HomeMy WebLinkAboutC & E Trenching Change Order 1 & 2 GR1-ST-33-15-75 2014-2015 ADA RetrofitCITY OF PASCO PUBLIC WORKS DEPARTMENT CONTRACT CHANGE ORDER NO. 1 Project No: GRI -ST -33-15-75 Project Title: 2014-2015 ADA RETROFIT Contractor: C & E Trenching Description of Change: Replacement of existing frame and grate of Stormwater Catch Basin Detail as Appropriate: the SE corner of 15th A of existinq frame and grate Storm Catch Basin located at and Contract Bid Amount: SALES TAX @ 8.6%: Total: $ 296,382.03 N/A $ 296,382.03 PREVIOUS CHANGE ORDER CURRENT CHANGE ORDER Subtotal $ Subtotal $ 856.74 Sales tax @ 8.6% $ Sales tax @ 8.6% N/A Total $ - Total $ 856.74 Total Change Orders To Date 856.74 New Contract Amount $ 297,238.77 IS CONTRACT TIME AFFECTED BY THIS CHANGE ORDER YES NO Contract Time Prior to this Change Order ................................................... 87 Working Days Modification to Contract time by this Change Order ....................................... N/A Revised Total Contract Time.................................................................... 87 Working Days It is mutually agreed by both parties that this Change Order fully describes the change(s) that is (are) being made and that the compensation for this Change Order is full and complete and is the only compensation due or owing for this Change Order. Further, it is mutually agreed that this document will supplement the present Contract Documents and that the provisions of the previously executed Contract Documents shall apply to this Change Order. AGREED TO AND AC EPTED: CgWRACTOIR Date APPROVED: NSTRUCTION MANAGER ' Date APPROVED: YA�/ 10(2111 -SPR ANAGER Date H W W 2 IL Y Q m r O z w W 0 Q' O W U z Q 2 U H U Q f - z O U H CL W CL CL IL O U a U- 0 H W Ir 0 0 Q LO 0 N V C) 0 N CL a TF I u a W O w a a Q C W F a W U U Q 0 a O 0 W W Q a r _=LO A l0 o 0 w �Q T N m C O m F �7 V r CUp O l0 0 U O � Q T N O c U 3 0 c ' a 0 00 O Q v3 d ' a` W C J 7 T a C m � C! r C C N C N O N U C m O U (D -O N N m � C m � L O C U 0 m a) N D E a c U- E N m � m a L U a m m � U `m a d z 0 U L r a W O w a a Q C W F a W U U Q 0 a O 0 W W Q CAe TRENCHING, LLC Date: 10/05/2015 Attention: Maria Cerra Company: City of Pasco Phone/Fax/Email: Project Name: 2014-2015 ADA Retrofit C&E Proiect Number: J15949CH Scope of Work Bid: Per Bid items C & E Proiect Manager: Jake Wray e0 CVie N 0 0 *.& • P.O. Box 3788 • Pasco, WA 99302 • 509.545.6940 owice • 509.545.8671 FAX Change Order Request#: 1 Change Order Reauest We hereby submit the following change order request for changes in the work required under this Contract with the listed changes in the Contract Sum listed below: Change Order Reouest Scope of Work: Description I Quantity I Unit Unit Price Ext Price Remove and reinstall new frame and grate 1.000 1 LS $428.37 $428.37 Grand Total: $428.37 Summary of Changes in Contract The Original Contract Sum Was $296,382.03 The Net Change by previous authorized change orders $0 Contract prior to this Change Order $296,382.03 This Change Order Request Contract Sum (Add) (Deduct) $428.37 New Contract Sum $296,810.40 Conditions/ Exclusions: Pricing excludes sales tax Pricine excludes sleevine. fencing, signage, lighdng, and site furnishhur. We look submit the following Change Order Request for your review if accepted please sign below and return authorization of work. Thank you for the opportunity to earn your work!! Acceptance of Change Request: The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work as specified. Payment will be made as outlined. Jake Wray Accepted by Date "For ALL Your Excavating Needs" www.candetrenching.com CITY OF PASCO PUBLIC WORKS DEPARTMENT CONTRACT CHANGE ORDER