HomeMy WebLinkAboutExeltech Consulting Lewis Street Overpass studyORIGINAL
PROFESSIONAL SERVICES AGREEMENT
Feasibility Study on Bridge Options for the Lewis Street Overpass Project
THIS AGREEMENT is made and entered into between the City of Pasco, a Washington
Municipal Corporation, hereinafter referred to as "City", and Exeltech Consulting, Inc.,
hereinafter referred to as "Consultant," on the It day of January, 2016.
RECITALS
WHEREAS, the City desires to have certain services and/or tasks performed as set forth
below requiring specialized skills, training, equipment, and other supportive capabilities; and
WHEREAS, the Consultant represents that it is qualified and possesses sufficient skills,
experience, equipment, and necessary capabilities, including: technical and professional
expertise, when required, to perform the services and/or tasks as set forth in this Agreement upon
which the City is relying.
NOW, THEREFORE, in consideration of the mutual covenants, and performances
contained herein, the parties agree as follows:
1. Scope of Services. The Consultant shall perform such services and accomplish such
tasks, including the furnishing of all labor, materials, facilities and equipment necessary
for full performance thereof, as identified and designated as Consultant's Responsibilities
throughout this Agreement, and as more particularly described in Scope of Work detailed
in Exhibit A, attached hereto and incorporated herein (the "Project").
2. Term. This Project shall begin upon execution of this agreement and promptly be
completed by June 30, 2016.
3. Compensation and Payment.
3.1 Payment for services provided hereunder shall be made following the
performance of such services. Such payment shall be full compensation for work
performed or services rendered, and for all labor, materials, supplies, equipment,
and incidentals necessary to complete the Project.
3.2 No payment shall be made for any services rendered by the Consultant except for
services identified and set forth in this Agreement except as may be authorized by
a written supplemental agreement approved by the City.
3.3 The City shall pay the Consultant for work performed under this Agreement upon
timely submitted invoices detailing work performed and expenses for which
reimbursement is sought. The City shall approve all invoices before payment is
Professional Services Agreement— Exeltech Consulting Inc.
Feasibility Study on Bridge Options for the Lewis Street overpass Project Page 1 of 9
issued. Payment shall occur within thirty (30) days of receipt and approval of an
invoice.
3.4 The City shall pay the Consultant for all work perforated and expenses incurred
under this Agreement, as follows.
❑ Hourly (Single Rate): $ per hour plus actual expenses
incurred as provided under this Agreement, but not to exceed a total of
$ without prior written authorization by the City; or
IRJ Hourly (Multiple Rate): Such rates as identified on Exhibit A, plus actual
expenses incurred as provided under this Agreement, but not to exceed a
total of $29,950 without the prior written authorization by the City; or
❑ Fixed Sum: A total of S ; or
❑ Other.
4. Reports and Inspections.
4.1 The Consultant at such times and in such forms as the City may require, shall
fUrnish to the City such statements, records, studies, surveys, reports, data, and
information as the City may request pertaining to matters covered by this
Agreement.
4.2 The Consultant shall, at any time during normal business hours and as often as the
City or the Washington State Auditor may reasonably deem necessary, make
available for examination all of its records and data with respect to all matters
covered, directly or indirectly, by this Agreement and shall permit the City, or its
designated authorized representative to audit and inspect other data relating to all
matters covered by this Agreement. The City shall receive a copy of all audit
reports made by the agency or firm as to the Consultant's activities. The City
may, at its discretion, conduct an audit at its expense, using its own or outside
auditors, of the Consultant's activities which relate, directly or indirectly, to this
Agreement. Consultant shall be provided a copy of such reports.
4.3 The Consultant, during the term of this Agreement, shall obtain all permits and
registration documents necessary for the performance of its work and for the
execution of services at its own expense, and shall maintain its validity. Upon
request, the Consultant shall deliver to the City copies of these licenses,
registration documents, and permits or proof of their issuance or renewal,
4.4 Consultant shall maintain books, records and documents, which sufficiently and
properly reflect all direct and indirect costs related to the performance of this
Agreement, and shall maintain such accounting procedures and practices as may
be necessary to assure proper accounting of all funds paid pursuant to this
Professional Services Agroement — Exeltech Consulting Inc.
