HomeMy WebLinkAboutRH2 Engineering Amend No 1 Butterfield Intake No 9AMENDMENT NUMBER 1 TO
PROFESSIONAL SERVICES AGREEMENT
Butterfield Intake Pump No. 9 Condition Assessment
WHEREAS, the City and RH2 Engineering, Inc. entered into a Professional Services
Agreement on January 27, 2016 to provide engineering services with respect to the Butterfield
Intake Pump No. 9 Condition Assessment project.
NOW, THEREFORE, this agreement is amended to allow RH2 Engineering, Inc. to
provide additional engineering services as described below:
Scope of Work:
See additional scope of work attached on Exhibit A.
2. Fee:
The compensation for the additional work is based on an hourly basis not to exceed the
amount of $2,989, as shown on Exhibit B, for a total contract amount of $5,663.
3. Time of performance:
The services shall be complete for the project on or before December 31, 2016.
DATED this W
CITY OF PASCO:
�i
ck Terway, D&for
day of November, 2016.
ATTEST:
�&L� 0 4
Debbie Clark, City C erk
APPROVED AS TO FORM:
Leland Kerr, City Attorney
CONSULTANT NAME:
c L� &IM
Paul R. Cross, Executive VP
Amendment No. 1 to Professional Services Agreement Page 1
RH2 Engineering, Inc.
Butterfield Intake Pump No. 9 Condition Assessment l C,2a
EXHIBIT A
Scope of Work
City of Pasco
Butterfield Intake Pump No. 9 Condition Assessment
Amendment No.1
October 2016
Background
The City of Pasco's (City) existing raw water intake for the Butterfield Water Treatment Plant
(WTP), located on the Columbia River near the Cable Bridge, is equipped with four vertical turbine
pumps (identified as Pump Nos. 6 through 9) that pump raw surface water to the WTP for
treatment. RH2 Engineering, Inc., (RH2) assessed the condition of Pump No. 9 in February 2016.
During field data collection for Pump No. 9, RH2 also collected data for Pump Nos. 6, 7, and 8.
The City contacted RH2 on September 27, 2016, and requested that RH2 analyze the data collected
for Pump Nos. 6, 7, and 8 to assess the current condition of these pumps and motors. This Scope of
Work includes the tasks necessary for RH2 to evaluate the condition of Pump Nos. 6, 7, and 8, and
to document those results.
Task 1— Pump and Motor Condition Assessment — Three Remaining
Butterfield Pumps
Objective: Assess the condition of the pumps and motors for Pump Nos. 6, 7, and 8 at the City's
Butterfield Intake facility.
Approach:
1.1 Import and review the data collected in February 2016 for Pump Nos. 6, 7, and 8 to conduct a
frequency vibration analysis and wire -to -water efficiency, develop a pump curve, and calculate
the total dynamic head required for each pump at its design pumping rate.
1.2 Input field data into spreadsheets. Develop pump and wire -to -water efficiency curves for
Pump Nos. 6, 7, and 8.
1.3 Compare the field-tested pump and wire -to -water efficiency curve data with the published
curve data provided by the manufacturer.
1.4 Based on the results of the frequency vibration analysis, evaluate the following:
• Status of motor conditions, including rotors, static/dynamic eccentricities,
connection faults, and load -related problems, etc; and
• Motor/pump bearing problems.
RH2 Deliverables: A letter report signed and stamped by licensed professional engineers
presenting the results of the existing condition and pumping characteristics of the Butterfield Intake
Facility pumps (Pump Nos. 6, 7, 8, and 9). One (1) PDF copy of the letter report.
1
10/6/201611:52:36 AM \\�h2\df5\Richland\Dare\PSC\716-015\A-Proj Man\A-1\Amend_N..A-1_S0IX'1'SC,3utte&dd Condtinn AssessmrnW.d
EXHIBIT B
City of Pasco
Butterfield Intake Pump No. 9 Condition Assessment
Amendment No. l
Fee Estimate
w;
Taskl Pum and Motor Condition Assessment -Three Remaining Butterfield Pumps
18
$
2,817
$ 172
$ 2,989
1.1 Import and review data
6
$
950
$ 36
1 986
1.2 lPrepare spreadsheets and develop curves
2
$
334
$ 8
$ 342
1.3 ICompare curves with published curves
2
$
334
$ 8
$ 342
1.4 lEvaluate pump and motor condition based on vibration results
8
$
1,199
$ 120
$ 1,319
PROJECT TOTAL
is
$
2,817
$ 172
2,989