Loading...
HomeMy WebLinkAboutSierra Electric Change Orders 11 - 16 C2-11-16-STR Rd 68 Improvements Ph 2CITY OF PASCO PUBLIC WORKS DEPARTMENT CONTRACT CHANGE ORDER NO. 11 Project No: C2-11-16-STR Project Title: Rd 68 Improvements Ph 2 Contractor: Sierra Electric Description of Change: Removal of PTZ Camera from Bid Items 3i,42, and 44 Detail as Appropriate: See Attached Contract Bid Amount: $ 1,201,687.00 SALES TAX @ 8.6%: N/A Total: $ 1,201,687.00 PREVIOUS CHANGE ORDERS CURRENT CHANGE ORDER Subtotal $ 56.53 Subtotal $ 18,315.00 Sales tax @ 8.6% N/A Sales tax @ 8.6% N/A Total $ 56.53 Total $ (18,315.00) Total Change Orders To Date $ (18,258.47) New Contract Amount $ 1,183,428.53 IS CONTRACT TIME AFFECTED BY THIS CHANGE ORDER YES NO Contract Time Prior to this Change Order ................................. ;&a- t l:b ^� Modification to Contract time by this Change Order .................... '5, p revised Total Contract Time .................................................... 168 It is mutually agreed by both parties that this Change Order fully describes the change(s) that is (are) being made and that the compensation for this Change Order is full and complete and is the only compensation due or owing for this Change Order. Further, it is mutually agreed that this document will supplement the present Contract Documents and that the provisions of the previously executed Contract Documents shall apply to this Change Order. AGREED TO AND ACCEPTED: ONT CTOR Date ,APPROVED: /� /I/�� Jr'lez 1Z1//,,.- nc.,ii�*l ' 1et^r't Date T APPROVED: ' JECT� Date APPROV1 11� /'�-/� �S PUB .IC Date DI I Memo To: Kent McCue, Construction Manager l�—WM CC: Rene Lopez, Construction Inspector Brenda Timpany, Admin Assistant 1 From: Kate Thompson, P.E., Civil Engineer Date: December 12, 2014 Public Works Department Engineering Division Re: Change Order#11, Road 68 Improvements Phase 2 and Interconnect Rd 68 Signals Change Order No. 11 reflects the revisions to the Road 68 Improvements Phase 2 Project listed below. This change order was requested by the City. 1) Prior to beginning construction, but after the project was awarded, City Council decided that they didn't want to install the PTZ Camera's that were part of this project. This change order is to remove the PTZ Camera's from the two signalized intersection in the project where they were to be installed (Rd 68/Burden and Burden/Convention) and the spare PTZ camera. This is a removal of a total of 3PTZ Cameras from the project. The Following Table shows the costs associated with Change Order #11. NO. DESCRIPTION UNIT BID UNIT QUANTITY PRICE TOTAL 3 Removal of PTZ Camera from Bid Item 39 LS -$6,105.00 1 -$6,105.00 6 Removal of PTZ Camera from Bid Item 42 LS -$6,105.00 1 -$6,105.00 7 Removal of PTZ Camera from Bid Item 44 LS -$6,105.00 1 -$6,105.00 TOTAL CHANGE ORDER #11 -$18,315.00 The price submitted by the contractor was compared to the lump sum breakdown for the above bid items submitted by the contractor earlier in the project and was found to be the same. 0 Page 1 CITY OF PASCO PUBLIC WORKS DEPARTMENT CONTRACT CHANGE ORDER NO. 12 Project No: C2-11-16-STR Project Title: Rd 68 Improvements, Ph 2 Contractor: Sierra Electric Description of Change: Additional Emitter Detail as Appropriate: See Attached Contract Bid Amount: $ 1,201,687.00 SALES TAX @ 8.6%: N/A Total: $ 1,201,687.00 PREVIOUS CHANGE ORDERS CURRENT CHANGE ORDER Subtotal $ (18,258.47 Subtotal $ 4,400.00 Sales tax @ 8.6% N/A Sales tax @ 8.6% N/A Total $ (18,258.47) Total $ 4,400.00 Total Change Orders To Date $ (13,858.47) New Contract Amount $ 1,187,828.53 IS CONTRACT TIME AFFECTED BY THIS CHANGE ORDER YES NO Contract Time Prior to this Change Order ................................. .63 fro$ n� Modification to Contract time by this Change Order .................... p revised Total Contract Time .................................................... 