Feasibility Study on Bridge Options for the Lewis Street Overpass Project Page 2 of 9
Agreement. These records shall be subject, at all reasonable times, to inspection,
review, or audit as provided above.
4.5 The Consultant shall retain all books, records, documents or other material
relevant to this Agreement for three (3) years after its expiration. Consultant
agrees that the City, or its designee, shall have full access and right to examine
any of said materials at all reasonable times during this period.
S. Ownership and Use of Documents.
5.1 All research, tests, surveys, preliminary data, information, drawings and
documents made, collected, or prepared by the Consultant for performing the
services subject to this Agreement, as well as any Final product, collectively
referred to as "work product," shall be deemed as the exclusive property of the
City, including copyright as secured thereon. Consultant may not use them except
in connection with the performance of the services under this Agreement or with
the prior written consent of the City. Any prior copyrighted materials owned by
the Consultant and utilized in the performance of the services under this
Agreement, or embedded in with the materials, products and services provided
thereunder, shall remain the property of the Consultant subject to a license
granted to the City for their continued use of the products and services provided
under this Agreement. Any work product used by the Consultant in the
performance of these services which it deems as "confidential," "proprietary," or
a "trade secret" shall be conspicuously designated as such.
5.2 In the event of Consultant's default, or in the event that this Agreement is
terminated prior to its completion, the work product of the Consultant, along with
a summary of the services performed to date of default or termination, shall
become the property of the City, and tender of the work product and summary
shall be a prerequisite to final payment under this Agreement. The summary of
services provided shall be prepared at no additional cost, if the Agreement is
terminated through default by the Consultant. If the Agreement is terminated
through convenience by the City, the City agrees to pay Consultant for the
preparation of the summary of services provided.
6. Public Records.
6.1 Consultant acknowledges that the City is an agency subject to Chapter 42.56
RCW "Public Records Act" All preliminary drafts or notes prepared or gathered
by the Consultant, and recommendations of the Consultant are exempt prior to the
acceptance by the City or public citation by the City in connection with City
action.
6.2 If the Consultant becomes a custodian of public records of the City and request
for such records is received by the City, the Consultant shall respond to the
request by the City for such records within five (5) business days by either
Professional Services Agreement— Exeltech Consulting Inc.
Feasibility Study on Bridge Options for the Lewis Street Overpass Project Page 3 of 9
providing the records, or by identifying in writing the additional time necessary to
provide the records with a description of the reasons why additional time is
needed. Such additional time shall not exceed twenty (20) business days unless
extraordinary good cause is shown.
6.3 In the event the City receives a public records request for protected work product
of the Consultant within its possession, the City shall, prior to the release of any
protected work product or as a result of a public records request or subpoena,
provide Consultant at least ten (10) business days prior written notice of the
pending release and to reasonably cooperate with any legal action which may be
initiated by the Consultant to enjoin or otherwise prevent such release.
7. Independent Contractor Relationship.
7.1 The parties intend that an independent contractor relationship is created by this
Agreement. The City is interested primarily in the results to be achieved; subject
to the scope of services and the specific requirements of this Agreement, the
implementation of services will lie solely with the discretion of the Consultant.
No agent, employee, officer or representative of the Consultant shall be deemed to
be an employee, agent, officer, or representative of the City for any purpose, and
the employees of the Consultant are not entitled to any of the benefits or
privileges the City provides for its employees. The Consultant will be solely and
entirely responsible for its acts and for the acts of its agents, employees, officers,
subcontractors or representatives during the performance of this Agreement.
7.2 In the performance of the services provided in this Agreement, Consultant is an
independent contractor with full authority to control and direct the performance of
the details of the work, however, the results of the work contemplated herein must
meet the approval of the City and shall be subject to the City's general rights of
inspection and review to secure the satisfactory completion thereof.
