Loading...
HomeMy WebLinkAboutDKS Associates, Inc. CP5-ST-3A-14-06 Power Source 20 & Lewisof Trmwiparballon Agreement Organization and DKS Associates Number 02 7192nd Ave., Suite 1250 Seattle, WA 98104 Original Agreement Number HSIP-3551(004) Phone: 206.382.9800 Project Number Execution Date Completion Date 1 CP5-ST-3A-14-06 7/15/2015 12/31/2017 Project Title New Maximum Amount Payable N 20th Ave Safety Improvements $ 156,958.18 Description of Work Traffic signal improvements, ADA ramp improvements, addition of two pedestrian hybrid beacons along safe walking routes, among other work as described in original Exhibit A, Scope of Work. The Local Agency of City of Pasco desires to supplement the agreement entered into with DKS Associates and executed on 7/15/2015 and identified as Agreement No. HSIP-3551(004) All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: Section 1, SCOPE OF WORK, is hereby changed to read: Additional design to address Franklin PUD request for seneration of Power source at 20th and Lewis II Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for completion of the work to read: New Completion Date is 12/31/2017 Section V, PAYMENT, shall be amended as follows: Arid if donn I f>> in ,fie ninnnin f 9'5dn Oil ling heen added It, the ` g al a runual n I le for 2 newintmI rn AV i In am amount payable of $156,958.18 as set forth in the attached Exhibit A, and by this reference made a part of this supplement. If you concur with this supplement and agree to the changes as stated above, please sign in the appropriate spaces below and return to this office for final action. By: Richard Hutchinsgioi Consultant Signature DOT Form 140-063 EF Revised 912005 Ry: -�Wy� Z�l�%'fl�, u4n 6 , proving Authority Signature (6& Date