, space criteria, space adjacency discusions. • Update program diagrams and adjacencies. • Final programming meeting. • Research project zoning ordinances and building code. • Develop civil engineering narrative. • Verify preliminary code information with City. • Develop site relationship diagrams and massing studies. • Develop conceptual civil engineering concept. • Presentation to stakeholders. • Refinement of site design concept, conceptual plan and massing studies. • Work with cost estimator to develop ROM construction costs and project budget. • Update project schedu le based on conceptual design findings. • Present conceptual design documents and cost estimate to the City for review and comment. • Finalize conceptual design documents and cost estimate. Deliverables TCA City Survey X Geotechnical report City X Phase 1 Environmental Survey X Ground Penetrating Radar Survey X Abatement Survey NA Risk Analys is Tracking Fram ework X Facility Program X Zoning & Code Complia nce Review w/ City X Project Schedule X Conceptua l Design X Project Budget X Page 9 of 28 PHASE 2 TASK 1 Schematic Design -13% of Basic Service Fee Services in this phase include: Services to prepare drawings and documents further developing the conceptual design, scale and relationship of project for approval by the City. • Provide project administration (project management, meetings, consultant coordination, client • Work with the City to coordinate additional on-site investigations, studies, reports, and/or update as nece ssary. • From the conceptual plan develop schematic design drawings in corporating comments into developed floor plans, elevations, site plan, and electronic massing model. Submit design drawings to City for review and comment. • Develop furnishings and equipment list for incorporation into construction documents as Owner or Contractor supplied . • Adjust sc hematic desi gn as required to meet City needs. • Refine outline specifications desc ribing general types of construction materials, HVAC systems and electrical requirements. • Review and develop documents as required for a conditional use/variance submittal (if required) • Further research of zoning ordinances and building code for project conformance. • Obtain preliminary code review of project from the City. • Work with cost estimator to develop updated construction costs. • Pre se nt drawings to neighborhood (if required). • Present 30 % design documents, including specifi cat ions and cost estimates to the City for review and comment. • Update project schedul e. • Obtain approval from the City to proceed to the next task. TASK 2 Design Development-20% of Basic Service Fee (Future) Services in this phase include : Services to prepare drawings, specifications and other documents to fix and describe the size and character of the entire project, including site and building systems, materials and elements. • Provide project administration (project management, meetings, consultant coordination, client correspondence). • Work with Civil Engineer, GeoTech, Traffic Engineer (if required), Surveyor, and Landscap e Architect to prepare the Conditional Use Permit/Variance and site plan submission. • Design development of site improvements and building as necessary to define the functional layout and meet the City design goa ls. • Develop 24 x 36 design drawings including plans, elevations, sections, wall sections, interior elevations, si te plan, site utilities, grading plan, drainage plan, paving plan and landscape plans in conjunction with the other disciplines. • Update specifications and expand detail. • Work with the City to review Owner Contractor Agreement and General Conditions of the Contract. • Work with estimator to develop an updated construction co st and project estimate. Estimate to include but not be limited to construction costs, professional fees, f urnishings, permit, special inspections, and escalation . Page 10 of 28 • • • • Submit 60% documents to the City for review and comment . Obtain approval from the City to proceed to next task . Update project sc hedule . Digital copy of final task deliverable shall be provided . TASK 3 Construction Documents-36% of Basic Service Fee (Future) Services in this phase include: Services to prepare drawings, specifications and other documents setting forth in detail the requirements for permit ap prova l, bidding and construction of the project. • Provide project administration (project management, meetings, cons ultant coordination, client correspondence). • Finalize construction documents. • Finalize technica l specifications. • Submit 95% documents to the City for review and comment. • Coordinate construction documents and specifications with project team. • Coordinate project team as necessary to obtain permit approvals. • Work with estima tor to update proj ect estimate to bidding level accuracy. • Project budget update. • Preparation of Project Manual. • Submit construction documents for permit. • Respond as necessary to plan check comments. • Upd ate project schedule. • Digital copy of fina l task deliverable shall be provided. TASK 4 Bidding and Negotiation-2% of Basic Service Fee (Future) Services in this phase include: Services to assist the City in issui ng bid documents. • Work with City coordinating the advertise ment for bid s. • Coordinate reproduction and delivery of bid documents for bidding with print shop. • Attend pre-b id confer ence (as required). • Respond to and clarify bidder questi on s by addendum. • Eva lu ate bids and recommend lowest