7.3 The Consultant shall comply with all State and Federal laws including, but not
limited to:
7.3.1 The definition requirements of RCW 50.04.140 (Employment Security).
7.3.2 RCW 51.08.195 (Industrial Insurance).
7.3.3 Obtain a City of Pasco business license.
7.4 The City may, at its sole discretion, require the Consultant to remove any
employee, agent or servant from employment on this Project who, in the City's
sole discretion, may be detrimental to the City's interest.
Professional Services Agreement — Exelteeh Consulting Inc.
Feasibility Study on Bridge Options for the Lewis Street Overpass Project Page 4 of 9
8. Indemnification.
8.1 The Consultant shall defend, indemnify, and hold harmless the City, its officers,
officials, agents, employees, and volunteers from any and all claims and causes of
action, including, but not limited to, actions of law or administrative proceedings
for all injuries to persons or damages to property, and all losses, damages,
demands, suits, judgments, including attorney fees, arising out o1; or as a result
of, or in connection with the work performed under this Agreement, and caused or
occasioned in whole or in part by reason of errors, negligent acts or omissions of
the Consultant or its subcontractors in the performance of this Agreement, except
for injuries and damages caused by the sole negligence of the City, its officers,
employees, agents, and volunteers.
8.2 Should a Court of competent jurisdiction determine that this Agreement is subject
to RCW 4.24.115, then, in the event of liability for damages arising out of bodily
injuries or damages to property caused by or resulting from the concurrent
negligence of the Consultant, and the City, its officers, employees, agents and
volunteers, the Consultant's liability and obligation to defend hereunder shall only
be the proportionate extent of the Consultant's negligence.
8.3 It is further agreed that the indemnification provided herein constitutes the
Consultant's waiver of immunity under Industrial Insurance, Title 51 RCW,
solely for the purposes of this indemnification.
8.4 No liability shall attach to the City by reason of entering into this Agreement
except as expressly provided herein.
8.5 This indemnification shall include damages, penalties and attorney fees sustained
as a result of Consultant's delayed or failed performance of Section 6 above.
8.6 This waiver has been mutually negotiated by the parties, and the provisions of this
section shall survive the expiration or termination of this Agreement.
9. insurance. The Consultant shall procure and maintain for the duration of the
Agreement, insurance against claims for injuries to persons or damage to property which
may arise from or in connection with the performance of the work hereunder by the
Consultant, its agents, representatives, employees, or subcontractors.
9.1 Minimum Scope of Insurance. Consultant shall obtain insurance of the types
described below:
9.1.1 Automobile Liability insurance covering all owned, non -owned, hired and
leased vehicles. Coverage shall be written on Insurance Services Office
(ISO) form CA 00 01 or a substitute form providing equivalent liability
coverage. If necessary, the policy shall be endorsed to provide contractual
liability coverage.
Professional Services Agreement — Exeltech Consulting Inc.
Feasibility Study on Bridge Options Por the Lewis Street Overpass Project Page 5 of 9
9.1.2 Commercial General Liability insurance shall be written on ISO
occurrence form CC 00 01 and shall cover liability arising from premises,
operations, independent contractors and personal injury and advertising
injury. The City shall be named as an insured under the Consultant's
Commercial General Liability insurance policy with respect to the work
performed for the City.
9.1.3 Workers' Compensation coverage as required by the Industrial Insurance
laws of the State of Washington.
9.I.4 Professional Liability insurance appropriate to the Consultant's profession.
9.2 Minimum Amounts of Insurance. Consultant shall maintain the following
insurance limits;
9.2.1 Automobile Liability insurance with a minimum combined single limit for
bodily injury and property damage of $1,000,000 per accident.
