HomeMy WebLinkAboutILA - 2017 Animal Control Authority Facility ConstructionWHEN RECORDED RETURN TO:
City of Pasco, Washington
525 North 3rd
Pasco WA 99301
INTERLOCAL AGREEMENT
Between
CITIES OF PASCO, KENNEWICK and RICHLAND, WASHINGTON
for the
CONSTRUCTION OF AN ANIMAL CONTROL AUTHORITY FACILITY
THIS INTERLOCAL COOPERATIVE AGREEMENT (hereinafter called
"Agreement") is made and entered into by and between the City of Kennewick,
Washington (hereinafter referred to as "Kennewick"); City of Pasco, Washington
(hereinafter referred to as "Pasco"); and the City of Richland, Washington (hereinafter
referred to as "Richland"), collectively referred to hereinafter as the "Parties."
WHEREAS, the Parties have entered into that Interlocal Agreement dated the
23`d day of August, 2005, and Amendments hereto, and the Operating Jurisdiction
Agreement, dated the 1'` day of January, 2007, creating and providing for the operation
of the Tri -Cities Animal Control Authority (ACA) for the benefit of the Parties; and
WHEREAS, the Parties have determined there is a need for a new physical
facility within which to locate the Animal Control Authority to provide effective and
humane animal control; and
WHEREAS, the Parties are authorized by RCW 39.34 to enter into an Interlocal
Cooperative Agreement for such purposes.
NOW, THEREFORE, in consideration of the mutual covenants contained
herein, it is agreed as follows:
1. Puraose. The purpose of this Agreement is to:
Interlocal Agreement - Construction of ACA Facility - I
A) Describe the process, procedures, and conditions by which the
Parties will cooperate in the siting, design, and construction of a new animal
control facility to serve the needs of the Parties, and such subscribers that may
be permitted to participate; and
B) Establish the conditions under which the newly constructed
animal control facility shall be operated.
2. Feasibility Study.
A) The Parties authorize and direct a feasibility study to be
commenced upon the execution of this Agreement to be prepared by a
Consultant selected by the Management Committee of the ACA composed of
the City Managers, or their designees (Committee) to determine the feasibility of
constructing an animal control facility consisting of approximately 8,000 square
feet upon real property owned by Pasco generally located at 1312 South 18th
Avenue, Pasco, Washington, to consist of up to five (5) acres within that area
designated in Exhibit A. The facility to be constructed is more particularly
described in Exhibit B, including such components as necessary for the conduct
of an animal control program. The facility will also be designed for incremental
addition of housing units with future expansion. The feasibility study will
include a determination of appropriateness of the site's size and configuration
for the construction of the proposed facility while continuing to operate the
existing facility, conformance with zoning regulations, any shoreline
management and land use requirements, utility service and easements. The
feasibility study would include determination of the steps and costs necessary
for land use and shoreline permitting, road vacations, easement and boundary
adjustments necessary to accommodate the facility; environmental suitability;
expansion capacity; the compatibility with neighboring uses, and an estimated
construction budget for the Facility. The feasibility study shall also include a
statement of estimated long-term operating costs of both the Facility and the
program operations.
B) Within three (3) months of the date of the execution of this
Agreement by all Parties, the feasibility study shall be completed and submitted
to the Committee for its consideration and authorization to proceed.
C) All costs of the feasibility study, not to exceed a total of
$60,000.00, shall be documented by Pasco; presented for approval by the ACA;
and such approved costs shall be equally borne among the Parties.
3. Purchase of Property. Upon authorization to proceed by the Parties
through the Committee the property shall be acquired by the Parties from Pasco who
shall sell by Statutory Warranty Deed an undivided one-third interest in the property to
Interlocal Agreement - Construction of ACA Facility - 2
Kennewick; one-third undivided interest to Richland; and retain one-third undivided
interest in the property, thereby, creating joint, undivided, and equal interest in the
ownership of the property by the Parties.
