Loading...
HomeMy WebLinkAboutIntermountain Slurry Seal Change Orders 1 & 2CITY OF PASCO PUBLIC WORKS DEPARTMENT CONTRACT CHANGE ORDER NO. 1 Project No: M3 -OV -3R-15-03 Project Title: 2015 Microsurfacing Contractor: Intermountain Slurry Seal, Inc. Description of Change: Removed and replaced deteriorated/blown out hot mix asphalt in roadway at three locations. Detail as Appropriate: See attached justificatin memorandum. Contract Bid Amount: $ 365,242.00 NO SALES TAX (exempt): $ - Total: $ 365,242.00 PREVIOUS CHANGE ORDER CURRENT CHANGE ORDER Subtotal Subtotal $ 4,137.94 No Sales tax $ No Sales tax $ Total $ Total $ 4,137.94 Total Change Orders To Date $ 4,137.94 New Contract Amount $ 369,379.94 IS CONTRACT TIME AFFECTED BY THIS CHANGE ORDER Contract Time Prior to this Change Order ................... Modification to Contract time by this Change Order....,. Revised Total Contract Time .... ..._.._ ._.................. YES NO 30 days 30 days It is mutually agreed by both parties that this Change Order fully describes the change(s) that is (are) being made and that the compensation for this Change Order is full and complete and is the only compensation due or owing for this Change Order. Further, it is mutually agreed that this document will supplement the present Contract Documents and that the provisions of the previously executed Contract Documents shall apply to this Change Order. AGREED TO AND ACCEPTED: 4101C ;Z/Iat� CONI PAU(oR 'r"DeV5y^ Date �AAPPPROVED: �'Ic���%C GR L�Z��� CONSTRUCTION PAANAGER 'Date APPROVED: / i PROJECTP4ANrE� Date ' i J APPROVE . I P au wo is Date IRECTOR C�) ( (8 Memo Public Works Department Engineering Division To: Kent McCue, Construction Manager CC: Rene Lopez, Construction Inspector Brenda Timpany, Admin Assistant 1 From: AndreyAvetisyan, P.E., Civil Engineer Date: June 22, 2015 Re: Change Order#1, Project No. M3 -OV -3R-15-03, 2015 Microsurfacing Description of Change: This change order adds work to the Contract to patch hot mix asphalt at three locations that were not included in original contract. The first and largest area was discovered as contractor removed plastic fog line just west of Sylvester Street and Road 28 intersection in the westbound direction. The existing asphalt was blown out under the plastic and needed to be replaced prior to microsurfacing to prevent further failure. The area was approximately 115' by 1.5' wide. The second blow out was located at the northeast comer of Sylvester Street and Road 22 intersection near the gutter. This area was about 4.5' by 1.5' wide. The last area was a small patch on Sylvester Street near 5"' Avenue in the left lane of the westbound traffic. It is critical to have a good structural base underneath microsurfacing for it to be an effective way to extend the fife of the pavement. Entitlement: This work is not included in the original Contract. The Contractor is entitled to added compensation for added work performed in accordance with Section 1-04.4. No entitlement is found for a revision to the number of working days. Adding this work will not increase the time to complete all critical items of work. In accordance with Section 1-08.8, no revision to the number of working days will be made by this change order. Price: A lump sum price was received from the Contractor detailing their cost. The Contractor included costs for labor, materials, traffic control, travel time, overhead, and profit in their determination of the final price. The City of Pasco Construction Manager reviewed and accepted the proposed cost. The total cost for this change order work is $4137.94. 0 Page 1