HomeMy WebLinkAboutTotal Site Services Change Order 4 & 5CITY OF PASCO
PUBLIC WORKS DEPARTMENT
CONTRACT CHANGE ORDER NO.4
Project No: C5 -GN -9A-14-01 Project Title: Pasco Police Community Services Building
Contractor: Total Site Services
Description of Change: Add hose bib at dot kennel
Detail as Appropriate: See
Contract Bid Amount:
SALES TAX @ 8.6%:
Total:
$ 6,582,112,00
$ 5661061.63
$ 7,148,173.63
Total Change Orders To Date $ 47,730.43
New Contract Amount
IS CONTRACT TIME AFFECTED BY THIS CHANGE ORDER
Contract Time Prior to this Change Order ............ .....................
Modification to Contract time by this Change Order ....................
revised Total Contract Time ....................................
................
It is
both
$ 7,195,904.06
YES NO
u., iycto� u,al q idlej Demg
made and that the compensation for this Change Order is full and complete and is the only compensation
due or owing for this Change Order. Further, it is mutually agreed that this document will supplement the
present Contract Documents and that the provisions of the previously executed Contract Documents shall
apply to this Change Order.
ZAGRECTOTO
AN ACCEPTED: /�A/PPROVED:%�JR /-1 / J-�c�! "�1 Y'�Ti • s�
Dale PROJECT MANAGER Deta
APPROVED: //77
�c�a��f/ AGr ¢�/4fG6
CONSTRUCTION NAGER -ate '7
APPRO ED:
euc w
e
DIRECTOR
Q(.0
Total Site Services, LLC
CHANGE PROPOSAL CP NO: 11 Rev1
TO: City of Pasco
525 North Third Ave PROJECT NAMEPasco Police Community
:
Pasco, WA 99301 Services Building
ATTN: Kent McCue, Construction Manager
CONTRACT M
C5 -GN -9A-14-01
PROJECT NO:
15-006
DATE:
2/3/2016
VIA:
E -Mail
FROM:
Dennis Hollis
CP DESCRIPTION
Request to add hose bib at dof kennel
This Change Proposal, consisting of an estimate, responds to:
The total cost of the proposed change without WSST is:
This Change Proposal is good through:
The schedule effect of this change is:
Enclosures in support of this proposal includes:
1 ) TSS Estimate for Change
2) ACM Change cost data
3) Sketch and email requesting hose bib
QUALIFICATIONS
■ This proposal covers only the specific items that have been priced as listed on the attached cost breakdown.
$2,194.00
2/28/2016
Our pricing is based on the quotes of our subcontractors and suppliers and includes any clarifications, qualifications, and exclusions contained
their quotes
SUBMITTED BY:
Dennis Hollis - Project Manager
APPROVED BY:
02/03/16
DATE
•\7\/14[7:{
f
l,B•�.!
})
®
......
...........-.
r
[
!
|a
§k(
§
\
}
�
\
,r
•
m
�
!!
!
�
|
`
!
|
0�
1207 W. Columbia Drive
Kennewick, WA 99336
509-586-1104
fax 509-582-6590
WWW APOLLOSM.COM
PROPOSED
CHANGE
ORDER
Customer Reference
kennel water
Apollo Proposal Number
PCO -002
Apollo Project Number
M1567
Proposal Date
1/20/2016
PROJECT: PASCO POLICE COMMUNITY SERVICE BUILDING
Change Description: Work associated with Kennel water add. EXCLUDES ALL CUTTING, PATCHING
AND ELECTRICAL.
Please see attached detail for breakdown on charges.