4. Determination of Purchase Price. The purchase price for the property
shall be its fair market value as determined by an MAI qualified appraiser selected by a
majority vote of the Committee The selected appraiser shall provide the appraised
value to the Committee of the ACA within sixty (60) days of the Committee's
authorization to proceed as provide in Section 3 above. Upon approval of the purchase
price by the Committee closing shall occur within ninety (90) days or such other date as
the Parties may mutually agree. Payment of the purchase price shall be in cash or by
electronic transfer of funds at closing consisting of:
A) Kennewick's payment of one-third of the purchase price;
B) Richland's payment of one-third of the purchase price; and
C) Pasco's receipt of a credit of one-third of the purchase price
representing its retained ownership interest in the property.
Closing shall be at Benton -Franklin Title Company, with all costs of closing
shared equally among the Parties.
5. Request for Proposals. Upon authorization and approval of the City
Managers of the participating jurisdictions, a Request for Proposals (RFP) will be
solicited by Pasco for the design and construction management of the ACA facility to
be constructed on the purchased property conforming with the project scope, standards
and specifications approved by the Committee, and a recommendation for the project
budget (including contingencies).
Pasco shall circulate and advertise the RFP, with responses to be received within
ninety (90) days. Upon receipt of the RFP responses, Pasco shall present such
proposals to the Committee for consideration. The Committee shall have the authority
upon unanimous concurrence to accept the qualified proposal meeting the project scope,
standards and specification of the RFP that best serves the interest of the Parties. The
Parties reserves the right to reject any and all responses, and retains the right to waive
minor irregularities in the procedure. The Parties may then authorize the Committee to
proceed with the project.
6. Construction of Facility.
A) Upon acceptance of a completed facility design and project
budget, the Committee shall call for, and award a bid for construction of the
Interlocal Agreement - Construction of ACA Facility - 3
Facility submitted by a responsible and qualified bidder within the approved
construction budget.
B) Pasco shall act as the lead agency for the project and shall
provide contract management services, including legal services, inspection
services (including authorization for approval or rejection of minor change
orders under $20,000.00 up to $100,000 of the contingency amount included in
the project budget), and secure the City Managers of the participating
jurisdiction's approval for major change orders (over $20,000.00) consistent
with the adopted project budget. Pasco will report all approved minor change
orders to the City Managers in a timely manner.
C) Pasco as lead agency shall administer the Request for Proposals
and any related bid process.
D) Pasco as lead agency shall provide notice of contract award and
administrate the contract, including accounting, payment of contractors selected,
and keeping the project records subject to the State record retention laws.
7. Payment for Facility Construction. The facility shall be constructed in
two phases. The fust phase shall consist of site preparation and construction of the new
facility. Subject to the payment schedule provided below, final payment for this phase
of the project shall be payable upon the issuance of a Certificate of Occupancy of the
facility. The second phase shall consist of the demolition of the existing facility and
completion of all site improvements of the project including the installation of all
fixtures, equipment and finnishings for the project. Final payment for this portion of
the project shall be payable upon the unanimous written acceptance by the Committee
of the second phase.
Pasco shall secure monthly progress payment invoices showing actual
expenditures during the previous month on the project. Invoices shall be based upon
contractor's payments, equipment, materials, and labor expended on the project. Pasco
shall bill each jurisdiction for one-third of the monthly progress payment which shall be
paid to Pasco for payment to the contractor within thirty (30) days of receipt.
Upon completion of the project, Pasco shall conduct a final audit of the project
at which time all adjustments required to be made shall be reflected in the final billing
prior to acceptance of the project. Any dispute regarding payment, shall be resolved
pursuant to Section 12 below, "Dispute Resolution." Each of the Parties shall be
responsible for one-third of the total final cost of construction of the facility.
8. Facility Use. Upon acceptance of the facility by the Committee, after
recommendation of the lead agency, the facility shall immediately be available for use
by ACA and all third -party contractors for services to the ACA under the terms of the
Interlocal Agreement - Construction of ACA Facility - 4
Interlocal Cooperative Agreement between the Cities of Pasco, Richland, and
Kennewick Washington for Creation and Operation of Tri -Cities Animal Control
Authority.
