Loading...
HomeMy WebLinkAbout4313 Ordinance - Amending PMC Repealing Appd A of Title 25 and Repealing Chapter 26.52ORDINANCE NO. �� AN ORDINANCE of the City of Pasco, Washington, Revising Land Use and Permitting Fees and Repealing Appendix A of Title 25 and Repealing Section 26.52 of the Pasco Municipal Code. WHEREAS, Title 3 of the Pasco Municipal Code contains the Fee Schedule for a variety of land use permits and processes; and WHEREAS, the existing Fee Schedule has remained unchanged for approximately 20 years; and WHEREAS; the existing Fee Schedule does not reflect the current cost of processing various land use permits; and WHEREAS; those land use processes costing more for processing than the current fees realize a public subsidy; and WHEREAS, the Pasco City Council desires to minimize the amount of public subsidy of the cost of processing land use permits; and WHEREAS, experience with Fire Safety Inspection Program has resulted in a more equitable manner in which to assign appropriate inspection fees; NOW THEREFORE, THE CITY COUNCIL OF THE CITY OF PASCO, WASHINGTON, DOES ORDAIN AS FOLLOWS: Section 1. That Section 3.07.030 of the Pasco Municipal Code shall be and hereby is amended and shall read as follows: 3.07.030 BUILDING PERMITS: A) State: Fee/Charge Reference 1) State Bldg Code Council — charged on all $4.50 16.04.040 building permits issued. B) Building: Fee/Charge Reference 1) Building Permit Based on Improvement Value. Value of Improvement: Permit Fee: 16.04.040 $1 to $10,000 $50.00 $10,001 to $11,000 $195.25 $11,001 to $12,000 $209.25 $12,001 to $13,000 $223.25 $13,001 to $14,000 $237.25 C) $14,001 to $15,000 $251.25 $15,001 to $16,000 $265.25 $16,001 to $17,000 $279.25 $17,001 to $18,000 $293.25 $18,001 to $19,000 $307.25 $19,001 to $20,000 $321.25 $20,001 to $21,000 $335.25 $21,001 to $22,000 $349.25 $22,001 to $23,000 $363.25 $23,001 to $24,000 $377.25 $24,001 to $25,000 $391.25 $25,001 to $50,000 $391.75 for the first $25,000 + $10.10 for each add'1$1,000, or fraction thereof $50,001 to $100,000 $643.75 for the first $50,000 + $7.00 for each add'l $1,000, or fraction thereof $100,001 to $500,000 $993.75 for the first $100,000 + $5.60 for each add'1$1,000, or fraction thereof $500,001 to $1,000,000 $3233.75 for the first $500,000 + $4.75 for each add'1$1,000 or fraction thereof $1,000,001 and up $5608.75 for the first $1,000,000 + $3.65 for each add'l $1,000 or fraction thereof 2) Plan Review 16.04.035 a) Improvement valueless than No plan review fee $10,000 b) Improvement value greater 65% of bldg. than $10,000 permit fee (when a plan view is required) 3) Fast Track Plan Review 100% of bldg. permit Admin fee Order #76 Plumbing: Fee/Charge Reference 1) Minimum Permit Fee $50.00 2) Gas appliance and piping installation $50.00 permit fee D) Restoration of surface by City and Fee/Charge inspection: 1) Restoration + 1 yr. of maintenance Cost E) Testing New Piping: Fee/Charge 1) Expense tests and inspections. Cost F) Factory Assembled/Mobile Homes: Fee/Charge 1) Placement permit $50.00 G) Moving Buildings: Fee/Charge 1) Without use of public R.O.W. $25.00 2) With use of R.O.W. $100.00 3) Into city limits from outside city limits $100.00 4) From within city limits to outside city $25.00 