TOTAL THIS CHANGE PROPOSAL: $
Authorized Apollo Sighature
Page 1
1,618.60
1207 W. Columbia Drive
Kennewick, WA 99336
509-586-1104
fax 509-582-6590
PROPOSED
BREAKDOWN OF COSTS
PASCO POLICE COMMUNITY SERVICE BUILDING Apollo Proposal Number
SHEET METAL/HVAC
LABOR: If of Hrs. Rate Total
Demo Labor 0.00 57.00 0.00
Field Labor 0.00 57.00 0.00
Controls Labor 0.00 68.00 0.00
Subtotal Labor
Supervision 15% total labor above
LABOR BURDENS:
Shop Burden 35% of Shop Labor
Safety 2%
MATERIALS AND EQUIPMENT
Delivery $50.00 per trip
Sheet Metal Materials
Controls Materials
Sheet Metal Equipment
Controls Equipment
Small Tools 6% at Field Labor
PLUMBING/PIPING
LABOR:
Field Labor
0.00
0.00
0.00
0.00
0.00
Subtotal Matls. And Equipment
# of Hrs. Rate Total
7.00 84.98 594.86
Subtotal Labor
Supervision 15% total labor above
MATERIALS AND EQUIPMENT
Delivery $50.00 per trip
Materials 516.77
Small Tools 5% of Field Labor 0.00
Subtotal Malls. And Equipment
ADMINISTRATIVE AND MISC. COORDINATION
Project Manager 0.00 67.00
Shop Drawings/Coordination 0.00 50.00
CHANGE
ORDER
PCO -002
$0.00
$0.00
$0.00
$0.00
$0.00
$594.86
$89.23
$516.77
$0.00
$0.00
SUBTOTAL APOLLO MATERIALS EQUIPMENT AND LABOR 1,200.86
Overhead 15% $180.13
Subtotal 1380.99
SUBCONTRACTS
CONTROLS 0.00
INSULATION 200.00
TAB 0.00
SUBTOTAL SUBCONTRACTS $200.00
Overhead and Profit on Subcontracts 10% $20.00
Subtotal 220.00
SUBTOTAL APOLLO AND SUBCONTRACTS 1,600.99
B & O Insurance 1.1% $17.61
GRAND TOTAL $1,618.60
Count DESCRIPTION
PIPE LABOR PIPE
FACTOR HOURS
PIPE
MATERIAL
UNIT PRICE
PIPE
MATERIALS
SUBS
70 Ft. of 3/4" copper pie
0.00
1.43
100.10
2 3/4" copper nipple
0.00
3.58
7.16
8 3/4" copper 90
0.00
1.08
8.64
3 3/4" copper coupling
0.00
0.73
2.19
1 3/4" male adapter
0.00
1.69
1.69
1 3/4" copper tee
0.00
1.99
1.99
0 3/4" ball valve
0.00
16.40
0.00
1 Lot of Han ers
0.00
120.00
120.00
2 3" core hole
0.00
75.00
150.00
1 Woodford Faucet
0.00
125.00
125.00
1 Insulation
0.00
0.00
200.00
7 Man Hours
1.00 7.00
0.00
0.00
0.00
TOTALS
7.00
516.77
200
PPCSB - Hose bib in Kennel
Devin Geisler [dgg@tltarch.com]
Sent:Tuesday, January 19, 2016 8:36 AM
To: Rick Routh (routhconsulbngengineers@charter.net)
Cc: Scott Schurman; Dennis Hollis; Donna Smith [drs@dtarch.com]; Holly Slatter [hds@tltarch.com]; Mike Good
[mrg@tltarch.com]; Terence Thornhill [tlt@tltarch.com]
Rick,
It was noticed that there is no hose bib in the Kennel area. Can you provide a quick sketch for the contractor
to include. The CMU is already installed but we need to have water to the dogs.
Thanks,
Devin Geisler
Sr. Architect / Project Manager
Terence L. Thornhill, Architect Inc. P.S.