9. Duration. This Agreement shall become effective immediately upon
execution by all Parties, and posting of the Agreement on each Party's website or filed
with the respective County Auditors pursuant to RCW 39.34.040. This Agreement shall
remain in effect until the construction of the facility is completed in full and the work
has been accepted by the Parties, unless terminated sooner by mutual agreement of the
Parties, or as provided herein.
10. Termination. This Agreement may be terminated by any Party upon
thirty (30) days advance written notice prior to the Committee's authorization to
proceed as provided in Section 3 above.
After authorization to proceed and the award of the construction contract, this
Agreement may only be terminated by mutual agreement of the Parties.
11. Chanties and Modification. Any Party may request changes,
amendments, or additions to any portion of this Agreement, however, except as
otherwise provided in this Agreement, no such change, amendment, or addition to any
portion of this Agreement shall be valid or binding upon any Party unless it is in writing
and executed by all Parties. Such changes shall be made part of this Agreement and
shall be posted upon each Party's website or filed with the County Auditor pursuant to
RCW 39.34.040.
12. Dispute Resolution. In the event of a dispute regarding the
enforcement, breach, default, or interpretation of this Agreement, the City Managers, or
their designees, shall first meet in a good faith effort to resolve such dispute. In the
event the dispute cannot be resolved by agreement of the Parties, said dispute shall be
resolved by arbitration pursuant to RCW 7.04A, as amended, with all Parties waiving
the right of a jury trial upon trial de novo, with venue placed in Pasco, Franklin County,
Washington.
13. Interlocal Agreement. No special budget or funds are anticipated, nor
shall be created, except for a temporary fund necessary for the payment of the
contractors as provided in Section 7 above. It is not intended that a separate legal entity
be established to conduct this cooperative undertaking, nor is the acquiring, holding, or
disposing of real or personal property other than as specifically provided within the
terms of this Agreement. The City Manager, or his designee for the City of Pasco shall
be designated as the Administrator of this Interlocal Agreement.
14. Records. The records and documents with respect to all matters covered
by this Agreement shall be subject to inspection by any jurisdiction during the terms of
Interlocal Agreement - Construction of ACA Facility - 5
this Agreement, and for three (3) years after its termination. Pasco, as the
Administrator of this Agreement, shall comply with all retention requirements under
Washington State law.
15. Disposition of Property. In the event of termination of the ACA, failure
of any Party to adopt an Animal Control Plan as provided in the ACA Interlocal
Agreement or in the event a Party gives notice of intent to withdraw, the remaining
Parties may elect to continue participation in the ACA Interlocal Cooperative
Agreement, or to terminate that Agreement. On such event, the Parties shall determine
a fair market value of the facility, improvements, and fixtures in the same manner as
provided in Section 4 above. The remaining Parties may continue by purchase of the
withdrawing Party or Parties' interest in the facility. In the event of termination, the
facility shall be placed for sale subject to a right of purchase by Pasco for fair market
value exercised by giving written notice within sixty (60) days of the date the property
is offered for sale and closed within ninety (90) days thereafter; or the right of first
refusal equal to any offer received by a bona fide third -party purchaser exercised by
written notice within thirty (30) days of the Committee's acceptance of a bona fide third
Party offer, and closed within ninety (90) days thereafter. In the event the facility is
placed for sale and Pasco does not exercise its right of first purchase nor any bona fide
third party offers to purchase have been received, the property shall be disposed by
mutual agreement of the Parties with each Party bearing an equal portion of the costs to
maintain the property pending disposition.
IN WITNESS WHEREOF, the undersigned having full authorization on behalf
of the Parties, have executed this Agreement on the year and date set forth above.
