Loading...
HomeMy WebLinkAbout3665 Resolution RESOLUTION NO. 3(9 Cq� A RESOLUTION APPROVING A PRELIMINARY PLAT FOR ROAD 84 ESTATES. WHEREAS, RCW 58.17 enables the City to uniformly administer the process of subdividing property for the overall welfare of the community; and, WHEREAS, owners and developers of property situated in the southwest quarter of the northwest quarter of Section 21, Township 9 North, Range 29 East, W.M., have requested approval of a preliminary plat; and, WHEREAS, the Planning Commission has reviewed said preliminary plat which is named Road 84 Estates; and, WHEREAS, following a public hearing, the Planning Commission found the proposed plat promoted the general welfare of the community and recommended said preliminary plat be approved with conditions; NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PASCO: That the preliminary plat for Broad 84 Estates located in southwest quarter of the northwest quarter of Section 21, Township 9 North, Range 29, East W.M., is hereby approved with the following conditions: 1) At the time lots are developed, all abutting roads and utilities shall be installed to City standards as approved by the City Engineer. This includes, but is not limited to water, sewer and irrigation lines, streets, and storm water retention or management. Sidewalks and street lights within the plat are not required due to the RS-20 zoning. 2) The developer must obtain the necessary easement and right-of-way relinquishment from the FCID for the southern 20 feet of the plat prior to submittal of construction drawings. 3) The developer must comply with PMC 26.04.115(B) and PMC 3.07.160 dealing with water rights acquisition. 4) No utility vaults, pedestals, or other obstructions will be allowed at street intersections. 5) All corner lots and other lots that present difficulties for the placement of yard fencing shall be identified in the notes on the face of the final plat(s). 6) All storm water is to be disposed of per City and State codes and requirements. 7) The developer shall insure active and ongoing dust, weed and litter abatement activities occur during the construction of the subdivision and construction of dwellings thereon. 8) The developer shall prepare a dust, weed and erosion control plan to be approved by the City prior to approval of any construction drawings for the first phase of the subdivision. 9) The developer shall be responsible for the creation of record drawings. All record drawings shall be created in accordance with the requirements detailed in the Record Drawing Requirements and Procedure form provided by the Engineering Division. This form shall be signed by the developer prior to construction plan approval. 1 10) All engineering designs for infrastructure and final plat(s) drawings shall utilize the published City of Pasco Vertical Control Datum and shall be identified on each such submittal. 11) The final plat(s) shall contain a 10-foot utility easement parallel to all streets unless otherwise required by the Franklin County PUD and an easement across Lot 1-8 as required by the FCID. 12) The final plat(s) shall contain the following Franklin County Public Utility District statement: "The individual or company making improvements on a lot or lots of this Plat is responsible for providing and installing all trench, conduit, primary vaults, secondary junction boxes, and backfill for the PUD's primary and secondary distribution system in accordance with PUD specifications; said individual or company will make full advance payment of line extension fees and will provide all necessary utility easements prior to PUD construction and/or connection of any electrical service to or within the plat". 13) Prior to the City of Pasco accepting construction plans for review the developer must enter into a Storm Water Maintenance Agreement with the City. The developer will be responsible for obtaining the signatures of all parties required on the agreement and to have the agreement recorded with the Franklin County Auditor. The original signed and recorded copy of the agreement must be presented to the City of Pasco at the intake meeting for construction plans. 14) The developer will be required to comply with the City of Pasco Civil Plan Review process. 15) The developer/builder shall pay the "traffic impact fee" and "park fee" established by ordinance at the time of issuance of building permits for homes. Passed by the City Council of the City of Pasco this 2nd day of November, 2015. Matt Watkins, Mayor ATTEST: APPROVED AS TO FORM: D'r." . Clark, Ci Clerk 'u Leland B. Kerr, City Attorney 2