168 It is mutually agreed by both parties that this Change Order fully describes the change(s) that is (are) being made and that the compensation for this Change Order is full and complete and is the only compensation due or owing for this Change Order. Further, it is mutually agreed that this document will supplement the present Contract Documents and that the provisions of the previously executed Contract Documents shall apply to this Change Order. AGREED TO AND ACCEPTED: �< CON CTOR %Date APPROVED: f2- Date CMM xq-r- APP D: PR JECT MANAGER Date Memo To: Kent McCue, Construction Manager CC: Rene Lopez, Construction Inspector Brenda Timpany, Admin Assistant 1 From: Kate Thompson, P.E., Civil Engineer Date: December 8, 2014 Public Works Department Engineering Division Re: Change Order#12, Road 68 Improvements Phase 2 and Interconnect Rd 68 Signals Change Order No. 12 reflects the revisions to the Road 68 Improvements Phase 2 Project listed below. This change order was requested by the City. 1) The City requested the Contractor to furnish an additional emitter to be mounted on a City truck. The Following Table shows the costs associated with Change Order #12. NO. DESCRIPTION UNIT BID UNIT PRICE QUANTITY TOTAL 1 I Additional Emitter LS $4,400.00 1 $4,400.00 TOTAL CHANGE ORDER #12 $4,400.00 The City has not purchased the emitters separately before and has no previous price to compare the change order pricing. The Construction Manager reviewed the price with the Fire Chief who has bought the emitters as part of the fire engines previous and they felt that the price was fair. 0 Page 1 CITY OF PASCO PUBLIC WORKS DEPARTMENT CONTRACT CHANGE ORDER NO. 13 Project No: C2-11-16-STR Project Title: Rd 68 Improvements, Ph 2 Contractor: Sierra Electric Description of Change: Additional Signs at Burden & Rd 68 with traffic control; Extruded Curbing at Clemente Ln; and Pedestrian ramp curbing Detail as Appropriate: See Attached Contract Bid Amount: $ 1,201,687.00 SALES TAX @ 8.6%: N/A Total: $ 1,201,687.00 PREVIOUS CHANGE ORDER(S) CURRENT CHANGE ORDER Subtotal $ 13,858.47 Subtotal $ 1,770.00 Sales tax @ 8.6% N/A Sales tax @ 8.6% N/A Total $ (13,858.47) Total $ 1,770.00 Total Change Orders To Date $ (12,088.47) New Contract Amount $ 1,189,598.53 IS CONTRACT TIME AFFECTED BY THIS CHANGE ORDER YES NO Contract Time Prior to this Change Order ................................. ] ' /68 Modification to Contract time by this Change Order .................... y Cj revised Total Contract Time .................................................... 168 It is mutually agreed by both parties that this Change Order fully describes the change(s) that is (are) being made and that the compensation for this Change Order is full and complete and is the only compensation due or owing for this Change Order. Further, it is mutually agreed that this document will supplement the present Contract Documents and that the provisions of the previously executed Contract Documents shall apply to this Change Order. AGREED TO AND ACCEPTED: COI TRACTOR Date APPROVED: GffyE� Dat C01141 "r AP — P00JECTMANAGER DaRe Memo To: Kent McCue, Construction Manager la's CC: Rene Lopez, Construction Inspector Brenda Timpany, Admin Assistant 1 From: Kate Thompson, P.E., Civil Engineer Date: February4, 2015 Public Works Department Engineering Division Re: Change Order#13, Road 68 Improvements Phase 2 and Interconnect Rd 68 Signals Change Order No. 13 reflects the revisions to the Road 68 Improvements Phase 2 Project listed below. This change order was requested by the City. 1) The City requested that two additional signs be added to the traffic signal mast arm at the intersection of Rd 68 & Burden to be viewable on Burden heading west bound. The additional signs would be 1 left tum arrow and 1 straight arrow. These signs will help prevent confusion and improve driver safety with the new intersection layout. 