9221 Sandifur Parkway - Suite A, Pasco, WA. 99301
Tel: 509 547 8854 Fax: 509 547 8912
www.titarch.com
T E R E N C E L T H O R N H I L L
A R C H I T E C T
2A0
P14
O
li
21
26
5
152
jI
Y4
12
CW DOWN ON WALL TO FIXTURE. MOUNT FAUCET AT ±18" ABOVE
FINISHED FLOOR. P-26 WALL FAUCET SHALL BE WOODFORD MODEL 26
WITH INTEGRAL DOUBLE CHECK VALVE BACKFLOW PREVENTER, Y4"
CONNECTION, OR EQUIVALENT.
PASCO POLICE COMMUNITY SERVICE BUILDING
Pasco, Washington
DATE:1/19/16
SKETCH:
Routh Consulting Engineers, Inc.
DRAWN:RDR
P.O. Box 3187 Pasco, WA 99302
-0 1
SCALE: 3Z16"=1'— 'MC
509-547-8262 509-542-0650 FAX
PROJ NO: 1095
REF: 1 095MOl A
Project No:
CITY OF PASCO
PUBLIC WORKS DEPARTMENT
CONTRACT CHANGE ORDER NO. 5
C5-GN-gA-14-01
Project Title: Pasco Police Community Services Building
Contractor: Total Site Services
Description of Change: Steel Column Fix
Detail as Appropriate: See Attached
Contract Bid Amount:
SALES TAX @ 8.6%:
Total:
$ 6,582,112.00
$ 566,061.63
$ 7,148,173.63
PREVIOUS CHANGE ORDER
CURRENT CHANGE ORDER
Subtotal $ 43,950.67
Subtotal
$ 3,427.00
Sales tax @ 8.6% $ 3,779.76
Sales tax @
8.6% $ 294.72
Total $ 47,730.43
Total
$ 3,721,72
Total Change Orders To Date $ 51,452.15
New Contract Amount $ 7,199,625.78
IS CONTRACT TIME AFFECTED BY THIS CHANGE ORDER
Contract Time Prior to this Change Order.. . ..... ................. .....
Modification to Contract time by this Change Order. . ..................
revised Total Contract Time .................................................
YES NO
It is mutually agreed by both parties that this Change Order fully describes the change(s) that is (are) being
made and that the compensation for this Change Order is full and complete and is the only compensation
due or owing for this Change Order. Further, it is mutually agreed that this document will supplement the
present Contract Documents and that the provisions of the previously executed Contract Documents shall
apply to this Change Order.
AGREED TO AND ACCEPTED:
11( �tb
CON A O nate
APPROVED:
r, ,, � / �� ��14
aK ECI M AG Dale —I
APPROVED::/ APPROVED:
ONS TRUCTION/NAGER a at�" UBLIC WOR O—!
DIRECTOR
Total Site Services, LLC
CHANGE PRO
TO: City of Pasco
525 North Third Ave
Pasco, WA 99301
PROJECT NAME: Pasco Police Cor
Services Building
ATTN: Kent McCue, Construction Manager CONTRACT #: C5 -GN -9A-14-01
PROJECT NO: 15-006
DATE: 3/8/2016
VIA: E -Mail
FROM: Chris Canario
CP DESCRIPTION
Pricing for Steel coluymn fix at Grid 11/N
This Change Proposal, consisting of an estimate, responds to your Request for Proposal No.
Owner Request
The total cost of the proposed change is:
$3,427.00
This Change Proposal is good through:
3/10/2016
The schedule effect of this change is:
0 Working Days
Enclosures in support of this proposal includes:
1) TSS Estimate for Change
2) Pacific Steel Invoice
3) Precision Precast Erectors, Quote
QUALIFICATIONS
■ This proposal covers only the specific items that have been priced as listed on the attached cost breakdown.
Our pricing is based on the quotes of our subcontractors and suppliers and includes any clarifications, qualifications, and exclusions contained
in their quotes
e 03/08/16
SUBMITTED BY:
Christopher Canario - Field Engineer DATE
APPROVED BY:
of Pasco
�§
:
.............�
'
;
§
�...�.....