9.2.2 Commercial General Liability insurance shall be written with limits no
less than:
❑ $1,000,000 each occurrence;
❑ $2,000,000 general aggregate; or
!� $1,000,000 each occurrence; and $2,000,000 general aggregate
9.2.3 Professional Liability insurance shall be written with limits no less than:
® $1,000,000 per claim;
❑ $1,000,000 policy aggregate limit; or
❑ $ per claim; and $ per policy aggregate limit
9.3 Other insurance Provisions. The insurance policies are to contain, or be endorsed
to contain, the following provisions for Automobile Liability, Professional
Liability, and Commercial General Liability insurance:
9.3.1 The Consultant's insurance coverage shall be primary insurance as
respects the City. Any insurance, self-insurance, or insurance pool
coverage maintained by the City shall be excess of the Consultant's
insurance and shall not contribute with it.
9.3.2 The Consultant's insurance shall be endorsed to state that coverage shall
not be cancelled by either party, except after thirty (30) days prior written
notice by certified mail, return receipt requested, has been given to the
City.
Professional Services Agreement — Exeltech Consulting Inc.
Feasibility Study on Bridge Options for the Lewis Street Overpass Project Page 6 of 9
9A AcceptabiIity of Insurers. Insurance is to be placed with insurers with a current
A.M. Best rating of not less than AND.
9.5 Verification of Coverage. Consultant shall famish the City with original
certificates and a copy of the amendatory endorsements, including, but not
necessarily limited to, the additional insured endorsement evidencing the
insurance requirements of the Consultant before commencement of the work.
10. Nondiscrimination. In the performance of this Agreement, the Consultant will not
discriminate against any employee or applicant for employment on the grounds of race,
creed, color, national origin, sex, marital status, age or the presence of any sensory,
mental or physical handicap; provided that the prohibition against discrimination in
employment because of handicap shall not apply if the particular disability prevents the
proper performance of the particular worker involved. The Consultant shall ensure that
applicants are employed, and that employees are treated during employment in the
performance of this Agreement without discrimination because of their race, creed, color,
national origin, sex, marital status, age or the presence of any sensory, mental or physical
handicap. Consultant shall take such action with respect to this Agreement as may be
required to ensure full compliance with local, State and Federal laws prohibiting
discrimination in employment.
11. Covenant Against Contingent Fees. The Consultant warrants that it has not employed
nor retained any company, firm, or person, other than a bona fide employee working
exclusively for the Consultant, to solicit or secure this Agreement; and that it has not paid
or agreed to pay any company, person or firm, other than a bona fide employee working
exclusively for the Consultant, any fee, commission, percentage, brokerage fee, gift, or
other consideration contingent upon or resulting from the award or making of this
Agreement. For breach or violation of this warranty, the City shall have the right to
terminate this Agreement.
12. Assignment and Subcontracting.
12.1 The City has awarded this Agreement to the Consultant due to its unique
qualifications to perform these services. The Consultant shall not assign (or
subcontract other than as specifically identified in Exhibit A) its performance
under this Agreement or any portions of this Agreement without the prior written
consent of the City, which consent must be sought at least thirty (30) days prior to
the date of any proposed assignment.
12.2 Any work or services assigned or subcontracted hereunder shall be subject to each
provision of this Agreement including Section ti, Public Records; Section 10,
Nondiscrimination; proper bidding procedures where applicable; and all local,
State and Federal statutes, ordinances and guidelines.
12.3 Any technical or professional service subcontract not listed in this Agreement,
must have prior written approval by the City.
Professional Services Agreement — Exeltech Consulting Inc.
Feasibility Study on Bridge Options for the Lewis Street Overpass Project Page 7 of 9
13. Termination.
13.1 Termination for Convenience. Either party may terminate this Agreement for any
reason upon giving the other party no less than ten (10) business days written
notice in advance of the effective date of such termination.
13.2 Termination for Cause. If the Consultant fails to perform in the manner called for
in this Agreement, or if the Consultant fails to comply with any other provisions
of this Agreement and fails to correct such noncompliance within five (5)
business days of written notice thereof, the City may terminate this Agreement for
cause. Termination shall be effected by serving a notice of termination on the
Consultant setting forth the manner in which the Consultant is in default. The
Consultant will only be paid for services and expenses complying with the terns
of this Agreement, incurred prior to termination.
