HomeMy WebLinkAbout3673 Resolution RESOLUTION NO. 3 i73
A RESOLUTION ACCEPTING THE PLANNING COMMISSION'S
RECOMMENDATION AND APPROVING A SPECIAL PERMIT FOR THE
LOCATION OF WIRELESS COMMUNICATION FACILITIES AT THE
SOUTHWEST CORNER OF COURT STREET AND ROAD 68.
WHEREAS, AT&T, submitted an application for the location of cellular
facilities at the southwest corner of W. Court Street and Road 68 (Tax Parcel 119-701-
412); and,
WHEREAS, the Planning Commission held a public hearing on November 19,
2015 to review the proposed cellular facilities; and,
WHEREAS, following deliberations on November 19, 2015 the Planning
Commission recommended approval of a Special Permit for the proposed cellular tower
with certain conditions; NOW,THEREFORE,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PASCO:
1. That a Special Permit is hereby granted to AT&T for the location of cellular
facilities in a C-1 (Retail Business) District under Master File# SP2015-014 with the
following conditions:
a) The special permit shall apply to parcel# 119-701-412, Lot 2, Short Plat
93-08, Franklin County WA;
b) The property shall be developed in substantial conformity with the
elevations and site plan submitted with the application except as
conditioned herein;
c) The cellular antennae tower shall not exceed 90 feet in height as
measured from existing grade;
d) The entire cellular antennae tower shall be treated with faux tree features
including branches, foliage and bark;
e) The ground-level equipment shall be screened from all adjacent rights-
of-way by a block wall;
f) The ground-level cellular equipment enclosure shall be surrounded by a
landscaping buffer which obscures view of the equipment enclosure.
Said landscaping buffer shall be served by an automatic irrigation
system and shall be maintained in a well-kept manner by the applicant;
g) The ground-level equipment enclosure shall be located no closer than
fifteen(15) feet from the property line adjacent to Road 68;
1
h) The driveway connecting Road 68 to the equipment enclosure shall be
paved with either concrete or asphalt to the design specifications of the
Pasco City Engineer;
i) The antennae tower shall not emit white light between the hours of 6pm
and 8am;
j) The proposed cellular facility must comply with all FCC regulations
regarding radio frequency emissions;
k) The special permit shall be null and void if a City of Pasco building
permit is not obtained by January 1, 2016.
Passed by thee' )City Council of the City of Pasco this 7th day of December, 2015.
Matt Watkins, Mayor
TEOAP VED AS TO FORM:
l '
i ebra L. Clark, City Clerk Leland B. Kerr, City Attorney
2