HomeMy WebLinkAboutDKS Associates, Inc. CP5-ST-3A-14-06 Power Source 20 & Lewisof Trmwiparballon
Agreement
Organization and
DKS Associates
Number 02
7192nd Ave., Suite 1250
Seattle, WA 98104
Original Agreement Number
HSIP-3551(004)
Phone: 206.382.9800
Project Number
Execution Date
Completion Date
1
CP5-ST-3A-14-06
7/15/2015
12/31/2017
Project Title
New Maximum Amount Payable
N 20th Ave Safety Improvements
$ 156,958.18
Description of Work
Traffic signal improvements, ADA ramp improvements, addition of two pedestrian hybrid beacons along safe
walking routes, among other work as described in original Exhibit A, Scope of Work.
The Local Agency of City of Pasco
desires to supplement the agreement entered into with DKS Associates
and executed on 7/15/2015 and identified as Agreement No. HSIP-3551(004)
All provisions in the basic agreement remain in effect except as expressly modified by this supplement.
The changes to the agreement are described as follows:
Section 1, SCOPE OF WORK, is hereby changed to read:
Additional design to address Franklin PUD request for seneration of Power source at 20th and Lewis
II
Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for
completion of the work to read: New Completion Date is 12/31/2017
Section V, PAYMENT, shall be amended as follows:
Arid if donn I f>> in ,fie ninnnin f 9'5dn Oil ling heen added It, the ` g al a runual n I le for 2 newintmI rn AV i In am
amount payable of $156,958.18
as set forth in the attached Exhibit A, and by this reference made a part of this supplement.
If you concur with this supplement and agree to the changes as stated above, please sign in the appropriate spaces
below and return to this office for final action.
By: Richard Hutchinsgioi
Consultant Signature
DOT Form 140-063 EF
Revised 912005
Ry: -�Wy� Z�l�%'fl�, u4n 6
,
proving Authority Signature
(6&
Date