CITY OF PASCO, WASHINGTON
Matt Watkins, Mayor
A est:
�t 4
ebbie Clark, City Clerk
Appr s to Form:
Leland B. Kerr, City Attorney
Interlocal Agreement - Construction of ACA Facility - 6
ASHINGTON
Steve Young,
CITY OF RICHLAND, WASHINGTON
Robert Thompson, Mayor
Interlocal Agreement - Construction of ACA Facility - 7
Atteess
Terri L. Wright, City Clerk
Approved as to Form:
Lisa Beaton, City Attorney
Attest:
Marcia Hopkins, Citi Clerk
Approved as to Form:
Heather Kintzley, City Attd&ey
STATE OF WASHINGTON)
ss.
County of Franklin )
On this day personally appeared before me Matt Watkins, Mayor of the City of
Pasco, to be known to be the individual described in and who executed the within and
foregoing instrument, and acknowledged that he signed the same as his free and
voluntary act and deed for the uses and purposes therein mentioned.
GIVEN under my hand and official seal this day of &G -2"r -
Notary PubMic T
State
of Washington
SANDY TI
MY COMMISSIONSION EXPIRES PIRRES
NOTARY PUB in and for the Stat of Washington
August 7, 2079
SMSS
Residing at: S
My Commission Expires: 7
STATE OF WASHINGTON)
ss.
County of Benton
)
On this day personally appeared before me Steve Young, Mayor of the City of
Kennewick, to be known to be the individual described in and who executed the within
and foregoing instrument, and acknowledged that he signed the same as his free and
voluntary act and deed for the uses and purposes therein mentioned.
GIVEN under my hand and official seal this ay of til(
2016. _
YN"
rm?OTA'q/ &
Ab9��6
,Ott OVA
9 C'�4q ���.�••�� V�Or.
Residing at:.-Y_k
My Commission
in and for the)State of Washington
Interlocal Agreement - Construction of ACA Facility - 8
STATE OF WASHINGTON )
ss.
County of Benton
On this day personally appeared before me Robert Thompson, Mayor of the City
of Richland, to be known to be the individual described in and who executed the within
and foregoing instrument, and acknowledged that he signed the same as his free and
voluntary act and deed for the uses and purposes therein mentioned.
GIVEN under my hand and official seal this IL day of Jr-twJ
2016.
\ p C 8q,, / NOTARY PUBLIC in and for the State of Washington
Residing at: jLbtp2nl Ct)W t-4
°e��Pss10 F y9'' My Commission Expires: llllt,�2e
PUBL\G •� 2
;o
FOF'WASN\\``��
Interlocal Agreement - Construction of ACA Facility - 9
CONTROL AUTHORITY FACILITY AREA (E;
EXHIBIT B
SCOPE OF ANIMAL CONTROL AUTHORITY REPLACEMENT FACILITY PROJECT
The Animal Control Authority facility being constructed pursuant to an interlocal agreement
between the cities of Pasco, Kennewick and Richland Washington will be designed and
constructed to meet the following requirements:
1. The facility will be constructed on up to a five -acre site, as determined by the feasibility
study provided for in the construction agreement, and shall be jointly owned by the
three cities.
2. The facility will be no larger than 8,000 square feet in size.
3. The facility will have a total annual capacity equal to 4,563 animals (2433 cats and 2130
dogs) assuming an average length of stay of 12 days per animal.
4. The facility will contain a total of 180 animal housing units of which 150 housing units will be all
weather units and 30 will be indoor/outdoor units. Of the 180 housing units, 70 will be for dogs
and 80 for cats. The 70 dog housing units will include 30 indoor/outdoor units and 40 all-
weather units. At least half of the dog housing units will be designed and constructed to provide
housing for more than one dog when required.
5. In addition to animal housing units, the facility shall contain two community cat rooms and an
outdoor visitation/exercise area for dogs.
6. The facility shall be designed and constructed so that additional animal housing units may be
easily added onto the facility at a future date.
7. Exterior building finishes should be and appear "functional" similarto the existing Benton
County Animal Control facility.
8. The facility shall be designed and constructed to meet the City of Pasco's building code and
design standards.
9. Animal housing units should be efficient and cost effective with the objective of minimizing
staffing and maintenance requirements over the life of the facility. An analysis of the housing
unit options and a recommendation shall be provided to the ACA Board for approval prior to
completion of the draft design.