TASK ORDER NO.4
Reviewed By:�gz: City Project Code: 110.4b. 3?s-5Y/.4sy�
REGARDING GENERAL AGREEMENT BETWEEN CITY OF PASCO
AND
DKS ASSOCIATES (CONSULTANT)
Project Description:
The professional engineering services associated with this Task Order 4 are for W Sylvester Street Audible
Push Buttons Improvements (PROJECT).
Scope of Services:
CONSULTANT will work with the City staff to provide professional engineering services for the
PROJECT. CONSULTANT services shall include:
See Exhibit A
Time of Performance:
Following authorization to proceed, CONSULTANT will diligently pursue completion of the PROJECT
within 60 calendar days
Fee for Services:
All work shall be performed on a time -spent basis at the normal hourly billing rates included in our General
Agreement with a maximum amount of $5,100. This maximum amount may be revised only by written
agreement of both parties. / ,,
Proposed:
DKS Associates
Date
Approved: r�i /9 �6
City of Pasco ate
RrkTerwa�—'� +a✓t or
Professional Services Agreement- DKS Associates
On -Call Municipal Engineering Services Pagel of 2
alyl&
Exhibit A
Task 4 Scope of Work
W Sylvester Street Audible Push Buttons Improvements
August 24, 2016
Purpose
The purpose of this project is to provide engineering design services for the installation of audible push
buttons at W Sylvester Street/N 4th Avenue and W Sylvester Street/N 5th Avenue intersections.
Task 1: Signal Design
DKS will revise existing 75% level signal design plans for this intersection as part of the Citywide Signal
Improvements project to allow for the installation of audible push buttons on existing poles prior to the
construction of the Citywide Signal Improvements project. A detail for the audible push button installation
will be added to the signal detail sheets as needed.
Deliverable:
• Preliminary submittal (l 1x17 PDF electronic format) via e-mail— 3 to 4 sheets
• Final submittal (l 1x17 PDF electronic format) via e-mail — 3 to 4 sheets
Assumptions:
• No additional survey/base map drafting will be required.
• Specifications and engineer's cost estimate will not be included.
• A site visit will not be necessary
• In person meetings will not be necessary as part of this task
• Design process is expected to be completed within a month of receiving notice to proceed,
dependent on City staff review time.
• Push buttons will be installed by City's electrical on-call contractor
Professional Services Agreement- DKS Associates
On -Call Municipal Engineering Services Page 2 of 2