14. General Provisions.
14.1 For the purpose of this Agreement, time is of the essence.
14.2 Notice. Notice provided for in this Agreement shall be sent by:
14.2.1 Personal service upon the Project Administrators.
14.2.2 Certified mail to the physical address of the parties, or by electronic
transmission to the e-mail addresses designated for the parties below.
14.3 The Project Administrator for the purpose of this Agreement shall be:
14.3.1 For the City: Ahmad Qayoumi, or his/her designee
Public Works Director
525 North 3'a
PO Box 293
Pasco, WA 99301
Uayoumia(<dPasco -wa. Qov
14.3.2 For the Consultant: David Talcott, PE PMP, or his designee
Director of Engineering
8729 Commerce Place Drive NE
Lacey, WA 98516
dtotcott@xItech.com
15. Dispute Resolution.
15.1 This Agreement has been and shall be construed as having been made and entered
into and delivered within the State of Washington and it is agreed by each party
Professional Services Agreement - Exeltech Consulting Inc.
Fmsihitity Study on Bridge Options for the Lewis Street Overpass Project Page 8 of 9
hereto that this Agreement shall be governed by the laws of the State of
Washington.
15.2 In the event of a dispute regarding the enforcement, breach, default, or
interpretation of this Agreement, the Project Administrators, or their designees.
shall first meet in a good faith effort to resolve such dispute. In the event the
dispute cannot be resolved by agreement of the parties, said dispute shall be
resolved by arbitration pursuant to RCW 7.04A, as amended, with both parties
waiving the right of a jury trial upon trial de novo, with venue placed in Pasco,
Franklin County, Washington. The substantially prevailing party shall be entitled
to its reasonable attorney fees and costs as additional award and judgment against
the other.
16. Nonwaiver. Waiver by the City of any provision of this Agreement or any time
limitation provided for in this Agreement shall not constitute a waiver of any other
similar event or other provision of this Agreement.
17. Integration. This Agreement between the parties consists in its entirety of this document
and any exhibits, schedules or attachments verified by initials as a part of Exhibit A. Any
modification of this Agreement or change order affecting lids Agreement shall be in
writing and signed by both parties.
18. Authorization. By signature below, each party warrants that they are authorized and
empowered to execute this Agreement binding the City and the Consultant respectively.
IN WITNESS WHEREOF, the parties have caused this Agreement to be executed on
the date first written above.
CITY OF PASCO, WASHINGTON
Davv Z'T +�'R!11'anager
ATTEST:
-- �LLLLJP 0
Debbie Clark, City Cler
APPROVED AS TO FORM:
Leland B. Kerr, City Attorney
CONSULTANT
1-1"
Sa*tivsh 'l!LLvltv-lttit
Professional Services Agreement — Exeltech Consulting Inc.
Feasibility Study on Bridge Options for the Lewis Street Overpass Project Page 9 of 9
Exhibit A
Scope of Services
Phase 1 - Feasibility Study
Lewis Street Overpass
December, 2015
Prepared by:
Exeltech Consulting, Inc.
8729 Commerce PI Dr NE
Lacey, WA 98516
Scope of Services— Page 1 of
e x
e
I t
e
c h
Scope of Services— Page 1 of
TABLE OF CONTENTS
TABLE OF CONTENTS
I.BACKGROUND3
11. PROJECT SCHEDULE 3
111. PROJECT DESCRIPTION ...... 3
IV. PROJECT ASSUMPTIONS 3
V. SCOPE OF SERVICES 4
TASK I PROJECT MANAGEMENT 4
TASK 2 COLLECTION AND REVIEW OF EXISTING DATA ........................................4
TASK 3 DEVELOP CONCEPTUAL ALTERNATIVES ................................ 4
TASK 4 PROJECT DELIVERY STRATEGIES ..............................................................5
TASK 5 REVIEW OF ENVIRONMENTAL DOCUMENTS ..............................................5
TASK 6 COUNCIL WORKING MEETING 5
Scope of Services — Page 2 of 5
Exhibit A
SCOPE OF SERVICES
Phase 1 - Feasibility Study
During the term of this Agreement, Exeltech Consulting, Inc., hereinafter referred to as the "CONSULTANT',
will perform professional services for the City of Pasco, hereinafter referred to as "CLIENT". This scope of
services includes conceptual development of up to five structural alternatives to replace the Lewis Street
undercrossing of the BNSF yard.
