HomeMy WebLinkAbout4313 Ordinance - Amending PMC Repealing Appd A of Title 25 and Repealing Chapter 26.52ORDINANCE NO. ��
AN ORDINANCE of the City of Pasco, Washington, Revising Land Use
and Permitting Fees and Repealing Appendix A of Title 25 and Repealing Section
26.52 of the Pasco Municipal Code.
WHEREAS, Title 3 of the Pasco Municipal Code contains the Fee Schedule for a variety
of land use permits and processes; and
WHEREAS, the existing Fee Schedule has remained unchanged for approximately 20
years; and
WHEREAS; the existing Fee Schedule does not reflect the current cost of processing
various land use permits; and
WHEREAS; those land use processes costing more for processing than the current fees
realize a public subsidy; and
WHEREAS, the Pasco City Council desires to minimize the amount of public subsidy of
the cost of processing land use permits; and
WHEREAS, experience with Fire Safety Inspection Program has resulted in a more
equitable manner in which to assign appropriate inspection fees; NOW THEREFORE,
THE CITY COUNCIL OF THE CITY OF PASCO, WASHINGTON, DOES
ORDAIN AS FOLLOWS:
Section 1. That Section 3.07.030 of the Pasco Municipal Code shall be and hereby is
amended and shall read as follows:
3.07.030 BUILDING PERMITS:
A) State:
Fee/Charge Reference
1) State Bldg Code Council — charged on all
$4.50 16.04.040
building permits issued.
B) Building:
Fee/Charge Reference
1) Building Permit Based on Improvement
Value. Value of Improvement:
Permit Fee: 16.04.040
$1 to $10,000
$50.00
$10,001 to $11,000
$195.25
$11,001 to $12,000
$209.25
$12,001 to $13,000
$223.25
$13,001 to $14,000
$237.25
C)
$14,001 to $15,000
$251.25
$15,001 to $16,000
$265.25
$16,001 to $17,000
$279.25
$17,001 to $18,000
$293.25
$18,001 to $19,000
$307.25
$19,001 to $20,000
$321.25
$20,001 to $21,000
$335.25
$21,001 to $22,000
$349.25
$22,001 to $23,000
$363.25
$23,001 to $24,000
$377.25
$24,001 to $25,000
$391.25
$25,001 to $50,000
$391.75 for the first
$25,000 + $10.10 for
each add'1$1,000, or
fraction thereof
$50,001 to $100,000
$643.75 for the first
$50,000 + $7.00 for
each add'l $1,000, or
fraction thereof
$100,001 to $500,000
$993.75 for the first
$100,000 + $5.60 for
each add'1$1,000, or
fraction thereof
$500,001 to $1,000,000
$3233.75 for the first
$500,000 + $4.75 for
each add'1$1,000 or
fraction thereof
$1,000,001 and up
$5608.75 for the first
$1,000,000 + $3.65 for
each add'l $1,000 or
fraction thereof
2) Plan Review
16.04.035
a) Improvement valueless than
No plan review fee
$10,000
b) Improvement value greater
65% of bldg.
than $10,000
permit fee (when a plan
view is required)
3) Fast Track Plan Review
100% of bldg. permit
Admin
fee
Order #76
Plumbing:
Fee/Charge
Reference
1)
Minimum Permit Fee
$50.00
2)
Gas appliance and piping installation
$50.00
permit fee
D)
Restoration of surface by City and
Fee/Charge
inspection:
1)
Restoration + 1 yr. of maintenance
Cost
E)
Testing New Piping:
Fee/Charge
1)
Expense tests and inspections.
Cost
F)
Factory Assembled/Mobile Homes:
Fee/Charge
1)
Placement permit
$50.00
G)
Moving Buildings:
Fee/Charge
1)
Without use of public R.O.W.
$25.00
2)
With use of R.O.W.