,
.
1..,...
||
|
r | • !
W-LLI -
||!|!|,|
;�
|;
Precision Precast Erectors, LLC
1096 W Innovation Wap • Post Falls, ID 83354
Phone: 208-2315650
Work Authorization Form No. 5798
Work complete (yes/no): Yes Date: 2/25/2016
Project: Pasco Police Station
Contractor: Total Site Services
Describe Work Performed: Install new 4 x 6 HSS column at 11/N Line per signed engineered sketch. TSS provided material &
sketch. Remove old column for framers to frame window opening
Labor:
Enter Name
Trade
Reg. OT.
Hrs Hours
$
Reg.
Rate
OT.
Rate
3 $
Amount
Subsistence
Bartlett, John
Ironworker
3
$
76.00
165.00
$
228.00
$ -
$ 97.82 $ -
$ -
Dawson, Cory
Foreman
2
$
82.00
Date:
$
164.00
$
$ 105.92 $ -
$ -
Ingwaldscn, Brice
Ironworker
3
$
76.00
$
228.00
$
$ 97.82 $ -
$ -
Neal, Zack
Ironworker
3
$
76.00
$
228.00
$ -
$ 97.82 $ -
$
$
$
$
$ $
$
Subtotal $ 848.00 $
Equipment Description
Hrs
Rate
$
Amount
305 G Welder
3 $
8.00
$
24.00
40 Foot Boom Lift
3 $
55.00
$
165.00
10 K Forklift
3 $
55.00
$
165.00
Paper Copy Signed by:
Date:
PPE Representative:
Subtotal 5 354.00
Consumables/Material Qty Price Amount
Subtotal
$
Total Labor, Equipment, & Materials
$
1,202.00
Overhead and Profit (15%):
$
180.30
Administrative Overhead
$
50.00
Total $
1,432.30
Paper Copy Signed by:
Date:
PPE Representative:
Date:
Distribution:
White: Contractor Yellow: Accounting
Pink: Job File
PAC I F I C
STEEL & RECYCLING-.•
SOLDTO 337428
TOTAL SITE SERVICES, LLC
27 80 SALK AVE
RI CHiAND, WA 99354
3109 371-1000
=x Dei i,ory Instructions: 2780 SALK AVE RICHLAND, VIA
Quantity Description
INVOICE
P ctct ntrP g
Quantity Uora
T
Unit Price
3706837
6 X 4 X .3175 @u" REC T03E
CUSTOMER M
—_�
3317428
146.3;
1 Piece @ 144"
ORDER DATE
02/24/16 4:49 FN.
1/2 X 5-1/2 F.R FLAT
SHIP DATE
02/24/16
22.1;
1 Piece @ 16"
CUSTOMER PO R
15006107
--`--------- 1 xoxAa wexcxx .__ P
METHOD 2E- 7-
-A!S ORDERED SC___
Elise H
33
---- -- ------`—'
SHIPTO
i TOTAL DUE
i
i
337428
TOTAL SITE SERVICES, LLC
2760 SALK AVE
RICFLAHD, WA 99354
509 371-1000
choosing Pacific Steel - Pasco
=x Dei i,ory Instructions: 2780 SALK AVE RICHLAND, VIA
Quantity Description
—�
Weight
P ctct ntrP g
Quantity Uora
T
Unit Price
Amount
6 X 4 X .3175 @u" REC T03E
2268
0.120 CF 1,219.4167
146.3;
1 Piece @ 144"
1/2 X 5-1/2 F.R FLAT
20' 12
0.125 CW 177.5134
22.1;
1 Piece @ 16"
--`--------- 1 xoxAa wexcxx .__ P
.-T.v-- - --- SUBTOTAL
SALES TAX
SIGNATURE:
---- -- ------`—'
i TOTAL DUE
i
i
5168.4E
I_
_� Thank you for
choosing Pacific Steel - Pasco