Loading...
HomeMy WebLinkAboutGray & Osborne Inc - PSA Amendment 1 - Primary Clarifier UpgradeAMEND NT ORIGINAL PROFESSIONAL SRVINUMBER AGREEMENT Construction Management and Inspection Services for the Primary Clarifier Upgrade Project WHEREAS, the City and Gray & Osborne. Inc. entered into a Professional Services Agreement on September 23. 2015 to provide engineering services with respect to the Prim Clarifier Upgrade project. NOW, THEREFORE, this agreement is amended to allow Gray & Osborne Inc. to provide additional engineering services as described on Exhibit A. 1. Scope of Work: Additional tasks are outlined in Exhibit A. 2. Fee: The compensation for the additional work is based on an hourly basis not to exceed the amount of $197,421, for a total contract amount of $491,161. 3. Time of performance: The services shall be complete for the project in accordance with the construction schedule. DATED THIS "/ DAY OF CITY OF PASCO: Dave Zabell, anage ATTEST: A,, oa. 0 /), De bie Clark, City Clerk Amendment No.I to Professional Services Agreement Gray & Osborne, Inc. Primary Clarifier Upgrade Project 2016. CONSULTANT: Gray & Osborne, Inc. Michael B. Johnson, President APPROVED AS TO FORM: Leland B. Kerr, City Attorney Page I EXHIBIT "A" SCOPE OF WORK CITY OF PASCO EXTENDED - CONSTRUCTION MANAGEMENT AND INSPECTION SERVICES FOR THE PRIMARY CLARIFIER UPGRADE PROJECT The City of Pasco is constructing two new primary clarifiers, a new sludge pump room and modifying the headworks as necessary to accommodate the new clarifiers. Gray & Osborne has been contracted for construction management services. This amendment is for additional services related to construction management including additional inspection, submittal reviews and the update of the W WTF O&M manual. In addition, the City desires to redesign the site grading, two electrical panels (LCP250 AND LCP251), and add VFDs to the sludge pumps. CONSTRUCTION MANAGMENT SERVICES Objective: Provide additional construction management services including the update of the W WTF O&M Manual, submittal review of the equipment O&M manuals and the HMI/PLC programming code and provide record drawings of the facility. The City also desires to continue full time resident inspection through the conclusion of the construction project. • Update the O&M Manual to incorporate Primary Clarifiers 3 and 4, the new sludge pump room, modifications to the Headworks, and all related piping and process modifications. • . Assist the City with submitting the updated O&M Manual to Ecology for review. • Provide three hardcopy and one electronic copy of the final updated O&M Manual in Microsoft WORD format and PDF format. • Provide a submittal review of the PLC and HMI code, resubmittals will be reviewed as necessary until submittal acceptance. This scope includes assistance with startup and troubleshooting as related to the PLC/HMI controls. • Provide a submittal review of the equipment O&M manuals, resubmittals will be reviewed as necessary until submittal acceptance. • Prepare record drawings from field observations and information provided by the Contractor. • Extend Resident Inspection to the end of July 2016. Resident inspector's time onsite will be appropriate for the level of construction activity. (May 19, 2016) Page 1 of 3 REDESIGN SITE GRADING PLAN Objective: Redesign the final grading plan at the direction of the City staff to provide for better access for services trucks around the primary clarifiers and the scum pump station. Provide design plans to the City for review and incorporate City comments. Provide new grading plan to the Contractor to obtain a change order proposal for the work. Review and assist the City with change order negotiation. PANEL LCP250 AND LCP251 Objective: Redesign the LCP250 and LCP251 at the direction of the City staff to relocate the scum pump station VFDs inside the building while providing remote control at the scum pump station. Provide design plans to the City for review and incorporate City comments. Provide new panel designs to the Contractor to obtain a change order proposal for the work. Review and assist the City with change order negotiation. DESIGN SLUDGE PUMP VFDS Objective: Replace the reduced voltage soft starts at the primary sludge pumps with variable frequency drives. Provide design plans to the City for review and incorporate City comments. Provide new design to the Contractor to obtain a change order proposal for the work. Review and assist the City with change order negotiation SERVICES PROVIDED BY THE OWNER This amendment assumes the services provided by the Owner will continue as specifically detailed in Amendment No. 1. In addition, the City will need to provide the following: Electronic (MS WORD) copy of the City's O&M manual including all appendices, figures, etc. (already obtained). AutoCAD drawings of the primary clarifier upgrade project. (May 19, 2016) Page 2 of 3 ) ! ) \ - - / k f f \ ® { \ " /i5 ! �- j \) //s oq oq - ;l.s,a An !!l22a .-,!! :£!�§!/!� §k l ` ! ) \ - - / k f f \ ® { \ " /i5 ! �- j \) //s