2) At the revised intersection of Clement Lane and Burden Blvd, the City requested that additional extruded curbing be installed to provide a better transition from the existing drive to the new drive. This required an additional 36 LF of extruded Curb. 3) When the contractor laid out the new pedestrian ramp at the corner of Rd 68 and Sandifur Pkwy, is became apparent that there was going to be an elevation difference between the existing ground and the new ADA ramp in order to install the new ramp to meet current ADA requirements. Due to this we asked the contractor to install a raised curb at the back of the sidewalk in this area to make up for the elevation difference. This resulted in approximately 16 LF of curbing being installed. NO. DESCRIPTION UNIT BID UNIT PRICE QUANTITY TOTAL 1 Additional Signs at Burden & RD 68 with Traffic LS $885.00 1 $885.00 Control 2 Extruded Curbing at Clemente Ln LS 0 1 3 Pedestrian Ramp Curbing LS $225.00 1 $225.00 TOTAL CHANGE ORDER #13 �&D �7 i The two additional signs in number 1 above cost $188.54 for materials each, total including labor to install the Jr] ' I fl signs $345.41 per sign. Per our Construction Manager, it costs the City's Sign Department approximately $200 to make a sign. Considering this price includes the sign and installation on a signal mast arm, the price is acceptable. The unit price from the for the extruded curbing was $8.75/1-F this price was compared to the unit price for similar curbing on the A St and 1a Ave RR Crossing project completed the previous year which was $18/1-F and found to be acceptable. 0 Page 1 Project No: CITY OF PASCO PUBLIC WORKS DEPARTMENT CONTRACT CHANGE ORDER NO. 14 C2-11-16-STR Project Title: Rd 68 Improvements, Ph 2 Contractor: Sierra Electric Description of Change: Contract Adjustments to date for Removed/Reduced items and overages. Detail as Appropriate: See Attached Contract Bid Amount: $ 1,201,687.00 SALES TAX @ 8.6%: N/A Total: $ 1,201,687.00 PREVIOUS CHANGE ORDER(S) CURRENT CHANGE ORDER Subtotal $ 12,088.47 Subtotal $ 19,096.70 Sales tax @ 8.6% N/A Sales tax @ 8.6% N/A Total $ (12,088.47) Total $ (19,096.70) Total Change Orders To Date $ (31,185.17) New Contract Amount $ 1,170,501.83 IS CONTRACT TIME AFFECTED BY THIS CHANGE ORDER YES Contract Time Prior to this Change Order ................................. Modification to Contract time by this Change Order .................... O Iy�JJJI revised Total Contract Time .................................................... 168 It is mutually agreed by both parties that this Change Order fully describes the change(s) that is (are) being made and that the compensation for this Change Order is full and complete and is the only compensation due or owing for this Change Order. Further, it is mutually agreed that this document will supplement the present Contract Documents and that the provisions of the previously executed Contract Documents shall apply to this Change Order. AGREED TO AND ACCEPTED: kA A 6*1 C RACTO Date APPROVED: tlT_P_�ENGfNEE Date n �ILo- APPROVED: � PRO53ECT MANAGER Date APPROVED: PUBLIC WORKS Date DIRECTOR Memo Public Works Department Engineering Division To: Kent McCue, Construction Manager CC: Rene Lopez, Construction Inspector Brenda Timpany, Admin Assistant 1 From: Kate Thompson, P. E., Civil Engineer Date: February 2, 2015 Re: Change Order#14, Road 68 Improvements Phase 2 and Interconnect Rd 68 Signals Change Order No. 14 reflects the revisions to the Road 68 Improvements Phase 2 Project listed below. This change order was requested by the City to reconcile overages on the project to date. 1) The bid quantity for Bid Item #13 included asphalt within the driveway entrance on the south side of Clemente Lane (for Discount Tire). This should not have been included as this was for the asphalt pathway only. This resulted in an underage of 35 SY. 2) Due to utility conflicts 1 new infiltration trench was not installed. Instead a different trench was lengthened to account for this loss. By not installing one new trench we ended up with 10 LF less of Bid Item #18 Storm Sewer Pipe 8 In- Diam. 3) The City never received any reports from the ECS Lead for the project. Therefore no days for ECS Lead can be paid. 60 Days were included in the original contract for Bid Item #20. 