responsible bidder to the City. TASK 5 Construction Administration & Closeout-29% of Basic Service Fee (Future) Services in this phase include: Services to administer the construction contract as se t forth in the genera l cond itions of the contract for construction. • Participate in pre-con struction meeting. • Attendance at bi-monthly site meetings during construction for the purpose of coordination and observing gener al conformance to the design intent. • Proces s Supp lementary Instructions, Proposal Reque sts, Change Orders, Change Directives and coordinate issue resolution during the construction phase. • Respond to contractor questions during construction (Request for Information-RFis). • Coordinate consu ltants to add ress questions during construction. • Review submittals and shop drawings. • Rev iew and process monthly certificates for payment in co njun ctio n with the City. Page 11 of 28 • Provide pre-final in spection and punchlist. • Facilitation of Operation and Maintenance Manuals, warranties and guarantees. • Issue a Certificate of Substantial Completion. • Provide Final Inspection (Base contract includes two reviews). • Time of constru ction administration assumes from Notice to Proceed to 60 days past substantia l completion. Work beyond this time period shall be billed as an additional service . Page 12 of 28 AGENDA REPORT FOR: City Council August 7, 2017 TO: Dave Zabell, City Manager Rick Terway, Interim Public Works Director Workshop Meeting: 8/14/17 FROM: Dan Ford, City Engineer Public Works SUBJECT: I-182 Interchange Feasibility Study Presentation I. REFERENCE(S): PowerPoint Presentation II. ACTION REQUESTED OF COUNCIL / STAFF RECOMMENDATIONS: Discussion III. FISCAL IMPACT: N/A - Presentation Only IV. HISTORY AND FACTS BRIEF: The City's centric location has made it home to several regional facilities, including the Tri-Cities Regional Airport, the Columbia Basin College, the Trade, Recreation and Agricultural Center (TRAC), and the GESA Stadium. Pasco has experienced recession-defying growth over the past 16 years, more than doubling its population from 32,066 in 2000 to an estimated 70,560 as of April 2016. This growth has resulted in high levels of congestion throughout the City, particularly along Interstate 182 (I - 182) and the local corridors that provide access to regional facilities. Current planning efforts estimate additional population growth between 75 and 80 percent over the next 25 years. Existing population levels, as well as expected growth, are driving the need to identify ways to redistribute regional traffic within the local transportation networks. Prior to considering improvements to the interstate system (I -182), WSDOT and FHWA required that the city conduct a feasibility study that demonstrates that improvements to the local transportation network alone will not meet the needs. Following a consultant selection process, Council awarded the Professional Services Agreement (PSA) to BergerABAM Inc. at the August 4, 2014 Regular Meeting. BergerABAM completed the feasibility study in January and staff, as well as WSDOT Page 13 of 28 and FHWA have reviewed the findings, conclusions and recommendations. V. DISCUSSION: In addition to the No-Build alternative, the feasibility study identified and evaluated a total of 13 build alternatives all geared at improving mobility and decreasing congestion. Employing a two -tiered screening process and traffic modeling results for each of the alternatives, the Technical Advisory Committee (TAC) determined that all of the local improvement alternatives were fatally flawed due to their inability to provide the desired congestion relief through the regional and local transportation networks. Alternatives that proposed access modifications to the existing regional network were the only options that successfully passed the Level 1 screening evaluation. Screening process and results were presented to key representatives from FHWA and WSDOT on July 25, 2016. This group agreed with the findings of the TAC’s evaluation that local alternatives alone are not able to meet current and projected traffic congestion within the central area of the City of Pasco. Given these findings, and following the project process that the City prepared at the inception of the project through coordination efforts with FHWA and WSDOT, the feasibility report recommends that the project moves forward to complete additional study through the development of an Interchange Justification Report (IJR). This may ultimately result in the addition of an interchange, within the Pasco corridor, that will help distribute local transportation and alleviate congestion. Jilma Jiménez, a Vice President of BergerABAM, will share the major findings of the study as part of the presentation to Council. Staff recommends moving forward with the development of the IJR. Page 14 of 28 Feasibility Traffic Study for Interchanges City Council Workshop 14 August 2017 Page 15 of 28 Project Background Page 16 of 28 Project Process  Page 17 of 28 Summary Report Page 18 of 28 Next Steps •Finalized coordination with WSDOT & FHWA on report approval •Begin IJR with new BFCOG Model Page 19 of 28 Questions? Page 20 of 28 AGENDA REPORT FOR: City Council August 10, 2017 TO: Dave Zabell, City Manager Workshop Meeting: 8/14/17 FROM: Stan Strebel, Deputy City Manager Executive SUBJECT: Possible Sale of City Real Properties I. REFERENCE(S): II. ACTION REQUESTED OF COUNCIL / STAFF RECOMMENDATIONS: Discussion; provide direction to staff III. FISCAL IMPACT: IV. HISTORY