Loading...
HomeMy WebLinkAboutBig D's Construction Change Order No. 1 CP5-ST-9A-15-01 Park St RevitalizationCITY OF PASCO PUBLIC WORKS DEPARTMENT CONTRACT CHANGE ORDER NO. 1 Project No: CP5-ST-9A-15-01 Project Title: Park St Revitalization Contractor: Big D's Construction of Tri -Cities, Inc. Description of Change: Removal of an additional large diameter tree (including stump) that was not shown in the Contract Plans. Detail as Appropriate: See attached justification memorandum. Contract Bid Amount: $ 54,134.00 SALES TAX (8.6%): $ 4,655.52 Total: $ 58,789.52 PREVIOUS CHANGE ORDER CURRENT CHANGE ORDER Subtotal Subtotal $ 4,960.10 Sales tax @ 8.6% $ Sales tax @ 8.6% $ 426.57 Total $ Total $ 5,386.67 Total Change Orders To Date $ 5,386.67 New Contract Amount $ 64,176.19 IS CONTRACT TIME AFFECTED BY THIS CHANGE ORDER YES NO Contract Time Prior to this Change Order ................................................... 45 days Modification to Contract time by this Change Order ....................................... Revised Total Contract Time.................................................................... 45 days It is mutually agreed by both parties that this Change Order fully describes the change(s) that is (are) being made and that the compensation for this Change Order is full and complete and is the only compensation due or owing for this Change Order. Further, it is mutually agreed that this document will supplement the present Contract Documents and that the provisions of the previously executed Contract Documents shall apply to this Change Order. AGREED TO AND ACCEPTED: CONTRACTOR Date AJP�P7' VED: PROJE T ANAG R Date DIRECTOR o((� Memo Public Works Department Engineering Division To: Kent McCue, Construction Manager CC: Brian Cartwright, Construction Inspector Brenda Timpany, Admin Assistant 1 From: Andrey Avetisyan, P.E., Civil Engineer Date: June 22, 2016 Re: Change Order#1, Project No. CPS -ST -9A-15-01, Park St Revitalization Description of Change: This change order adds work to the Contract by adding removal of a large diameter tree that was not included on the original Contract Plans. The project includes removal of trees along the Park Street block between 5"' Avenue and Ph Avenue due to their roots damaging and breaking the sidewalk, as well as majority of them being diseased and limbs and branches falling during storms. The tree in question, located on the south side of Park St approximately near Station 2+80, needs to be removed along with the rest of the trees. Entitlement: This work is not included in the original Contract. The Contractor is entitled to added compensation for added work performed in accordance with Section 1-04.4. No entitlement is found for a revision to the number of working days. Adding this work will not increase the time to complete all critical items of work. In accordance with Section 1-08.8, no revision to the number of working days will be made by this change order. Price: A lump sum price was received from the Contractor detailing their cost for this additional work. The Contractor included all costs associated with the removal of the extra tree and stump within the cost breakdown. The City of Pasco Construction Manager reviewed and accepted the proposed cost. The total cost for this change order work is $5386.67, which includes sales tax. 0 Page 1 CITY OF PASCO PUBLIC WORKS DEPARTMENT CONTRACT CHANGE ORDER NO. 2 Project No: CP5-ST-9A-15-01 Project Title: Park St Revitalization Contractor: Big D's Construction of Tri -Cities, Inc. Description of Change: Deleting two contract bid items, Type 1 J -Box and Conduit Pipe 2 In. Diam, due to uncertainties of the future layout of street lighting locations. Detail as Appropriate: See attached justification memorandum. Contract Bid Amount: SALES TAX (8.6%): Total: $ 54,134.00 $ 4,655.52 $ 58,789.52 PREVIOUS CHANGE ORDER CURRENT CHANGE ORDER Subtotal $ 4,960.10 Subtotal $ 2,475.00 Sales tax @ 8.6% $ 426.57 Sales tax @ 8.6% $ 212.85 Total $ 5,386.67 Total $ (2,687.85) Total Change Orders To Date $ 2,698.82 New Contract Amount $ 61,488.34 IS CONTRACT TIME AFFECTED BY THIS CHANGE ORDER YES NO Contract Time Prior to this Change Order ................................................... 45 days Modification to Contract time by this Change Order ....................................... Revised Total Contract Time....................................................I............... 45 days It is mutually agreed by both parties that this Change Order fully describes the change(s) that is (are) being made and that the compensation for this Change Order is full and complete and is the only compensation due or owing for this Change Order. Further, it is mutually agreed that this document will supplement the present Contract Documents and that the provisions of the previously executed Contract Documents shall apply to this Change Order. AGREED TO AND ACCEPTED: APVED D.M `yyit"4 �w `��2'.2OIb PR 6so/t/ CONTRACTOR e PROJ T MANA Date DIRECTOR Memo Public Works Department Engineering Division To: Kent McCue, Construction Manager CC: Brian Cartwright, Construction Inspector Brenda Timpany, Admin Assistant 1 From: Andrey Avetisyan, P.E., Civil Engineer Date: June 30, 2016 Re: Change Order #2, Project No. CPS -ST -9A-15-01, Park St Revitalization Description of Change: This change order deletes work from the Contract by deleting two original bid items in their entirety, Conduit Pipe 2 In. Diam. And Type 1 J -Box. The project originally included this work with the intentions of installing the empty conduit for future conversion of the electrical line for street lighting from the existing overhead line to being underground. During construction, it was discussed and agreed upon that the existing locations of the utility poles may quite possibly change whenever the street lighting conversion is planned in that vicinity. Also, the existing utility poles are wooden and will most likely have to be upgraded to current street light standards. Due to the uncertainties, it was decided that it is best to delete this work at this time as it would be best addressed concurrently with the future street lighting upgrade project. Entitlement: This work was included in the original Contract and is being deleted in accordance with Section 1- 04.4. The City and the Contractor mutually agreed to delete the work based on original bid prices without any equitable adjustments made. The agreement for this change was made prior to the work beginning and no costs actually incurred by the Contractor. No entitlement is found for a revision to the number of working days. Deleting this work will not decrease the time to complete all critical items of work. In accordance with Section 1-08.8, no revision to the number of working days will be made by this change order. Price: Below is the breakdown of the deletion of two bid items from the original Contract: Type 1 J -Box, per Each (Bid Item #8): 2 (quantity) x $450 (unit price) _ $900.00 Conduit Pipe 2 In. Diam., per LF (Bid Item #9): 225 (quantity) x $7 (unit price) _ $1575.00 After including sales tax, the total cost for this change order work is -$2687.85 (credit). 0 Page 1