HomeMy WebLinkAbout3670 Resolution RESOLUTION NO. 3 1e76
A RESOLUTION APPROVING A PRELIMINARY PLAT
FOR SUNRISE ESTATES DIVISION II.
WHEREAS, RCW 58.17 enables the City to uniformly administer the process of
subdividing property for the overall welfare of the community; and,
WHEREAS, owners and developers of property situated on the southeast quarter of the
northwest quarter of the southeast quarter, Township 9 North, Range 30 East, Section 28, located
westerly of Heritage Boulevard right-of-way and less Sunrise Estates Phase 1, have requested
approval of a preliminary plat; and,
WHEREAS,the Planning Commission has reviewed said preliminary plat which is named
Sunrise Estates Division II; and,
WHEREAS, following a public hearing, the Planning Commission found the proposed
plat promoted the general welfare of the community and recommended said preliminary plat be
approved with conditions; NOW THEREFORE,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PASCO:
That the preliminary plat for Sunrise Estates Division II, located on the southeast quarter of the
northwest quarter of the southeast quarter, Township 9 North, Range 30 East, Section 28, located
westerly of Heritage Boulevard right-of-way and less Sunrise Estates Phase 1, is hereby
approved with the following conditions:
1) At the time lots are developed, all abutting roads and utilities shall be installed to
City standards as approved by the City Engineer. This includes, but is not limited to water,
sewer and irrigation lines, streets, street lights and storm water retention. The handicapped
accessible pedestrian ramps must be completed with the street and curb improvements prior
to final plat approval. All proposed utilities must be installed underground by the developer
at the developer's expense.
2) The developer must comply with PMC 26.04.115(B) and PMC 3.07.160 dealing
with water rights acquisition.
3) No utility vaults, pedestals, or other obstructions will be allowed at street
intersections.
4) Lots 8, 10 & 15 shall be identified in the notes on the face of the final plat(s) as
lots that present difficulties for the placement of front yard fencing.
5) All storm water is to be disposed of per City and State codes and requirements.
1
6) The developer shall insure active and ongoing dust, weed and litter abatement
activities occur during the construction of the subdivision and construction of dwellings
thereon. The developer shall not place construction refuse upon adjoining parcels.
7) The developer shall prepare a dust, weed and erosion control plan to be approved
by the City prior to approval of any construction drawings for the first phase of the
subdivision.
8) The developer shall be responsible for the creation of record drawings. All record
drawings shall be created in accordance with the requirements detailed in the Record
Drawing Requirements and Procedure form provided by the Engineering Division. This
form shall be signed by the developer prior to construction plan approval.
9) All engineering designs for infrastructure and final plat(s) drawings shall utilize
the published City of Pasco Vertical Control Datum and shall be identified on each such
submittal.
10) The final plat(s) shall contain a 10-foot utility easement parallel to all streets
unless otherwise required by the Franklin County PUD.
11) The final plat(s) shall contain the following Franklin County Public Utility
District statement: "The individual or company making improvements on a lot or lots of
this Plat is responsible for providing and installing all trench, conduit, primary vaults,
secondary junction boxes, and backfill for the PUD's primary and secondary distribution
system in accordance with PUD specifications; said individual or company will make full
advance payment of line extension fees and will provide all necessary utility easements
prior to PUD construction and/or connection of any electrical service to or within the plat".
12) Street lighting must be installed to the City of Pasco/Franklin County PUD
standards and as directed by the City Engineer. Residential street lights are typically
installed every 300 feet, and collector/arterial type street lights are typically installed every
150 feet. Street light positioning is alternating and is measured along the centerline of the
road.
13) Prior to the City of Pasco accepting construction plans for review the developer
must enter into a Storm Water Maintenance Agreement with the City. The developer will
be responsible for obtaining the signatures of all parties required on the agreement and to
have the agreement recorded with the Franklin County Auditor. The original signed and
recorded copy of the agreement must be presented to the City of Pasco at the intake
meeting for construction plans.
14) The developer will be required to conform to all conditions set forth in the Storm
Water Maintenance Agreement including, but not limited to, regular cleaning and
maintenance of all streets, gutters, catch basins and catch basin protection systems.
Cleaning shall occur on a regular basis to ensure that no excess buildup of sand,trash, grass
clippings, weeds or other debris occurs in any portion of the streets, gutters, or storm water
collection facilities. Cleaning and upkeep of the streets, gutters, and storm water collection
facilities must be to the satisfaction of the City Engineer. The developer will be responsible
for operating and maintaining the storm drain system in accordance with the Storm Water
Maintenance Agreement.
15) The developer will be required to comply with the City of Pasco Civil Plan
Review process.
2
16) The developer/builder shall pay the City a "common area maintenance fee" of
$275 per lot upon issuance of building permits for homes. These funds shall be placed in a
fund and used to finance the maintenance of arterial boulevard strips.
17) The developer/builder shall pay the "school impact fee" and "park fee"
established by ordinance at the time of issuance of building permits for homes.
Passed by the City Council of the City of Pasco this 16th day of November, 2015.
. )__",(..j,"5-:-94.___
Matt Watkins, Mayor
TAPP D AS TO FORM:
I / -0.° A• —.150 ebra L. Clark, City Cler -—- Leland B. Kerr, City Attorney
i
i
3