4) During construction the prime contractor and their subcontractors all cleaned up any construction materials in the roadway at the end of each day. Due to some changes in the methods of construction, formal street cleaning was not needed. The construction contract included Bid Item #22 Street Cleaning with 60 hrs, this is deleted. 5) Due to site irregularities in existing ground topography at the southern entrance of Clemente Lane there ended up being 14 LF less Cement Concrete Valley Gutter installed which was bid item #35. 6) The original contract included Induction Loop Vehicle Detectors to replace any that may have been damaged during construction. No Induction Loop Vehicle Detectors were damaged or had to be replaced due to the project so Bid Item #49 is deleted. 7) When we were replacing the pedestrian ramp at the corner of Sandifur Parkway and Rd 68, we ended up needing to replace some additional sidewalk near the ramp in order to meet the maximum cross slope requirement for ADA of 2%. This resulted in an overage of 23 SY of Bid Item #32 Cement Concrete Sidewalk. 8) Due to site irregularities in existing ground topography there ended up being an overage of 125 LF of Removing Paint Line which was bid item #52. 9) During construction the turn pocket into Walgreens was modified this resulted in the need to lengthen the C Curb in order to provide an overlap to help prevent vehicles from driving the wrong way through the tum pocket. This resulted in an overage of 8 LF of Bid Item #59. 10) Due to the way the contractor performed the work along Rd 68, the Inlet Protection wasn't needed along that roadway during construction. This resulted in a reduction to Bid Item #23 of 18 EA. 11) Due to site irregularities in existing ground topography there ended up being a reduction of 31.7 SY of Cement Concrete median which was bid item #30. 0 Page 1 The Following Table shows the bid items removed or reduced with Change Order #14. NO. DESCRIPTION UNIT BID UNIT PRICE QUANTITY TOTAL 1 Reduction in Quantity for Bid Item #13 SY $51.00 -35 -$1,785.00 2 Reduction in Quantity for Bid Item #18 LF $37.00 -10 -$370.00 3 Reduction in Quantity for Bid Item #20 DAY $120.00 -60 -$7,200.00 4 Removal of Bid Item #22 HR $182.00 -60 -$10,920.00 5 Reduction in Quantity for Bid Item #35 LF $34.00 -14 -$476.00 6 Removal of Bid Item #49 EA $540.00 -6 X3240.00 10 Reduction in Quantityfor Bid Item #23 EA $63.00 -18 -$1,134.00 11 k Reduction in Quantityfor Bid Item #30 Sy $71.00 -31.7 -$2,250.70 TOTAL CHANGE ORDER #14 -$27,375. 10 The Following Table shows the overage costs associated with Change Order #14. NO. DESCRIPTION UNIT BID UNIT PRICE QUANTITY TOTAL 7 Overage of Bid Item #32 Sy $58.00 23 $1,334.00 8 Overage of Bid Item #52 LF $75.00 125 $6,625.00 9 Overage of Bid Item #59 LF 40.00 8 $320.00 TOTAL CHANGE ORDER #14 $8,279.00 The unit prices for all of the overage items are the same as the original bid unit price. • Page 2 CITY OF PASCO PUBLIC WORKS DEPARTMENT CONTRACT CHANGE ORDER NO. 15 Project No: C2-11-16-STR Project Title: Rd 68 Improvements, Ph 2 Contractor: Sierra Electric Description of Change: Detail as Appropriate: Various changes to signal cabinets. Reduce detection fields from 64 to 32 channels, delete dual fan on single circuit, add two fans on independent circuit and thermostat control. add circuit with GFI on lower riaht of Contract Bid Amount: SALES TAX @ 8.6%: Total: $ 1,201,687.00 N/A $ 1,201,687.00 PREVIOUS CHANGE ORDER(S) CURRENT CHANGE ORDER Subtotal $ 31,185.17 Subtotal $ Sales tax @ 8.6% N/A Sales tax @ 8.6% N/A Total $ (31,185.17) Total $ Total Change Orders To Date $ (31,185.17) New Contract Amount $ 1,170,501.83 IS CONTRACT TIME AFFECTED BY THIS CHANGE ORDER Contract Time Prior to this Change Order ................................. Modification to Contract time by this Change Order .................... revised Total Contract Time .................................................... YES NO 168 0 168 It is mutually agreed by both parties that