$100.00
3)
Into city limits from outside city limits
$100.00
4)
From within city limits to outside city
$25.00
limits
H)
Mechanical Permit:
Fee/Charge
1)
Minimum Permit Fee
$50.00
I)
Fire Safety Inspections:
Fee/Charge
1)
Initial Inspection (all Moderate Hazard and
$75.00
all High Hazard inspections taking less
than 2 hours inspection time (Moderate
Hazard is billed in annual increments of
$37.50 — High Hazard is billed $75.00
annually)
High Hazard inspections of 2 hours or $150.00
more duration
2) Re -Inspection (first re -inspection is w/o $75.00
fee)
J) Signs:
1) Application Fee
K) Demolition Permits:
Fee/Charge
$50.00
$50.00
16.08.020
16.12.160
Reference
16.12.270
Reference
16.12.300
Reference
19.24.050
Reference
16.28.030
16.28.030
16.28.030
16.28.030
Reference
16.32.030
Reference
16.40.010
16.40.010
Reference
17.16.030
16.04.040
L) Right -of -Way Permits: $50.00 12.04.050
M) Street Cut — including inspection of
surfaces
1) Unpaved surfaces
Fee/Charge Reference
$10.00 12.24.100
Section 2. That Section 3.07.100 of the Pasco Municipal Code shall be and hereby is
amended and shall read as follows:
3.07. 100 PLANNING PERMITS:
A)
Plats and Subdivisions:
1)
Title 4 Appeals
2)
Park Impact Fee, per unit plus 3.25%
8
annual increase from 1/1/99
3)
Planned Unit Development
4)
Long Plat (Preliminary Plat)
-24
a) Additional per lot (not to exceed
2)
$950.00)
5)
Final Plat Inspections and Plan
Fee/Charge
Approval
6)
Short Plat Applications (26.36.048)
-)
T84
Hearing pestpefiefnent
W0.08
Ap�1+omWearingExa
Deeision
14)
Rezone (Zone Change) `25.89)
849)
Appeals from Planning Commission
Decision
99)
Right of Way/Easement Vacation
10)
Boundary Line Adjustment
11)
Zoning Determination
8
Special/Conditional Use Permit
B)
Hearing Examiner:
1)
Hearings and Variance 2
-24
Appeal Hearing Examiner PeeWen
2)
Copy of Hearing Examiner Review
Fee/Charge Reference
Actual costs 4.02.100
$450.00 26.20.020
$700.00 25.62.090
$650.00 700.00 26.0 10
(26.24.1204
$30.00 26 52 m n
Prevailing 26-52
Engineering Rates 26_28
$300:00 700.00 26.5
26.36
n�7!I
$700.00
Title 25.88 (Apdx
A)
$390.00 700.00
25.88.0 �^
?5.86
25.88
$200:00 300.00
12.40
$50.00
26_44
$75.00
4.02
$380:90 500.00
25.86
Fee/Charge
Reference
$300.00 700.00
Title 25.84 (Apdx
A)
W0.08
25.84.150
Cost
25.844439
C)
11
�7
Conditional (Speeia) Use D. fmi
(25.86)
$' g
Title 25 (A pEN A )
.. �r�7
Development:
Fee/Charge
Reference
1)
Binding Site Plan
$200.00
26.52.010
2)
Binding Site Plan Revision
$200.00
26.52.010
3)
Comprehensive Plan Amendment
$700.00
Title 25.92 (
•
..
A)
4)
Environmental Checklists and
$100.00 75.00
23.10.040
Determination
5)
Appeals of Environmental
$200.00
23.10.040
Determination
6)
Environmental Impact Statements
Cost
23.10.040
Section 3. That "APPENDIX A FEES" of Title 25 shall be and hereby is repealed in its
entirety:
WINNOW
- _ ....
Section 4. That Section 26.52 "FEES" of Title 26 shall be and hereby is repealed in its
entirety:
. .
Section 4. That Section 26.52 "FEES" of Title 26 shall be and hereby is repealed in its
entirety:
. .
-
„
•
..
Section 5. This ordinance shall take full force and effect five (5) days after approval,
passage and publication as required by law.
PASSED by the City Council of the City of Pasco, at its regular meeting of
Matt Watkins, Mayor
ATTEST:
A D 1�
1(�
Debra ark, City Clerk
APPROVED AS TO FORM:
Leland B. Kerr, City Attorney