The CONSULTANT will actively coordinate and manage the work, identify and resolve issues in a timely
manner, communicate effectively, and maintain the accuracy and overall quality of the work and work
products. The CONSULTANT will be responsible for the performance of the services described hereinafter,
furnishing materials and information as needed to accomplish the work tasks. This document will be used to
plan, conduct and complete the work for the Project.
(.BACKGROUND
The City seeks to replace the existing Lewis Street undercrossing of the BNSF yard. This feasibility study will
develop options with planning level costs for the Lewis Street undercrossing replacement. The city desires an
option that completely spans the BNSF property. The BNSF yard width is approximately 560 feet which must
be spanned.
Lewis Street currently crosses a BNSF switching yard with several tracks through a tunnel build in the 1930s.
This tunnel requires replacement and Pasco seeks services to design a replacement structure to carry Lewis
Street over the BNSF tracks and yard. The ultimate project must be designed to accommodate railroad traffic,
automobile traffic, and pedestrian (non -motorized) traffic.
11. PROJECT SCHEDULE
The following project milestones dates are defined in months following Notice to Proceed:
Feasibility Study Draft 2.0 Months
Feasibility Study Final 3.0 Months
III. PROJECT DESCRIPTION
This study will develop planning level profile, plan, and estimate for up to five (5) options of crossing the
BNSF yard in Pasco.
IV. PROJECT ASSUMPTIONS
1. CLIENT will provide copies of existing utility and roadway background information. This
information should include plans for the existing roadway, undercrossing, storm drainage system,
survey drawings, right-of-way reports, geotechnical reports (existing borings), and other relevant
information.
2. CLIENT will have timely reviews of submitted deliverables at mutually agreed upon times and will
consolidate review comments into one review document prior to returning to the Consultant. The
Project schedule assumes two week review tum -around times by the CLIENT.
3. CLIENT will keep Consultant Informed as to status of reviews, invoices, and other decisions that
may affect the delivery of the Project.
Scope of Services — Page 3 of 5
4. Alternative options will be limited to five for crossing of the BNSF yard.
5. Design calculations beyond planning level will not be prepared.
6. One presentation at a City Council meeting is included.
7. Staffing levels are anticipated in accordance with attached budget estimate. Services will be
limited to these assumed hours/costs, unless additional services are authorized.
8. Cost estimates are planning level and developed for the purposes of applying for project funding.
9. Services not included within this Scope of Services are excluded from this Contract.
V. SCOPE OF SERVICES
TASK 1 PROJECT MANAGEMENT
The Project Management task includes controlling scope, schedule, and budget during the course of the
project by communicating with project team members. Communications will include emails, electronic and
hard copy documentation control, monthly invoicing, progress reports, coordination of project design criteria,
sharing project design technical information, and coordination of project deliverable submittals with the project
team members and CLIENT.
DELIVERABLES:
a. Monthly progress report and invoice (4)
TASK 2 COLLECTION AND REVIEW OF EXISTING DATA
During this task, the Consultant will review existing available documentation provided by the CLIENT:
• Right-of-way Plans,
• Geotechnical Documents,
• As Built Plans,
• Other available information (Permitting and Environmental Documents).
TASK 3 DEVELOP CONCEPTUAL ALTERNATIVES
The CONSULTANT will develop up to five potential structural alternatives to a planning level of accuracy
Plan work and drawings during the development stage will use easily accessible mapping data such as
Google Maps and USGS Maps to develop photo renderings to a planning level of detail,
For each alternative, the Consultant will prepare a planning level cost estimate using approximate square foot
unit costs from similar projects in Western Washington.