this Change Order fully describes the change(s) that is (are) being made and that the compensation for this Change Order is full and complete and is the only compensation due or owing for this Change Order. Further, it is mutually agreed that this document will supplement the present Contract Documents and that the provisions of the previously executed Contract Documents shall apply to this Change Order. AGREED TO AND ACC TED: IAA G_ \5 CO R CTO e APPROVED: pdTY'ENr'I41L'ER� Date ` Memo Public Works Department Engineering Division To: Kent McCue, Construction Manager CC: Rene Lopez, Construction Inspector Brenda Timpany, Admin Assistant 1 From: David Tanner, P.E., Civil Engineer Date: March 23, 2015 Re: Change Order #15, Road 68 Improvements Phase 2 and Interconnect Rd 68 Signals Change Order No. 15 reflects the revisions to the Road 68 Improvements Phase 2 Project listed below. This change order was negotiated between the City and the Contractor to address needed changes to the signal cabinets. 1. Detection fields reduced from 64 channels to 32 channels 2. Delete dual fan on a single circuit 3. Add two fans — each fan on an independent circuit with separate thermostat control 4. Add heater shelf on lower right side 5. Add Sd independent circuit with a GFI outlet and 15amp circuit breaker 6. GFI outlet located on lower right side adjacent to heater shelf. There is no cost or change in working days associated with this change order. • Page 1 Project No: Contractor: CITY OF PASCO PUBLIC WORKS DEPARTMENT CONTRACT CHANGE ORDER NO. 16 C2 -11 -16 -ST R Sierra Electric Description of Change: Detail as Appropriate: Project Title: Rd 68 Improvements, Ph 2 Adjustment to Change Order #1, and Schedule B Bid Item #6 See Attached Contract Bid Amount: SALES TAX @ 8.6%: Total: $ 1,201,687.00 NA $ 1,201,687.00 PREVIOUS CHANGE ORDER CURRENT CHANGE ORDER Subtotal $ 31,185.17 Subtotal $ 5,190.00 Sales tax @ 8.6% NA Sales tax @ 8.6% NA Total $ (31,185.17) Total $ (5,190.00) Total Change Orders To Date $ (36,375.17) New Contract Amount $ 1,165,311.83 IS CONTRACT TIME AFFECTED BY THIS CHANGE ORDER YES NO Contract Time Prior to this Change Order ................................. 168 Modification to Contract time by this Change Order .................... 0 revised Total Contract Time .................................................... 168 It is mutually agreed by both parties that this Change Order fully describes the change(s) that is (are) being made and that the compensation for this Change Order is full and complete and is the only compensation due or owing for this Change Order. Further, it is mutually agreed that this document will supplement the present Contract Documents and that the provisions of the previously executed Contract Documents shall apply to this Change Order. AGREED TO AND ACCEPTED: CONT COR \ ate \1 ,J APPROVED: Date /� l En -;t-- nql f. APPROVEB P JECT MANAGER Date APPROVE .� PUB IC Date DIR ,_TOR Memo Public Works Department Engineering Division To: Kent McCue, Construction Manager CC: Rene Lopez, Construction Inspector Brenda Timpany, Admin Assistant 1 From: David Tanner, P.E., Civil Engineer Date: October 5, 2015 Re: Change Order #16, Road 68 Improvements Phase 2 and Interconnect Rd 68 Signals Change Order No. 16 reflects the revisions to the Road 68 Improvements Phase 2 Project listed below. This change order was requested by the City to reconcile unused quantities. 1. When Change Order#1 was added it was anticipated that 220 SY of Exposed Aggregate would be needed. Upon Completion of the work, only 182.8 SY was used. A credit in the amount of $2,790, for 37.2 SY in unused quantities at $75/SY, is needed. 2. The City never received any reports from the ECS Lead for the project. Therefore no days for ECS Lead can be paid. 20 Days were included in the original contract for Schedule B, Bid Item #8. A credit in the amount of $2,400, for 20 unused days at $120/Day, is needed. The total credit being requested as part of Change Order #16 is for $5,190 0 Page 1