AND FACTS BRIEF: The City has ownership of a number of real properties, which are not needed for public purposes, and which could be leased or sold. As individuals inquire about the possible purchase of such properties, it is helpful for staff to understand the parameters within which it may operate, in responding to such inquiries. There are currently five properties for which staff has received inquires, and which have been discussed with Council over the last several months. While the sale of real estate can involve some discussion in executive session (specifically the value associated with the factors that influence the sale price) the discussion leading up to and following the setting of an acceptable sale price must be conducted in open public meetings. These discussions include: 1. Whether Council is interested in sale or lease of a property; and 2. Whether the property should be sold by private -negotiated or public sale. In the case of a negotiated sale, the Council should prepare a Resolution declaring the property surplus and setting the price for the sale of the property, including Council's reasons for the negotiated sale selection. There are a number of factors which can influence the price of the property, including: 1. Possible future City need/use; 2. The appraisal price; 3. Property or sales tax generation by the purchaser; Page 21 of 28 4. The services to be provided by the purchaser; 5. The compatibility of the proposed purchaser's plan with the existing neighborhood or master plan; and 6. The availability of essential governmental services. Council should discuss the above factors in open public session; however, the value associated with each factor discussed relative to the setting of the sale or lease price may be discussed in executive session. The five (5) parcels that have been identified for possible sale are listed below: 1. 2.11 acre Industrial parcel on Commercial Avenue and Highway 12 (see attachment #1). This property was offered for sale or lease by a request for proposals. The minimum purchase price was listed at $185 ,000 and the minimum monthly lease amount set at $1,000. No proposals were received by the City at the July 14 submittal deadline. o Recommendation: staff recommends this parcel be posted on site for sale with the same price guideline as above. 2. 3.78 acre Commercial/Residential parcel on East Lewis Street (see attachment #2). This property was offered for sale by a request for proposals. The minimum price was listed at $335,000. No proposals were received by the City at the July 28 submittal deadline. o Recommendation: staff recommends the parcel be posed on site for sale with the same minimum price guidelines as above. 3. 18 acres of Industrial zoned property on A Street, east of Oregon Avenue (see attachment #3). The City has received an unsolicited offer to purchase this property. The property is currently in mid -process for demolition of a nuisance structure, a former meat-packing plant. The unsolicited offer contains a provision for demolition of that structure. City costs for the purchase of the property, several years ago, through the payment of tax liens, forgiveness of penalties for code violations, forgiveness of costs incurred for actual abatement costs and for the purchase of one of the parcels at a Sheriff's sale total approximately $150,000. o Recommendation: staff recommends discussion in executive session to determine the minimum acceptable price for sale of the property. 4. Residential lot (12,000+/- square feet) at the northwest corner of "A" Street and 1st Avenue (see attachment #4). The City purchased this property, in order to make intersection improvements, for $28,456 in 2013. The improvements have been made and the City no longer needs the remaining parcel. o Recommendation: staff recommends this parcel be posted on site for sale or listed with a real estate agent after an appraisal or opinion of value is secured. 5. Residential lot (60,500 square feet or 1.4 acres) located between Road 52 and Road 56 on Dradie Street (see attachment #5). The City obtained title to this property, which was a well site, at the time that it purchased the West Pasco Water System. As the well is no longer viable, the City Water Utility has no need for the property. The property has been appraised at $100,000 if sold as Page 22 of 28 one parcel. The property could be subdivided into two lots, each with an appraised value of $80,000. Staff is in the process of de-commissioning the well to make the parcel more readily useable for another purpose. It is estimated that it will cost about $3,000 to subdivide the property. o Recommendation: staff recommends that the parcel be subdivided and posted on site for sale or listed with a real estate agent at the appraised value. As the parcel was acquired through the Utility Fund, a public hearing must be held prior to disposal of the property. V. DISCUSSION: Council may wish to discuss the factors which may affect the value of each parcel during the workshop meeting. Discussion regarding how factors relate to price may be held in executive session. Page 23 of 28 SpmguePestSolutionsPage 24 of 28 N.m...._..%?w_Crum,RH:112073088378AcresPage 25 of 28 City of Pasco, IS Division VicinityMap Item: K F Inc. Meat Packing Plant DemolitionApplicant: City of Pasco WAFile #: EXE C 2017-019 ± SITE E "A" ST BUTTE ST ELM AVEDOUGLAS AVEOWEN AVEBEECH AVESYCAMORE AVEHUGO AVEWALDEMAR AVECEDAR AVEPage 26 of 28 8mmn_..w><maucmuwmbm..<......E._8>>z m~m8o~:u_wu._m¢ Page 27 of 28 Page 28 of 28