limits H) Mechanical Permit: Fee/Charge 1) Minimum Permit Fee $50.00 I) Fire Safety Inspections: Fee/Charge 1) Initial Inspection (all Moderate Hazard and $75.00 all High Hazard inspections taking less than 2 hours inspection time (Moderate Hazard is billed in annual increments of $37.50 — High Hazard is billed $75.00 annually) High Hazard inspections of 2 hours or $150.00 more duration 2) Re -Inspection (first re -inspection is w/o $75.00 fee) J) Signs: 1) Application Fee K) Demolition Permits: Fee/Charge $50.00 $50.00 16.08.020 16.12.160 Reference 16.12.270 Reference 16.12.300 Reference 19.24.050 Reference 16.28.030 16.28.030 16.28.030 16.28.030 Reference 16.32.030 Reference 16.40.010 16.40.010 Reference 17.16.030 16.04.040 L) Right -of -Way Permits: $50.00 12.04.050 M) Street Cut — including inspection of surfaces 1) Unpaved surfaces Fee/Charge Reference $10.00 12.24.100 Section 2. That Section 3.07.100 of the Pasco Municipal Code shall be and hereby is amended and shall read as follows: 3.07. 100 PLANNING PERMITS: A) Plats and Subdivisions: 1) Title 4 Appeals 2) Park Impact Fee, per unit plus 3.25% 8 annual increase from 1/1/99 3) Planned Unit Development 4) Long Plat (Preliminary Plat) -24 a) Additional per lot (not to exceed 2) $950.00) 5) Final Plat Inspections and Plan Fee/Charge Approval 6) Short Plat Applications (26.36.048) -) T84 Hearing pestpefiefnent W0.08 Ap�1+omWearingExa Deeision 14) Rezone (Zone Change) `25.89) 849) Appeals from Planning Commission Decision 99) Right of Way/Easement Vacation 10) Boundary Line Adjustment 11) Zoning Determination 8 Special/Conditional Use Permit B) Hearing Examiner: 1) Hearings and Variance 2 -24 Appeal Hearing Examiner PeeWen 2) Copy of Hearing Examiner Review Fee/Charge Reference Actual costs 4.02.100 $450.00 26.20.020 $700.00 25.62.090 $650.00 700.00 26.0 10 (26.24.1204 $30.00 26 52 m n Prevailing 26-52 Engineering Rates 26_28 $300:00 700.00 26.5 26.36 n�7!I $700.00 Title 25.88 (Apdx A) $390.00 700.00 25.88.0 �^ ?5.86 25.88 $200:00 300.00 12.40 $50.00 26_44 $75.00 4.02 $380:90 500.00 25.86 Fee/Charge Reference $300.00 700.00 Title 25.84 (Apdx A) W0.08 25.84.150 Cost 25.844439 C) 11 �7 Conditional (Speeia) Use D. fmi (25.86) $' g Title 25 (A pEN A ) .. �r�7 Development: Fee/Charge Reference 1) Binding Site Plan $200.00 26.52.010 2) Binding Site Plan Revision $200.00 26.52.010 3) Comprehensive Plan Amendment $700.00 Title 25.92 ( • .. A) 4) Environmental Checklists and $100.00 75.00 23.10.040 Determination 5) Appeals of Environmental $200.00 23.10.040 Determination 6) Environmental Impact Statements Cost 23.10.040 Section 3. That "APPENDIX A FEES" of Title 25 shall be and hereby is repealed in its entirety: WINNOW - _ .... Section 4. That Section 26.52 "FEES" of Title 26 shall be and hereby is repealed in its entirety: . . Section 4. That Section 26.52 "FEES" of Title 26 shall be and hereby is repealed in its entirety: . . - „ • .. Section 5. This ordinance shall take full force and effect five (5) days after approval, passage and publication as required by law. PASSED by the City Council of the City of Pasco, at its regular meeting of Matt Watkins, Mayor ATTEST: A D 1� 1(� Debra ark, City Clerk APPROVED AS TO FORM: Leland B. Kerr, City Attorney