NO. 2 Project No: GR1-ST-33-15-75 Project Title: 2014-2015 ADA RETROFIT Contractor: C & E Description of Change: Scope of projectis adjusted to include the replacement two(2) non -conforming ramps Detail as Appropriate: Existing ramps in Argent and 65th PI. exceed admisible slope and need to be replaced o?q!! Z• 03 Contract Bid Amount: $ 3v—,-23- 8 323 7% SALES TAX @ 8.6%: N/A Total: $ -297,236:77— Allo, 38z• 63 PREVIOUS CHANGE ORDERS CURRENT CHANGE ORDER Subtotal $ 856.74 Subtotal $ AN/A Sales tax @ 8.6% $ - Sales tax @ 8.6% Total $ 856.74 Total $ Total Change Orders To Date $ 5,903.94 New Contract Amount $ J 12 1J2k65'g7 IS CONTRACT TIME AFFECTED BY THIS CHANGE ORDER YES NO Contract Time Prior to this Change Order .............................................. 87 Working Days Modification to Contract time by this Change Order ................................. 0 Revised Total Contract Time............................................................... 87 Working Days It is mutually agreed by both parties that this Change Order fully describes the change(s) that is (are) being made and that the compensation for this Change Order is full and complete and is the only compensation due or owing for this Change Order. Further, it is mutually agreed that this document will supplement the present Contract Documents and that the provisions of the previously executed Contract Documents shall apply to this Change Order. AGREED /T�O�AND AC,CETTED: SCC CONT CTOR / Date APPROVED: eONSTRDc'non MANAGER Dat6 APPROVED: PROdIMT MANAGER Date AP RO j/ 67/ I � PU LI WO Date DIRECTOR LL O w W a 0 Q LO 0 N 7 0 N IL IL W 0 0. a a O U �u 6 w O w IL IL a a LU H IL LU U a C] Z Q O H LU W W CC Q o . ro o o0 LO H EE v T N A Y O m F- m O C N 7 O n O � N � ER a� T N O c U � CY 00 a 6 O N m E a W N V U C •` N �a En N C W J o O r C m m 7 Ci � a) w (6 m C N U C N O cl m - L c 3 � o U cl cl Y E m�� QO ul U L U (] Q `) O (a a) a) m O m p C m o O E h U m o a) a) O d Z O M m L H 6 w O w IL IL a a LU H IL LU U a C] Z Q O H LU W W CC Q CAe TRENCHING, LLC Date: 10/16/2015 Attention: Maria Serra, Rene Lopez Company: City of Pasco Phone/Pax/Email: Proiect Name: 65' place and Argent road. C&EProiect Number: J15949CH2 Scope of Work Bid: Per Bid items C & E Proiect Manaeer: Jake Wray • P, 0. Box 3788 • Pasco, WA 99302 • 509.545.6940 oFFIcE • 509.545.8671 Fax Change Order Request #: 2 Change Order Request We hereby submit the following change order request for changes in the work required under this Contract with the listed changes in the Contract Sum listed below: Change Order Request Scope of Work: Description -Quantity Unit Unit Price Ext Price Demo and pour new ADA ramps with pedestrian curbs and gravel under sidewalk and landscape. 2.000 EA $2,273.60 $4,547.20 Traffic control 1.000 cs $500.00 $500.00 Grand Total: $ Summary of Changes in Contract The Original Contract Sum Was $296,382.03 The Net Change by previous authorized change orders $428.37 Contract prior to this Change Order $296,810.40 This Change Order Request Contract Sum (Add) (Deduct) $`447.20- New Contract Sum $301,357.60 Conditions/ Exclusions: We look submit the following Change Order Request for your review if accepted please sign below and return authorization of work. Thank you for the opportunity to earn your work!! Acceptance of Change Request: The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work as specified. Payment will be made as outlined. "For ALL Your Excavating Needs" www.candetrenching.com CAe TRENCHING, LLC Jake Wray J060 "F .0 c e • P.O. Box 3788 • Pasco, WA 99302 • 509.545.6940 omce • 509.545.8671 FAX Accepted by "For ALL Your Excavating Needs" www. ca ndetrenc king. Com Date