ASSUMPTIONS:
1. Itis assumed that the following five planning level structural alternatives will be developed for the
PROJECT:
Alternative #1: Concrete segmental Bridge
ARemabbe #2: Steel Tied Arch Bridge
Alternative #3: Basket Handle Arch Bridge
Alternative #4: Cable Stayed Bridge (Dual Tower)
Alternative 45: Modified Cable Stayed Bridge (Slanted single column)
Scope of Services — Page 4 of 5
DELIVERABLES:
Lewis Street Overpass Conceptual Alternatives Report, with the fallowing sections.,
a. Narrative of each alternative with construc!ability advantages and disadvantages
b. Elevation View rendering of each conceptual alternative (t for each alternative)
C. Plan View showing approximate project limits for estimating purposes (i for each alternative)
d. Cost Summary of each alternative based on tate plan view described in b (above).
TASK 4 PROJECT DELIVERY STRATEGIES
The following alternative delivery methods will be considered for the PROJECT:
• Design -Bid -Build
• Design -Build
• General Contractor/Construction Manager (GCCM)
DELivERABLES:
a. The CONSULTANT will discuss the respective advantages and disadvantages of each
delivery method, summarize and make recommendations of project delivery method moving
Forward in a memorandum.
TASK 5 REVIEW OF ENVIRONMENTAL DOCUMENTS
The Consultant will review existing environmental documents, including xxx.
Based an review, the Consultant will evaluate which documents will need to be updated and the significance
of updates. This evaluation will be summarized in a technical memorandum.
DEUvERABLES:
a. Environmental document updates technical memorandum
TASK 6 COUNCIL WORKING MEETING
The Consultant will support the City in facilitating a working meeting to review the conceptual bridge
alternatives, planning level cost estimates associated with each, suggested updates to existing environmental
documents, and project delivery methods.
During this meeting, the Consultant will work with the City and stakeholders to prepare an alternatives
analysis matrix, considering the above elements for each alternative.
DELIVERABLES:
a. Summary Technical Memorandum
Scope of Services — Page 6 of 5
Client Name City of Pasco
Project Name Lewis Way Overpass- Phase l Feasibility Study
Date 101'12/15
LABOR HOURS (Exullach):
TASKS
Labur-hours Total
TASK COST SUMMARY
LABOR COSTS (Exeltech):
Labor Resources
Structural
Salary Rate
PM
Enginocr Graphics Enviro Admin
Project Manager
I Protect Managemeni
4
4 4 =
12
2 Collection and Review of Exl9ng Da'a
4
12 =
16
3 Develop Conceptual Alternatives
12
44 40 =
96
4 Project Delivery Strategies
12
8
20
5 Revlew of Environmental Documents
CAD
32 =
32
6 Council Working Meeting
12
12 12
36
4
His.
$107.51
0
4d
80 40 44 4
212
TASK COST SUMMARY
LABOR COSTS (Exeltech):
E%ELTECH ESTIMATED COSTS = $29,941.86
Page 1 of 1
Labor Resources
Labor -hours
Salary Rate
Cost
1
Project Manager
44
His.
$234.06 =
$10,298A8
2
Structural Engineer
30
Hrs.
$129.06
$10,396.75
2
Environmental
40
Hrs. a
$122.86 =
$4,914.56
3
CAD
44
Hrs.
SB2.93
$8,848.06
4
Administraticn
4
His.
$107.51
$430.02
212
Hrs.
$29,968.86
$0.00
Mail
DIRECT
NON4.ABOR COSTS ANTICIPATED:
Repoducllon
0.00
®
S2.50
$0.00
Mileage
440.00
@
S0.58
$253.00
Par Diem for Meals and Incidental Expenses
0.00
@
556.00
50.00
Postage
0.00
0
55.00
MIX)
Misceaarreous
0.00
@
$700.00
$0,00
Direct Non -Labor Costs Subtotal
=
$253.00
E%ELTECH ESTIMATED COSTS = $29,941.86
Page 1 of 1