HomeMy WebLinkAboutIndustrial Constructors WWTP Caustic Soda Improv Change Order 1CITY OF PASCO PUBLIC WORKS DEPARTMENT CONTRACT CHANGE ORDER NO. 1 Project No: C7 -SE -1A-15-42 Project Title: WWTP Caustic Soda Improvements Contractor: Industrial Constructors, Inc. Description of Change: Detail as Appropriate: e order to address desi approved prior to beginning construction. See Attached Contract Bid Amount SALES TAX @ 8.6% Total and $ 164,200.00 $ 14,121.20 $ 178,321.20 PREVIOUS CHANGE ORDER CURRENT CHANGE ORDER Subtotal Subtotal $ 11,369.82 Sales tax @ 8.6% $ Sales tax @ 8.6% $ 977.80 Total $ Total $ 12,347.62 Total Change Orders To Date $ 12,347.62 New Contract Amount $ 190,668.82 IS CONTRACT TIME AFFECTED BY THIS CHANGE ORDER Contract Time Prior to this Change Order ................................. Modification to Contract time by this Change Order .................... revised Total Contract Time .................................................... YES NO 23 68 It is mutually agreed by both parties that this Change Order fully describes the change(s) that is (are) being made and that the compensation for this Change Order is full and complete and is the only compensation due or owing for this Change Order. Further, it is mutually agreed that this document will supplement the present Contract Documents and that the provisions of the previously executed Contract Documents shall apply to thA Change Order. ACCEPTED: APPROVED: -� ITYMGINEER Date f C)(03'(;3 Memo Public Works Department Engineering Division To: Kent McCue, Construction Manager CC: Rene Lopez, Construction Inspector Brenda Timpany, Admin Assistant 1 From: David Tanner, P.E., Civil Engineer Date: October 5, 2015 Re: Change Order#1, WWTP Caustic Soda Improvements Change Order No. 1 reflects the revisions to the W WTP Caustic Soda Improvements listed below. This change order was negotiated by the City and Contractor to address needed revisions to the project design prior to beginning construction. 1. Upgrade the proposed Heat Trace system as recommended by the manufacturer and as reviewed and approved by the Consultant Engineer. $3,978 plus tax. 2. Revisions to the piping and insulation system as recommended by the manufacturer and as reviewed and approved by the Consultant Engineer. $6,701.46 plus tax. 3. Additional Signage as directed by the Consultant Engineer. $363.41 4. Revisions to the metering pump and valve board as directed by the Consultant Engineer. $326.86 The total change order being requested as part of Change Order #1 is for $11,369.82 plus tax. The contractor is requesting an additional 23 contract days for time spent in the review and negotiation of the above change order items. 0 Page 1